Bevilacqua & Sons
- Based in
- So San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 21 permits filed
467 permits since 2000: 376 completed, 5 in progress, 61 never finaled, 25 expired or cancelled.
Of the 61 never-finaled permits, 4 are 3 to 5 years old, 18 are 5 to 10 years old, 39 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 467.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | Completed final sign-off Sep 2026 | 1932 Taylor St | to obtain final inspection for work approved under pa#202303284567. all work is complete.Details
to obtain final inspection for work approved under pa#202303284567. all work is complete. | |
| Aug 3, 2026 | In progress issued Aug 2026 | 180 Montgomery St | revision to 202605111055. interior tenant improvement revised layout with reduced scope. scope includes demo of non structural partitions, new partitons, finishes, relocation of light fixtures. mep, fire and life safety under sep permit.Details
revision to 202605111055. interior tenant improvement revised layout with reduced scope. scope includes demo of non structural partitions, new partitons, finishes, relocation of light fixtures. mep, fire and life safety under sep permit. | |
| May 11, 2026 | In progress issued Jul 2026 | 180 Montgomery St | 16th flool #1675: interior tenant improvement: demolition of non-structural partitions, new partitions, finishes and relocation of light fixtures. mep & fire life safety under separate permit.Details
16th flool #1675: interior tenant improvement: demolition of non-structural partitions, new partitions, finishes and relocation of light fixtures. mep & fire life safety under separate permit. | $250,000 |
| Apr 9, 2026 | Completed final sign-off Jul 2026 | 388 Market St | installation of 4 phone booths at suite 800. seisimic anchoring, electrical and life safety to be included.Details
installation of 4 phone booths at suite 800. seisimic anchoring, electrical and life safety to be included. | $30,000 |
| Jan 22, 2026 | In progress filed Jan 2026, not yet issued | 180 Montgomery St | 15/f: demo & construction of non-load bearing partitions to create 2 new phone rooms and downsize of (e) serve room. new/relocazted power/data, light fixtures, exit signage, and new paint.Details
15/f: demo & construction of non-load bearing partitions to create 2 new phone rooms and downsize of (e) serve room. new/relocazted power/data, light fixtures, exit signage, and new paint. | $100,000 |
| Dec 23, 2025 | Completed final sign-off Feb 2026 | 210 Post St | to comply with nov#202548248 to repair drywall material at rear stairwell from 1st floor to basement with type x 5/8. due to water damage.Details
to comply with nov#202548248 to repair drywall material at rear stairwell from 1st floor to basement with type x 5/8. due to water damage. | $10,000 |
| Dec 3, 2025 | Completed final sign-off May 2026 | 180 Montgomery St | 19th floor ti: to include selective demo and construction of non-load bearing partitions, light fixture relocation including re-switching, relocated and new office doors and frames, salvage adn reuse of existing selected materials if practical, and new finishes.Details
19th floor ti: to include selective demo and construction of non-load bearing partitions, light fixture relocation including re-switching, relocated and new office doors and frames, salvage adn reuse of existing selected materials if practical, and new finishes. | $110,000 |
| Sep 29, 2025 | Completed final sign-off Aug 2026 | 412 Pacheco St | kitchen and bathroom remodel. relocate laundry to basement, and add new window, window not visible from street.Details
kitchen and bathroom remodel. relocate laundry to basement, and add new window, window not visible from street. | $150,000 |
| Aug 8, 2025 | Completed final sign-off Sep 2026 | 180 Montgomery St | #2150: modification of an existing t.i. & common area to include selective demolition & construction of non-load bearing partition, existing modifications to cieling grid & tile , light fixture relocation & new including re-switching, new office dooors & frames, salvage & reuse of exist. mep deferDetails
#2150: modification of an existing t.i. & common area to include selective demolition & construction of non-load bearing partition, existing modifications to cieling grid & tile , light fixture relocation & new including re-switching, new office dooors & frames, salvage & reuse of exist. mep defer | $245,577 |
| Aug 1, 2025 | In progress issued Aug 2025 | 180 Montgomery St | 2/f -t.i. of (e) full floor suite on the 2nd flr. demo of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures.Details
2/f -t.i. of (e) full floor suite on the 2nd flr. demo of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures. | $1,011,466 |
| May 30, 2025 | Completed final sign-off Jan 2026 | 180 Geary St | remove existing sidewalk around existing elevator opening. attach new l 4x4 3/8 around inside of face of (e) sidewalk elevator opening concrete walls. weld (n) steel deck and place concrete topping over steel deck. place (n) sidewalk topping slab around (e) grade and over (n) opening elevatorDetails
remove existing sidewalk around existing elevator opening. attach new l 4x4 3/8 around inside of face of (e) sidewalk elevator opening concrete walls. weld (n) steel deck and place concrete topping over steel deck. place (n) sidewalk topping slab around (e) grade and over (n) opening elevator | $30,000 |
| May 23, 2025 | Completed final sign-off Oct 2025 | 180 Montgomery St | revision to 202504023549 for construction of new gyp board soffit at the break areaDetails
revision to 202504023549 for construction of new gyp board soffit at the break area | $3,500 |
| Apr 28, 2025 | Completed final sign-off Jul 2025 | 730 Polk St | 2-3rd/floors: interior remodel on 2nd and 3rd floors due to water damage. all new walls are non-load bearing. mep deferred.Details
2-3rd/floors: interior remodel on 2nd and 3rd floors due to water damage. all new walls are non-load bearing. mep deferred. | $150,000 |
| Apr 2, 2025 | Completed final sign-off Oct 2025 | 180 Montgomery St | suite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred)Details
suite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred) | $600,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2025 | 570 Pacific Av | install new low side duct per new tenant space layout. ref pa 202502100003Details
install new low side duct per new tenant space layout. ref pa 202502100003 | $200,000 |
| Feb 20, 2025 | Completed final sign-off Oct 2025 | 388 Market St | 14/f-ste 1420: demolition of (e) flr and (e) partitions, (e) ceiling grid/tile to remain, (e) lighting to remain and some to be relocated. the new propsed design includes: offices, break area, open office area, one conference room and new finishes.Details
14/f-ste 1420: demolition of (e) flr and (e) partitions, (e) ceiling grid/tile to remain, (e) lighting to remain and some to be relocated. the new propsed design includes: offices, break area, open office area, one conference room and new finishes. | $285,000 |
| Feb 10, 2025 | Completed final sign-off Jul 2025 | 570 Pacific Av | 2/fl- interior only renovation of 2nd floor for a single tenant improvement. all (n) walls are non load bearing, creating amenities such as (2) offices and a conference room. mep deferredDetails
2/fl- interior only renovation of 2nd floor for a single tenant improvement. all (n) walls are non load bearing, creating amenities such as (2) offices and a conference room. mep deferred | $400,000 |
| Feb 10, 2025 | Completed final sign-off Oct 2025 | 388 Market St | 14/f-ste 1460: demolition of (e) flr finishes and (e) partitions and (e) ceiling. the new proposed design includes: offices, break area, open office area, one conference room and new ceiling.Details
14/f-ste 1460: demolition of (e) flr finishes and (e) partitions and (e) ceiling. the new proposed design includes: offices, break area, open office area, one conference room and new ceiling. | $160,000 |
| Feb 10, 2025 | Completed final sign-off Oct 2025 | 388 Market St | 14/f-ste 1450: demolition of (e) flr finishes and (e) partitions and (e) ceiling. the new propsed design includes: offices, break area, open office area, one conference room and new ceiling.Details
14/f-ste 1450: demolition of (e) flr finishes and (e) partitions and (e) ceiling. the new propsed design includes: offices, break area, open office area, one conference room and new ceiling. | $199,500 |
| Jan 23, 2025 | Completed final sign-off Aug 2026 | 1932 Taylor St | voluntary foundation wall retrofit along aladdin terrace.Details
voluntary foundation wall retrofit along aladdin terrace. | $80,000 |
| Dec 5, 2024 | Completed final sign-off Jul 2025 | 1155 Market St | demolition of non-structural partitions, doors, glazing, ceiling light fixtures and finishesDetails
demolition of non-structural partitions, doors, glazing, ceiling light fixtures and finishes | $125,000 |
| Aug 15, 2024 | In progress issued Aug 2024 | 1100 California St | revision to pa# 2023-0728-3254 one sheet revision per inspectors request add light fixtures and panic hardwareDetails
revision to pa# 2023-0728-3254 one sheet revision per inspectors request add light fixtures and panic hardware | |
| Jul 17, 2024 | Completed final sign-off Aug 2024 | 388 Market St | 10/f: addition of approx 40 sq ft room to use as idf room for the internet and the communication needs. the room located within an existing office suite #1000. adding ceiling height partitions and relocating some of ceiling devices such as light fixtures, hvac, and architectural.Details
10/f: addition of approx 40 sq ft room to use as idf room for the internet and the communication needs. the room located within an existing office suite #1000. adding ceiling height partitions and relocating some of ceiling devices such as light fixtures, hvac, and architectural. | $30,000 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 155 Montgomery St | 6/f suite 600: interior t.i. removal of non-structural partitions, new partitions, finishes and new, and relocate lighting.Details
6/f suite 600: interior t.i. removal of non-structural partitions, new partitions, finishes and new, and relocate lighting. | $306,987 |
| Apr 11, 2024 | Completed final sign-off Sep 2024 | 180 Montgomery St | 19/f suite 1950: modification of existing tenant with selective demolition and construction of non-load bearing partitions. relocate office doors and frames, relocation of light fixture, and new finishes. mep deferred.Details
19/f suite 1950: modification of existing tenant with selective demolition and construction of non-load bearing partitions. relocate office doors and frames, relocation of light fixture, and new finishes. mep deferred. | $100,238 |
| Sep 7, 2023 | Never finaled filed Sep 2023, never issued | 3838 California St | replacement of existing rooftop generator on the existing equipment concrete pad. not visible from the street.Details
replacement of existing rooftop generator on the existing equipment concrete pad. not visible from the street. | $75,000 |
| Sep 5, 2023 | Completed final sign-off Feb 2024 | 1 Sansome St | revision to 202207188670 to remove (e) basement bathrooms upgrades from scope of work.Details
revision to 202207188670 to remove (e) basement bathrooms upgrades from scope of work. | |
| Aug 28, 2023 | Completed final sign-off Feb 2024 | 155 Montgomery St | suite 1400: t.i. demolition of non-structural partitions. new partitions and finishes. electrical and plumbing under sep permit.Details
suite 1400: t.i. demolition of non-structural partitions. new partitions and finishes. electrical and plumbing under sep permit. | $250,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | 8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break roomDetails
8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break room | $93,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | 9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishesDetails
9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishes | $150,000 |
| Aug 2, 2023 | Never finaled filed Aug 2023, never issued | 180 Montgomery St | work include selective demo and construction of non load bearing partitons. modification to ceiling grid and tile., new light fixtures, new and relocated office doors and frames, new finishes.Details
work include selective demo and construction of non load bearing partitons. modification to ceiling grid and tile., new light fixtures, new and relocated office doors and frames, new finishes. | $447,710 |
| Jul 28, 2023 | Completed final sign-off Feb 2025 | 1100 California St | replace (e) outdated electrical distribution switchboards & panel boards with new. move (e) loads over to (n) boards. provide short circuit breaker coordination & arc flash studies & label for all (n) equipment installed.Details
replace (e) outdated electrical distribution switchboards & panel boards with new. move (e) loads over to (n) boards. provide short circuit breaker coordination & arc flash studies & label for all (n) equipment installed. | $225,000 |
| Apr 26, 2023 | Completed final sign-off Aug 2023 | 155 Montgomery St | 11/f ste 1100: interior t.i. demo of non-structural partitions, new partitions and relocated light fixtures.Details
11/f ste 1100: interior t.i. demo of non-structural partitions, new partitions and relocated light fixtures. | $200,000 |
| Mar 21, 2023 | Completed final sign-off Aug 2023 | 155 Montgomery St | suite 301: t.i. demo nonstructural partitions, new partitions, grid ceiling/light fixtures @ new offices, relocate light fixturesDetails
suite 301: t.i. demo nonstructural partitions, new partitions, grid ceiling/light fixtures @ new offices, relocate light fixtures | $137,795 |
| Mar 2, 2023 | Completed final sign-off Dec 2023 | 180 Montgomery St | 23rd fl, ste 2340 - 1742 sf interior tenant finish for dental office ti. fully sprinkleredDetails
23rd fl, ste 2340 - 1742 sf interior tenant finish for dental office ti. fully sprinklered | $250,000 |
| Jan 12, 2023 | Never finaled issued Jan 2023, no final | 1 Sansome St | 1st floor and basement: revision to pa# 202207188670 walk-in cooler & storage rm locations.Details
1st floor and basement: revision to pa# 202207188670 walk-in cooler & storage rm locations. | |
| Nov 10, 2022 | Completed final sign-off Mar 2023 | 155 Montgomery St | 15/f interior ti: addition of 4 window line offices and 1 conference room. new non-structural partitions, finishes & relocated lighting.Details
15/f interior ti: addition of 4 window line offices and 1 conference room. new non-structural partitions, finishes & relocated lighting. | $143,705 |
| Oct 21, 2022 | Completed final sign-off Mar 2024 | 358 Brannan St | to comply w/city planning complaint #2020088enf, remove storefront & brannan facade, legalize varney place facadeDetails
to comply w/city planning complaint #2020088enf, remove storefront & brannan facade, legalize varney place facade | $8,000 |
| Sep 27, 2022 | Completed final sign-off Jul 2023 | 730 Polk St | add fire rated access door 18x18 to existing 2nd fl elevator shaft. revision to permit 202205234748.Details
add fire rated access door 18x18 to existing 2nd fl elevator shaft. revision to permit 202205234748. | $2,000 |
| Aug 11, 2022 | Completed final sign-off Sep 2022 | 44 Montgomery St | 33rd fl, ste #3340: demo of (e) partition, doors, millwork. electrical, plumbing and finishes. fire sprinklers under separate permit. currently unoccupied untll future tenant buildout ab-017.Details
33rd fl, ste #3340: demo of (e) partition, doors, millwork. electrical, plumbing and finishes. fire sprinklers under separate permit. currently unoccupied untll future tenant buildout ab-017. | $50,000 |
| Aug 11, 2022 | Completed final sign-off Mar 2023 | 44 Montgomery St | 14/f, ste #1480: demo (e) partition & associated power /data, fl finishes & lighting construction of (n) partitions, doors, power and tele/data, lighting, millwork & finishes. mep. lfs & sprinkler under separated permitDetails
14/f, ste #1480: demo (e) partition & associated power /data, fl finishes & lighting construction of (n) partitions, doors, power and tele/data, lighting, millwork & finishes. mep. lfs & sprinkler under separated permit | $350,000 |
| Aug 11, 2022 | Completed final sign-off Feb 2023 | 44 Montgomery St | 8/f: ste 850: limited dmeo of partitions, power, flooring, millwork, lhgiting and finshes. construction of limited partitions power, finishes & millwork. some (e) lighting to be rmeoved & relocated mep & fls deferred.Details
8/f: ste 850: limited dmeo of partitions, power, flooring, millwork, lhgiting and finshes. construction of limited partitions power, finishes & millwork. some (e) lighting to be rmeoved & relocated mep & fls deferred. | $216,000 |
| Aug 11, 2022 | Completed final sign-off Feb 2023 | 44 Montgomery St | 12/f consist of combining ste 1250 and 1288 to create one ste. demo includes partitions, pwr/data, flooring, millwork, lighting and finishes. construction includes (n) partitions, doors power, lighting, finishes and millwork. all (n) lighting to be replaced w/ (n) title 24 mep. l/s and deffered mep.Details
12/f consist of combining ste 1250 and 1288 to create one ste. demo includes partitions, pwr/data, flooring, millwork, lighting and finishes. construction includes (n) partitions, doors power, lighting, finishes and millwork. all (n) lighting to be replaced w/ (n) title 24 mep. l/s and deffered mep. | $570,000 |
| Aug 11, 2022 | Completed final sign-off Feb 2023 | 44 Montgomery St | 42/f ste 4205 consists of limited demo includes partitions, ceiling, power, flooring, millwork, lighting and finishes. construction of limited partitions ceiling,power, lighting, finishes and millwork. all lighting in ste 4205 to be replaced w/ (n) in (e) locations. deffered mep and l/s.Details
42/f ste 4205 consists of limited demo includes partitions, ceiling, power, flooring, millwork, lighting and finishes. construction of limited partitions ceiling,power, lighting, finishes and millwork. all lighting in ste 4205 to be replaced w/ (n) in (e) locations. deffered mep and l/s. | $200,000 |
| Aug 4, 2022 | Completed final sign-off Nov 2023 | 650 Townsend St | infilling an abandoned elevator pit under an existing hallway elevator pit is not visible from street view.Details
infilling an abandoned elevator pit under an existing hallway elevator pit is not visible from street view. | $48,000 |
| Aug 3, 2022 | Completed final sign-off May 2023 | 180 Montgomery St | ste 600 - work include selective demo and construction of non-load bearing partitions, light fixtures relocation and new, re-switching, new office doors & frames; millwork & new finishes (mep deferred)Details
ste 600 - work include selective demo and construction of non-load bearing partitions, light fixtures relocation and new, re-switching, new office doors & frames; millwork & new finishes (mep deferred) | $185,000 |
| Jul 18, 2022 | Completed final sign-off Feb 2024 | 1 Sansome St | bar and retail t.i. basement: walk in cooler, storage room, upgrade to staff restrooms. 1/f renovation: new bar/retail, existing kitchen upgrades.Details
bar and retail t.i. basement: walk in cooler, storage room, upgrade to staff restrooms. 1/f renovation: new bar/retail, existing kitchen upgrades. | $800,000 |
| Jul 14, 2022 | Completed final sign-off Nov 2022 | 108 Cole St | rev to pa 202204122039 repair non conforming guardrail per ab 005Details
rev to pa 202204122039 repair non conforming guardrail per ab 005 | |
| Jun 21, 2022 | Completed final sign-off Jan 2023 | 180 Montgomery St | suite 1250 on 12th fl: work include: selective demo and construction of non bearing partitions (e) modification of ceiling grid and tile life fixture. mep deferred.Details
suite 1250 on 12th fl: work include: selective demo and construction of non bearing partitions (e) modification of ceiling grid and tile life fixture. mep deferred. | $535,000 |
| Jun 14, 2022 | Completed final sign-off Sep 2022 | 180 Montgomery St | ste 1260: selective demo and construction of non bearing partitions. modification to existing ceiling grid and tile, light fixture relocation and new office doors and frames. mep deferred.Details
ste 1260: selective demo and construction of non bearing partitions. modification to existing ceiling grid and tile, light fixture relocation and new office doors and frames. mep deferred. | $94,000 |
| May 23, 2022 | Never finaled issued May 2022, no final | 730 Polk St | 2/f add fire-rated access door (~8"x8") to existing 2nd floor elevator shaft.Details
2/f add fire-rated access door (~8"x8") to existing 2nd floor elevator shaft. | $2,000 |
| May 9, 2022 | Completed final sign-off Oct 2022 | 155 Montgomery St | int ti: 3 window line office. new non-structural partitions & finishes. relocated lighting. mep, fire, and life safety under separate permit. 5th floor ti in this case.Details
int ti: 3 window line office. new non-structural partitions & finishes. relocated lighting. mep, fire, and life safety under separate permit. 5th floor ti in this case. | $100,000 |
| Apr 28, 2022 | Completed final sign-off Nov 2022 | 180 Montgomery St | ste #1750: work include selective demolition and construction of non-load bearing partitions. modification to ceilling grid and tile, light fixture relocation and new/re-switching, new office doors and frames and new finishes.Details
ste #1750: work include selective demolition and construction of non-load bearing partitions. modification to ceilling grid and tile, light fixture relocation and new/re-switching, new office doors and frames and new finishes. | $93,130 |
| Apr 28, 2022 | Completed final sign-off Nov 2022 | 180 Montgomery St | ste #1950: work include selective demolition and construction of non-load bearing partitions. modification to ceiling grid and tile, light fixture relocation and new/re-switching, new office doors and frames and new finishes.Details
ste #1950: work include selective demolition and construction of non-load bearing partitions. modification to ceiling grid and tile, light fixture relocation and new/re-switching, new office doors and frames and new finishes. | $521,120 |
| Apr 25, 2022 | Completed final sign-off Oct 2022 | 155 Montgomery St | 7th fl: interior tenant improvement - new non-structural partitions & finishes. mep & fire safety under separate permit.Details
7th fl: interior tenant improvement - new non-structural partitions & finishes. mep & fire safety under separate permit. | $55,000 |
| Apr 12, 2022 | Completed final sign-off Nov 2022 | 108 Cole St | demo of restroom on 2nd fl, including accessories, adjacent bedroom closet and (1) water closet. at exterior, deck slats to be demo and replaced with (n). 2nd fl receives (2) restrooms with (n) floring and accessories.Details
demo of restroom on 2nd fl, including accessories, adjacent bedroom closet and (1) water closet. at exterior, deck slats to be demo and replaced with (n). 2nd fl receives (2) restrooms with (n) floring and accessories. | $100,000 |
| Feb 8, 2022 | Completed final sign-off Oct 2022 | 155 Montgomery St | 15/f: interior t.i. removal and new non structural partitions, break finishes, millwork, mep, and fire life safety under sep permit.Details
15/f: interior t.i. removal and new non structural partitions, break finishes, millwork, mep, and fire life safety under sep permit. | $350,000 |
| Dec 21, 2021 | Completed final sign-off Oct 2022 | 44 Montgomery St | suite 3500: rev pa202106253267 - shift copy/panty 3517 wall south, relocate cabinetry to east corridor wall and add additional pocket door. replace (1) 2x4 troffer light with decorative pendant.Details
suite 3500: rev pa202106253267 - shift copy/panty 3517 wall south, relocate cabinetry to east corridor wall and add additional pocket door. replace (1) 2x4 troffer light with decorative pendant. | |
| Sep 10, 2021 | Completed final sign-off Jan 2022 | 601 California St | 19th fl ti minoe demo full fl occupied ste to add 3 new offices split (1) lrg office into (2) and convert (1) i.t. into an office. includes new ceiling height partitions; doors, frame and hardware; power/data; ceiling adjustments, and touch up finishes. mep, sprinkler and/or life safty deferredDetails
19th fl ti minoe demo full fl occupied ste to add 3 new offices split (1) lrg office into (2) and convert (1) i.t. into an office. includes new ceiling height partitions; doors, frame and hardware; power/data; ceiling adjustments, and touch up finishes. mep, sprinkler and/or life safty deferred | $95,000 |
| Aug 10, 2021 | Completed final sign-off Dec 2021 | 655 Montgomery St | 20/f: add linear diffusers at wood slat ceiling. replace all ceiling supply diffusers and return air/exhaust grilles with new per plans. provide sheet metal ductwork and insulation on new ductwork only. add 3 ddc thermostats and control wiring for (e) hvac system. final air balance for space.Details
20/f: add linear diffusers at wood slat ceiling. replace all ceiling supply diffusers and return air/exhaust grilles with new per plans. provide sheet metal ductwork and insulation on new ductwork only. add 3 ddc thermostats and control wiring for (e) hvac system. final air balance for space. | $40,000 |
| Jul 30, 2021 | Completed final sign-off Oct 2021 | 3065 Jackson St | mechanical & electrical improvements to 2 classrooms space. t.i.project - no structural. ref t.i. pa202106102150 & 202108116261Details
mechanical & electrical improvements to 2 classrooms space. t.i.project - no structural. ref t.i. pa202106102150 & 202108116261 | $75,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 601 California St | 5/f: demo a wing wall and inter-suite door.construction includes wall infiill & a new coffee service aera. any alt to mep,sprinkler,life safety under sep permits. maher n/a.Details
5/f: demo a wing wall and inter-suite door.construction includes wall infiill & a new coffee service aera. any alt to mep,sprinkler,life safety under sep permits. maher n/a. | $45,000 |
| Jun 30, 2021 | Completed final sign-off Dec 2021 | 601 California St | 13th floor: buildlout of a vacant shell space. includes conference room, offices, break area, new partitions, d/f/h, casework, power, plumbing, ceiling and lights, etc. any new and/or alteration to mep, sprinkler & life safety systems will be under separate permits.Details
13th floor: buildlout of a vacant shell space. includes conference room, offices, break area, new partitions, d/f/h, casework, power, plumbing, ceiling and lights, etc. any new and/or alteration to mep, sprinkler & life safety systems will be under separate permits. | $185,000 |
| Jun 25, 2021 | Completed final sign-off Oct 2022 | 44 Montgomery St | suite 3500: demo of partitions, power, flooring, millwork, lighting and finishes. construction of limited partitions, power, lighitng, finishes and millwork. all lighting to be replaced with new in (e) location to accomodate t24. mep, fire/life safety is defered. maher n/a.Details
suite 3500: demo of partitions, power, flooring, millwork, lighting and finishes. construction of limited partitions, power, lighitng, finishes and millwork. all lighting to be replaced with new in (e) location to accomodate t24. mep, fire/life safety is defered. maher n/a. | $261,356 |
| May 13, 2021 | Completed final sign-off Dec 2021 | 185 Berry St | berry bldg - unit #350: lighting retrofitDetails
berry bldg - unit #350: lighting retrofit | $6,000 |
| May 12, 2021 | Completed final sign-off Dec 2021 | 185 Berry St | suite 350, room 385, 386: remove existing wall to convert existing lunch room to open breakroom. new sidelite at existing office.Details
suite 350, room 385, 386: remove existing wall to convert existing lunch room to open breakroom. new sidelite at existing office. | $75,000 |
| May 5, 2021 | Completed final sign-off Nov 2021 | 180 Montgomery St | 17th fl/ste #1700 - this project involves modification of (e) t.i. to include selective demo and construction of non-bearing partitions, modificate to ceilings & lighting, new doors & frames and new finishes.Details
17th fl/ste #1700 - this project involves modification of (e) t.i. to include selective demo and construction of non-bearing partitions, modificate to ceilings & lighting, new doors & frames and new finishes. | $300,000 |
| Apr 29, 2021 | Completed final sign-off Oct 2021 | 1155 Market St | barrier removal. new handrails in 2 stairwells from the 1st floor to the 11th fl.Details
barrier removal. new handrails in 2 stairwells from the 1st floor to the 11th fl. | $120,000 |
| Apr 20, 2021 | Completed final sign-off May 2022 | 250 Montgomery St | suite 1210, 12th fl ti: demolition of existing partitions, act ceiling & millwork. provide new millwork, act ceiling, lighting fixtures & finishes.Details
suite 1210, 12th fl ti: demolition of existing partitions, act ceiling & millwork. provide new millwork, act ceiling, lighting fixtures & finishes. | $295,780 |
| Feb 4, 2021 | Expired or cancelled withdrawn Jul 2021 | 1550 Wallace Av | ti & change of use commercial storage to cannbis cultivation facility w/in (e) warehouse bldg. ext'r scope consists of (n)(e)door in (e)overhead sectional door & (2)class(2)bike parking. int'r scope consists of (n)prefab partitions for cultivation & drying rooms, rated egress corridor, ada accessDetails
ti & change of use commercial storage to cannbis cultivation facility w/in (e) warehouse bldg. ext'r scope consists of (n)(e)door in (e)overhead sectional door & (2)class(2)bike parking. int'r scope consists of (n)prefab partitions for cultivation & drying rooms, rated egress corridor, ada access | $120,000 |
| Dec 3, 2020 | Completed final sign-off Dec 2021 | 655 Montgomery St | interior t.i.. 4th fl full restroom upgrades. 14th fl minor upgrades to restroom, common corridor, lobby. 19th fl upgrades to restroom, common corridor, lobby. elctrical, plumbing, fire, life safety under separate permit. mech n/a.Details
interior t.i.. 4th fl full restroom upgrades. 14th fl minor upgrades to restroom, common corridor, lobby. 19th fl upgrades to restroom, common corridor, lobby. elctrical, plumbing, fire, life safety under separate permit. mech n/a. | $480,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2022 | 155 Montgomery St | 11th flr tenant improvement. removal and new non-structural partitions, break finishes, millwork. mep and fire life safety under separate permit.Details
11th flr tenant improvement. removal and new non-structural partitions, break finishes, millwork. mep and fire life safety under separate permit. | $550,879 |
| Oct 19, 2020 | Completed final sign-off Mar 2022 | 155 Montgomery St | suite 300: removal and new non-structural partitions, break, finishes, millwork. mep and fire life safety under separate permit.Details
suite 300: removal and new non-structural partitions, break, finishes, millwork. mep and fire life safety under separate permit. | $387,840 |
| Oct 19, 2020 | Completed final sign-off Mar 2022 | 155 Montgomery St | suite 600: removal and new non-structural partitions, break, finishes, millwork. mep and fire life safety under separate permit.Details
suite 600: removal and new non-structural partitions, break, finishes, millwork. mep and fire life safety under separate permit. | $539,369 |
| Sep 12, 2020 | Completed final sign-off Jan 2021 | 303 02nd St | restroom upgrades on 3/f scope of work includes new stall partitions, reinstalling (e) plumbing fixtures & restroom accessories, or providing new as required. scope of work to be barrier removal only.Details
restroom upgrades on 3/f scope of work includes new stall partitions, reinstalling (e) plumbing fixtures & restroom accessories, or providing new as required. scope of work to be barrier removal only. | $75,000 |
| Aug 6, 2020 | Completed final sign-off Aug 2021 | 235 Pine St | 17th fl, ti - minor demo of (e) partitions & addition of entrance door. (n) construction to include interior partitions, minor work with (e) ceiling tiles, (n) doors, minor addition to (e) mech systems, (n) break area, (n) light fixtures & additions to (e) elec fixtures & equipmentDetails
17th fl, ti - minor demo of (e) partitions & addition of entrance door. (n) construction to include interior partitions, minor work with (e) ceiling tiles, (n) doors, minor addition to (e) mech systems, (n) break area, (n) light fixtures & additions to (e) elec fixtures & equipment | $500,000 |
| Jul 9, 2020 | Completed final sign-off Dec 2020 | 458 Jackson St | structural work comprises of repair to existing timbers and columns.Details
structural work comprises of repair to existing timbers and columns. | $40,000 |
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 155 Montgomery St | suite #500: interior tenant improvement- remodel of/and new non-strutural partitions, new break area, lighting and finishes, mep and fire life safety under seperate permitDetails
suite #500: interior tenant improvement- remodel of/and new non-strutural partitions, new break area, lighting and finishes, mep and fire life safety under seperate permit | $360,058 |
| Jun 16, 2020 | Completed final sign-off Aug 2020 | 180 Montgomery St | fire sprinkler tenant improvement. relocate 4 sprinklers on the 18th floor. reference permit # 2020-0220-4940Details
fire sprinkler tenant improvement. relocate 4 sprinklers on the 18th floor. reference permit # 2020-0220-4940 | $1,000 |
| Jun 9, 2020 | Completed final sign-off Mar 2021 | 410 Townsend St | basement: construction of new single user shower and restroom, new valet office and bike room storage at the basement level. maher n/aDetails
basement: construction of new single user shower and restroom, new valet office and bike room storage at the basement level. maher n/a | $260,000 |
| May 20, 2020 | Completed final sign-off Apr 2021 | 601 California St | 16/f - suite 1600: work consists of limited demolition of partitions, doors, frames and hardware, millwork, power/data and finishes. any alterations to mep, sprinkler & life safety systems will be under separate permits. maher n/a.Details
16/f - suite 1600: work consists of limited demolition of partitions, doors, frames and hardware, millwork, power/data and finishes. any alterations to mep, sprinkler & life safety systems will be under separate permits. maher n/a. | $40,000 |
| Feb 20, 2020 | Completed final sign-off Dec 2020 | 180 Montgomery St | #1850: the project involves modification of an extg t.i. to include selective demolition of non-load bearing partitions, extg modification to ceiling grid and tile, new light fixtures and reswitching, new millwork and new finishes.Details
#1850: the project involves modification of an extg t.i. to include selective demolition of non-load bearing partitions, extg modification to ceiling grid and tile, new light fixtures and reswitching, new millwork and new finishes. | $150,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2021 | 601 California St | scope includes 16 new fire smoke dampers and associated rated duct enclosures at corner and core shaft locationsDetails
scope includes 16 new fire smoke dampers and associated rated duct enclosures at corner and core shaft locations | $35,000 |
| Feb 11, 2020 | Completed final sign-off Jun 2020 | 155 Montgomery St | 12/f: permit revision to pa#201907155890, tenant improvement on 12/f, new ceiling tile & grid & fixtures in open ceiling area. mep and fire safety separate permit.Details
12/f: permit revision to pa#201907155890, tenant improvement on 12/f, new ceiling tile & grid & fixtures in open ceiling area. mep and fire safety separate permit. | $55,000 |
| Feb 11, 2020 | Completed final sign-off Dec 2021 | 655 Montgomery St | 20th floor: demo of extg partitions, plmg, lighting, ceilings, power. install of new partitions, plmg, lighting, ceilings, power and finishes, ada upgrades and millwork. mep, life safety and sprinklers and deferred submittals.Details
20th floor: demo of extg partitions, plmg, lighting, ceilings, power. install of new partitions, plmg, lighting, ceilings, power and finishes, ada upgrades and millwork. mep, life safety and sprinklers and deferred submittals. | $450,000 |
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 300 Montgomery St | 4th fkl - revision to pa 2019-0909-1019 remove nic hatch in restrooms. add 1 hr shaft around duct in ceilingDetails
4th fkl - revision to pa 2019-0909-1019 remove nic hatch in restrooms. add 1 hr shaft around duct in ceiling | $10,000 |
| Jan 31, 2020 | Completed final sign-off Aug 2020 | 100 01st St | accessibility improvements to the restrooms on the 17th fl. scope of work includes barrier removal only deferred mep life safety fire sprinklers fire alarmDetails
accessibility improvements to the restrooms on the 17th fl. scope of work includes barrier removal only deferred mep life safety fire sprinklers fire alarm | $78,000 |
| Jan 31, 2020 | Completed final sign-off Sep 2020 | 100 01st St | accessibility improvements to the restrooms on the 12th fl. scope of work includes barrier removal only deferred mep life safety fire sprinklers fire alarmDetails
accessibility improvements to the restrooms on the 12th fl. scope of work includes barrier removal only deferred mep life safety fire sprinklers fire alarm | $55,000 |
| Jan 31, 2020 | Completed final sign-off Sep 2020 | 100 01st St | accessibility improvements to the restrooms on the 16th fl. scope of work includes barrier removal only deferred mep life safety fire sprinklers fire alarmDetails
accessibility improvements to the restrooms on the 16th fl. scope of work includes barrier removal only deferred mep life safety fire sprinklers fire alarm | $55,000 |
| Dec 20, 2019 | Completed final sign-off May 2021 | 650 Townsend St | basement - interior ti includes demo of (e) partitions, floor finishes, ceiling & lighting. (n) partitions, doors, poiwer & tele/data, lighting & millwork. mep deferredDetails
basement - interior ti includes demo of (e) partitions, floor finishes, ceiling & lighting. (n) partitions, doors, poiwer & tele/data, lighting & millwork. mep deferred | $1,750,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2021 | 121 Spear St | suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permitDetails
suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit | $2,343,634 |
| Nov 6, 2019 | Completed final sign-off Aug 2020 | 410 Townsend St | upgrading path of travel elements. installation of new wheel guards at lobby pedestrian ramp, new door opener at exterior entrance, and truncated domes and signage at basement level.Details
upgrading path of travel elements. installation of new wheel guards at lobby pedestrian ramp, new door opener at exterior entrance, and truncated domes and signage at basement level. | $15,000 |
| Nov 5, 2019 | Completed final sign-off Jul 2021 | 601 California St | 16th floor: project consist of upgrading finishes & replacing fixtures and lighting in core restrooms. any alteration to mep, sprinkler, or fire life safety will be under separate permit.Details
16th floor: project consist of upgrading finishes & replacing fixtures and lighting in core restrooms. any alteration to mep, sprinkler, or fire life safety will be under separate permit. | $115,000 |
| Sep 16, 2019 | Never finaled issued Oct 2019, no final | 180 Montgomery St | tenant improvement to include selective demo and construction of non load bearing partitions, e modification to ceiling grid and tile, light fixture relocation and switch new office doors and frames, new millworkDetails
tenant improvement to include selective demo and construction of non load bearing partitions, e modification to ceiling grid and tile, light fixture relocation and switch new office doors and frames, new millwork | $132,000 |
| Sep 9, 2019 | Never finaled issued Dec 2019, no final | 300 Montgomery St | 4th fl - interior ti. removal of non-structural partitions. new finishes and lighting. mep, fire, life safety and sprinkler under separate permitDetails
4th fl - interior ti. removal of non-structural partitions. new finishes and lighting. mep, fire, life safety and sprinkler under separate permit | $900,000 |
| Aug 2, 2019 | Never finaled issued Aug 2019, no final | 535 Pacific Av | ti to include removal of existing finishes, construction of non-load bearing partitions, new ceiling grid and tile, new light fixtures and new switching, new office doors and frames, new millwork and new sink and new finishesDetails
ti to include removal of existing finishes, construction of non-load bearing partitions, new ceiling grid and tile, new light fixtures and new switching, new office doors and frames, new millwork and new sink and new finishes | $500,000 |
| Jul 19, 2019 | Completed final sign-off Oct 2019 | 655 Montgomery St | ste 1490 - interior ti removal of non-structural partitions, offices, light fixtures and finishes. mep, fire and life safety and sprinkler under separate permitDetails
ste 1490 - interior ti removal of non-structural partitions, offices, light fixtures and finishes. mep, fire and life safety and sprinkler under separate permit | $100,000 |
| Jul 15, 2019 | Completed final sign-off Jun 2020 | 155 Montgomery St | 12th fl - interior tenant improvement - non structural partitions, finishes, break and millwork. mep and fire safety under separate permitDetails
12th fl - interior tenant improvement - non structural partitions, finishes, break and millwork. mep and fire safety under separate permit | $400,000 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 155 Montgomery St | ste 901 - interior ti removal and new non-structural partitions, break, finishes, millwork. mep and fire life safety under separate permitDetails
ste 901 - interior ti removal and new non-structural partitions, break, finishes, millwork. mep and fire life safety under separate permit | $200,000 |
| Jul 8, 2019 | Completed final sign-off Mar 2020 | 655 Montgomery St | 17th floor, ste 1720: demo of existing partitions and associated power/data, finishes, millwork and lighting. construction of new partitions, doors, power/data, lighting, millwork, plumbing and finishes. mep and life safety deferred submittal.Details
17th floor, ste 1720: demo of existing partitions and associated power/data, finishes, millwork and lighting. construction of new partitions, doors, power/data, lighting, millwork, plumbing and finishes. mep and life safety deferred submittal. | $538,000 |