Greg Sheppard
- Listed as
- architect, authorized agent-others, engineer, lessee
- Firm
- Forge
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Nov 2020
73 permits since 2000 (architect on 71 permits, authorized agent-others on 1 permit, engineer on 1 permit, lessee on 1 permit): 50 completed, 1 in progress, 14 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2020 | Completed final sign-off Feb 2023 | 301 Toland St | C & J Contracting Inc | renovation of an existing warehouse including new exterior openings, and new accessible exitDetails
renovation of an existing warehouse including new exterior openings, and new accessible exit | $250,000 |
| Sep 22, 2020 | Never finaled filed Sep 2020, never issued | 450 Shotwell St | Edgewood Builders Inc | tenant improvement to add conf rooms, storage room, and subdivision of e rooms to create a mechanical shop and space operations room. addition of internal storefront and door. no exterior work to occur, existing productions, distribution and repair use to remain. no change in use. no structural workDetails
tenant improvement to add conf rooms, storage room, and subdivision of e rooms to create a mechanical shop and space operations room. addition of internal storefront and door. no exterior work to occur, existing productions, distribution and repair use to remain. no change in use. no structural work | $215,000 |
| May 8, 2020 | Expired or cancelled suspend Feb 2021 | 438 Shotwell St | Edgewood Builders Inc | ti for 438 shotwell: to add 2 conf rooms, 1 storage room, and subdivisions of e rooms t create a mech shop and space operation rm. addition of interal storefront and door. no exterior work to occur, existing production, distributions and repair use to remain. no change in use. no structural workDetails
ti for 438 shotwell: to add 2 conf rooms, 1 storage room, and subdivisions of e rooms t create a mech shop and space operation rm. addition of interal storefront and door. no exterior work to occur, existing production, distributions and repair use to remain. no change in use. no structural work | $215,000 |
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2026 | 235 02nd St | the work is in responce to the accessible bldg entrance program addition of auto door operator push button/bar, restriping accessible parking spaces, adjusting door operating force.Details
the work is in responce to the accessible bldg entrance program addition of auto door operator push button/bar, restriping accessible parking spaces, adjusting door operating force. | $6,000 | |
| Feb 24, 2020 | Completed final sign-off Apr 2022 | 450 Shotwell St | C C I Commercial Construction & Improv | demolition of non-structural partitions, ceiling, lighting, finishes, and any associated mechanical, plumbing and electrical at 2nd floor. pid eid required for demo sep permitsDetails
demolition of non-structural partitions, ceiling, lighting, finishes, and any associated mechanical, plumbing and electrical at 2nd floor. pid eid required for demo sep permits | $15,000 |
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 220 Montgomery St | San Francisco Commercial Builders Inc | commercial ti on 10 fl, suite 1060: includes new consturction of non-structural walls, casework, ceiling, lighting and finishes. maher naDetails
commercial ti on 10 fl, suite 1060: includes new consturction of non-structural walls, casework, ceiling, lighting and finishes. maher na | $379,500 |
| Jan 30, 2020 | Completed final sign-off Oct 2022 | 101 Spear St | Marchetti Group | revision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit.Details
revision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit. | |
| Jan 29, 2020 | Completed final sign-off Jan 2022 | 170 Maiden Ln | Hp Build | revision to pa 201808207774. dimension changes to penthouse wall, 6th floor smoke door and other miscDetails
revision to pa 201808207774. dimension changes to penthouse wall, 6th floor smoke door and other misc | |
| Jan 24, 2020 | Completed final sign-off Feb 2021 | 1 Market St | M C S Construction Services | lobby - demo of (e) security desks, (e) wood cielings & lighting fixtures @ plaza level in spear & steuart tower lobbies. construction of new security desks, custom millwork and wood slat portals in plaza level lobbiesDetails
lobby - demo of (e) security desks, (e) wood cielings & lighting fixtures @ plaza level in spear & steuart tower lobbies. construction of new security desks, custom millwork and wood slat portals in plaza level lobbies | $250,000 |
| Dec 30, 2019 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | 19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terraceDetails
19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terrace | $385,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2021 | 100 Hooper St | Gci, Inc | suite 4 - revision to permit #201901291477. to clarify co2 system per sffd request. maher na.Details
suite 4 - revision to permit #201901291477. to clarify co2 system per sffd request. maher na. | |
| Dec 20, 2019 | Completed final sign-off Feb 2020 | 450 Shotwell St | C C I Commercial Construction & Improv | proposed level 1 work only. removal of existing non-structural brick infill to reopen connection in 450 shotwell. infill two existing openings between 454 and 450 shotwell. exisitng pdr use to remain. no change in use. no structural work to occurDetails
proposed level 1 work only. removal of existing non-structural brick infill to reopen connection in 450 shotwell. infill two existing openings between 454 and 450 shotwell. exisitng pdr use to remain. no change in use. no structural work to occur | $10,000 |
| Dec 19, 2019 | Completed final sign-off Oct 2021 | 1 Market St | Bcci Construction Company | 18th fl - office ti. new partitions, millwork & finishes. mep deferred.Details
18th fl - office ti. new partitions, millwork & finishes. mep deferred. | $990,000 |
| Dec 19, 2019 | Completed final sign-off Oct 2021 | 1 Market St | Bcci Construction Company | 19th fl - office ti. new partitions, millwork & finishes. mep deferred.Details
19th fl - office ti. new partitions, millwork & finishes. mep deferred. | $980,000 |
| Dec 12, 2019 | Completed final sign-off Jul 2020 | 601 Montgomery St | Commercial Interior Builders Inc | ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher naDetails
ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na | $254,249 |
| Dec 11, 2019 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher naDetails
basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na | $1,100,000 |
| Dec 11, 2019 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroomDetails
demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroom | $1,250,000 |
| Dec 4, 2019 | Expired or cancelled cancelled Jan 2026 | 600 Montgomery St | Skyline Construction | install an additional door in extg office of suite 1900. n/a for maherDetails
install an additional door in extg office of suite 1900. n/a for maher | $34,427 |
| Dec 3, 2019 | Completed final sign-off Sep 2023 | 220 Montgomery St | Webcor Construction Lp | revision to 201903084752, 201906062714 and 201910184996 includes reconfiguring rated vestibule at top of e egress stairDetails
revision to 201903084752, 201906062714 and 201910184996 includes reconfiguring rated vestibule at top of e egress stair | |
| Nov 25, 2019 | Completed final sign-off Jun 2021 | 100 Hooper St | Gci, Inc | 1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968Details
1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968 | $750,000 |
| Nov 14, 2019 | In progress issued Nov 2024 | 5 03rd St | change of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest roomsDetails
change of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms | $43,000,000 | |
| Oct 30, 2019 | Completed final sign-off Jun 2021 | 100 Hooper St | Gci, Inc | revision to pa# 201908158968; updated electrical rm. with 1 hr rating & relocate compressor roomDetails
revision to pa# 201908158968; updated electrical rm. with 1 hr rating & relocate compressor room | $1,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2020 | 500 Sutter St | Jon K Takata Corp Dba Restoration Mgmt | demo (e) millwork and installing new millworkDetails
demo (e) millwork and installing new millwork | $50,000 |
| Oct 23, 2019 | Completed final sign-off Dec 2019 | 909 Montgomery St | Source Planning And Construction Inc | 6th floor: demolition of extg finishes, casework and construction of new non structural partitions, doors, glazing, power, finishes, and lighting.Details
6th floor: demolition of extg finishes, casework and construction of new non structural partitions, doors, glazing, power, finishes, and lighting. | $40,000 |
| Oct 23, 2019 | Completed final sign-off May 2020 | 601 Montgomery St | Commercial Interior Builders Inc | suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.Details
suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a. | $120,155 |
| Oct 21, 2019 | Completed final sign-off May 2022 | 100 Hooper St | Gci, Inc | proposed new curb cut mid-block on hooper st. frontage for dpw review. ref pa 2019-0815-8968Details
proposed new curb cut mid-block on hooper st. frontage for dpw review. ref pa 2019-0815-8968 | |
| Oct 18, 2019 | Completed final sign-off Dec 2021 | 220 Montgomery St | Webcor Construction Lp | 2nd floor: revision to app#201906062714 includes: adding new electrical room, revising lighting layout, new structural support at new interior openings at extg brick wall, relocating one new drinking fountain, and modifying layout to 2 new restroom enteries. n/a for maherDetails
2nd floor: revision to app#201906062714 includes: adding new electrical room, revising lighting layout, new structural support at new interior openings at extg brick wall, relocating one new drinking fountain, and modifying layout to 2 new restroom enteries. n/a for maher | $400,000 |
| Oct 17, 2019 | Completed final sign-off May 2020 | 500 Sutter St | Cobuild Construction Services Inc | floors 2/5/8: each floor install new accessible drinking fountain based on approved pre-app letter issued on 04/24/2019. maher n/a.Details
floors 2/5/8: each floor install new accessible drinking fountain based on approved pre-app letter issued on 04/24/2019. maher n/a. | $15,000 |
| Oct 15, 2019 | Completed final sign-off Mar 2020 | 123 Townsend St | Swinerton Builders | partial 4th floor interior t.i. to include: non-structural demo; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maherDetails
partial 4th floor interior t.i. to include: non-structural demo; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maher | $1,000,000 |
| Aug 22, 2019 | Completed final sign-off Apr 2022 | 100 Hooper St | Gci, Inc | revision to app#201906042400. revised lift layout and relocated stairs. n/a for maherDetails
revision to app#201906042400. revised lift layout and relocated stairs. n/a for maher | $1,000 |
| Aug 15, 2019 | Completed final sign-off Apr 2021 | 100 Hooper St | Gci, Inc | ste 1,2 & 6 - commercial tenant improvement including construction of non-structural partitoins; exterior door alterations, lighting, cabinetry & finishes. ample for use pursuant to planning code section 102 w/accessory office, gategory g per approved pdr use map-robotics manufacturingDetails
ste 1,2 & 6 - commercial tenant improvement including construction of non-structural partitoins; exterior door alterations, lighting, cabinetry & finishes. ample for use pursuant to planning code section 102 w/accessory office, gategory g per approved pdr use map-robotics manufacturing | $2,000,000 |
| Jul 22, 2019 | Completed final sign-off Mar 2020 | 64 Townsend St | Truebeck Construction | demo of non-structural partitions, restrooms and showers, light fixtures and finishes. construction of (n) non-structural partitions, restrooms, light fixtures, millwork and finishes.Details
demo of non-structural partitions, restrooms and showers, light fixtures and finishes. construction of (n) non-structural partitions, restrooms, light fixtures, millwork and finishes. | $480,000 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 303 02nd St | Commercial Interior Builders Inc | 4th floor: includes removal of non-compliant modular ramps and door hardware, and installation of new compliant modular ramps and door hardware. n/a for maherDetails
4th floor: includes removal of non-compliant modular ramps and door hardware, and installation of new compliant modular ramps and door hardware. n/a for maher | $30,000 |
| Jun 12, 2019 | Completed final sign-off Jan 2021 | 465 California St | Bevilacqua & Sons | revision to pa 201902011867. revision of ceilings and light fixtures at 6th flr.Details
revision to pa 201902011867. revision of ceilings and light fixtures at 6th flr. | |
| Jun 11, 2019 | Completed final sign-off Mar 2022 | 100 Hooper St | Gci, Inc | unit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a.Details
unit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a. | $150,000 |
| Jun 6, 2019 | Completed final sign-off Aug 2020 | 220 Montgomery St | Webcor Construction Lp | work includes improvements on 2nd fl - phase 2 - construction includes new lighting and restrooms, including new finishes, fixtures and accessories. maher naDetails
work includes improvements on 2nd fl - phase 2 - construction includes new lighting and restrooms, including new finishes, fixtures and accessories. maher na | $1,445,000 |
| Jun 4, 2019 | Completed final sign-off Apr 2022 | 100 Hooper St | Gci, Inc | unit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maherDetails
unit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maher | $180,000 |
| Jun 4, 2019 | Completed final sign-off Mar 2022 | 100 Hooper St | unit 2: construction of mezzanine, accessible lift & stairs in (e) core & shell building n/a maherDetails
unit 2: construction of mezzanine, accessible lift & stairs in (e) core & shell building n/a maher | $165,000 | |
| May 9, 2019 | Never finaled issued May 2019, no final | 303 02nd St | Skyline Construction | ti to 2nd fl to include new non0load bearing partitions, floor finishes, ceilings, millworks. mech, elec, life safety and sprinkler under separate permit.Details
ti to 2nd fl to include new non0load bearing partitions, floor finishes, ceilings, millworks. mech, elec, life safety and sprinkler under separate permit. | $800,000 |
| May 8, 2019 | Completed final sign-off Sep 2020 | 150 Hooper St | Gci, Inc | ti - unit 212 & 214 on 2nd flr. partition & door for conference room, a sound-rated door btwn units, relocattion of plumbing for utility sink & misc finishesDetails
ti - unit 212 & 214 on 2nd flr. partition & door for conference room, a sound-rated door btwn units, relocattion of plumbing for utility sink & misc finishes | $300,000 |
| Mar 27, 2019 | Never finaled issued May 2019, no final | 235 02nd St | Swinerton Builders | maintenance permit to waterproof (e) fountain and replace (e) finishes wtih bronze tiles, no expansion of (e) fountain dimensions mep under separate permitDetails
maintenance permit to waterproof (e) fountain and replace (e) finishes wtih bronze tiles, no expansion of (e) fountain dimensions mep under separate permit | $100,000 |
| Mar 11, 2019 | Completed final sign-off Aug 2019 | 123 Townsend St | Swinerton Builders | interior ti improvement to include: selective non structural demo of partitions, doors, lighting & finishes. construction of non structual partitions , doors, millwork, finishes, lighting electrical, mechanical, & plumbingDetails
interior ti improvement to include: selective non structural demo of partitions, doors, lighting & finishes. construction of non structual partitions , doors, millwork, finishes, lighting electrical, mechanical, & plumbing | $700,000 |
| Nov 20, 2018 | Never finaled issued Jan 2019, no final | 100 Hooper St | Gci, Inc | revision to pa #201810052399. for sffd approval of a-2 assembly space only. suite 4Details
revision to pa #201810052399. for sffd approval of a-2 assembly space only. suite 4 | |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 150 Hooper St | 2nd fl - new sink and casework in existing breakroom. existing electrical and rough in plumbingDetails
2nd fl - new sink and casework in existing breakroom. existing electrical and rough in plumbing | $5,000 | |
| Nov 6, 2018 | Expired or cancelled expired Jul 2020 | 150 Hooper St | Bcci Construction Company | unit 211. add a demising wall in order to create unit 215Details
unit 211. add a demising wall in order to create unit 215 | $5,000 |
| Oct 10, 2018 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | replace extg hot water boilers with 2 high efficiency condensing boiler units. n/a for maherDetails
replace extg hot water boilers with 2 high efficiency condensing boiler units. n/a for maher | $200,000 | |
| Oct 5, 2018 | Completed final sign-off Apr 2021 | 100 Hooper St | Gci, Inc | suite 4: construction of temporary non structural partitions, doors, lighting for phase 1, 1500sf of production distribution and repair with accessary retail. n/a for maherDetails
suite 4: construction of temporary non structural partitions, doors, lighting for phase 1, 1500sf of production distribution and repair with accessary retail. n/a for maher | $50,000 |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 150 Hooper St | Bcci Construction Company | 3rd fl: architectural drawings of construction of demising wall in unit 3a to create unit 3g. mep submittals deferred.Details
3rd fl: architectural drawings of construction of demising wall in unit 3a to create unit 3g. mep submittals deferred. | $15,000 |
| Sep 18, 2018 | Completed final sign-off Jul 2020 | 150 Hooper St | Bcci Construction Company | tenant build out of 4th fl suite for manufacturing studio including machine shop, wood shop, office and conference space, breakroom. no changes to e lighting, defered mep, sprinkler, alarmDetails
tenant build out of 4th fl suite for manufacturing studio including machine shop, wood shop, office and conference space, breakroom. no changes to e lighting, defered mep, sprinkler, alarm | $600,000 |
| Sep 17, 2018 | Expired or cancelled cancelled Jan 2026 | 1 Market St | scope of work demo on non structural partitions, ceiling, lighting, finishes, and andy associated mech, plumb, elec. new snon structural parotions, interior storefront, lighting, floor and wall finishesDetails
scope of work demo on non structural partitions, ceiling, lighting, finishes, and andy associated mech, plumb, elec. new snon structural parotions, interior storefront, lighting, floor and wall finishes | $637,000 | |
| Aug 20, 2018 | Completed final sign-off Jan 2022 | 170 Maiden Ln | Hp Build, Peacock Construction | barrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit.Details
barrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit. | $500,000 |
| Jul 16, 2018 | Completed final sign-off Aug 2018 | 100 01st St | Commercial Interior Builders Inc | 3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suitesDetails
3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suites | $30,000 |
| Jul 10, 2018 | Expired or cancelled expired Jul 2020 | 150 Hooper St | Bcci Construction Company | rev to pa# 201803163925; to omit door at non-rated corridor & break rm.Details
rev to pa# 201803163925; to omit door at non-rated corridor & break rm. | |
| May 24, 2018 | Completed final sign-off Apr 2022 | 100 Hooper St | Gci, Inc | first floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maherDetails
first floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maher | $150,000 |
| May 4, 2018 | Completed final sign-off Aug 2020 | 100 Hooper St | Gci, Inc | suite 7: commercial t.i. includes construction of non-structural partitions ceiling, lighting, mechanical and electrical as well as casework and finishes. n/a for maherDetails
suite 7: commercial t.i. includes construction of non-structural partitions ceiling, lighting, mechanical and electrical as well as casework and finishes. n/a for maher | $968,250 |
| May 4, 2018 | Completed final sign-off Aug 2020 | 100 Hooper St | Gci, Inc | suite 7: construction of mezzanine, accessible lift and stairs in extg core and shellDetails
suite 7: construction of mezzanine, accessible lift and stairs in extg core and shell | $500,000 |
| Mar 16, 2018 | Never finaled issued Apr 2018, no final | 150 Hooper St | Bcci Construction Company | t.i. to 4 suite on 2nd fl in new building. work includes partitions, lighting, plumbing & ventilation systems. 12775 sf. maher na sprinkler nad fire alarm separte permitDetails
t.i. to 4 suite on 2nd fl in new building. work includes partitions, lighting, plumbing & ventilation systems. 12775 sf. maher na sprinkler nad fire alarm separte permit | $853,000 |
| Mar 16, 2018 | Never finaled issued Apr 2018, no final | 150 Hooper St | Bcci Construction Company | t.i. to 1 suite (full floor) om 4th level in new building. work includes, power, lighting, plumbing & hvac systems. 12785 sf. maher naDetails
t.i. to 1 suite (full floor) om 4th level in new building. work includes, power, lighting, plumbing & hvac systems. 12785 sf. maher na | $882,000 |
| Mar 16, 2018 | Never finaled issued Apr 2018, no final | 150 Hooper St | Bcci Construction Company | ti to 3 ground level suites in new building. work includes partitions, lighting, plumbing & exhaust system. 8430 sfDetails
ti to 3 ground level suites in new building. work includes partitions, lighting, plumbing & exhaust system. 8430 sf | $707,000 |
| Mar 16, 2018 | Never finaled issued Apr 2018, no final | 150 Hooper St | Bcci Construction Company | ti to create 4 light industrial workshop suites on 3rd level in new building. work includes pratitions, lighting, plumbing & ventilation system. 12785 sf, fire alarm and sprinklers under separate permits.Details
ti to create 4 light industrial workshop suites on 3rd level in new building. work includes pratitions, lighting, plumbing & ventilation system. 12785 sf, fire alarm and sprinklers under separate permits. | $747,500 |
| Dec 1, 2017 | Never finaled issued Jun 2018, no final | 217 Sutter St | C C I Commercial Construction & Improv | 1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13Details
1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13 | $300,000 |
| Sep 25, 2017 | Never finaled issued Jan 2018, no final | 217 Sutter St | C C I Commercial Construction & Improv | exploratory demo associated with 2017-007879coa minor permit to alter & permit app #2017-0601-8094 bldg permit app for a facade modification. explored locations shall be patched back to original finishes.Details
exploratory demo associated with 2017-007879coa minor permit to alter & permit app #2017-0601-8094 bldg permit app for a facade modification. explored locations shall be patched back to original finishes. | $1,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Peacock Construction | revision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maherDetails
revision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maher | $50,000 |
| May 15, 2017 | Never finaled issued Aug 2017, no final | 600 California St | Novo Construction Inc | demo plaza level: exterior stone pavers & panels & waterproofing system. construct with paving & waterproofing system, modify handrails. n/a maher ordinanceDetails
demo plaza level: exterior stone pavers & panels & waterproofing system. construct with paving & waterproofing system, modify handrails. n/a maher ordinance | $1,000,000 |
| Mar 16, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Richlen Construction | revision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher naDetails
revision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher na | $100,000 |
| Jan 26, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Richlen Construction | renovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanineDetails
renovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanine | $200,000 |
| Dec 21, 2016 | Expired or cancelled cancelled Jun 2017 | 303 02nd St | Skyline Construction | 9/f, #950n- improvements to unoccupied suite on 9th fl, ste 950n - new non-structural partitions, ceilings, light fixtures, millwork and finishes. demo under separate pa 2016-0913-7556Details
9/f, #950n- improvements to unoccupied suite on 9th fl, ste 950n - new non-structural partitions, ceilings, light fixtures, millwork and finishes. demo under separate pa 2016-0913-7556 | $450,000 |
| Dec 2, 2016 | Completed final sign-off Nov 2017 | 121 Spear St | Peacock Construction | removal of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maherDetails
removal of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maher | $90,000 |
| Nov 2, 2016 | Completed final sign-off Jun 2017 | 600 Montgomery St | Hathaway Dinwiddie Co. | 4th flr, suite 480: demo of non structural partitions. addition of new non structural walls, light fixtures, power signals and finishes maher naDetails
4th flr, suite 480: demo of non structural partitions. addition of new non structural walls, light fixtures, power signals and finishes maher na | $250,000 |
| Apr 12, 2016 | Never finaled issued Jun 2016, no final | 600 California St | Richlen Construction | ground floor: revision to app#2015-1201-3828. additional scope of work includes new gypsum board backdrop and surround, and structural design for securing new wall-hung art work. n/a for maher.Details
ground floor: revision to app#2015-1201-3828. additional scope of work includes new gypsum board backdrop and surround, and structural design for securing new wall-hung art work. n/a for maher. | $75,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 100 01st St | Commercial Interior Builders Inc | selective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit.Details
selective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit. | $15,134 |
| Apr 26, 2013 | Never finaled issued Apr 2013, no final | 340 Bryant St | Charles Pankow Builders Ltd | 1st/2nd/3rd/4th floors-limited interior demolition of portion of slab on grade & floor penitrations per ab-017Details
1st/2nd/3rd/4th floors-limited interior demolition of portion of slab on grade & floor penitrations per ab-017 | $25,000 |
| Jun 1, 2006 | Completed final sign-off Sep 2006 | 1100 California St | Plant Construction Co, Lp | revision to existing permit to relocate presure refief damper & related fire smokeDetails
revision to existing permit to relocate presure refief damper & related fire smoke |