Swinerton Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 50 permits filed
2,175 permits since 2000: 1,535 completed, 31 in progress, 283 never finaled, 326 expired or cancelled.
Of the 283 never-finaled permits, 25 are 3 to 5 years old, 71 are 5 to 10 years old, 187 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 2,175.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Sep 2026 | 121 Spear St | 3/fl- mechanical modifications to improve cooling capabilitiesDetails
3/fl- mechanical modifications to improve cooling capabilities | $50,000 |
| Jul 28, 2026 | In progress issued Sep 2026 | 555 Bryant St | suite 100: tenant improvement, coffee shop, in existing warm shell space on gr fl with e accessible entrance from sidewalk and 2 e accessible restrooms. change of use from m to b occupancy. new fully accessible service support and customer areas. no exterior work.Details
suite 100: tenant improvement, coffee shop, in existing warm shell space on gr fl with e accessible entrance from sidewalk and 2 e accessible restrooms. change of use from m to b occupancy. new fully accessible service support and customer areas. no exterior work. | $350,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 50 California St | 16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building.Details
16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building. | $2,234,736 |
| Jul 6, 2026 | In progress issued Jul 2026 | 201 Spear St | 14th fl - deferred mep to pa# 202605191493.Details
14th fl - deferred mep to pa# 202605191493. | $250,000 |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 680 Folsom St | 4/fl- ref 202603036842 - evacuation maps total of 6 mapsDetails
4/fl- ref 202603036842 - evacuation maps total of 6 maps | $1,000 |
| May 19, 2026 | In progress issued Jun 2026 | 201 Spear St | 14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishesDetails
14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishes | $45,000 |
| Apr 14, 2026 | In progress issued May 2026 | 1200 Carroll Av | the work to be performed is deep soil mixing ground improvement. this consists of treating the soils in-situ w/ soil - cement mixing technology. using a continous -blade- cutter. the dsm scope has a lenght of 325' and the dsm sheer walls are 35' by 37", which yiels a replacement ratio of 35.1%.Details
the work to be performed is deep soil mixing ground improvement. this consists of treating the soils in-situ w/ soil - cement mixing technology. using a continous -blade- cutter. the dsm scope has a lenght of 325' and the dsm sheer walls are 35' by 37", which yiels a replacement ratio of 35.1%. | $1,120,000 |
| Apr 9, 2026 | Completed final sign-off Aug 2026 | 680 Folsom St | 4/fl- ref 202603036842 - deferred mepDetails
4/fl- ref 202603036842 - deferred mep | $800,000 |
| Apr 8, 2026 | Completed final sign-off Jul 2026 | 1805 Geary Bl | extend the existing service elevator canopy within the rear alleyway to provide continue weather protection over the 2nd fl exterior landing.Details
extend the existing service elevator canopy within the rear alleyway to provide continue weather protection over the 2nd fl exterior landing. | $18,500 |
| Mar 27, 2026 | In progress issued May 2026 | 1212 Maryland St | deferred mep for permit 202601304958.Details
deferred mep for permit 202601304958. | |
| Mar 25, 2026 | In progress issued Apr 2026 | 988 Market St | revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors.Details
revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors. | $14,580 |
| Mar 3, 2026 | Completed final sign-off Aug 2026 | 680 Folsom St | 4/fl- ti work includes construction of non load bearing partitions, (n) ceilings, carpet and paint. replace finishes in kind for the (e) bathrooms.Details
4/fl- ti work includes construction of non load bearing partitions, (n) ceilings, carpet and paint. replace finishes in kind for the (e) bathrooms. | $4,100,000 |
| Feb 4, 2026 | In progress issued Jul 2026 | 201 Spear St | new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof.Details
new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof. | $38,000 |
| Jan 30, 2026 | In progress issued Mar 2026 | 1212 Maryland St | tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces.Details
tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces. | $225,000 |
| Jan 16, 2026 | Completed final sign-off Jan 2026 | 3471 California St | amendment to existing permit 202505166619 to clarify fire alarm is not required per code due to no existing fire alarm present.Details
amendment to existing permit 202505166619 to clarify fire alarm is not required per code due to no existing fire alarm present. | |
| Dec 30, 2025 | In progress issued Jan 2026 | 680 Folsom St | 4/f: interior demo per ab-017 in existing 4th floor office tenant space.Details
4/f: interior demo per ab-017 in existing 4th floor office tenant space. | $100,000 |
| Dec 29, 2025 | Completed final sign-off Jul 2026 | 99 Rhode Island St | revision to bpa 202504285348 to document field verification of existing conditions at south egress door.Details
revision to bpa 202504285348 to document field verification of existing conditions at south egress door. | |
| Dec 24, 2025 | Completed final sign-off Apr 2026 | 747 Howard St | to comply with nov 202539626: exhibition level interior work, install prefabricated office system vender check in desk. change of use from storage to businessDetails
to comply with nov 202539626: exhibition level interior work, install prefabricated office system vender check in desk. change of use from storage to business | $48,220 |
| Dec 23, 2025 | In progress issued May 2026 | 55 Spear St | 36th fl - minor ti to accomodate a new focus room and trade desk space. new wall powerDetails
36th fl - minor ti to accomodate a new focus room and trade desk space. new wall power | $800,000 |
| Nov 20, 2025 | Completed final sign-off Jan 2026 | 1805 Geary Bl | to obtain final inspection for work approved under 202302101799. all work is complete.Details
to obtain final inspection for work approved under 202302101799. all work is complete. | |
| Nov 12, 2025 | In progress issued Sep 2026 | 201 Spear St | level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permitsDetails
level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits | $135,915 |
| Oct 23, 2025 | Completed final sign-off Jan 2026 | 3471 California St | reuse e) equipmemt & reconfigure aire distribution to supply aire to new layout, ref to t.i. pa# 202505166619Details
reuse e) equipmemt & reconfigure aire distribution to supply aire to new layout, ref to t.i. pa# 202505166619 | $50,000 |
| Oct 7, 2025 | In progress issued Oct 2025 | 1200 Carroll Av | install 1 test pile 30'for tension test.test piles are sacrificial, not in production locations.locations as directed by geotechnical engineer.indicator piles to be driven from (e) grade through (e) paving or as otherwise specified. install 1 test pile 80'(&4 reaction piles for compression test.Details
install 1 test pile 30'for tension test.test piles are sacrificial, not in production locations.locations as directed by geotechnical engineer.indicator piles to be driven from (e) grade through (e) paving or as otherwise specified. install 1 test pile 80'(&4 reaction piles for compression test. | $165,000 |
| Sep 22, 2025 | In progress issued May 2026 | 1200 Carroll Av | site permit-3 of 4, fire department training facility, bldg #b1 & b2, 1-story, type 2b.Details
site permit-3 of 4, fire department training facility, bldg #b1 & b2, 1-story, type 2b. | $31,378,000 |
| Sep 22, 2025 | In progress issued Mar 2026 | 1200 Carroll Av | site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2bDetails
site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2b | $45,000,000 |
| Sep 22, 2025 | In progress issued May 2026 | 1200 Carroll Av | site permit-1 of 4, site design for the new san francisco fire department division of training facility. work includes general site design, egress and site utilities.Details
site permit-1 of 4, site design for the new san francisco fire department division of training facility. work includes general site design, egress and site utilities. | $37,433,135 |
| Sep 19, 2025 | In progress issued Feb 2026 | 1200 Carroll Av | the work to be performed under this permit is rough grading to prepare the site for construction activities, including the clearing of existing vegetation and removal of top 2' of existing grade. this rough grading work is associated with site permits submitted for same site-combined parcels forDetails
the work to be performed under this permit is rough grading to prepare the site for construction activities, including the clearing of existing vegetation and removal of top 2' of existing grade. this rough grading work is associated with site permits submitted for same site-combined parcels for | $4,154,000 |
| Sep 16, 2025 | Completed final sign-off Aug 2026 | 1212 Maryland St | revision to mep drawings 202212229038 to update t-24 compliance forms & hers testingDetails
revision to mep drawings 202212229038 to update t-24 compliance forms & hers testing | |
| Aug 20, 2025 | Completed final sign-off Aug 2026 | 44 Montgomery St | 34/fl- single floor office at a mutli tenant floor ti to include updated finishes new lighting fixtures, removal of 2 partitions between offices to convert to lounge/meeting spaces. removal of previous ti roll up door and convert into drywall partitionDetails
34/fl- single floor office at a mutli tenant floor ti to include updated finishes new lighting fixtures, removal of 2 partitions between offices to convert to lounge/meeting spaces. removal of previous ti roll up door and convert into drywall partition | $650,000 |
| Aug 14, 2025 | In progress issued Apr 2026 | 1200 Carroll Av | site permit-4 of 4, fire department training facility, bldg #c1, c2, c3, c4, c5, c6, and c7, 7-story, type 2b.Details
site permit-4 of 4, fire department training facility, bldg #c1, c2, c3, c4, c5, c6, and c7, 7-story, type 2b. | $34,564,600 |
| May 16, 2025 | Completed final sign-off Jan 2026 | 3471 California St | construct new non structural partitions. install new lights. reuse e hvac system, millworks, doors, and finishes. defereed permits, elec/mechDetails
construct new non structural partitions. install new lights. reuse e hvac system, millworks, doors, and finishes. defereed permits, elec/mech | $250,000 |
| May 16, 2025 | Completed final sign-off Dec 2025 | 2 Folsom St | 15/f: ti - new partitions, floor and wall finishes, doors, restrooms, and associated mep.Details
15/f: ti - new partitions, floor and wall finishes, doors, restrooms, and associated mep. | $900,000 |
| May 14, 2025 | In progress issued Oct 2025 | 99 Rhode Island St | full building renovation and change ofuse from office to private school (k-12) and group e childcare (+36mos).(e) on-site parking convert to outdoor play yard for students. mandatory seismic upgrade.Details
full building renovation and change ofuse from office to private school (k-12) and group e childcare (+36mos).(e) on-site parking convert to outdoor play yard for students. mandatory seismic upgrade. | $15,000,000 |
| May 5, 2025 | Completed final sign-off Aug 2025 | 555 Bryant St | 2-15/fl- revision ti 202102124635- add exit sign in locations shower per sfbc 1013.5- self luminos and photoluminescent exit signs. ul924 labelsDetails
2-15/fl- revision ti 202102124635- add exit sign in locations shower per sfbc 1013.5- self luminos and photoluminescent exit signs. ul924 labels | |
| Apr 16, 2025 | In progress issued Jul 2026 | 245 East Clementina St | project is commercial t.i.for non-profit childcare facility ages 0-5 w/in (e) residential building. inclds. 4 classrooms, for infant-toddlers and pre-school + administrative areas and 2 outdoor play areas. existing core and shell warm shell conditions to remain.Details
project is commercial t.i.for non-profit childcare facility ages 0-5 w/in (e) residential building. inclds. 4 classrooms, for infant-toddlers and pre-school + administrative areas and 2 outdoor play areas. existing core and shell warm shell conditions to remain. | $1,821,294 |
| Apr 9, 2025 | Completed final sign-off Jan 2026 | 1805 Geary Bl | revision to permit 202202212343 ground floor tentant 1539 fillmore st. reconfigure machine room, restroom @ ground fl; remove stair & 2nd fl lula elevator from scopeDetails
revision to permit 202202212343 ground floor tentant 1539 fillmore st. reconfigure machine room, restroom @ ground fl; remove stair & 2nd fl lula elevator from scope | |
| Mar 25, 2025 | Completed final sign-off Aug 2026 | 1212 Maryland St | revision to arch and mep drawings for 2 hours fire resistive riser. ref pa# 202212229038 s5.Details
revision to arch and mep drawings for 2 hours fire resistive riser. ref pa# 202212229038 s5. | $2,000 |
| Mar 19, 2025 | Completed final sign-off Sep 2025 | 1212 Maryland St | priority 100% affordable housing: twenty-six (26) evacuation maps for levels 1 thru 8, plus a roof terrace. reference site permit pa# 202212229038.Details
priority 100% affordable housing: twenty-six (26) evacuation maps for levels 1 thru 8, plus a roof terrace. reference site permit pa# 202212229038. | $5,000 |
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 1240 Valencia St | to obtain final inspection for work approved under pa # 201910043650, #201912189882, & 201912139558. all work is complete.Details
to obtain final inspection for work approved under pa # 201910043650, #201912189882, & 201912139558. all work is complete. | |
| Mar 7, 2025 | Completed final sign-off Aug 2025 | 555 Bryant St | 61 evacuation maps for floors b2-16. reference pa# 202102124635.Details
61 evacuation maps for floors b2-16. reference pa# 202102124635. | $10,000 |
| Mar 6, 2025 | Completed final sign-off Aug 2025 | 555 Bryant St | revision to pa# 202102124635 s4: arch and mech for udpated smoke control report. the changes do not involve any changes to the smoke control sequence of operations or mechanical fan capacities.Details
revision to pa# 202102124635 s4: arch and mech for udpated smoke control report. the changes do not involve any changes to the smoke control sequence of operations or mechanical fan capacities. | |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 555 Bryant St | priority housing: revision to errcs addendum #10 tracked by rev3. reference pa# 2021.02.12.4635 s10Details
priority housing: revision to errcs addendum #10 tracked by rev3. reference pa# 2021.02.12.4635 s10 | |
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 1500 19th Av | revision to 202403278722 for plumbing review of proposed drainage within property line, connecting to existing sanitary service lateral. installation of 2 catch basins, 1 manhole, associated storm pipes.Details
revision to 202403278722 for plumbing review of proposed drainage within property line, connecting to existing sanitary service lateral. installation of 2 catch basins, 1 manhole, associated storm pipes. | |
| Jan 16, 2025 | Completed final sign-off Jun 2025 | 555 Bryant St | rev 202102124635-s4 arch & mech: remove lobby space from the project in order to create a future tenant shell space with arch/inter design electments removeled. mech systems reconfigured and lighting fixtures and controls adjusted and elctrical fixtures removed.Details
rev 202102124635-s4 arch & mech: remove lobby space from the project in order to create a future tenant shell space with arch/inter design electments removeled. mech systems reconfigured and lighting fixtures and controls adjusted and elctrical fixtures removed. | |
| Jan 9, 2025 | Completed final sign-off Nov 2025 | 350 California St | 23/f: installation of a new emergency generator. the scope inlcudes installation of (n) generator, connection of em generator to building systems w/related mechanical,electrical & structural tie-down to (e) mechanical pad.Details
23/f: installation of a new emergency generator. the scope inlcudes installation of (n) generator, connection of em generator to building systems w/related mechanical,electrical & structural tie-down to (e) mechanical pad. | $181,000 |
| Jan 3, 2025 | Completed final sign-off Aug 2026 | 1212 Maryland St | revision to arch & mep drawings for boa/electrical room ratings ref pa 202212229038s5Details
revision to arch & mep drawings for boa/electrical room ratings ref pa 202212229038s5 | |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 2 Folsom St | 12th & 14th fl- interior demo & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep workDetails
12th & 14th fl- interior demo & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep work | $554,436 |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 2 Folsom St | 11th & 13th fl- interior demo & ti. includes install of (n) non load bearing partitions. install (n) lighting & receptacles. install (n) millwork. associated mep work.Details
11th & 13th fl- interior demo & ti. includes install of (n) non load bearing partitions. install (n) lighting & receptacles. install (n) millwork. associated mep work. | $399,158 |
| Nov 7, 2024 | In progress issued May 2025 | 2 Folsom St | 3/f: deferred electrical permit for pa# 202405101903. clarification that no deferred mechanical or plumbing required. trade permit required.Details
3/f: deferred electrical permit for pa# 202405101903. clarification that no deferred mechanical or plumbing required. trade permit required. | |
| Oct 10, 2024 | Completed final sign-off Aug 2025 | 800 Howard St | mechanical electrical permit. ref pa# 202409181070Details
mechanical electrical permit. ref pa# 202409181070 | $68,000 |
| Oct 2, 2024 | Completed final sign-off Feb 2026 | 888 Post St | ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered...Details
ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered... | $3,500,000 |
| Sep 20, 2024 | Completed final sign-off Apr 2025 | 2727 Mariposa St | 1/f: interior ti includes new flooring, wall and ceiling finishes, replace (e) restroom signage tp code compliance all gender accessible signageDetails
1/f: interior ti includes new flooring, wall and ceiling finishes, replace (e) restroom signage tp code compliance all gender accessible signage | $220,000 |
| Sep 18, 2024 | Completed final sign-off Sep 2025 | 800 Howard St | voluntary plumbing fixture in kind replacement. at (e) mens/womens restrooms on 1st,2nd,3rd floor. replace (e) wall finishes. no layout changes.Details
voluntary plumbing fixture in kind replacement. at (e) mens/womens restrooms on 1st,2nd,3rd floor. replace (e) wall finishes. no layout changes. | $650,000 |
| Sep 10, 2024 | Completed final sign-off Mar 2025 | 1240 Valencia St | rev 201912139558- to renovate (e) site ada ramp and bike racks facing front of building. scope includes (n) 3 ft play area fence located at frontDetails
rev 201912139558- to renovate (e) site ada ramp and bike racks facing front of building. scope includes (n) 3 ft play area fence located at front | |
| Sep 10, 2024 | Completed final sign-off Mar 2025 | 1240 Valencia St | revision to pa # 2019-1230-0998 non structural ti to create 1 infant, 1 preschool & 2 toddler classroom with 4 bathrooms & 2 offices. (e) sklights to be covered with new lights. revise change of use from e to i-4.Details
revision to pa # 2019-1230-0998 non structural ti to create 1 infant, 1 preschool & 2 toddler classroom with 4 bathrooms & 2 offices. (e) sklights to be covered with new lights. revise change of use from e to i-4. | |
| Sep 6, 2024 | In progress issued Sep 2024 | 2 Folsom St | to obtain final inspection for work approved under pa# 201712196790. all work is complete.Details
to obtain final inspection for work approved under pa# 201712196790. all work is complete. | |
| Sep 6, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | temporay shoring permanent wall at east and south property line related to 2012403278722Details
temporay shoring permanent wall at east and south property line related to 2012403278722 | |
| Sep 4, 2024 | Completed final sign-off Jan 2025 | 1240 Valencia St | roofing: (n) silicon coating and metal flashing on (e) concrete roof. no hot works.Details
roofing: (n) silicon coating and metal flashing on (e) concrete roof. no hot works. | $270,000 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | install one non-illuminated sign, non electric single faced sign on pollard; "30 min max".Details
install one non-illuminated sign, non electric single faced sign on pollard; "30 min max". | $3,333 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | install one non-illuminated sign, non electric single faced sign; h-frame ev charging sign "shell recharge electric vechicle charging".Details
install one non-illuminated sign, non electric single faced sign; h-frame ev charging sign "shell recharge electric vechicle charging". | $10,000 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | install one ground electric sign, double faced sign next to exit; "shell recharging" monument signDetails
install one ground electric sign, double faced sign next to exit; "shell recharging" monument sign | $10,000 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | install one non-illuminated sign, non electric single faced sign on pole; "30 min max".Details
install one non-illuminated sign, non electric single faced sign on pole; "30 min max". | $3,333 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | install one non-illuminated sign, non electric single faced sign by drive way exit; "do not enter".Details
install one non-illuminated sign, non electric single faced sign by drive way exit; "do not enter". | $3,333 |
| Aug 22, 2024 | Expired or cancelled withdrawn Mar 2026 | 200 Folsom St | 200 folsom st west: rev to 202208019628-s3 due to changes in the emergency generator location.Details
200 folsom st west: rev to 202208019628-s3 due to changes in the emergency generator location. | |
| Aug 16, 2024 | Completed final sign-off Apr 2026 | 200 Folsom St | 100% affordable housing. revision to 2022-1118-6863-s3, structural permit due to unforseen obstructions encountered during ground improvement work & excavation.Details
100% affordable housing. revision to 2022-1118-6863-s3, structural permit due to unforseen obstructions encountered during ground improvement work & excavation. | $26,467 |
| Aug 9, 2024 | Completed final sign-off Mar 2025 | 1240 Valencia St | non-struc revisions to pa 201912189882. change use and occup to e daycare. rev to incl: create 1 pre-school and 1 toddler classroom, restroom layout modifications, add 2 child restrooms, removal of (e) skylights, create electrical room and add additional lighting. these plans supersede 202010086195Details
non-struc revisions to pa 201912189882. change use and occup to e daycare. rev to incl: create 1 pre-school and 1 toddler classroom, restroom layout modifications, add 2 child restrooms, removal of (e) skylights, create electrical room and add additional lighting. these plans supersede 202010086195 | |
| Jul 18, 2024 | Completed final sign-off Feb 2025 | 2 Folsom St | 15th fl ti: new partitons, ceilings, fixtures, finishes & mepDetails
15th fl ti: new partitons, ceilings, fixtures, finishes & mep | $2,465,940 |
| Jun 21, 2024 | Completed final sign-off Apr 2025 | 555 Bryant St | revision to amep(pa# 202102124635 (s4) for revised fsae lobby water proofing details.Details
revision to amep(pa# 202102124635 (s4) for revised fsae lobby water proofing details. | |
| May 24, 2024 | Completed final sign-off Feb 2025 | 2 Folsom St | 15/f- interior demo of (e) non load rearing partitions for future office ti per ab 017. no reflected ceiling plan demo o be dong until deferred sprinkler modification to be submitted and approved.Details
15/f- interior demo of (e) non load rearing partitions for future office ti per ab 017. no reflected ceiling plan demo o be dong until deferred sprinkler modification to be submitted and approved. | $50,000 |
| May 22, 2024 | Completed final sign-off Mar 2025 | 1431 Kirkham St | exploratory investigation to determine if foundation has underpiping. to stabilize its interaction with 1500 19th ave. five test pits. fill all pits after investigation.Details
exploratory investigation to determine if foundation has underpiping. to stabilize its interaction with 1500 19th ave. five test pits. fill all pits after investigation. | $7,500 |
| May 14, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453Details
chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453 | $2,750,000 |
| May 10, 2024 | In progress issued May 2024 | 2 Folsom St | 3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred.Details
3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred. | $717,000 |
| May 7, 2024 | Completed final sign-off Jul 2025 | 200 Folsom St | priority process mayoral dir 17-02: deferred permit for 2022-0801-9628, for a 151 unit, 84'-10" tall building, 100% affordable. shoring for cistern installation about 9ft deep, with 28 ft long steel soldier piles with wood lagging. ch fatty clay at 14ft to 20ft, in liquefaction.Details
priority process mayoral dir 17-02: deferred permit for 2022-0801-9628, for a 151 unit, 84'-10" tall building, 100% affordable. shoring for cistern installation about 9ft deep, with 28 ft long steel soldier piles with wood lagging. ch fatty clay at 14ft to 20ft, in liquefaction. | $148,467 |
| May 6, 2024 | Completed final sign-off Apr 2025 | 555 Bryant St | revision to metal stair addendum #6 due to design changes tracked by rev3 and rev4. reference pa# 2021.02.12.4635 s6Details
revision to metal stair addendum #6 due to design changes tracked by rev3 and rev4. reference pa# 2021.02.12.4635 s6 | |
| May 3, 2024 | Completed final sign-off Feb 2025 | 1518 19th Av | exploratory investigation to determine if foundation has underpinning to stabalize its interactive with 1500 19th avenue. five test pits approx 2ft from street frontage prop line. backfill holes after.Details
exploratory investigation to determine if foundation has underpinning to stabalize its interactive with 1500 19th avenue. five test pits approx 2ft from street frontage prop line. backfill holes after. | $7,500 |
| Apr 24, 2024 | Completed final sign-off Nov 2024 | 2 Folsom St | 7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elecDetails
7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elec | $900,000 |
| Apr 9, 2024 | Completed final sign-off Aug 2024 | 2 Folsom St | 9th fl interior ti new mock store and open office. includes new non load bearing partitions and altered lightingDetails
9th fl interior ti new mock store and open office. includes new non load bearing partitions and altered lighting | $99,322 |
| Apr 2, 2024 | In progress issued Apr 2024 | 2 Folsom St | revision 202308295512 and 202309287619 to remove noted special inspections items due to reduced scope or work of office ti.Details
revision 202308295512 and 202309287619 to remove noted special inspections items due to reduced scope or work of office ti. | |
| Apr 1, 2024 | In progress issued Apr 2024 | 1240 Valencia St | to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtainedDetails
to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtained | $100,000 |
| Apr 1, 2024 | Completed final sign-off Aug 2026 | 1212 Maryland St | priority per ab-004. tower crane erection for contruction of project,tower crane dismantleDetails
priority per ab-004. tower crane erection for contruction of project,tower crane dismantle | $888,000 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 2 Folsom St | 7/f: demo existing non-load bearing partitions for future office ti. per ab-017.Details
7/f: demo existing non-load bearing partitions for future office ti. per ab-017. | $60,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | asbestos removal for demo permit #202402075453. work shall be done by licensed asbestos handling contractor.Details
asbestos removal for demo permit #202402075453. work shall be done by licensed asbestos handling contractor. | $2,377 |
| Feb 23, 2024 | In progress issued Feb 2024 | 1255 Battery St | to obtain final insepction for work approved under pa 202204263053.all work is complete.Details
to obtain final insepction for work approved under pa 202204263053.all work is complete. | |
| Feb 23, 2024 | In progress issued Feb 2024 | 1255 Battery St | to obtain final insepction for work approved under pa 202112063805. all work is complete.Details
to obtain final insepction for work approved under pa 202112063805. all work is complete. | |
| Feb 23, 2024 | Completed final sign-off Jul 2024 | 77 Harriet St | priority processing ab-004*** to demolish a type v, 1-story recreation building. (new construction under pa# 202212168587)Details
priority processing ab-004*** to demolish a type v, 1-story recreation building. (new construction under pa# 202212168587) | $230,200 |
| Feb 7, 2024 | Completed final sign-off Oct 2024 | 1500 19th Av | to demolish 1-story, type v-b, occupancy s-1 & b, auto repair shop.Details
to demolish 1-story, type v-b, occupancy s-1 & b, auto repair shop. | $59,580 |
| Feb 5, 2024 | Completed final sign-off Mar 2025 | 1240 Valencia St | new exterior windows to fit extg window opening and match extg windw design/profile for historic preservation. ref pa#201912300998Details
new exterior windows to fit extg window opening and match extg windw design/profile for historic preservation. ref pa#201912300998 | $60,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 2 Folsom St | 9/f: revision to pa# 202309217150 & 202309287617, center area interior partitions enlarged for increase stc rating, new fitness equipment.Details
9/f: revision to pa# 202309217150 & 202309287617, center area interior partitions enlarged for increase stc rating, new fitness equipment. | $10,000 |
| Jan 5, 2024 | Completed final sign-off Oct 2024 | 555 California St | 36th fl: minor interior renovation/reconfiguration of partial 36th fl. no change to use or occupancy.Details
36th fl: minor interior renovation/reconfiguration of partial 36th fl. no change to use or occupancy. | $300,000 |
| Nov 14, 2023 | Completed final sign-off Feb 2025 | 1 California St | 19th fl: revision to 202212289252. tenant build out of 19th fl. reduction of sf footage to 7000 sf. flooring, partitions, mep, ceiling,ligting.Details
19th fl: revision to 202212289252. tenant build out of 19th fl. reduction of sf footage to 7000 sf. flooring, partitions, mep, ceiling,ligting. | |
| Oct 13, 2023 | Completed final sign-off Jul 2026 | 555 Bryant St | pid review of stormwater control systems for 16 story residential building. reference site permit 202102124635Details
pid review of stormwater control systems for 16 story residential building. reference site permit 202102124635 | |
| Oct 5, 2023 | Completed final sign-off Apr 2024 | 200 Folsom St | trenching to locate existing freeway footings & demolitionDetails
trenching to locate existing freeway footings & demolition | $8,500 |
| Oct 3, 2023 | Completed final sign-off May 2024 | 1563 Mission St | 4th floor: construction of new non-structural partions, acoustical grid and tile drywall ceilings, light fixtures, mill work and finishes. also includes upgraded meps.Details
4th floor: construction of new non-structural partions, acoustical grid and tile drywall ceilings, light fixtures, mill work and finishes. also includes upgraded meps. | $2,907,146 |
| Oct 3, 2023 | Never finaled filed Oct 2023, never issued | 1939 Market St | installation of underground fire protection water service.Details
installation of underground fire protection water service. | $21,600 |
| Sep 28, 2023 | Completed final sign-off May 2024 | 2 Folsom St | 12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed accessDetails
12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed access | |
| Sep 28, 2023 | Completed final sign-off Apr 2024 | 2 Folsom St | 9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details.Details
9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details. | |
| Sep 22, 2023 | In progress issued Oct 2023 | 2 Folsom St | 12/f: electrical associated with pa 2023-0829-5512Details
12/f: electrical associated with pa 2023-0829-5512 | $340,000 |
| Sep 21, 2023 | Completed final sign-off Mar 2024 | 2 Folsom St | 10/f: mep associated with bpa#202307202583Details
10/f: mep associated with bpa#202307202583 | $257,000 |
| Sep 21, 2023 | Completed final sign-off Apr 2024 | 2 Folsom St | 9/f: mep associated with bpa#202307202579Details
9/f: mep associated with bpa#202307202579 | $450,000 |
| Sep 5, 2023 | Completed final sign-off Jan 2024 | 200 Folsom St | trenching for archaeological exploration.Details
trenching for archaeological exploration. | $12,600 |