Source Planning And Construction Inc

Contractor license
950183
State license record
Based in
San Francisco
On San Francisco permits
Oct 2010 to Sep 2026
Last 24 months
136 permits filed

811 permits since 2000: 628 completed, 52 in progress, 122 never finaled, 9 expired or cancelled.

Of the 122 never-finaled permits, 15 are 3 to 5 years old, 57 are 5 to 10 years old, 50 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 1Stairs 26Kitchen remodel 4Bathroom remodel 5

Showing the 100 most recent of 811.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 30, 2026In progress
issued Sep 2026
101 California St46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494
Details
Permit
202609308804
Status
issued
Filed
Sep 30, 2026
Permit issued
Sep 30, 2026
Declared cost
$35,000
Address
101 California St

46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494

Open the permit page

$35,000
Sep 30, 2026In progress
issued Sep 2026
101 California St39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369
Details
Permit
202609308800
Status
issued
Filed
Sep 30, 2026
Permit issued
Sep 30, 2026
Declared cost
$35,000
Address
101 California St

39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369

Open the permit page

$35,000
Sep 29, 2026In progress
issued Sep 2026
101 California St10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884
Details
Permit
202609298784
Status
issued
Filed
Sep 29, 2026
Permit issued
Sep 30, 2026
Declared cost
$35,000
Address
101 California St

10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884

Open the permit page

$35,000
Sep 16, 2026In progress
issued Sep 2026
300 Mission St14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633
Details
Permit
202609168175
Status
issued
Filed
Sep 16, 2026
Permit issued
Sep 24, 2026
Declared cost
$50,000
Address
300 Mission St

14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633

Open the permit page

$50,000
Sep 15, 2026In progress
issued Sep 2026
300 Mission St14th - floor (5) evacuation maps.
Details
Permit
202609158119
Status
issued
Filed
Sep 15, 2026
Permit issued
Sep 15, 2026
Declared cost
$3,000
Address
300 Mission St

14th - floor (5) evacuation maps.

Open the permit page

$3,000
Sep 10, 2026In progress
issued Sep 2026
888 Brannan St1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuanc
Details
Permit
202609107888
Status
issued
Filed
Sep 10, 2026
Permit issued
Sep 30, 2026
Declared cost
$250,000
Address
888 Brannan St

1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuanc

Open the permit page

$250,000
Sep 10, 2026In progress
issued Sep 2026
101 02nd St8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers
Details
Permit
202609107930
Status
issued
Filed
Sep 10, 2026
Permit issued
Sep 10, 2026
Declared cost
$92,450
Address
101 02nd St

8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers

Open the permit page

$92,450
Aug 27, 2026In progress
issued Sep 2026
101 California St47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits.
Details
Permit
202608277286
Status
issued
Filed
Aug 27, 2026
Permit issued
Sep 21, 2026
Declared cost
$202,000
Address
101 California St

47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits.

Open the permit page

$202,000
Aug 20, 2026In progress
issued Sep 2026
1 Beach St1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred.
Details
Permit
202608206913
Status
issued
Filed
Aug 20, 2026
Permit issued
Sep 11, 2026
Declared cost
$574,044
Address
1 Beach St

1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred.

Open the permit page

$574,044
Aug 17, 2026In progress
issued Sep 2026
55 Spear St18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.
Details
Permit
202608176695
Status
issued
Filed
Aug 17, 2026
Permit issued
Sep 24, 2026
Declared cost
$37,488
Address
55 Spear St

18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.

Open the permit page

$37,488
Aug 13, 2026In progress
issued Aug 2026
1 Embarcadero Center11floor: high rise common corridor, elevator lobby, restroom lighting remodel. new lighting fixtures and associated circuiting/ controls ref bpa: 202512222453
Details
Permit
202608136536
Status
issued
Filed
Aug 13, 2026
Permit issued
Aug 13, 2026
Declared cost
$85,000
Address
1 Embarcadero Center

11floor: high rise common corridor, elevator lobby, restroom lighting remodel. new lighting fixtures and associated circuiting/ controls ref bpa: 202512222453

Open the permit page

$85,000
Aug 10, 2026In progress
issued Sep 2026
539 Bryant Sttenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening.
Details
Permit
202608106298
Status
issued
Filed
Aug 10, 2026
Permit issued
Sep 21, 2026
Declared cost
$89,646
Address
539 Bryant St

tenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening.

Open the permit page

$89,646
Jul 30, 2026In progress
issued Sep 2026
1 Beach St3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishes
Details
Permit
202607305827
Status
issued
Filed
Jul 30, 2026
Permit issued
Sep 11, 2026
Address
1 Beach St

3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishes

Open the permit page

Jul 22, 2026In progress
issued Aug 2026
101 California St39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491
Details
Permit
202607225369
Status
issued
Filed
Jul 22, 2026
Permit issued
Aug 12, 2026
Declared cost
$202,000
Address
101 California St

39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491

Open the permit page

$202,000
Jul 22, 2026In progress
issued Aug 2026
300 Mission St14th floor: electrical for pa #202605201633 project.
Details
Permit
202607225388
Status
issued
Filed
Jul 22, 2026
Permit issued
Aug 14, 2026
Declared cost
$573,000
Address
300 Mission St

14th floor: electrical for pa #202605201633 project.

Open the permit page

$573,000
Jul 22, 2026In progress
issued Aug 2026
101 California St45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491
Details
Permit
202607225371
Status
issued
Filed
Jul 22, 2026
Permit issued
Aug 12, 2026
Declared cost
$202,000
Address
101 California St

45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491

Open the permit page

$202,000
Jul 14, 2026In progress
issued Jul 2026
101 02nd St8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.
Details
Permit
202607144969
Status
issued
Filed
Jul 14, 2026
Permit issued
Jul 17, 2026
Declared cost
$324,000
Address
101 02nd St

8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.

Open the permit page

$324,000
Jul 14, 2026Completed
final sign-off Sep 2026
345 Spear St2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.
Details
Permit
202607145001
Status
complete
Filed
Jul 14, 2026
Permit issued
Jul 20, 2026
Final sign-off
Sep 11, 2026
Declared cost
$30,000
Address
345 Spear St

2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.

Open the permit page

$30,000
Jul 13, 2026In progress
issued Jul 2026
300 Mission St14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room.
Details
Permit
202607134900
Status
issued
Filed
Jul 13, 2026
Permit issued
Jul 20, 2026
Declared cost
$513,000
Address
300 Mission St

14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room.

Open the permit page

$513,000
Jun 29, 2026In progress
issued Jun 2026
55 Spear St17th fl structural for high density files. ref 202606032446
Details
Permit
202606294121
Status
issued
Filed
Jun 29, 2026
Permit issued
Jun 30, 2026
Address
55 Spear St

17th fl structural for high density files. ref 202606032446

Open the permit page

Jun 23, 2026In progress
issued Jun 2026
345 California Stmep deferred. partial 24th floor office ti. demo of some interior non bearing walls, ceiling, lighting, electrical. construction of new full height partitions, doors, glazing, millwork, and finishes.
Details
Permit
202606233688
Status
issued
Filed
Jun 23, 2026
Permit issued
Jun 23, 2026
Declared cost
$342,850
Address
345 California St

mep deferred. partial 24th floor office ti. demo of some interior non bearing walls, ceiling, lighting, electrical. construction of new full height partitions, doors, glazing, millwork, and finishes.

Open the permit page

$342,850
Jun 23, 2026In progress
issued Jul 2026
345 California St24th floor: mechanical: duct distribution to be modified to serve new space plan in area of work. 5 new vav boxes are being added. electrical: new led light fixtures and power and signal. plumbing: new plumbing in pantry. ref pa #202606233688
Details
Permit
202606233756
Status
issued
Filed
Jun 23, 2026
Permit issued
Jul 7, 2026
Declared cost
$375,000
Address
345 California St

24th floor: mechanical: duct distribution to be modified to serve new space plan in area of work. 5 new vav boxes are being added. electrical: new led light fixtures and power and signal. plumbing: new plumbing in pantry. ref pa #202606233688

Open the permit page

$375,000
Jun 18, 2026In progress
issued Jun 2026
101 California St46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes
Details
Permit
202606183494
Status
issued
Filed
Jun 18, 2026
Permit issued
Jun 23, 2026
Declared cost
$250,000
Address
101 California St

46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes

Open the permit page

$250,000
Jun 17, 2026Completed
final sign-off Sep 2026
345 Spear St2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work
Details
Permit
202606173460
Status
complete
Filed
Jun 17, 2026
Permit issued
Jun 22, 2026
Final sign-off
Sep 11, 2026
Declared cost
$30,000
Address
345 Spear St

2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work

Open the permit page

$30,000
Jun 9, 2026In progress
issued Jun 2026
550 Kearny St5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.
Details
Permit
202606092869
Status
issued
Filed
Jun 9, 2026
Permit issued
Jun 10, 2026
Declared cost
$75,000
Address
550 Kearny St

5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.

Open the permit page

$75,000
Jun 5, 2026In progress
filed Jun 2026, not yet issued
550 Kearny St5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.
Details
Permit
202606052686
Status
filed
Filed
Jun 5, 2026
Address
550 Kearny St

5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.

Open the permit page

Jun 3, 2026In progress
issued Jun 2026
55 Spear Stspear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps.
Details
Permit
202606032446
Status
issued
Filed
Jun 3, 2026
Permit issued
Jun 11, 2026
Declared cost
$2,199
Address
55 Spear St

spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps.

Open the permit page

$2,199
Jun 3, 2026In progress
issued Jun 2026
55 Spear St18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.
Details
Permit
202606032408
Status
issued
Filed
Jun 3, 2026
Permit issued
Jun 18, 2026
Declared cost
$3,279,000
Address
55 Spear St

18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.

Open the permit page

$3,279,000
May 20, 2026In progress
issued Jun 2026
300 Mission St14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred.
Details
Permit
202605201633
Status
issued
Filed
May 20, 2026
Permit issued
Jun 10, 2026
Declared cost
$2,000,000
Address
300 Mission St

14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred.

Open the permit page

$2,000,000
May 19, 2026Completed
final sign-off Sep 2026
55 Spear St16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower)
Details
Permit
202605191497
Status
complete
Filed
May 19, 2026
Permit issued
May 19, 2026
Final sign-off
Sep 30, 2026
Declared cost
$150,000
Address
55 Spear St

16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower)

Open the permit page

$150,000
May 18, 2026In progress
issued May 2026
101 02nd Stsuite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312
Details
Permit
202605181420
Status
issued
Filed
May 18, 2026
Permit issued
May 18, 2026
Declared cost
$70,000
Address
101 02nd St

suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312

Open the permit page

$70,000
May 14, 2026In progress
issued May 2026
101 02nd Stunit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312
Details
Permit
202605141296
Status
issued
Filed
May 14, 2026
Permit issued
May 18, 2026
Declared cost
$54,000
Address
101 02nd St

unit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312

Open the permit page

$54,000
Apr 27, 2026In progress
issued Apr 2026
101 02nd St(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.
Details
Permit
202604270132
Status
issued
Filed
Apr 27, 2026
Permit issued
Apr 27, 2026
Address
101 02nd St

(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.

Open the permit page

Apr 16, 2026Completed
final sign-off Sep 2026
55 Spear St16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing
Details
Permit
202604169572
Status
complete
Filed
Apr 16, 2026
Permit issued
Apr 28, 2026
Final sign-off
Sep 30, 2026
Declared cost
$1,000,000
Address
55 Spear St

16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing

Open the permit page

$1,000,000
Apr 9, 2026In progress
issued Apr 2026
550 Kearny Stselective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.
Details
Permit
202604099141
Status
issued
Filed
Apr 9, 2026
Permit issued
Apr 28, 2026
Declared cost
$135,000
Address
550 Kearny St

selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.

Open the permit page

$135,000
Mar 27, 2026Completed
final sign-off May 2026
66 Kearny Strevision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.
Details
Permit
202603278413
Status
complete
Filed
Mar 27, 2026
Permit issued
Apr 21, 2026
Final sign-off
May 4, 2026
Address
66 Kearny St

revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.

Open the permit page

Mar 26, 2026In progress
issued Mar 2026
101 02nd St3/f suite 350 - work includes: new partitions, office door and glazing and mill work.
Details
Permit
202603268312
Status
issued
Filed
Mar 26, 2026
Permit issued
Mar 30, 2026
Declared cost
$125,000
Address
101 02nd St

3/f suite 350 - work includes: new partitions, office door and glazing and mill work.

Open the permit page

$125,000
Mar 23, 2026Completed
final sign-off Aug 2026
88 Kearny St7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered.
Details
Permit
202603238090
Status
complete
Filed
Mar 23, 2026
Permit issued
Mar 27, 2026
Final sign-off
Aug 25, 2026
Declared cost
$15,000
Address
88 Kearny St

7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered.

Open the permit page

$15,000
Mar 17, 2026In progress
issued Mar 2026
595 Market Stsuite 2450a: def mechanical & electrical for 202602135931.
Details
Permit
202603177684
Status
issued
Filed
Mar 17, 2026
Permit issued
Mar 19, 2026
Declared cost
$129,654
Address
595 Market St

suite 2450a: def mechanical & electrical for 202602135931.

Open the permit page

$129,654
Mar 13, 2026In progress
issued Mar 2026
1 Market St18th fl - selective interior demo only (ab-017) ref fire 26-158
Details
Permit
202603137530
Status
issued
Filed
Mar 13, 2026
Permit issued
Mar 19, 2026
Declared cost
$70,000
Address
1 Market St

18th fl - selective interior demo only (ab-017) ref fire 26-158

Open the permit page

$70,000
Mar 13, 2026In progress
issued Mar 2026
1 Market St17th fl - selective interior demo only (ab-017) ref 26-158
Details
Permit
202603137532
Status
issued
Filed
Mar 13, 2026
Permit issued
Mar 19, 2026
Declared cost
$70,000
Address
1 Market St

17th fl - selective interior demo only (ab-017) ref 26-158

Open the permit page

$70,000
Mar 12, 2026Completed
final sign-off Sep 2026
88 Kearny St20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen.
Details
Permit
202603127462
Status
complete
Filed
Mar 12, 2026
Permit issued
Mar 23, 2026
Final sign-off
Sep 1, 2026
Address
88 Kearny St

20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen.

Open the permit page

Mar 10, 2026Completed
final sign-off May 2026
66 Kearny St1st fl - meps for 202511260493
Details
Permit
202603107224
Status
complete
Filed
Mar 10, 2026
Permit issued
Mar 10, 2026
Final sign-off
May 12, 2026
Declared cost
$194,832
Address
66 Kearny St

1st fl - meps for 202511260493

Open the permit page

$194,832
Mar 6, 2026Completed
final sign-off May 2026
66 Kearny Strevision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours."
Details
Permit
202603067068
Status
complete
Filed
Mar 6, 2026
Permit issued
Mar 23, 2026
Final sign-off
May 4, 2026
Address
66 Kearny St

revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours."

Open the permit page

Mar 3, 2026Completed
final sign-off Sep 2026
88 Kearny St19th floor. add 2 ton wshp to serve 1df room.
Details
Permit
202603036837
Status
complete
Filed
Mar 3, 2026
Permit issued
Mar 5, 2026
Final sign-off
Sep 1, 2026
Address
88 Kearny St

19th floor. add 2 ton wshp to serve 1df room.

Open the permit page

Feb 26, 2026Completed
final sign-off Aug 2026
88 Kearny St4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms
Details
Permit
202602266574
Status
complete
Filed
Feb 26, 2026
Permit issued
Mar 27, 2026
Final sign-off
Aug 19, 2026
Declared cost
$12,000
Address
88 Kearny St

4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms

Open the permit page

$12,000
Feb 24, 2026Completed
final sign-off Mar 2026
345 Spear Stto obtain final inspection for work approved under pa # 202412116597. all work is complete.
Details
Permit
202602246427
Status
complete
Filed
Feb 24, 2026
Permit issued
Mar 5, 2026
Final sign-off
Mar 16, 2026
Address
345 Spear St

to obtain final inspection for work approved under pa # 202412116597. all work is complete.

Open the permit page

Feb 17, 2026Completed
final sign-off Sep 2026
88 Kearny St6/f: meps for t.i. 202511250447.
Details
Permit
202602176007
Status
complete
Filed
Feb 17, 2026
Permit issued
Feb 18, 2026
Final sign-off
Sep 9, 2026
Declared cost
$120,000
Address
88 Kearny St

6/f: meps for t.i. 202511250447.

Open the permit page

$120,000
Feb 17, 2026Completed
final sign-off Sep 2026
88 Kearny St11th fl - mep for pa 202511109302
Details
Permit
202602176029
Status
complete
Filed
Feb 17, 2026
Permit issued
Feb 18, 2026
Final sign-off
Sep 9, 2026
Declared cost
$350,000
Address
88 Kearny St

11th fl - mep for pa 202511109302

Open the permit page

$350,000
Feb 17, 2026Completed
final sign-off Sep 2026
88 Kearny St7/f: meps for t.i. 202511250451.
Details
Permit
202602176004
Status
complete
Filed
Feb 17, 2026
Permit issued
Feb 25, 2026
Final sign-off
Sep 9, 2026
Declared cost
$450,000
Address
88 Kearny St

7/f: meps for t.i. 202511250451.

Open the permit page

$450,000
Feb 13, 2026In progress
issued Feb 2026
595 Market St24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permit
Details
Permit
202602135931
Status
issued
Filed
Feb 13, 2026
Permit issued
Feb 19, 2026
Declared cost
$400,000
Address
595 Market St

24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permit

Open the permit page

$400,000
Feb 4, 2026Completed
final sign-off Sep 2026
88 Kearny St13th floor: add 3 ton wshp to serve mdf room.
Details
Permit
202602045180
Status
complete
Filed
Feb 4, 2026
Permit issued
Feb 25, 2026
Final sign-off
Sep 1, 2026
Declared cost
$55,000
Address
88 Kearny St

13th floor: add 3 ton wshp to serve mdf room.

Open the permit page

$55,000
Feb 4, 2026Completed
final sign-off Sep 2026
88 Kearny St20th fl - meps for pa 202511109312
Details
Permit
202602045210
Status
complete
Filed
Feb 4, 2026
Permit issued
Feb 5, 2026
Final sign-off
Sep 1, 2026
Declared cost
$307,000
Address
88 Kearny St

20th fl - meps for pa 202511109312

Open the permit page

$307,000
Jan 21, 2026Completed
final sign-off Aug 2026
88 Kearny St4th fl - ref arch 202510288260 mep for project
Details
Permit
202601214230
Status
complete
Filed
Jan 21, 2026
Permit issued
Jan 30, 2026
Final sign-off
Aug 19, 2026
Declared cost
$120,000
Address
88 Kearny St

4th fl - ref arch 202510288260 mep for project

Open the permit page

$120,000
Jan 21, 2026Completed
final sign-off Aug 2026
88 Kearny St18th floor: mep project. ref pa #202511048826
Details
Permit
202601214220
Status
complete
Filed
Jan 21, 2026
Permit issued
Jan 30, 2026
Final sign-off
Aug 25, 2026
Address
88 Kearny St

18th floor: mep project. ref pa #202511048826

Open the permit page

Dec 22, 2025In progress
issued May 2026
1 Embarcadero Center11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain.
Details
Permit
202512222453
Status
issued
Filed
Dec 22, 2025
Permit issued
May 18, 2026
Declared cost
$400,000
Address
1 Embarcadero Center

11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain.

Open the permit page

$400,000
Dec 11, 2025Completed
final sign-off Aug 2026
88 Kearny Stdeferred mep for 17th floor ti under permit 202510217772.
Details
Permit
202512111528
Status
complete
Filed
Dec 11, 2025
Permit issued
Jan 29, 2026
Final sign-off
Aug 25, 2026
Declared cost
$75,000
Address
88 Kearny St

deferred mep for 17th floor ti under permit 202510217772.

Open the permit page

$75,000
Dec 11, 2025Completed
final sign-off Aug 2026
88 Kearny St3rd/f mep for t.i. 202510147260: mep for project
Details
Permit
202512111531
Status
complete
Filed
Dec 11, 2025
Permit issued
Feb 9, 2026
Final sign-off
Aug 19, 2026
Declared cost
$145,000
Address
88 Kearny St

3rd/f mep for t.i. 202510147260: mep for project

Open the permit page

$145,000
Dec 11, 2025Completed
final sign-off Mar 2026
4 Embarcadero Centerdemo of level 28-level 29 convenience stairs & slab in-fill.
Details
Permit
202512111504
Status
complete
Filed
Dec 11, 2025
Permit issued
Dec 15, 2025
Final sign-off
Mar 25, 2026
Declared cost
$150,000
Address
4 Embarcadero Center

demo of level 28-level 29 convenience stairs & slab in-fill.

Open the permit page

$150,000
Dec 4, 2025Completed
final sign-off Feb 2026
121 Spear St2nd floor: addition of 7 phone booths in office space.
Details
Permit
202512041028
Status
complete
Filed
Dec 4, 2025
Permit issued
Dec 9, 2025
Final sign-off
Feb 3, 2026
Declared cost
$20,000
Address
121 Spear St

2nd floor: addition of 7 phone booths in office space.

Open the permit page

$20,000
Dec 1, 2025Completed
final sign-off Apr 2026
215 Fremont Stlevel 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406
Details
Permit
202512010652
Status
complete
Filed
Dec 1, 2025
Permit issued
Dec 22, 2025
Final sign-off
Apr 14, 2026
Declared cost
$640,000
Address
215 Fremont St

level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406

Open the permit page

$640,000
Dec 1, 2025In progress
issued Dec 2025
655 Montgomery St19/f: demo (e) toilet partitions and finishes and replace with (n). (n) bathroom finishes and fixtures and lighting.
Details
Permit
202512010657
Status
issued
Filed
Dec 1, 2025
Permit issued
Dec 12, 2025
Declared cost
$67,088
Address
655 Montgomery St

19/f: demo (e) toilet partitions and finishes and replace with (n). (n) bathroom finishes and fixtures and lighting.

Open the permit page

$67,088
Nov 26, 2025Completed
final sign-off May 2026
66 Kearny Stproject consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture.
Details
Permit
202511260493
Status
complete
Filed
Nov 26, 2025
Permit issued
Feb 10, 2026
Final sign-off
May 12, 2026
Declared cost
$800,000
Address
66 Kearny St

project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture.

Open the permit page

$800,000
Nov 25, 2025Completed
final sign-off Sep 2026
88 Kearny St6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263905
Details
Permit
202511250447
Status
complete
Filed
Nov 25, 2025
Permit issued
Dec 29, 2025
Final sign-off
Sep 9, 2026
Declared cost
$1,243,215
Address
88 Kearny St

6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263905

Open the permit page

$1,243,215
Nov 25, 2025Completed
final sign-off Sep 2026
88 Kearny St7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263899
Details
Permit
202511250451
Status
complete
Filed
Nov 25, 2025
Permit issued
Dec 3, 2025
Final sign-off
Sep 9, 2026
Declared cost
$1,251,419
Address
88 Kearny St

7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263899

Open the permit page

$1,251,419
Nov 14, 2025In progress
issued Nov 2025
1 Bush St8/f: new power and signal devices throughtou the space. new title 24 complaint lighting & controls. ref pa# 202510167525.
Details
Permit
202511149640
Status
issued
Filed
Nov 14, 2025
Permit issued
Nov 21, 2025
Declared cost
$25,000
Address
1 Bush St

8/f: new power and signal devices throughtou the space. new title 24 complaint lighting & controls. ref pa# 202510167525.

Open the permit page

$25,000
Nov 13, 2025Completed
final sign-off Mar 2026
1 Embarcadero Center29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)
Details
Permit
202511139481
Status
complete
Filed
Nov 13, 2025
Permit issued
Nov 18, 2025
Final sign-off
Mar 9, 2026
Declared cost
$198,000
Address
1 Embarcadero Center

29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)

Open the permit page

$198,000
Nov 10, 2025Completed
final sign-off Sep 2026
88 Kearny St20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273960.
Details
Permit
202511109312
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 24, 2025
Final sign-off
Sep 1, 2026
Declared cost
$777,000
Address
88 Kearny St

20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273960.

Open the permit page

$777,000
Nov 10, 2025Completed
final sign-off Sep 2026
88 Kearny St11/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273963
Details
Permit
202511109302
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 17, 2025
Final sign-off
Sep 9, 2026
Declared cost
$573,000
Address
88 Kearny St

11/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273963

Open the permit page

$573,000
Nov 7, 2025In progress
issued Jan 2026
333 Pine St1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.
Details
Permit
202511079210
Status
issued
Filed
Nov 7, 2025
Permit issued
Jan 12, 2026
Declared cost
$670,500
Address
333 Pine St

1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.

Open the permit page

$670,500
Nov 6, 2025Completed
final sign-off Dec 2025
101 02nd St15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514
Details
Permit
202511069100
Status
complete
Filed
Nov 6, 2025
Permit issued
Nov 6, 2025
Final sign-off
Dec 17, 2025
Declared cost
$10,000
Address
101 02nd St

15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514

Open the permit page

$10,000
Nov 4, 2025Completed
final sign-off Aug 2026
88 Kearny St18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered. ref demo # 202508273958.
Details
Permit
202511048826
Status
complete
Filed
Nov 4, 2025
Permit issued
Nov 10, 2025
Final sign-off
Aug 25, 2026
Declared cost
$734,582
Address
88 Kearny St

18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered. ref demo # 202508273958.

Open the permit page

$734,582
Oct 28, 2025Completed
final sign-off Aug 2026
88 Kearny St4th/fl: ti improvement includes building of new non structural partitions. all new or revised meps and life safety work will be design build and submitted seperately (bldg is fully sprinklers).
Details
Permit
202510288260
Status
complete
Filed
Oct 28, 2025
Permit issued
Nov 6, 2025
Final sign-off
Aug 19, 2026
Declared cost
$537,611
Address
88 Kearny St

4th/fl: ti improvement includes building of new non structural partitions. all new or revised meps and life safety work will be design build and submitted seperately (bldg is fully sprinklers).

Open the permit page

$537,611
Oct 21, 2025Completed
final sign-off Jan 2026
333 Bush Stref 202504164519- 25/fl- mep work only.
Details
Permit
202510217779
Status
complete
Filed
Oct 21, 2025
Permit issued
Oct 22, 2025
Final sign-off
Jan 16, 2026
Declared cost
$60,000
Address
333 Bush St

ref 202504164519- 25/fl- mep work only.

Open the permit page

$60,000
Oct 21, 2025Completed
final sign-off Aug 2026
88 Kearny St17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinklered
Details
Permit
202510217772
Status
complete
Filed
Oct 21, 2025
Permit issued
Nov 6, 2025
Final sign-off
Aug 25, 2026
Declared cost
$959,611
Address
88 Kearny St

17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinklered

Open the permit page

$959,611
Oct 17, 2025Completed
final sign-off May 2026
333 Bush St20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical.
Details
Permit
202510177572
Status
complete
Filed
Oct 17, 2025
Permit issued
Oct 24, 2025
Final sign-off
May 14, 2026
Declared cost
$120,000
Address
333 Bush St

20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical.

Open the permit page

$120,000
Oct 16, 2025Completed
final sign-off Jan 2026
1 Bush St8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separately
Details
Permit
202510167525
Status
complete
Filed
Oct 16, 2025
Permit issued
Oct 29, 2025
Final sign-off
Jan 22, 2026
Declared cost
$77,958
Address
1 Bush St

8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separately

Open the permit page

$77,958
Oct 14, 2025Completed
final sign-off Aug 2026
88 Kearny St3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is fully sprinklerd).
Details
Permit
202510147260
Status
complete
Filed
Oct 14, 2025
Permit issued
Oct 23, 2025
Final sign-off
Aug 19, 2026
Declared cost
$832,402
Address
88 Kearny St

3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is fully sprinklerd).

Open the permit page

$832,402
Oct 7, 2025Completed
final sign-off Mar 2026
345 Spear St6th fl- architectural only for 3 new phone booth units in office.
Details
Permit
202510076905
Status
complete
Filed
Oct 7, 2025
Permit issued
Nov 6, 2025
Final sign-off
Mar 16, 2026
Declared cost
$20,000
Address
345 Spear St

6th fl- architectural only for 3 new phone booth units in office.

Open the permit page

$20,000
Oct 6, 2025In progress
issued Oct 2025
101 California St8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8
Details
Permit
202509155263
Status
issued
Filed
Oct 6, 2025
Permit issued
Oct 31, 2025
Address
101 California St

8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8

Open the permit page

Oct 1, 2025Completed
final sign-off Dec 2025
101 02nd St15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.
Details
Permit
202510016514
Status
complete
Filed
Oct 1, 2025
Permit issued
Oct 2, 2025
Final sign-off
Dec 17, 2025
Declared cost
$250,000
Address
101 02nd St

15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.

Open the permit page

$250,000
Sep 25, 2025Completed
final sign-off Dec 2025
101 02nd St3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649
Details
Permit
202509256128
Status
complete
Filed
Sep 25, 2025
Permit issued
Oct 2, 2025
Final sign-off
Dec 1, 2025
Declared cost
$7,500
Address
101 02nd St

3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649

Open the permit page

$7,500
Sep 15, 2025Completed
final sign-off Jan 2026
333 Bush St7th/f ste 700: revision to 202505196809 & 202508223701, add fsd to demo plan, fire smoke dampers, mechanical work only.
Details
Permit
202509155280
Status
complete
Filed
Sep 15, 2025
Permit issued
Sep 15, 2025
Final sign-off
Jan 2, 2026
Address
333 Bush St

7th/f ste 700: revision to 202505196809 & 202508223701, add fsd to demo plan, fire smoke dampers, mechanical work only.

Open the permit page

Sep 15, 2025Completed
final sign-off Mar 2026
333 Bush St21st fl ref pa # 2024-1205-6265: provide new lighting & branch circuiting to existing panel. provide california title 24 complaince forms.
Details
Permit
202509155320
Status
complete
Filed
Sep 15, 2025
Permit issued
Sep 15, 2025
Final sign-off
Mar 3, 2026
Declared cost
$75,000
Address
333 Bush St

21st fl ref pa # 2024-1205-6265: provide new lighting & branch circuiting to existing panel. provide california title 24 complaince forms.

Open the permit page

$75,000
Sep 10, 2025Completed
final sign-off Jan 2026
1 Embarcadero Center32nd floor: infill former stair opening 11' x 13' with new floor slab.
Details
Permit
202509104986
Status
complete
Filed
Sep 10, 2025
Permit issued
Oct 2, 2025
Final sign-off
Jan 6, 2026
Declared cost
$198,000
Address
1 Embarcadero Center

32nd floor: infill former stair opening 11' x 13' with new floor slab.

Open the permit page

$198,000
Sep 4, 2025Completed
final sign-off Jul 2026
333 Bush Stfloor/20- ste 2020 consist of minor demo of non structural elements including paritions doors, lighting and ceiling. construction at pantry and copy area. (n) ceiling, lighting and finishes. mep , life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel.
Details
Permit
202509044546
Status
complete
Filed
Sep 4, 2025
Permit issued
Sep 16, 2025
Final sign-off
Jul 31, 2026
Declared cost
$250,000
Address
333 Bush St

floor/20- ste 2020 consist of minor demo of non structural elements including paritions doors, lighting and ceiling. construction at pantry and copy area. (n) ceiling, lighting and finishes. mep , life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel.

Open the permit page

$250,000
Aug 27, 2025Completed
final sign-off Dec 2025
88 Kearny St18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070
Details
Permit
202508273958
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 4, 2025
Final sign-off
Dec 18, 2025
Declared cost
$59,000
Address
88 Kearny St

18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070

Open the permit page

$59,000
Aug 27, 2025Completed
final sign-off Dec 2025
88 Kearny St20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070
Details
Permit
202508273960
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 4, 2025
Final sign-off
Dec 17, 2025
Declared cost
$59,000
Address
88 Kearny St

20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070

Open the permit page

$59,000
Aug 27, 2025Completed
final sign-off Mar 2026
88 Kearny St11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070
Details
Permit
202508273963
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 4, 2025
Final sign-off
Mar 2, 2026
Declared cost
$58,000
Address
88 Kearny St

11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070

Open the permit page

$58,000
Aug 27, 2025Completed
final sign-off Mar 2026
88 Kearny St04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070
Details
Permit
202508273962
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 4, 2025
Final sign-off
Mar 2, 2026
Declared cost
$77,406
Address
88 Kearny St

04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070

Open the permit page

$77,406
Aug 27, 2025Completed
final sign-off Dec 2025
88 Kearny St17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070
Details
Permit
202508273961
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 4, 2025
Final sign-off
Dec 17, 2025
Declared cost
$59,000
Address
88 Kearny St

17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070

Open the permit page

$59,000
Aug 26, 2025Completed
final sign-off Dec 2025
88 Kearny St7th fl - demo of non structural partitions, suspended ceilings; lighting, 0lumbing, finishes etc; (e) sprinkler heads will be turned uponce suspended ceiling ciling has been removed; ref sprinkler drawings pa 202508143070
Details
Permit
202508263899
Status
complete
Filed
Aug 26, 2025
Permit issued
Sep 4, 2025
Final sign-off
Dec 18, 2025
Declared cost
$60,000
Address
88 Kearny St

7th fl - demo of non structural partitions, suspended ceilings; lighting, 0lumbing, finishes etc; (e) sprinkler heads will be turned uponce suspended ceiling ciling has been removed; ref sprinkler drawings pa 202508143070

Open the permit page

$60,000
Aug 26, 2025Completed
final sign-off Mar 2026
88 Kearny St6th fl - demo of non structural partitions, suspended ceilings; lighting, plumbing, finishes etc; (e) sprinkler heads will be turned up once suspended accoustical ceiling has been removed; ref sprinkler drawings pa 202508143070
Details
Permit
202508263905
Status
complete
Filed
Aug 26, 2025
Permit issued
Sep 4, 2025
Final sign-off
Mar 2, 2026
Declared cost
$60,000
Address
88 Kearny St

6th fl - demo of non structural partitions, suspended ceilings; lighting, plumbing, finishes etc; (e) sprinkler heads will be turned up once suspended accoustical ceiling has been removed; ref sprinkler drawings pa 202508143070

Open the permit page

$60,000
Aug 22, 2025Completed
final sign-off Nov 2025
333 Bush Stste 700- 7/fl-revision 202505196809 to remove (4) fire smoke dampers
Details
Permit
202508223701
Status
complete
Filed
Aug 22, 2025
Permit issued
Aug 22, 2025
Final sign-off
Nov 21, 2025
Address
333 Bush St

ste 700- 7/fl-revision 202505196809 to remove (4) fire smoke dampers

Open the permit page

Aug 21, 2025Completed
final sign-off Jan 2026
1 Maritime Pz3rd/fl:installation of 3 furniture phone booths. structural plans and calcs for anchoring included. no mep work within the scope, fire, sprinkler, and alarm under seperate permit.
Details
Permit
202508213588
Status
complete
Filed
Aug 21, 2025
Permit issued
Aug 25, 2025
Final sign-off
Jan 9, 2026
Declared cost
$20,000
Address
1 Maritime Pz

3rd/fl:installation of 3 furniture phone booths. structural plans and calcs for anchoring included. no mep work within the scope, fire, sprinkler, and alarm under seperate permit.

Open the permit page

$20,000
Aug 21, 2025Completed
final sign-off Dec 2025
101 02nd St3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby
Details
Permit
202508213649
Status
complete
Filed
Aug 21, 2025
Permit issued
Aug 25, 2025
Final sign-off
Dec 1, 2025
Declared cost
$15,000
Address
101 02nd St

3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby

Open the permit page

$15,000
Aug 21, 2025Completed
final sign-off Dec 2025
88 Kearny St3rd/f: demo of non-structural partition, suspended ceiling, lighting, plumbing, finishes etc. e) sprinkler heads will be turned up once suspended ceiling has been removed. ref sprinkler dwg pa# 202508143070
Details
Permit
202508213610
Status
complete
Filed
Aug 21, 2025
Permit issued
Sep 3, 2025
Final sign-off
Dec 18, 2025
Declared cost
$77,413
Address
88 Kearny St

3rd/f: demo of non-structural partition, suspended ceiling, lighting, plumbing, finishes etc. e) sprinkler heads will be turned up once suspended ceiling has been removed. ref sprinkler dwg pa# 202508143070

Open the permit page

$77,413
Aug 14, 2025In progress
issued Aug 2025
101 California Stthe beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710.
Details
Permit
202508143032
Status
issued
Filed
Aug 14, 2025
Permit issued
Aug 14, 2025
Address
101 California St

the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710.

Open the permit page

Jul 30, 2025Completed
final sign-off Nov 2025
88 Kearny Stdeferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and grilles and add 1 duck work, install insulation per t24. install (12) new 2x2 fixtures; install 11
Details
Permit
202507301939
Status
complete
Filed
Jul 30, 2025
Permit issued
Jul 31, 2025
Final sign-off
Nov 5, 2025
Declared cost
$30,000
Address
88 Kearny St

deferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and grilles and add 1 duck work, install insulation per t24. install (12) new 2x2 fixtures; install 11

Open the permit page

$30,000
Jul 22, 2025Completed
final sign-off Nov 2025
88 Kearny St14th flr/suite 1450: t.i. includes demo of non strutural partiions + building new non-str partitions. all new or revisions mep and life safety work + sprinkler will be design -build and submitted for permit separately. (bldg is fully sprinklered).
Details
Permit
202507221279
Status
complete
Filed
Jul 22, 2025
Permit issued
Jul 24, 2025
Final sign-off
Nov 5, 2025
Declared cost
$101,388
Address
88 Kearny St

14th flr/suite 1450: t.i. includes demo of non strutural partiions + building new non-str partitions. all new or revisions mep and life safety work + sprinkler will be design -build and submitted for permit separately. (bldg is fully sprinklered).

Open the permit page

$101,388