Webcor Construction Lp
- Based in
- Alameda
- On San Francisco permits
- Nov 2001 to Mar 2026
- Last 24 months
- 12 permits filed
496 permits since 2000: 370 completed, 10 in progress, 78 never finaled, 38 expired or cancelled.
Of the 78 never-finaled permits, 5 are 3 to 5 years old, 41 are 5 to 10 years old, 32 are over 10 years old. 16 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 496.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2026 | In progress issued Apr 2026 | 1201 Illinois St | deferred curtain wall for temp non-occupiable temporary structure. ref pa #202511129357. temporary structure with non-occupiable space inside vmu.Details
deferred curtain wall for temp non-occupiable temporary structure. ref pa #202511129357. temporary structure with non-occupiable space inside vmu. | $10,000 |
| Dec 3, 2025 | In progress issued Dec 2025 | 1201 Illinois St | potrero power plant development agreement priority. construction of exterior facade-visual moch up for power station block 2 (clinical life science building). structure is temporary (2 to 3 years) and non-occupiable.Details
potrero power plant development agreement priority. construction of exterior facade-visual moch up for power station block 2 (clinical life science building). structure is temporary (2 to 3 years) and non-occupiable. | $745,000 |
| Nov 13, 2025 | Completed final sign-off Jan 2026 | 200 Humboldt St | administrative permit for city planning tsf impact fee on new construction of an 8-story, non-residential mixed-use building pursuant to cpc motion no. 21581 (case no. 2017-011878pha-10). no construction under this permit.Details
administrative permit for city planning tsf impact fee on new construction of an 8-story, non-residential mixed-use building pursuant to cpc motion no. 21581 (case no. 2017-011878pha-10). no construction under this permit. | |
| Jul 21, 2025 | In progress issued Aug 2025 | 39 Tehama St | administrative review at the request of field inspector for 2 missing t-24 sheets related to pa # 202401294844 & ew202405208788.Details
administrative review at the request of field inspector for 2 missing t-24 sheets related to pa # 202401294844 & ew202405208788. | |
| Apr 7, 2025 | Completed final sign-off Aug 2026 | 747 Howard St | water proofing repairs at the expansion joint at moscone center. not on the public wayDetails
water proofing repairs at the expansion joint at moscone center. not on the public way | $40,000 |
| Apr 3, 2025 | Completed final sign-off Aug 2026 | 747 Howard St | waterproofing repairs at several locations at moscone center, emergency repairDetails
waterproofing repairs at several locations at moscone center, emergency repair | $1,000,000 |
| Mar 4, 2025 | In progress issued Aug 2025 | 1201 Illinois St | lot a: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.Details
lot a: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless. | $329,000 |
| Feb 10, 2025 | In progress issued Aug 2025 | 1201 Illinois St | lot g: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.Details
lot g: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless. | $206,000 |
| Feb 10, 2025 | In progress issued Aug 2025 | 1201 Illinois St | lot c: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.Details
lot c: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless. | $210,000 |
| Feb 10, 2025 | In progress issued Aug 2025 | 1201 Illinois St | lot ab: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.Details
lot ab: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027.bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless. | $210,000 |
| Feb 10, 2025 | In progress issued Aug 2025 | 1201 Illinois St | lot s: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027. bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.Details
lot s: priority for potrero power station development: work in this permit includes tiebacks only. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027. bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless. | $297,000 |
| Feb 10, 2025 | In progress issued Aug 2025 | 1201 Illinois St | lot aa: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027. bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless.Details
lot aa: priority for potrero power station development: work in this permit includes tiebacks only .. to support main shoring system to serve block 2 ucsf (state) development at apn 4175/027. bpa is approved for documentation purposes only.tech review by dsa and ccsf shall be held harmless. | $206,000 |
| Sep 6, 2024 | Completed final sign-off Oct 2024 | 350 Mission St | remove (e) glass and replace with new (22) windows. random/specified locations at each elevation. to comply with nov 202305480. new glass to match (e) size, treatment and color.Details
remove (e) glass and replace with new (22) windows. random/specified locations at each elevation. to comply with nov 202305480. new glass to match (e) size, treatment and color. | $50,000 |
| Sep 4, 2024 | Completed final sign-off Jun 2025 | 39 Bruton St | sffd only - to submit fire alarm as-built associated with new building on 39-49 bruton street. ref. 201912169619 s-5Details
sffd only - to submit fire alarm as-built associated with new building on 39-49 bruton street. ref. 201912169619 s-5 | |
| Aug 14, 2024 | Completed final sign-off Sep 2024 | 39 Tehama St | floors 2-34- replace and patch (e) drywall to 2 hour fire rated at electrical room for new fiber cable. no other work being proposedDetails
floors 2-34- replace and patch (e) drywall to 2 hour fire rated at electrical room for new fiber cable. no other work being proposed | $15,000 |
| Apr 25, 2024 | Completed final sign-off Feb 2025 | 3150 03rd St | emergency repair to abate nov replace corrugated exterior siding and stucco finishes per plan. replace exterior brick finishes at right of entry and over reinforced concrete staircase per plan.. replace railing in kind. repair e roof framing. replace diagonal steel pipe struts and connection at canoDetails
emergency repair to abate nov replace corrugated exterior siding and stucco finishes per plan. replace exterior brick finishes at right of entry and over reinforced concrete staircase per plan.. replace railing in kind. repair e roof framing. replace diagonal steel pipe struts and connection at cano | $10,000 |
| Apr 2, 2024 | Completed final sign-off Jul 2024 | 39 Bruton St | deferred submittal for car stacker shop drawings associated with 201912169619Details
deferred submittal for car stacker shop drawings associated with 201912169619 | |
| Apr 2, 2024 | Completed final sign-off Jun 2024 | 39 Bruton St | revision to pa#201912169619-s3 - to incorporate mechanical changes & fsae narrative per plans.Details
revision to pa#201912169619-s3 - to incorporate mechanical changes & fsae narrative per plans. | |
| Jan 31, 2024 | Completed final sign-off Mar 2024 | 39 Tehama St | revision to pa# 202312283210 to revise egress pathDetails
revision to pa# 202312283210 to revise egress path | |
| Jan 29, 2024 | In progress issued Feb 2024 | 39 Tehama St | revision to pa 202303073201 addition of artwork/associated support structure & lighting (lighting is a deferred permit). removal & replacement of the existing concrete topping slab at the exterior plaza deck.Details
revision to pa 202303073201 addition of artwork/associated support structure & lighting (lighting is a deferred permit). removal & replacement of the existing concrete topping slab at the exterior plaza deck. | $1,000,000 |
| Dec 28, 2023 | Completed final sign-off Mar 2024 | 39 Tehama St | fabricate and install signage as shown in this drawing packageDetails
fabricate and install signage as shown in this drawing package | |
| Dec 14, 2023 | Completed final sign-off Jul 2024 | 39 Bruton St | parcel c2.4: revision to pa#: 202203250955. to change permit address from 1 avenue of the palms (apn: 8901/002) to 39-49 bruton st (8904/005).Details
parcel c2.4: revision to pa#: 202203250955. to change permit address from 1 avenue of the palms (apn: 8901/002) to 39-49 bruton st (8904/005). | |
| Dec 14, 2023 | Completed final sign-off Jul 2024 | 39 Bruton St | parcel c2.4: revision to pa#: 202205204712. to change permit address from 15th 4th st (apn: 1939/001) to 39-49 bruton st (8904/005).Details
parcel c2.4: revision to pa#: 202205204712. to change permit address from 15th 4th st (apn: 1939/001) to 39-49 bruton st (8904/005). | |
| Dec 12, 2023 | Completed final sign-off Jul 2024 | 39 Bruton St | parcel c2.4: revision to pa#: 201912169619. to change site permit address from 1 avenue of the palms (apn: 8901/002) to 39-49 bruton st (8904/005).Details
parcel c2.4: revision to pa#: 201912169619. to change site permit address from 1 avenue of the palms (apn: 8901/002) to 39-49 bruton st (8904/005). | |
| Aug 15, 2023 | Completed final sign-off Mar 2025 | 300 Kansas St | revision to 201812269158 addendum 7_rev3. to incorporate the following changes updated plumbing drawings to match the installed and approved fuel oil drawings. fuel oil riser to be installed at grid lines 2.1/f.Details
revision to 201812269158 addendum 7_rev3. to incorporate the following changes updated plumbing drawings to match the installed and approved fuel oil drawings. fuel oil riser to be installed at grid lines 2.1/f. | |
| Jun 7, 2023 | Never finaled filed Jun 2023, never issued | 30 Van Ness Av | tower crane #1 erection & foundation. reference site permit #201912139539. tower crane tie-ins to superstructure included in a separate permit.Details
tower crane #1 erection & foundation. reference site permit #201912139539. tower crane tie-ins to superstructure included in a separate permit. | $150,000 |
| Jun 7, 2023 | Never finaled filed Jun 2023, never issued | 30 Van Ness Av | tower crane #2 erection & foundation. reference site permit #201912139539.Details
tower crane #2 erection & foundation. reference site permit #201912139539. | $150,000 |
| May 16, 2023 | Completed final sign-off Jun 2024 | 5030 03rd St | exterior t.i.: 2-new entrance door/opener; interior: new non profit market, produce/merchandising display cases, display shelving, accessible restroom, refinished flooring & lighting. front entrance doors changed from swing doors to electronic sliders w/auto openerDetails
exterior t.i.: 2-new entrance door/opener; interior: new non profit market, produce/merchandising display cases, display shelving, accessible restroom, refinished flooring & lighting. front entrance doors changed from swing doors to electronic sliders w/auto opener | $560,000 |
| Apr 14, 2023 | Completed final sign-off Mar 2025 | 300 Kansas St | revision to 201812269158 s3 work includes shifting stair 2 mid landing to fix li head knocker conditionDetails
revision to 201812269158 s3 work includes shifting stair 2 mid landing to fix li head knocker condition | |
| Nov 10, 2022 | Completed final sign-off Mar 2025 | 300 Kansas St | revision to pa# 201812269158 s2. work under revision includes lobby re-design and associated m.e.Details
revision to pa# 201812269158 s2. work under revision includes lobby re-design and associated m.e. | |
| Sep 30, 2022 | Completed final sign-off May 2024 | 39 Bruton St | parcel c2.4 - revision to pa#201912169619-s1 to include foundation detail sheets inadvertently left out of addendum issuance plan set.Details
parcel c2.4 - revision to pa#201912169619-s1 to include foundation detail sheets inadvertently left out of addendum issuance plan set. | |
| Aug 17, 2022 | Completed final sign-off Sep 2023 | 300 Kansas St | revision to 2018 1226 9158 s1. to capture / recoed foundation as built conditions in accordance w/ cbc 3202.1.1.Details
revision to 2018 1226 9158 s1. to capture / recoed foundation as built conditions in accordance w/ cbc 3202.1.1. | |
| Aug 12, 2022 | Completed final sign-off May 2024 | 39 Bruton St | tower crane erection; temporary use, will be removed upon construction completion. liehberr 316- ec-h 12 litronic. max huh 301 ft. max jib radius 180 ft. ref pa# 201912169619.Details
tower crane erection; temporary use, will be removed upon construction completion. liehberr 316- ec-h 12 litronic. max huh 301 ft. max jib radius 180 ft. ref pa# 201912169619. | $75,000 |
| Jun 10, 2022 | Completed final sign-off Sep 2023 | 300 Kansas St | tower crane & tower crane foundation.Details
tower crane & tower crane foundation. | |
| Jun 7, 2022 | Never finaled issued Jul 2022, no final | 300 Kansas St | revision to pa#201812269158 (s-2) addendum #2 (arch/mep/t-24). change name of elevator from freight to service. add access hatch to shaft for smoke detectors in elevators shafts: two shafts total with two access hatches - one access jatch for shaft 1,2 and one access hatch for shaft 3Details
revision to pa#201812269158 (s-2) addendum #2 (arch/mep/t-24). change name of elevator from freight to service. add access hatch to shaft for smoke detectors in elevators shafts: two shafts total with two access hatches - one access jatch for shaft 1,2 and one access hatch for shaft 3 | |
| Jun 2, 2022 | Completed final sign-off May 2024 | 39 Bruton St | parcel c2.4 - grading associated to new building under pa #201912169619Details
parcel c2.4 - grading associated to new building under pa #201912169619 | $100,000 |
| Jun 1, 2022 | Completed final sign-off May 2024 | 39 Bruton St | parcel c2.4-shoring associated with new building under bpa#201912169619/.Details
parcel c2.4-shoring associated with new building under bpa#201912169619/. | $100,000 |
| May 20, 2022 | Completed final sign-off May 2024 | 150 04th Ti St | parcel c2.4- production pile submission associated with new building under 201912169619.Details
parcel c2.4- production pile submission associated with new building under 201912169619. | $2,660,000 |
| Dec 8, 2021 | Never finaled filed Dec 2021, never issued | 546 Howard St | cmu wall, shoring wall and excavation.Details
cmu wall, shoring wall and excavation. | $29,300,000 |
| Nov 10, 2021 | Completed final sign-off Nov 2022 | 72 Ellis St | added 2 ways communication per inspector (4 additional call boxes) ref pa# 201508033157-s12Details
added 2 ways communication per inspector (4 additional call boxes) ref pa# 201508033157-s12 | $5,000 |
| Oct 7, 2021 | Completed final sign-off Aug 2025 | 830 Eddy St | administrative correction to site permit #2016-1228-5985; to clarify location of 2 code required car share spaces per planning commission motion #19819 associated with cua# 2015-00946 cuaDetails
administrative correction to site permit #2016-1228-5985; to clarify location of 2 code required car share spaces per planning commission motion #19819 associated with cua# 2015-00946 cua | |
| Oct 7, 2021 | Completed final sign-off Nov 2022 | 72 Ellis St | place of assembly permit operation: purpose: to operate warming kitchen on 3/f of hotel.Details
place of assembly permit operation: purpose: to operate warming kitchen on 3/f of hotel. | |
| Sep 15, 2021 | Never finaled issued Nov 2021, no final | 546 Howard St | revision to pa #202006259099. drilled piers test shafts & associated site prepartion.Details
revision to pa #202006259099. drilled piers test shafts & associated site prepartion. | |
| Aug 6, 2021 | Completed final sign-off Sep 2021 | 830 Eddy St | administrative permit to correct unit count on permit application of app# 201612285985 from 126 to 137 units per approved site permit drawings.Details
administrative permit to correct unit count on permit application of app# 201612285985 from 126 to 137 units per approved site permit drawings. | |
| Jul 20, 2021 | Completed final sign-off Aug 2025 | 830 Eddy St | revision to 201612285985 r1 (fire alarm) and 56 w/ reused sequene of operation matrixDetails
revision to 201612285985 r1 (fire alarm) and 56 w/ reused sequene of operation matrix | |
| May 26, 2021 | Completed final sign-off Oct 2021 | 830 Eddy St | level 1 and 2 unit guardrails and roof level glass guardrails at roof parapet. shop drawings per approval under 201612285985Details
level 1 and 2 unit guardrails and roof level glass guardrails at roof parapet. shop drawings per approval under 201612285985 | |
| May 6, 2021 | Never finaled issued Jun 2021, no final | 72 Ellis St | revision to pa# 201508033157-s6. smoke control.Details
revision to pa# 201508033157-s6. smoke control. | |
| Apr 15, 2021 | Completed final sign-off Sep 2023 | 830 Eddy St | chaanges to fire pump switchboard amerage from 2000a to 1200a to match the incoming 1200a 480/277v ucd service.Details
chaanges to fire pump switchboard amerage from 2000a to 1200a to match the incoming 1200a 480/277v ucd service. | |
| Apr 8, 2021 | Never finaled filed Apr 2021, never issued | 700 Mission St | administrative permit only for sffd assembly stamps for approved permit. pa # 2020-0306-6390, 2013-1220-4747.Details
administrative permit only for sffd assembly stamps for approved permit. pa # 2020-0306-6390, 2013-1220-4747. | |
| Apr 7, 2021 | Never finaled issued Apr 2021, no final | 250 Howard St | 4-10th flrs: t.i mep only. furnish and install new hydronic trench forced convectors to the plan south exterior for the 4-10th flrs. will not modify any (e) fsd's or add new, or vav's. modify (e) ductwork to accommodate minor changes to underfloor. air and water balance. start up and test.Details
4-10th flrs: t.i mep only. furnish and install new hydronic trench forced convectors to the plan south exterior for the 4-10th flrs. will not modify any (e) fsd's or add new, or vav's. modify (e) ductwork to accommodate minor changes to underfloor. air and water balance. start up and test. | $75,000 |
| Mar 23, 2021 | Completed final sign-off Jul 2021 | 830 Eddy St | revision to pa# 201612285985 addendum 3. changes to an office and a bathroom at level 1 only.Details
revision to pa# 201612285985 addendum 3. changes to an office and a bathroom at level 1 only. | |
| Mar 11, 2021 | Completed final sign-off Jul 2021 | 830 Eddy St | installatin of exterior building maintenance system, ref pa# 2016-1228-5985Details
installatin of exterior building maintenance system, ref pa# 2016-1228-5985 | $10,000 |
| Nov 18, 2020 | Completed final sign-off Jan 2023 | 72 Ellis St | for health review only in relationship to pa #201508033157Details
for health review only in relationship to pa #201508033157 | |
| Oct 29, 2020 | Never finaled issued Nov 2020, no final | 738 Mission St | evac. maps for parking garageDetails
evac. maps for parking garage | $10,000 |
| Aug 28, 2020 | Never finaled issued Apr 2021, no final | 706 Mission St | install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco"Details
install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco" | $5,000 |
| Aug 28, 2020 | Never finaled issued Apr 2021, no final | 706 Mission St | install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco"Details
install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco" | $5,000 |
| Aug 22, 2020 | Never finaled issued Aug 2020, no final | 250 Howard St | add 2 new fire smoke dampers and update matrix. revision to pa# 201907236697 and pa#201904299208Details
add 2 new fire smoke dampers and update matrix. revision to pa# 201907236697 and pa#201904299208 | |
| Aug 20, 2020 | Completed final sign-off Mar 2021 | 250 Howard St | evacuation signs for level 29-45Details
evacuation signs for level 29-45 | $20,000 |
| Jul 22, 2020 | Completed final sign-off Nov 2023 | 830 Eddy St | installation of a new 8" fire water service totaling approx 23'-3", backflow preventer, and two fire department connections servicing a new 13-story structure with 3-levels below grade parking, connecting to an existing 8" main on eddy street.Details
installation of a new 8" fire water service totaling approx 23'-3", backflow preventer, and two fire department connections servicing a new 13-story structure with 3-levels below grade parking, connecting to an existing 8" main on eddy street. | $10,000 |
| Jun 25, 2020 | Never finaled issued Sep 2020, no final | 546 Howard St | installation of two drilled shafts, testig of one drilled shaft, and associated site preperation.Details
installation of two drilled shafts, testig of one drilled shaft, and associated site preperation. | $100,000 |
| Jun 12, 2020 | Never finaled issued Oct 2020, no final | 706 Mission St | all floors: evac signage for building. see site permit application # 201312204747. maher n/a.Details
all floors: evac signage for building. see site permit application # 201312204747. maher n/a. | $15,000 |
| May 29, 2020 | Never finaled filed May 2020, never issued | 425 04th St | phase 1 - temporary shoring required for subsurface construction at 725 harrison st between 4th st and 759 harrison.** comply with maher ord 155-13, route to dph**Details
phase 1 - temporary shoring required for subsurface construction at 725 harrison st between 4th st and 759 harrison.** comply with maher ord 155-13, route to dph** | $9,802,519 |
| Mar 13, 2020 | Never finaled issued Aug 2020, no final | 706 Mission St | revision to 201312204747 to move emergency generator fuel vent pipes fro orig designDetails
revision to 201312204747 to move emergency generator fuel vent pipes fro orig design | |
| Mar 12, 2020 | Completed final sign-off May 2021 | 250 Howard St | 27th fl - revision to pa 2019-0717-6121 to document catering storageDetails
27th fl - revision to pa 2019-0717-6121 to document catering storage | |
| Mar 6, 2020 | Completed final sign-off Aug 2021 | 706 Mission St | revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a **Details
revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a ** | |
| Feb 26, 2020 | Completed final sign-off Apr 2021 | 250 Howard St | revision to 201910093971 - 36/f - add (1) fire smoke damper and revise fire smoke damper matrix.Details
revision to 201910093971 - 36/f - add (1) fire smoke damper and revise fire smoke damper matrix. | $1,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 250 Howard St | evac. maps for floors 4-10 and 25-28Details
evac. maps for floors 4-10 and 25-28 | $2,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 126 Perry St | grading. demo of (e) parking lot, excavate, fill & grading (surface parking lot) ** maher: yes, route to dph **Details
grading. demo of (e) parking lot, excavate, fill & grading (surface parking lot) ** maher: yes, route to dph ** | $150,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 725 Harrison St | grading. demo of (e) parking lot, excavate, fill & grading (surface parking lot) ** maher: yes, route to dph **Details
grading. demo of (e) parking lot, excavate, fill & grading (surface parking lot) ** maher: yes, route to dph ** | $150,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 735 Harrison St | demolish a two story, one basement, commercial bldg.Details
demolish a two story, one basement, commercial bldg. | $300,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 425 04th St | to demolish 1 story, no basement, office, garage, comercial building. ** maher: n/a **Details
to demolish 1 story, no basement, office, garage, comercial building. ** maher: n/a ** | $300,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 130 Perry St | demolish a 1 story, no basement warehouse.**maher n/a**Details
demolish a 1 story, no basement warehouse.**maher n/a** | $300,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 120 Perry St | demolish a 1 story, no basement repair garage (vacant).Details
demolish a 1 story, no basement repair garage (vacant). | $300,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2021 | 250 Howard St | revision to 201907236702 addition of fan coil unit to high rise elevator lobby on 28th flDetails
revision to 201907236702 addition of fan coil unit to high rise elevator lobby on 28th fl | $1,000 |
| Dec 24, 2019 | Completed final sign-off Aug 2021 | 706 Mission St | revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4Details
revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4 | |
| Dec 16, 2019 | Completed final sign-off Aug 2025 | 55 Bruton St | mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel- | $84,400,000 |
| Dec 16, 2019 | Completed final sign-off Sep 2023 | 220 Montgomery St | demo of (e) mechanical penthouse, and construction of new skylight, including structural improvements to (e) curb to reamin and new repaired roofing.**maher n/a**Details
demo of (e) mechanical penthouse, and construction of new skylight, including structural improvements to (e) curb to reamin and new repaired roofing.**maher n/a** | $1,200,000 |
| Dec 16, 2019 | Completed final sign-off Dec 2024 | 1 Avenue Of The Palms | mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4 | $130,240,000 |
| Dec 11, 2019 | Never finaled issued Feb 2020, no final | 250 Howard St | update smoke control report. add smoke damper (fsds) to floor 4-10 per updated smoke control report maher not reqDetails
update smoke control report. add smoke damper (fsds) to floor 4-10 per updated smoke control report maher not req | $2,000 |
| Dec 3, 2019 | Completed final sign-off Sep 2023 | 220 Montgomery St | revision to 201903084752, 201906062714 and 201910184996 includes reconfiguring rated vestibule at top of e egress stairDetails
revision to 201903084752, 201906062714 and 201910184996 includes reconfiguring rated vestibule at top of e egress stair | |
| Nov 26, 2019 | Completed final sign-off Sep 2021 | 706 Mission St | rev to pa201312204747-s5: mechanical smoke control systems.Details
rev to pa201312204747-s5: mechanical smoke control systems. | |
| Nov 22, 2019 | Completed final sign-off Aug 2021 | 706 Mission St | revision to superstructure addendum 3 - 201312204747 s3. change include an update to stairway st-01 on level 1-4, reclocation of elevator p3, infill of flr opening in the mexican museum level 3+4, and update to the solarium roof framing.Details
revision to superstructure addendum 3 - 201312204747 s3. change include an update to stairway st-01 on level 1-4, reclocation of elevator p3, infill of flr opening in the mexican museum level 3+4, and update to the solarium roof framing. | |
| Nov 20, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | 43/f: new non-structural partions, acoustical gride & tile and gyp board ceilings, light fixtures, millwork and finishes. no change in use, exit stairs, egress pat, elevator. maher n/a.Details
43/f: new non-structural partions, acoustical gride & tile and gyp board ceilings, light fixtures, millwork and finishes. no change in use, exit stairs, egress pat, elevator. maher n/a. | $1,500,000 |
| Nov 18, 2019 | Completed final sign-off Aug 2024 | 30 Otis St | tower crane #1 tie-in permit. (crane a)Details
tower crane #1 tie-in permit. (crane a) | $5,000 |
| Nov 15, 2019 | Never finaled filed Nov 2019, never issued | 725 Harrison St | to erect a type 1-a, 1-story parking. (phase 1 podium west basement)Details
to erect a type 1-a, 1-story parking. (phase 1 podium west basement) | $15,744,000 |
| Nov 15, 2019 | Never finaled filed Nov 2019, never issued | 725 Harrison St | to erect a type 1-a, 1-story parking. (phase 2 podium east basement)Details
to erect a type 1-a, 1-story parking. (phase 2 podium east basement) | $7,131,000 |
| Nov 15, 2019 | Never finaled filed Nov 2019, never issued | 725 Harrison St | to erect a type 1-a, 15 story with one basement, office, retail, pdr & childcare bldg. (phase 1 west building)Details
to erect a type 1-a, 15 story with one basement, office, retail, pdr & childcare bldg. (phase 1 west building) | $167,103,000 |
| Nov 15, 2019 | Never finaled filed Nov 2019, never issued | 725 Harrison St | to erect a type 1-a, 15 story with one basement, office, retail, pdr & childcare bldg. (phase 2 east building)Details
to erect a type 1-a, 15 story with one basement, office, retail, pdr & childcare bldg. (phase 2 east building) | $93,439,000 |
| Nov 14, 2019 | Completed final sign-off Aug 2021 | 830 Eddy St | tower crane permit approvalDetails
tower crane permit approval | $223,204 |
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 250 Howard St | suite 2-b:add new 200af/200as fuse on the existing retail switchboard 'rbm-1a' to feed a new pp-2b which is a 225a panelboard, 277/480v 3ph, 4w with a 200a mcb (200at/225af).Details
suite 2-b:add new 200af/200as fuse on the existing retail switchboard 'rbm-1a' to feed a new pp-2b which is a 225a panelboard, 277/480v 3ph, 4w with a 200a mcb (200at/225af). | $500 |
| Oct 24, 2019 | Never finaled issued Nov 2020, no final | 250 Howard St | 28/f: rev to pa201904299214 to replace (e) landscaping with new landscaping. install new free standing trellis. maher n/a.Details
28/f: rev to pa201904299214 to replace (e) landscaping with new landscaping. install new free standing trellis. maher n/a. | $10,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | replace (e) card readers with (n) card readers, add new card readers n/a maherDetails
replace (e) card readers with (n) card readers, add new card readers n/a maher | $5,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | replace (e) card readers with (n) card readers, add new card readers n/a maherDetails
replace (e) card readers with (n) card readers, add new card readers n/a maher | $5,000 |
| Oct 18, 2019 | Completed final sign-off Dec 2021 | 220 Montgomery St | 2nd floor: revision to app#201906062714 includes: adding new electrical room, revising lighting layout, new structural support at new interior openings at extg brick wall, relocating one new drinking fountain, and modifying layout to 2 new restroom enteries. n/a for maherDetails
2nd floor: revision to app#201906062714 includes: adding new electrical room, revising lighting layout, new structural support at new interior openings at extg brick wall, relocating one new drinking fountain, and modifying layout to 2 new restroom enteries. n/a for maher | $400,000 |
| Oct 15, 2019 | Never finaled issued Dec 2019, no final | 250 Howard St | 37/f: construction new non structural partitions, acoustical grid tile and gyp bd ceilings, light fixtures, millwork, finishesDetails
37/f: construction new non structural partitions, acoustical grid tile and gyp bd ceilings, light fixtures, millwork, finishes | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 38th flr - construction of new non structural partitions, acoustical grid and tile gyp board ceiling, lighting, fixtures, millwork and finishes. maher not req.Details
38th flr - construction of new non structural partitions, acoustical grid and tile gyp board ceiling, lighting, fixtures, millwork and finishes. maher not req. | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 42nd flr - construction of new non structural partitions, acoutstical grid and tile and gyp board ceilings, lighting fixtures, millwork and finishes.Details
42nd flr - construction of new non structural partitions, acoutstical grid and tile and gyp board ceilings, lighting fixtures, millwork and finishes. | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | 41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |