Edgewood Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2013 to Sep 2026
- Last 24 months
- 5 permits filed
85 permits since 2000: 67 completed, 4 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 1330 Howard St | revision to pa 202403188022 new accessible restrooms and kitchenette; new egress stairs from 2nd floor and basement; new accessible on-grade entranceDetails
revision to pa 202403188022 new accessible restrooms and kitchenette; new egress stairs from 2nd floor and basement; new accessible on-grade entrance | $88,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 1330 Howard St | to obtain final inspection for work approved under bpa 202402095668 & 202403188022 all work completedDetails
to obtain final inspection for work approved under bpa 202402095668 & 202403188022 all work completed | |
| Jun 10, 2026 | Completed final sign-off Aug 2026 | 1418 Leavenworth St | unit 3- in kind kitchen and bathroom remodel. no wall removal or layout change.cDetails
unit 3- in kind kitchen and bathroom remodel. no wall removal or layout change.c | $15,000 |
| Jun 10, 2026 | Completed final sign-off Sep 2026 | 1610 Leavenworth St | unit 9- in kind kitchen and bathroom remodel. no wall removal or layout change. add (1) electrical stackable washer and ventless dryer.Details
unit 9- in kind kitchen and bathroom remodel. no wall removal or layout change. add (1) electrical stackable washer and ventless dryer. | $15,000 |
| Aug 18, 2025 | Completed final sign-off Sep 2025 | 3440 24th St | reface of 8 sf/ft damaged existing brick exterior brick vaneer, replace (1) wood stud at interior window sill, and repair drywall and paint interior at 8 sq ft.Details
reface of 8 sf/ft damaged existing brick exterior brick vaneer, replace (1) wood stud at interior window sill, and repair drywall and paint interior at 8 sq ft. | $5,000 |
| Sep 10, 2024 | Completed final sign-off May 2025 | 2137 Lombard St | units # a, b, c: in kind (1) bathroom remodel, (1) in kind kitchen remodel.Details
units # a, b, c: in kind (1) bathroom remodel, (1) in kind kitchen remodel. | $60,000 |
| Jun 4, 2024 | Completed final sign-off Dec 2024 | 2026 46th Av | replace e windows, new stucco at fromt. new sliding at rear,larger opening between living rm and kitchen, small punch openings between living rm and stair, new skylight in living rm.Details
replace e windows, new stucco at fromt. new sliding at rear,larger opening between living rm and kitchen, small punch openings between living rm and stair, new skylight in living rm. | $40,000 |
| Mar 18, 2024 | In progress issued Apr 2024 | 1330 Howard St | replace e) storefront window system at front in-kind. replace e) section door w/ n) section door. replace falling second fl concrete exterior lightwell wall w/ n) wall. add plywood & re-root e) roof accessibility improvement (structural work roof framing). new front entry landing & ramp.Details
replace e) storefront window system at front in-kind. replace e) section door w/ n) section door. replace falling second fl concrete exterior lightwell wall w/ n) wall. add plywood & re-root e) roof accessibility improvement (structural work roof framing). new front entry landing & ramp. | $12,000 |
| Feb 9, 2024 | In progress issued Feb 2024 | 1330 Howard St | upgrade electrical service. concrete pad and supporting structure for (n) electrical equipment. accessiblity improvement- float & finish (n) accessible landing at (e) restroom; new accessible grab bar & toilet paper dispenser @ restroom.Details
upgrade electrical service. concrete pad and supporting structure for (n) electrical equipment. accessiblity improvement- float & finish (n) accessible landing at (e) restroom; new accessible grab bar & toilet paper dispenser @ restroom. | $6,850 |
| Nov 29, 2023 | Completed final sign-off Dec 2023 | 512 Haight St | to comply for nov #202314291, item #6. install of handrailDetails
to comply for nov #202314291, item #6. install of handrail | $300 |
| Sep 21, 2023 | Never finaled filed Sep 2023, never issued | 1330 Howard St | interior finishes demolition to prepare for future work.Details
interior finishes demolition to prepare for future work. | $5,000 |
| Jun 22, 2023 | Completed final sign-off Aug 2023 | 246 Eureka St | revision to 201908158852 as requested by inspector. structural change at skylight: s2.2, s8.4. revision 2 architectual removal of a door: a2.0 adding a 4 foot tall parapet wall on property line.Details
revision to 201908158852 as requested by inspector. structural change at skylight: s2.2, s8.4. revision 2 architectual removal of a door: a2.0 adding a 4 foot tall parapet wall on property line. | |
| May 4, 2023 | Completed final sign-off Aug 2023 | 1236 Mason St | (1) bathroom remodel. same location.Details
(1) bathroom remodel. same location. | $15,000 |
| Jan 5, 2023 | Completed final sign-off Jan 2023 | 621 York St | revision to plan pa#201907176097 to clarify omission of special inspections 18c required for anchors installed in existing concrete. existing concrete was replaced at front & all anchors installed in new concrete.Details
revision to plan pa#201907176097 to clarify omission of special inspections 18c required for anchors installed in existing concrete. existing concrete was replaced at front & all anchors installed in new concrete. | |
| Nov 29, 2022 | Completed final sign-off Aug 2023 | 246 Eureka St | revised shear wall nailing & locations. revised sheets: s0.0, s0.1, s2.1, s2.2, s2.3, s2.4, s3.1, s8.2, s8.4, s8.6 & s8.8. pa# 201908158852Details
revised shear wall nailing & locations. revised sheets: s0.0, s0.1, s2.1, s2.2, s2.3, s2.4, s3.1, s8.2, s8.4, s8.6 & s8.8. pa# 201908158852 | |
| May 19, 2022 | Completed final sign-off Aug 2023 | 246 Eureka St | revision to pa# 201908158852. foundation revision. new perimeter foundation. new foundation details.Details
revision to pa# 201908158852. foundation revision. new perimeter foundation. new foundation details. | $2,000 |
| Jan 26, 2022 | Completed final sign-off Jan 2023 | 621 York St | revision to 202104148538. revised scope to include removeal of new roof deck from scope and minor interior changesDetails
revision to 202104148538. revised scope to include removeal of new roof deck from scope and minor interior changes | |
| Oct 29, 2021 | Completed final sign-off Aug 2023 | 246 Eureka St | temporary shoring related to 201901291480 and 201908158852Details
temporary shoring related to 201901291480 and 201908158852 | $20,000 |
| Aug 4, 2021 | Expired or cancelled cancelled Jan 2026 | 398 11th St | change of use from retail (15) to office (10). add 2 new restrooms and drinking fountains. upgrade (e) walls to 1hr fire barrier walls.Details
change of use from retail (15) to office (10). add 2 new restrooms and drinking fountains. upgrade (e) walls to 1hr fire barrier walls. | $10,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | floors 10 & 11: add new partition wall in 12 (e) student housing units on levels 10/11 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a or bed count. maher n/aDetails
floors 10 & 11: add new partition wall in 12 (e) student housing units on levels 10/11 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a or bed count. maher n/a | $49,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | add (n) partition wall in 12 (e) student housing units on levels 6 & 7 to create 3 separate bedrooms in each modified unit. no change in life safety, da or bed countDetails
add (n) partition wall in 12 (e) student housing units on levels 6 & 7 to create 3 separate bedrooms in each modified unit. no change in life safety, da or bed count | $49,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | floors 8 & 9: add new partition wall in 12 (e) student housing units on levels 8/9 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a. maher n/aDetails
floors 8 & 9: add new partition wall in 12 (e) student housing units on levels 8/9 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a. maher n/a | $49,000 |
| Jun 8, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | add new partial wall in g extg student housing units on levels 3 & 4 to create 3 seperate bedrooms in each modified unit and associated mep, no change to life-safety, disabled access, or bed countDetails
add new partial wall in g extg student housing units on levels 3 & 4 to create 3 seperate bedrooms in each modified unit and associated mep, no change to life-safety, disabled access, or bed count | $49,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2023 | 621 York St | revision to pa# 201907176097. reconfiguration of 1st fl layout. new internal stair, skylight hatch, roof deck, & reconfiguration of rear exterior stairs.Details
revision to pa# 201907176097. reconfiguration of 1st fl layout. new internal stair, skylight hatch, roof deck, & reconfiguration of rear exterior stairs. | $30,000 |
| Sep 22, 2020 | Never finaled filed Sep 2020, never issued | 450 Shotwell St | tenant improvement to add conf rooms, storage room, and subdivision of e rooms to create a mechanical shop and space operations room. addition of internal storefront and door. no exterior work to occur, existing productions, distribution and repair use to remain. no change in use. no structural workDetails
tenant improvement to add conf rooms, storage room, and subdivision of e rooms to create a mechanical shop and space operations room. addition of internal storefront and door. no exterior work to occur, existing productions, distribution and repair use to remain. no change in use. no structural work | $215,000 |
| Aug 25, 2020 | Completed final sign-off Mar 2021 | 20 Shields St | drywall garage, remove & replace liv rm window-non strt vis-in-kind. install (n)insulation & siding at north backyard wall (400 sqft appx backyard). remove & replace (e) front door in-kind. install (n) tub & van at upstair bathrm, install (n) tile at upstair bathrm flr & wall. (n) cabs, bs at kitchDetails
drywall garage, remove & replace liv rm window-non strt vis-in-kind. install (n)insulation & siding at north backyard wall (400 sqft appx backyard). remove & replace (e) front door in-kind. install (n) tub & van at upstair bathrm, install (n) tile at upstair bathrm flr & wall. (n) cabs, bs at kitch | $50,000 |
| Jul 16, 2020 | Completed final sign-off Sep 2020 | 2621 Sacramento St | all work complete. to renew permits 201702068655 and 201705035501Details
all work complete. to renew permits 201702068655 and 201705035501 | $90,000 |
| May 8, 2020 | Expired or cancelled suspend Feb 2021 | 438 Shotwell St | ti for 438 shotwell: to add 2 conf rooms, 1 storage room, and subdivisions of e rooms t create a mech shop and space operation rm. addition of interal storefront and door. no exterior work to occur, existing production, distributions and repair use to remain. no change in use. no structural workDetails
ti for 438 shotwell: to add 2 conf rooms, 1 storage room, and subdivisions of e rooms t create a mech shop and space operation rm. addition of interal storefront and door. no exterior work to occur, existing production, distributions and repair use to remain. no change in use. no structural work | $215,000 |
| Jan 29, 2020 | Completed final sign-off Apr 2020 | 1330 De Haro St | addition of a new bathroom to an existing room. addition will occur entirely within the envelope of an (e) condo unit in a two unit bldg.Details
addition of a new bathroom to an existing room. addition will occur entirely within the envelope of an (e) condo unit in a two unit bldg. | $15,000 |
| Sep 17, 2019 | Expired or cancelled cancelled Mar 2024 | 1330 Howard St | new storefronts at front facade. new stairs & elevator. new accessible entry with interior ramp. new accessible restrooms. new a-3 accesembly on roof deck & infill second floor area. new accessible kitchenette.Details
new storefronts at front facade. new stairs & elevator. new accessible entry with interior ramp. new accessible restrooms. new a-3 accesembly on roof deck & infill second floor area. new accessible kitchenette. | $1,000,000 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 528 Haight St | add bathroom to e dwelling unit, new vanity, fiberglass shower unit, new interior partitionsDetails
add bathroom to e dwelling unit, new vanity, fiberglass shower unit, new interior partitions | $3,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2023 | 246 Eureka St | lower level: relocate laundry-add(n)bath, rebuild(e)stair. excavate lightwell,(n)rear bedrm behind garage. 1st fl: demo/relocate powder rm. relocate kitchen, demo(e)breakfast rm, add(n)family rm. 2nd fl: remodel (e)front bedrm. re-organize rear bedrm w/ horizontal addition.add bath,(n) stair to 3rdDetails
lower level: relocate laundry-add(n)bath, rebuild(e)stair. excavate lightwell,(n)rear bedrm behind garage. 1st fl: demo/relocate powder rm. relocate kitchen, demo(e)breakfast rm, add(n)family rm. 2nd fl: remodel (e)front bedrm. re-organize rear bedrm w/ horizontal addition.add bath,(n) stair to 3rd | $1,200,000 |
| Jul 17, 2019 | Completed final sign-off Jan 2023 | 621 York St | rear addition @ the first fl with a new deck @ second fl,infill of an (e) light well new entry. reconfigured interior stair & interior layout @ 1st fl with new walls, doors, fixtures & finishes.Details
rear addition @ the first fl with a new deck @ second fl,infill of an (e) light well new entry. reconfigured interior stair & interior layout @ 1st fl with new walls, doors, fixtures & finishes. | $200,000 |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 1353 Stevenson St | street spaceDetails
street space | |
| May 23, 2019 | Completed final sign-off Jul 2019 | 1526 Wallace Av | to obtain final inspection for work approved under pa's 201001215081 and 201101218776. all work is complete.Details
to obtain final inspection for work approved under pa's 201001215081 and 201101218776. all work is complete. | |
| Apr 26, 2019 | Completed final sign-off Jul 2019 | 1536 Wallace Av | to obtain final inspection for work approved under pa# 2010-0121-5084 and 2011-0121-8779. all work is complete.Details
to obtain final inspection for work approved under pa# 2010-0121-5084 and 2011-0121-8779. all work is complete. | |
| Feb 22, 2019 | Never finaled issued Feb 2019, no final | 1330 Howard St | exploritory, exploration - small limited in walls to see framing (to remain vacant, no occupancy allowed)Details
exploritory, exploration - small limited in walls to see framing (to remain vacant, no occupancy allowed) | $1,000 |
| Feb 21, 2019 | Completed final sign-off Jul 2019 | 721 Brannan St | 1st & 2nd flr of building b. tenant improvement incl new lobby, employee kitchenettes, shower, new stairs and non-load bearing interior partitionsDetails
1st & 2nd flr of building b. tenant improvement incl new lobby, employee kitchenettes, shower, new stairs and non-load bearing interior partitions | $95,000 |
| Feb 11, 2019 | Completed final sign-off Nov 2019 | 1353 Stevenson St | mandatory soft story retrofit per sfebc chp 4d. this permit for administrative purposes (and project cost adjustment) for documenting all soft story work completed under 201708316644. this permit cost for ss work only.Details
mandatory soft story retrofit per sfebc chp 4d. this permit for administrative purposes (and project cost adjustment) for documenting all soft story work completed under 201708316644. this permit cost for ss work only. | $100,000 |
| Dec 7, 2018 | Never finaled filed Dec 2018, never issued | 1330 De Haro St | addition of a (n) condo to an (e) 2-condo unit bldg. addition will be on the lowest 2nd flr under utilized crawl space & storage. addition will consist of excavation & a "permitted obstruction" into rear yard. other work will consist of minor interior alterations to unit #2 to remove interior stairsDetails
addition of a (n) condo to an (e) 2-condo unit bldg. addition will be on the lowest 2nd flr under utilized crawl space & storage. addition will consist of excavation & a "permitted obstruction" into rear yard. other work will consist of minor interior alterations to unit #2 to remove interior stairs | $600,000 |
| Aug 28, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | revision to 201802272389 & 201807023573. new work to include apprx 1333 sf mezzanine, stair & ada lift. relocation of ada bathroom & structural upgrades of bld a. no exterior changes under this permit.Details
revision to 201802272389 & 201807023573. new work to include apprx 1333 sf mezzanine, stair & ada lift. relocation of ada bathroom & structural upgrades of bld a. no exterior changes under this permit. | $200,000 |
| Jul 2, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | rev to pa#201802272389; new work to include replace (e) stair w/new, revise location of 2nd fl bathroms, new stairs to be wood framed, demo of (e) 2nd fl accessory office. n/a for maher.Details
rev to pa#201802272389; new work to include replace (e) stair w/new, revise location of 2nd fl bathroms, new stairs to be wood framed, demo of (e) 2nd fl accessory office. n/a for maher. | $20,000 |
| Feb 27, 2018 | Completed final sign-off Jul 2019 | 721 Brannan St | t.i. to extg production space. work to include ada upgrade and construction of new egress stair. no change of use(deffered mep permits) n/a for maherDetails
t.i. to extg production space. work to include ada upgrade and construction of new egress stair. no change of use(deffered mep permits) n/a for maher | $200,000 |
| Oct 10, 2017 | Completed final sign-off Dec 2019 | 3270 24th St | exterior lighting on ground floor for pa 2015-1001-8525Details
exterior lighting on ground floor for pa 2015-1001-8525 | $5,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2019 | 1353 Stevenson St | legalize 1 bedroom, 1 bathroom unit (unit 7) per ord 43-14; lower slab and add bicycleparking.Details
legalize 1 bedroom, 1 bathroom unit (unit 7) per ord 43-14; lower slab and add bicycleparking. | $15,000 |
| Jul 3, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | interior renovation of 1 kitchen and 2 bathrooms, add new forced air unit and connect to extg diffusers. n/a for maherDetails
interior renovation of 1 kitchen and 2 bathrooms, add new forced air unit and connect to extg diffusers. n/a for maher | $50,000 |
| May 3, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | revision to 201702068655: shoring planDetails
revision to 201702068655: shoring plan | $15,000 |
| Mar 30, 2017 | Completed final sign-off Dec 2017 | 144 Noe St | remodel kitchen, new partitions, remodel (e) bathroom, new lighting, demolition of walls & doors.Details
remodel kitchen, new partitions, remodel (e) bathroom, new lighting, demolition of walls & doors. | $55,000 |
| Feb 17, 2017 | Completed final sign-off Jun 2017 | 195 Collingwood St | new concrete deck & steps 171 sq ft & 30" from grade at rear of apt bldg.Details
new concrete deck & steps 171 sq ft & 30" from grade at rear of apt bldg. | $8,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 5811 Mission St | apt 2 - add new partition walls; demo partition walls, relocate /renovate kitchen, repair dry wall as required; add 1 bedroom, no work on facade. add washer and dryer in unitDetails
apt 2 - add new partition walls; demo partition walls, relocate /renovate kitchen, repair dry wall as required; add 1 bedroom, no work on facade. add washer and dryer in unit | $10,000 |
| Feb 6, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | upgrade structure - foundations & shear walls on ground floor.Details
upgrade structure - foundations & shear walls on ground floor. | $90,000 |
| Nov 3, 2016 | Expired or cancelled cancelled Jan 2026 | 4302 19th St | remodel of bathroom and new lighting fixture in master bedroom.Details
remodel of bathroom and new lighting fixture in master bedroom. | $20,000 |
| Sep 30, 2016 | Completed final sign-off Sep 2017 | 398 11th St | 3rd floor t.i. incuding new accessible restrooms and shower, conference rooms, offices, and cafe area. new elevator and 1st floor elevator lobby w. new storefront to replace exist. roll up. n/a for maherDetails
3rd floor t.i. incuding new accessible restrooms and shower, conference rooms, offices, and cafe area. new elevator and 1st floor elevator lobby w. new storefront to replace exist. roll up. n/a for maher | $324,000 |
| Sep 29, 2016 | Expired or cancelled suspend Aug 2021 | 3241 Washington St | remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing,Details
remodel of interior unit & associated structural work including relocating kitchen, baths & laundry. replace existing windows or sashes at select locations. install new radiant heat system. new floors, repaint all walls, ceiling & trims. interiors demo less than 75% casement windows street facing, | $437,000 |
| Sep 1, 2016 | Completed final sign-off Jan 2018 | 508 Ashbury St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $75,000 |
| Aug 15, 2016 | Completed final sign-off Nov 2016 | 5811 Mission St | unit 3 - add new partition wall & demo (e) partition wall. repair drywall as required; add bedroom and studyDetails
unit 3 - add new partition wall & demo (e) partition wall. repair drywall as required; add bedroom and study | $15,000 |
| Jun 24, 2016 | Completed final sign-off Jan 2020 | 3266 24th St | interior renovation of upper floor residential units. upgrade heating, renovate floors, install washer/dryer, renovate bath finishes, upgrade electrical as req, add 1 partition wall on 2nd fl front unit, repair waterproofing and windows in kindDetails
interior renovation of upper floor residential units. upgrade heating, renovate floors, install washer/dryer, renovate bath finishes, upgrade electrical as req, add 1 partition wall on 2nd fl front unit, repair waterproofing and windows in kind | $125,000 |
| Feb 10, 2016 | Completed final sign-off Jun 2016 | 136 Noe St | new partitions to create new bedrooms. convert rear bedroom into living room. relocate bathroom, remodel (e) kitchen. remodel existing bathroom. remove ceiling in rear bedroom and add rigid insulation. replace existing water heater with new tankless water heater.Details
new partitions to create new bedrooms. convert rear bedroom into living room. relocate bathroom, remodel (e) kitchen. remodel existing bathroom. remove ceiling in rear bedroom and add rigid insulation. replace existing water heater with new tankless water heater. | $200,000 |
| Jan 14, 2016 | Completed final sign-off Jun 2017 | 195 Collingwood St | add unit per ordinance# 30-15. remodel of existing ground level space into dwelling unit. ref mandatory seismic upgrade pa# 2015/11/13/2496.Details
add unit per ordinance# 30-15. remodel of existing ground level space into dwelling unit. ref mandatory seismic upgrade pa# 2015/11/13/2496. | $30,000 |
| Nov 18, 2015 | Completed final sign-off Jan 2016 | 398 11th St | demolish interior partition walls on 3rd floor light manufacturing partial area. no exterior work. no structural work. (use ab-017 to defer accessibility upgrade until tenant improvement, area involved will remain vacant till tenant improvement is performed under separate permit.) n/a for maherDetails
demolish interior partition walls on 3rd floor light manufacturing partial area. no exterior work. no structural work. (use ab-017 to defer accessibility upgrade until tenant improvement, area involved will remain vacant till tenant improvement is performed under separate permit.) n/a for maher | $10,000 |
| Nov 13, 2015 | Completed final sign-off Dec 2016 | 195 Collingwood St | soft story mandatory seismic retrofit on ground floor per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story mandatory seismic retrofit on ground floor per sfbc chapter 34b, 2012 iebc appendix a-4 | $85,000 |
| Oct 7, 2015 | Completed final sign-off May 2016 | 142 Noe St | new partition walls to create new bedrooms. demo (e) non shear, non structural walls. relocate (e) bathroom, remodel all (e) bathrooms. replace w/h with tankless. remove rear drop ceiling - repair with new- add gyp boardDetails
new partition walls to create new bedrooms. demo (e) non shear, non structural walls. relocate (e) bathroom, remodel all (e) bathrooms. replace w/h with tankless. remove rear drop ceiling - repair with new- add gyp board | $65,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2018 | 3270 24th St | demo only on gr fl and basement. walls and columns to remain for future renovation work under sep per. demo () ceiling , flooring, sheetrock throughout, demo () plumbing fixtures, elec outlets and lighting per ab-017. remain vacancyDetails
demo only on gr fl and basement. walls and columns to remain for future renovation work under sep per. demo () ceiling , flooring, sheetrock throughout, demo () plumbing fixtures, elec outlets and lighting per ab-017. remain vacancy | $5,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2018 | 3270 24th St | gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate perDetails
gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate per | $500,000 |
| Aug 26, 2015 | Completed final sign-off Sep 2016 | 4300 19th St | remodel (e) garage; upgrade structure for (n) roof deck. access from adjacent (attached) condo (4300 19th st). open railings and trellis not to exceed 42".Details
remodel (e) garage; upgrade structure for (n) roof deck. access from adjacent (attached) condo (4300 19th st). open railings and trellis not to exceed 42". | $87,000 |
| Nov 13, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | note added to plans clarifying fire resistive rating requirement for new structural work per field inspector request 201405095327Details
note added to plans clarifying fire resistive rating requirement for new structural work per field inspector request 201405095327 | |
| Aug 28, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | revision to 201405095372: enlarge size of new accessible bathroom. relocate door. structrual modifications to address field conditions including new beams and foundation improvementsDetails
revision to 201405095372: enlarge size of new accessible bathroom. relocate door. structrual modifications to address field conditions including new beams and foundation improvements | $4,600 |
| Aug 15, 2014 | Completed final sign-off Oct 2014 | 1015 Shotwell St | new 6 ft metal fence; to be open 75% per planning code req. n/a for the maher ordinance #155-13Details
new 6 ft metal fence; to be open 75% per planning code req. n/a for the maher ordinance #155-13 | $8,000 |
| Aug 7, 2014 | Completed final sign-off Apr 2015 | 3215 Mission St | replace approximately 50% of deteriorated stucco on the primary facade. no other work.Details
replace approximately 50% of deteriorated stucco on the primary facade. no other work. | $49,000 |
| Jun 16, 2014 | Completed final sign-off Nov 2014 | 1015 Shotwell St | #3 & #4 (level 3)- relocate interior walls, replace gypsum board as needed, relocate plumbing & electrical as required. n/a ordinance #155-13Details
#3 & #4 (level 3)- relocate interior walls, replace gypsum board as needed, relocate plumbing & electrical as required. n/a ordinance #155-13 | $30,000 |
| Jun 3, 2014 | Completed final sign-off Dec 2018 | 3270 24th St | change of use from retail to restaurant w/bar. lightwell to be removed for planning. no work to be done under this permit. ground floor to remain b occupancy. work to be done under separate permit.Details
change of use from retail to restaurant w/bar. lightwell to be removed for planning. no work to be done under this permit. ground floor to remain b occupancy. work to be done under separate permit. | $1,200 |
| May 20, 2014 | Completed final sign-off Nov 2014 | 1015 Shotwell St | reinforce existing roof and ceiling joist at apt #3 & #4. maher n/a.Details
reinforce existing roof and ceiling joist at apt #3 & #4. maher n/a. | $8,000 |
| May 9, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | seismic upgrade consisting of ordinary moment frames, foundations, & shear walls. required accessibility improvements per 20% rule including automatic door opener & accessible bathroom upgrade.Details
seismic upgrade consisting of ordinary moment frames, foundations, & shear walls. required accessibility improvements per 20% rule including automatic door opener & accessible bathroom upgrade. | $70,000 |
| Feb 28, 2014 | Completed final sign-off Jul 2014 | 1015 Shotwell St | level 2 unit 10 interior remodel: upgrade electrical and plmbg as required. relocate extg interior walls as shown on a3.01. replace extg drywall as needed. relocate extg heater.n/a for the maher ordinance #155-13Details
level 2 unit 10 interior remodel: upgrade electrical and plmbg as required. relocate extg interior walls as shown on a3.01. replace extg drywall as needed. relocate extg heater.n/a for the maher ordinance #155-13 | $20,000 |
| Feb 27, 2014 | Expired or cancelled cancelled Oct 2014 | 891 Post St | #101,105,206,210,302,303,310,314,403,405,408,412,414- kitchen & bath remodel of 13 units includes demo of non-structural beams & posts, remodel (e) baths & kitchens, upgrade hvac systems, add electrical fixtures/outlets, replace windows not facing street with same dimension/trim. na #155-13Details
#101,105,206,210,302,303,310,314,403,405,408,412,414- kitchen & bath remodel of 13 units includes demo of non-structural beams & posts, remodel (e) baths & kitchens, upgrade hvac systems, add electrical fixtures/outlets, replace windows not facing street with same dimension/trim. na #155-13 | $300,000 |
| Feb 27, 2014 | Expired or cancelled cancelled Jan 2026 | 891 Post St | window replacement for nine residential units facing the right of way. the current window appearance will not be altered. all dimension, interior and exterior trim will be the same. new windows will be double pane with low e glass.n/a for the maher ordinance #155-13Details
window replacement for nine residential units facing the right of way. the current window appearance will not be altered. all dimension, interior and exterior trim will be the same. new windows will be double pane with low e glass.n/a for the maher ordinance #155-13 | $15,000 |
| Feb 4, 2014 | Completed final sign-off May 2014 | 5811 Mission St | replace existing drywall in entire residential unit.Details
replace existing drywall in entire residential unit. | $5,000 |
| Dec 6, 2013 | Completed final sign-off May 2014 | 5811 Mission St | bathroom and kitchen renovation to a single unit #4 in a multifamily residential bldg. work will include remodel extg kitchen and bathroom, replace and upgrade unit radiator, upgrade electrical system within unit, and upgrade extg studio to a one bedroom unit.Details
bathroom and kitchen renovation to a single unit #4 in a multifamily residential bldg. work will include remodel extg kitchen and bathroom, replace and upgrade unit radiator, upgrade electrical system within unit, and upgrade extg studio to a one bedroom unit. | $20,000 |
| Dec 5, 2013 | Never finaled issued Dec 2013, no final | 891 Post St | non-structural exploratory demo requested by architect, removing wall covering, cabinets, finishes in 5 unoccupied units & storage in basement.Details
non-structural exploratory demo requested by architect, removing wall covering, cabinets, finishes in 5 unoccupied units & storage in basement. | $10,000 |
| Aug 22, 2013 | Completed final sign-off Oct 2013 | 780 Treat Av | revision to app#201304033702. revision delta 3 omit proposed work in unit 782 from scope of work and closet addition to new bedroom in unit 780Details
revision to app#201304033702. revision delta 3 omit proposed work in unit 782 from scope of work and closet addition to new bedroom in unit 780 | |
| Aug 15, 2013 | Completed final sign-off Jul 2014 | 1015 Shotwell St | revision to pa# 2013-0508-6409-remove & replace (e) foundation as shown on plansDetails
revision to pa# 2013-0508-6409-remove & replace (e) foundation as shown on plans | $18,000 |
| Jul 2, 2013 | Completed final sign-off Nov 2013 | 780 Treat Av | revision to pa# 2013-0403-3702-indicate 1 hour fire rated wall between new & (e) work & addition of a 45 min rated door on both floors as shown on plan.Details
revision to pa# 2013-0403-3702-indicate 1 hour fire rated wall between new & (e) work & addition of a 45 min rated door on both floors as shown on plan. | |
| May 8, 2013 | Completed final sign-off Aug 2014 | 1015 Shotwell St | 1) replace (e) windows on south & west facades; 2) replace (e) shingles on south & west facades with stucco & tile; 3)replace (e) guardrails. visible from the street. 4)replace, paint, and install (e) fire escape.Details
1) replace (e) windows on south & west facades; 2) replace (e) shingles on south & west facades with stucco & tile; 3)replace (e) guardrails. visible from the street. 4)replace, paint, and install (e) fire escape. | $95,000 |
| Apr 3, 2013 | Completed final sign-off Oct 2013 | 780 Treat Av | renovation of 2 units - expansion of (e) residential units into (e) unused storage spaces & market; #780 addition of new bedroom, fam room & bath. #782 additional of study & bath. renovation of (e) kitchen & bathrooms, new heating system for both units. sprinklers for new space in units nfpa 13rDetails
renovation of 2 units - expansion of (e) residential units into (e) unused storage spaces & market; #780 addition of new bedroom, fam room & bath. #782 additional of study & bath. renovation of (e) kitchen & bathrooms, new heating system for both units. sprinklers for new space in units nfpa 13r | $61,000 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 780 Treat Av | demolition of 2 interior brick fireplaces. remove from top down sheetmetal, all brick within wall. repair roof, membrane. repair rafter if necessary with 2x6 and simpson hardwareDetails
demolition of 2 interior brick fireplaces. remove from top down sheetmetal, all brick within wall. repair roof, membrane. repair rafter if necessary with 2x6 and simpson hardware | $3,000 |