213 permits since 2000: 162 completed, 15 in progress, 23 never finaled, 13 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 13 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 213.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 71 Stevenson St | to obtain final inspection for work approved under pa# 2015608285538. all work is complete.Details
to obtain final inspection for work approved under pa# 2015608285538. all work is complete. | |
| Sep 10, 2026 | In progress issued Sep 2026 | 71 Stevenson St | provide sheet metal modification to accomadate (n) t.i., furnish & install (n) transfer fan. ref. bpa#202607014426Details
provide sheet metal modification to accomadate (n) t.i., furnish & install (n) transfer fan. ref. bpa#202607014426 | $96,000 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 71 Stevenson St | 9/f suites 925 and 950: interior tenant improvement - demolition and new non-structural paritions, new finishes, fixtures, and relocate lighting. mep, fire life safety under separate permit.Details
9/f suites 925 and 950: interior tenant improvement - demolition and new non-structural paritions, new finishes, fixtures, and relocate lighting. mep, fire life safety under separate permit. | $569,163 |
| Aug 28, 2026 | In progress issued Sep 2026 | 90 New Montgomery St | 8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered)Details
8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered) | $500,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 71 Stevenson St | deferred mechanical/electrical work ref pa#202606102960: rebalance (e) vav boxes where medicated to serve (n) & (e) zones demo (e) and install (n) low side duct & grills as required. relocate (e) vav tsats as required. electrical: lighting & controls for 3 (n) meeting rooms w/associatedDetails
deferred mechanical/electrical work ref pa#202606102960: rebalance (e) vav boxes where medicated to serve (n) & (e) zones demo (e) and install (n) low side duct & grills as required. relocate (e) vav tsats as required. electrical: lighting & controls for 3 (n) meeting rooms w/associated | $133,750 |
| Jul 13, 2026 | In progress issued Jul 2026 | 75 Broadway | 2nd fl/ ste# 201: t.i. included building new non-structural partitions, ceiling, lights, & millwork, all new or revised meps & life safety work will be design-build & submitted separately (bldg fully sprinklered)Details
2nd fl/ ste# 201: t.i. included building new non-structural partitions, ceiling, lights, & millwork, all new or revised meps & life safety work will be design-build & submitted separately (bldg fully sprinklered) | $1,400,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 71 Stevenson St | 9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permitDetails
9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permit | $800,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 550 Montgomery St | 8th floor: tenant improvement includes seismic bolting of existing phone boothsDetails
8th floor: tenant improvement includes seismic bolting of existing phone booths | |
| Jun 10, 2026 | In progress issued Jun 2026 | 71 Stevenson St | 19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferredDetails
19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferred | $150,000 |
| Feb 18, 2026 | In progress issued Mar 2026 | 650 Davis St | ground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered).Details
ground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered). | $350,000 |
| Jan 22, 2026 | Completed final sign-off May 2026 | 75 Broadway | ste 206-ref 202512302986- rework low side air distribution and air balance area of work.Details
ste 206-ref 202512302986- rework low side air distribution and air balance area of work. | $175,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 71 Stevenson St | documentation and anchoring of single person phone booth (7) with new signage to accessible phone room.Details
documentation and anchoring of single person phone booth (7) with new signage to accessible phone room. | $20,000 |
| Dec 30, 2025 | Completed final sign-off May 2026 | 75 Broadway | 2nd fl suite 206: office tenant improvement. new non structural partitions, ceilings, lights & millwork. new or revised hvac, plumbing, electrical & life safety work to be design build & permitted separately. electrical t-24 added to this permit.Details
2nd fl suite 206: office tenant improvement. new non structural partitions, ceilings, lights & millwork. new or revised hvac, plumbing, electrical & life safety work to be design build & permitted separately. electrical t-24 added to this permit. | $490,000 |
| Dec 23, 2025 | Completed final sign-off May 2026 | 75 Broadway | deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space.Details
deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space. | $75,000 |
| Nov 12, 2025 | In progress filed Nov 2025, not yet issued | 300 Montgomery St | ti: work on single floor to include demo new partions doors frames finishes elecrical lighting and fire protection work.Details
ti: work on single floor to include demo new partions doors frames finishes elecrical lighting and fire protection work. | $20,000 |
| Nov 5, 2025 | In progress issued Dec 2025 | 650 Davis St | 2nd floor: revision to pa#202509115071. removal of 2 double doors from scope, construction of a wall.Details
2nd floor: revision to pa#202509115071. removal of 2 double doors from scope, construction of a wall. | |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 650 Davis St | 2nd floor: commercial interior improvement at restrooms. partial non-structural demo, new nonstructural partitions, doors, frames, lighting, plumbing, interior finishes and new millwork. mep, l/s and sprinkler work to be design-built and filed seperately. bldg is fully sprinklered. barrier removal.Details
2nd floor: commercial interior improvement at restrooms. partial non-structural demo, new nonstructural partitions, doors, frames, lighting, plumbing, interior finishes and new millwork. mep, l/s and sprinkler work to be design-built and filed seperately. bldg is fully sprinklered. barrier removal. | $50,000 |
| Oct 29, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage.Details
7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage. | $95,000 |
| Oct 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment.Details
7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment. | $125,000 |
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017.Details
7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017. | $5,000 |
| Sep 11, 2025 | Completed final sign-off Feb 2026 | 650 Davis St | 2nd fl - office ti, non-structural demo, non structural, partitions, doors/frames, lighting and interior finishes. meps, l/s & sprinklers work (if needed) to be deferreed submittal (bldg fully sprinklered)Details
2nd fl - office ti, non-structural demo, non structural, partitions, doors/frames, lighting and interior finishes. meps, l/s & sprinklers work (if needed) to be deferreed submittal (bldg fully sprinklered) | $53,000 |
| Aug 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sfDetails
6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sf | $35,000 |
| Jul 25, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair)Details
6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair) | $65,000 |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sfDetails
6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sf | $28,000 |
| Jul 10, 2025 | In progress filed Jul 2025, not yet issued | 799 Market St | 5th floor: lighting replacement inside elevator lobby.Details
5th floor: lighting replacement inside elevator lobby. | $12,000 |
| Jul 9, 2025 | Completed final sign-off Mar 2026 | 799 Market St | lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl)Details
lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl) | $50,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 2 New Montgomery St | revision to 202104148558, 202307111848: to comply with special inspections per field inspectors requestDetails
revision to 202104148558, 202307111848: to comply with special inspections per field inspectors request | |
| Jun 4, 2025 | In progress issued Jul 2025 | 300 Montgomery St | as required by 2022 cbc section 1010.2.12.1 modify existing tenant entry doors at both elevator lobbies, installation of 2 way voice communication system.Details
as required by 2022 cbc section 1010.2.12.1 modify existing tenant entry doors at both elevator lobbies, installation of 2 way voice communication system. | $20,000 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 71 Stevenson St | 10th fl - install pre-fabricated phone booth in existing officeDetails
10th fl - install pre-fabricated phone booth in existing office | $2,400 |
| Apr 3, 2025 | Completed final sign-off Jul 2025 | 71 Stevenson St | 18th fl ref pa #2025-0121-8674: modify existing ductwork to better serve tenant spaceDetails
18th fl ref pa #2025-0121-8674: modify existing ductwork to better serve tenant space | $16,750 |
| Mar 4, 2025 | Completed final sign-off Apr 2026 | 71 Stevenson St | relocation and documentation of single person phone booths and new signage to accessible phone roomDetails
relocation and documentation of single person phone booths and new signage to accessible phone room | $11,237 |
| Feb 26, 2025 | Completed final sign-off May 2026 | 75 Broadway | 1st flr: commercial interior improvment. partial non-strucutural demo, new conference room with non-structural partitions, doors/frames, lighting, interior finishes or new millwork.Details
1st flr: commercial interior improvment. partial non-strucutural demo, new conference room with non-structural partitions, doors/frames, lighting, interior finishes or new millwork. | $165,000 |
| Jan 21, 2025 | Completed final sign-off Jul 2025 | 71 Stevenson St | 18th/f interior t.i.: new partition, door assembles, minor electrical & finish upgrades. mep , fire life safety & sprinkler under seprate permitDetails
18th/f interior t.i.: new partition, door assembles, minor electrical & finish upgrades. mep , fire life safety & sprinkler under seprate permit | $175,000 |
| Jan 17, 2025 | Completed final sign-off Sep 2025 | 2 New Montgomery St | revision to permits 202104148558 and 202307111848. change position of fence relative to property line. recess one access gate to not swing over property line. change one freight elevator loading access gate to sliding gate from swinging gate.Details
revision to permits 202104148558 and 202307111848. change position of fence relative to property line. recess one access gate to not swing over property line. change one freight elevator loading access gate to sliding gate from swinging gate. | |
| Dec 17, 2024 | Completed final sign-off Jul 2025 | 251 Rhode Island St | provide & install one new 5 ton packaged roof top unit, unit to omit on curb adapter, new stand alone thermostat, n) ductwork to match n) layout. n) linneardiffusers. n) power & signal divices thru the space, new 2022 compliant lighting & controls. ref to t.i. 202312152587 mep deferralDetails
provide & install one new 5 ton packaged roof top unit, unit to omit on curb adapter, new stand alone thermostat, n) ductwork to match n) layout. n) linneardiffusers. n) power & signal divices thru the space, new 2022 compliant lighting & controls. ref to t.i. 202312152587 mep deferral | $120,000 |
| Oct 18, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | 10th flr. interior t.i. to 10th flr. to include walls, ceilings and finishes.Details
10th flr. interior t.i. to 10th flr. to include walls, ceilings and finishes. | $1,400,000 |
| Oct 15, 2024 | Completed final sign-off Aug 2025 | 1 Warriors Wy | space 16- (n) ti includsive of partitions, ceiling, lighting , finishes, and millwork. (n) commerical kitchen with new equipment. update to exterior patio for bbq cooking area with safety barrier and new lightingDetails
space 16- (n) ti includsive of partitions, ceiling, lighting , finishes, and millwork. (n) commerical kitchen with new equipment. update to exterior patio for bbq cooking area with safety barrier and new lighting | $705,820 |
| Aug 13, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | ref pa 2024-0606-3908 demo and reroute low dide duct to accomodate new floor plan and rebalance existing grilles. provide new vav boxes and assoicated low side system to accomodate new zones where required.Details
ref pa 2024-0606-3908 demo and reroute low dide duct to accomodate new floor plan and rebalance existing grilles. provide new vav boxes and assoicated low side system to accomodate new zones where required. | $373,500 |
| Jul 16, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | 22nd and 23rd floors: installation of indoor lighting, controls, and associated power distribution. ref. approved pa #202406063908Details
22nd and 23rd floors: installation of indoor lighting, controls, and associated power distribution. ref. approved pa #202406063908 | $35,000 |
| Jun 6, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | floors 22 &23- interior tenant improvement, selective demo and construction of non structural partitions. minor reworking of e ceilings and light fixtures, new millwork, finishes, mep deferred.Details
floors 22 &23- interior tenant improvement, selective demo and construction of non structural partitions. minor reworking of e ceilings and light fixtures, new millwork, finishes, mep deferred. | $2,200,000 |
| May 21, 2024 | Completed final sign-off Sep 2024 | 75 Broadway | 2nd fl: 206: tenant improvement include the demo of non- structural partitions, building is fully sprinklered per ab-017 tenant suite 206: is to remain vacant and disable review/ compliance to be deferred. sprinkler permit app # 2024-0517-2331.Details
2nd fl: 206: tenant improvement include the demo of non- structural partitions, building is fully sprinklered per ab-017 tenant suite 206: is to remain vacant and disable review/ compliance to be deferred. sprinkler permit app # 2024-0517-2331. | $15,000 |
| Feb 27, 2024 | Completed final sign-off Apr 2024 | 900 North Point St | 2/f: revision to pa# 202307111874 na pa# 202308114236 - for removal of 2nd story bar and other minor revisions.Details
2/f: revision to pa# 202307111874 na pa# 202308114236 - for removal of 2nd story bar and other minor revisions. | |
| Feb 14, 2024 | Completed final sign-off May 2024 | 71 Stevenson St | 14/f ste 1450: demo & reourt low side duct to accommodate new floor plan and rebalance e grills. provided new vav boxes and associated low side system to accommodate new zones where required. provide lighting w/ asso circuits & controls, power & signal w/ asso circuites & wiring for office retrofit.Details
14/f ste 1450: demo & reourt low side duct to accommodate new floor plan and rebalance e grills. provided new vav boxes and associated low side system to accommodate new zones where required. provide lighting w/ asso circuits & controls, power & signal w/ asso circuites & wiring for office retrofit. | $137,621 |
| Jan 25, 2024 | Completed final sign-off May 2024 | 71 Stevenson St | interior tenant improvement: demolition of non structural partitions, millwork, finnishes. new partitions, finishes and reolcated lighting. mep, fire and life safety under sep permitDetails
interior tenant improvement: demolition of non structural partitions, millwork, finnishes. new partitions, finishes and reolcated lighting. mep, fire and life safety under sep permit | $566,784 |
| Dec 15, 2023 | Completed final sign-off Jul 2025 | 251 Rhode Island St | lobby improvement: demolition of non-structural partitions, new non structural partitions, millwork, door assemblies, light fixtures, ceiling assemblies and finishes. new interior stairsDetails
lobby improvement: demolition of non-structural partitions, new non structural partitions, millwork, door assemblies, light fixtures, ceiling assemblies and finishes. new interior stairs | $1,038,424 |
| Oct 18, 2023 | Completed final sign-off Feb 2024 | 335 Powell St | structural support of ceiling, wall & door assembly at hotel entrance. this new enclosure is supported by 2 floor assembly. the main structure of the assembly is made up of hss beams and columns, using ordinary steel moment frame connecting for 2 lateral support of the assembly. ref pa# 202209152520Details
structural support of ceiling, wall & door assembly at hotel entrance. this new enclosure is supported by 2 floor assembly. the main structure of the assembly is made up of hss beams and columns, using ordinary steel moment frame connecting for 2 lateral support of the assembly. ref pa# 202209152520 | $25,000 |
| Oct 4, 2023 | Completed final sign-off Jan 2024 | 335 Powell St | installing 2 linear diffusers w/ accociated duct work & flex. (ref pa# 202209152520)Details
installing 2 linear diffusers w/ accociated duct work & flex. (ref pa# 202209152520) | $12,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 900 North Point St | deferred mep for 202307111874Details
deferred mep for 202307111874 | $349,200 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 71 Stevenson St | 14/f: use existing reheat and cooling only vav boxes, install low side supply ductwork.Details
14/f: use existing reheat and cooling only vav boxes, install low side supply ductwork. | $25,000 |
| Jul 11, 2023 | Completed final sign-off Sep 2025 | 2 New Montgomery St | revision to pa#202104148558, defferred structural engineering & special inspections. add exterior security fence at ground fl along annie st to enclose 855 sf of existing open sidewalk.Details
revision to pa#202104148558, defferred structural engineering & special inspections. add exterior security fence at ground fl along annie st to enclose 855 sf of existing open sidewalk. | |
| Jul 11, 2023 | Completed final sign-off Apr 2024 | 900 North Point St | 1st & 2nd fl interior ti. new interior partitions, kitchen equipment, lighting, casework and finishes mep deferredDetails
1st & 2nd fl interior ti. new interior partitions, kitchen equipment, lighting, casework and finishes mep deferred | $900,000 |
| Jun 7, 2023 | Completed final sign-off Nov 2023 | 71 Stevenson St | interior tenant improvement for suite 1400: demo of non structural partitions. new non structural partitions, millwork, finishes, light fixtues, ceiling assemblies, door assemblies, plumbing fixures. mep deferredDetails
interior tenant improvement for suite 1400: demo of non structural partitions. new non structural partitions, millwork, finishes, light fixtues, ceiling assemblies, door assemblies, plumbing fixures. mep deferred | $260,000 |
| Apr 19, 2023 | Completed final sign-off Mar 2024 | 851 Beach St | proposed demolitoin of non load bearing partitons that currently demise the suite to allow for future constrtuction (under separate permit) of a new single tenant. no exterior work unde this permit.Details
proposed demolitoin of non load bearing partitons that currently demise the suite to allow for future constrtuction (under separate permit) of a new single tenant. no exterior work unde this permit. | $20,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | demo ceiling & sidewall supply & return grilles. add new ceiling and sidewall supply and return grilles. ref t.i. pa#2022-1221-8859. mech review only.Details
demo ceiling & sidewall supply & return grilles. add new ceiling and sidewall supply and return grilles. ref t.i. pa#2022-1221-8859. mech review only. | $15,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | 31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured.Details
31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured. | $190,000 |
| Jan 12, 2023 | Completed final sign-off Mar 2023 | 71 Stevenson St | replace all existing light fixtures w/ energy efficient led lighting. ref ti permit 202104279372Details
replace all existing light fixtures w/ energy efficient led lighting. ref ti permit 202104279372 | $25,000 |
| Dec 27, 2022 | Completed final sign-off Apr 2023 | 300 Montgomery St | ste300:reuse (e) vav boxes as shown. demo duct work and supply diffusers as shown. provide new supply dectwork for new layout. relocate (e) supply diffusers to new locations. provide new return grilles as shown. relocate (e) thermostat as required. provide air balance report. ref permit 202211166623Details
ste300:reuse (e) vav boxes as shown. demo duct work and supply diffusers as shown. provide new supply dectwork for new layout. relocate (e) supply diffusers to new locations. provide new return grilles as shown. relocate (e) thermostat as required. provide air balance report. ref permit 202211166623 | $12,000 |
| Dec 21, 2022 | Completed final sign-off Sep 2023 | 335 Powell St | renovation of 8 guest rooms on level 31 no change to number of guest rooms, construction including mior demo, plumbing fixtures, new walls and finishes any mep sprinkler and fire alarm shall be done as part of a seperate permit.Details
renovation of 8 guest rooms on level 31 no change to number of guest rooms, construction including mior demo, plumbing fixtures, new walls and finishes any mep sprinkler and fire alarm shall be done as part of a seperate permit. | $160,000 |
| Dec 7, 2022 | Completed final sign-off Dec 2023 | 121 Spear St | ste 220: provide & install 1 water source heat pump., 2 new ceiling mounted supply diffusers & new ductwork connecting to new heat pump. provide & install 2 new ceiling mounted return grills & sound socks. install 2 side wall return grills & soundsocks. air balance, ref pa# 202210043727.Details
ste 220: provide & install 1 water source heat pump., 2 new ceiling mounted supply diffusers & new ductwork connecting to new heat pump. provide & install 2 new ceiling mounted return grills & sound socks. install 2 side wall return grills & soundsocks. air balance, ref pa# 202210043727. | $30,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2023 | 121 Spear St | new power and data for offices. new lighting and controls. ref app# 202210043727.Details
new power and data for offices. new lighting and controls. ref app# 202210043727. | $2,000 |
| Nov 16, 2022 | Completed final sign-off Apr 2023 | 300 Montgomery St | #300: interior t.i. work on a single floor. work includes demolition. new partitions, doors, and frames, casework, finishes, electrical and lighting work.Details
#300: interior t.i. work on a single floor. work includes demolition. new partitions, doors, and frames, casework, finishes, electrical and lighting work. | $390,000 |
| Oct 4, 2022 | Completed final sign-off Dec 2023 | 121 Spear St | suite 220: ti project : creating two (n) offices. this involves removal of existing lights, new partitions, doors, glazing, power and data, ceiling grid and tile, mechanical, lighting & controls and finishes. deferred submittal for fire sprinklers.Details
suite 220: ti project : creating two (n) offices. this involves removal of existing lights, new partitions, doors, glazing, power and data, ceiling grid and tile, mechanical, lighting & controls and finishes. deferred submittal for fire sprinklers. | $140,000 |
| Sep 15, 2022 | Completed final sign-off Feb 2024 | 335 Powell St | barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away)Details
barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away) | |
| Sep 2, 2022 | Completed final sign-off Jan 2024 | 550 Montgomery St | washing davits and tiebacks at the roof levels of 550 montgomeryDetails
washing davits and tiebacks at the roof levels of 550 montgomery | $50,000 |
| Aug 26, 2022 | Completed final sign-off Jan 2023 | 625 02nd St | new exit door at (e) storefront and enlarge an (e) exit door at an exit stairway at 1/f. maher n/a.Details
new exit door at (e) storefront and enlarge an (e) exit door at an exit stairway at 1/f. maher n/a. | $35,000 |
| Jun 23, 2022 | Completed final sign-off Sep 2022 | 460 Bush St | reference pa 202201216401 electrical/t24 work only.Details
reference pa 202201216401 electrical/t24 work only. | |
| Jun 17, 2022 | Completed final sign-off Sep 2022 | 550 Montgomery St | 7th floor/suite 750: t.i. includes new non structural partitions, doors/frames and interior glazing. all new or revised mep, life safety work will be design build and submitted seperately. (bldg fully sprinklered)lighting.Details
7th floor/suite 750: t.i. includes new non structural partitions, doors/frames and interior glazing. all new or revised mep, life safety work will be design build and submitted seperately. (bldg fully sprinklered)lighting. | $50,000 |
| Jun 17, 2022 | Completed final sign-off Jan 2023 | 44 Montgomery St | 42nd fl: commercial tenant improvement of part of existing offices to include partial height walls, doors, millwork, minor electrical work, and potential reconfigure of sprinklers + hvac diffusers if required.Details
42nd fl: commercial tenant improvement of part of existing offices to include partial height walls, doors, millwork, minor electrical work, and potential reconfigure of sprinklers + hvac diffusers if required. | $152,469 |
| Jun 3, 2022 | Never finaled issued Aug 2022, no final | 335 Powell St | demolition in discoveries gift shop. remove fixtures, furnishings, ceiling, walls, casework & supporting structures of those items to reveal eisting structural. ab-007 appliesDetails
demolition in discoveries gift shop. remove fixtures, furnishings, ceiling, walls, casework & supporting structures of those items to reveal eisting structural. ab-007 applies | $8,000 |
| May 6, 2022 | Completed final sign-off Aug 2022 | 650 California St | ste #2000- ref to t.i. 202202188311. install 1 new cooling only vav. rework lowside deckwork and rebalance vav's as req. install 1 new wshp to serve it room.Details
ste #2000- ref to t.i. 202202188311. install 1 new cooling only vav. rework lowside deckwork and rebalance vav's as req. install 1 new wshp to serve it room. | $34,100 |
| Apr 25, 2022 | Completed final sign-off Sep 2022 | 121 Spear St | new convenience receptacle for future tenant space. new lighting & controls. reference #202203180339Details
new convenience receptacle for future tenant space. new lighting & controls. reference #202203180339 | |
| Apr 12, 2022 | Completed final sign-off Sep 2022 | 460 Bush St | revision to pa#202201216401. change 4 of 6 dental exam rm show disabled access 36" wied side clearance at one side of exam chair per cbc 11b-804.1 exception for non-emergency settings. 1hr wall and 45min door and frame at med gas closet. sffd op permit for med gas submitted separately.Details
revision to pa#202201216401. change 4 of 6 dental exam rm show disabled access 36" wied side clearance at one side of exam chair per cbc 11b-804.1 exception for non-emergency settings. 1hr wall and 45min door and frame at med gas closet. sffd op permit for med gas submitted separately. | |
| Mar 24, 2022 | Completed final sign-off Feb 2023 | 71 Stevenson St | accessibility path of travel and ramp.Details
accessibility path of travel and ramp. | |
| Feb 18, 2022 | Completed final sign-off Jul 2022 | 650 California St | commercial tenant imrovment of e office space. adding new rooms to include new doors, walls, ceiling reconfiguration, relocation of e light fixtures, addition of new light fixtures, minor reconfiguration of hvac, addition of vanity sink to mothers roomDetails
commercial tenant imrovment of e office space. adding new rooms to include new doors, walls, ceiling reconfiguration, relocation of e light fixtures, addition of new light fixtures, minor reconfiguration of hvac, addition of vanity sink to mothers room | $398,926 |
| Feb 16, 2022 | Completed final sign-off Sep 2022 | 101 Spear St | gr floor interior dmeo for 1 vacant retail space. demolish e suspended ceiling and carpet. patch e drywall walls and ceiling and paint. polish e concrete floor. no other work.Details
gr floor interior dmeo for 1 vacant retail space. demolish e suspended ceiling and carpet. patch e drywall walls and ceiling and paint. polish e concrete floor. no other work. | $10,000 |
| Jan 21, 2022 | Completed final sign-off Sep 2022 | 460 Bush St | new partitions, gypboard and suspended ceilings, casework and finishes. new accessible restroom, new operatories and associated service rooms for dental office ti on 2/f. new partition at g/f for bldg lobby. mep, lighting, life safety and sprinkers under sep permits. no ext work. historical bldg.Details
new partitions, gypboard and suspended ceilings, casework and finishes. new accessible restroom, new operatories and associated service rooms for dental office ti on 2/f. new partition at g/f for bldg lobby. mep, lighting, life safety and sprinkers under sep permits. no ext work. historical bldg. | $250,000 |
| Dec 16, 2021 | Completed final sign-off Feb 2024 | 101 Spear St | revisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved.Details
revisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved. | $125,000 |
| Sep 14, 2021 | Expired or cancelled cancelled Jan 2026 | 101 Spear St | revision to existing permit # 2020-5310-6671 and 2020-0922-4736 to keep e temporary barricade walls as permanentDetails
revision to existing permit # 2020-5310-6671 and 2020-0922-4736 to keep e temporary barricade walls as permanent | $5,000 |
| Jul 21, 2021 | Completed final sign-off Dec 2022 | 1725 Montgomery St | g/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed.Details
g/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed. | $150,000 |
| Jul 8, 2021 | Completed final sign-off Jun 2022 | 151 Clement St | (n) entry door & store front system at clement st. renovation of giorgio's pizza, relocate kitchen counterDetails
(n) entry door & store front system at clement st. renovation of giorgio's pizza, relocate kitchen counter | $115,000 |
| Jun 1, 2021 | Completed final sign-off Jan 2023 | 901 Market St | 5th fl restroom - includes floor, sink area, plumbing fixtures, toilet partitions, lighting.Details
5th fl restroom - includes floor, sink area, plumbing fixtures, toilet partitions, lighting. | $226,000 |
| May 3, 2021 | Never finaled issued Jun 2021, no final | 121 Spear St | removal & replacement of sections of 1st floor slab. interior location.Details
removal & replacement of sections of 1st floor slab. interior location. | $15,000 |
| Apr 27, 2021 | Completed final sign-off Feb 2023 | 71 Stevenson St | interior tenant improvement: upgrade ground floor lobby finishes & lighting. existing lobby exterior doors to be replaced. mep to be filed separately.Details
interior tenant improvement: upgrade ground floor lobby finishes & lighting. existing lobby exterior doors to be replaced. mep to be filed separately. | $468,000 |
| Apr 14, 2021 | Completed final sign-off Sep 2025 | 2 New Montgomery St | add exterior security fence at ground floor along annie st, at south-west side of palace hotel to enclose 855 sf of existing open sidewalk within property.Details
add exterior security fence at ground floor along annie st, at south-west side of palace hotel to enclose 855 sf of existing open sidewalk within property. | $50,000 |
| Oct 8, 2020 | Completed final sign-off Sep 2022 | 121 Spear St | removal of (e) retail, plumb, electr & lighting fixtures, removal of (e) walls, doors & finishes. patching & preparation for future tenant improvement build-out. space to remain vacant per sf ab-017. mep under separate permit.Details
removal of (e) retail, plumb, electr & lighting fixtures, removal of (e) walls, doors & finishes. patching & preparation for future tenant improvement build-out. space to remain vacant per sf ab-017. mep under separate permit. | $65,000 |
| Sep 28, 2020 | Completed final sign-off Dec 2022 | 1725 Montgomery St | revison to pa #2020-0310-6580: mechanical for permit.Details
revison to pa #2020-0310-6580: mechanical for permit. | |
| Sep 22, 2020 | Completed final sign-off Sep 2022 | 101 Spear St | 1st fl - temporary barricades and egress path per inspector's request. ref to pa 2020 0310 6671.Details
1st fl - temporary barricades and egress path per inspector's request. ref to pa 2020 0310 6671. | $8,000 |
| Sep 19, 2020 | Completed final sign-off Aug 2021 | 1725 Montgomery St | 3/f: t.i.:demo non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mech. minor replace of light fixt. elec trade by gc. gc to provide supply lines for beverage equip,Details
3/f: t.i.:demo non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mech. minor replace of light fixt. elec trade by gc. gc to provide supply lines for beverage equip, | $165,000 |
| Mar 10, 2020 | Completed final sign-off Dec 2022 | 1725 Montgomery St | 1st fl ti includes demo of non structural partitions and building new non structural partitions. meps life safetyDetails
1st fl ti includes demo of non structural partitions and building new non structural partitions. meps life safety | $828,000 |
| Mar 10, 2020 | Completed final sign-off Sep 2021 | 101 Spear St | renovation of existing elevator lobby space, including ceiling, lighting, and new reception desk area.Details
renovation of existing elevator lobby space, including ceiling, lighting, and new reception desk area. | $350,000 |
| Mar 10, 2020 | Completed final sign-off Aug 2021 | 101 Spear St | revision to pa #2019-0806-7976: omission of scope including raised platform area at spear st. entry including associated finish work, and elevator lift.Details
revision to pa #2019-0806-7976: omission of scope including raised platform area at spear st. entry including associated finish work, and elevator lift. | |
| Feb 28, 2020 | Never finaled issued Mar 2020, no final | 101 Spear St | revision to pa #201911278338 for local equivalency of existing verical grase ducts.Details
revision to pa #201911278338 for local equivalency of existing verical grase ducts. | |
| Jan 30, 2020 | Completed final sign-off Oct 2022 | 101 Spear St | revision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit.Details
revision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit. | |
| Dec 10, 2019 | Completed final sign-off Jun 2020 | 1725 Montgomery St | ti include only demo work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinkleredDetails
ti include only demo work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinklered | $75,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | ground fl suite b8: demolition of non-structural walls & finishes.Details
ground fl suite b8: demolition of non-structural walls & finishes. | $20,000 |
| Nov 27, 2019 | Completed final sign-off Sep 2021 | 101 Spear St | ref# 201908279939 & 201908067976: deferred mep including grease exhaust fans&ducts, general exhaust & type 2 exhaust ducts. motorized operable windows for smoke control, restroom exhasut and rebalance existing restroom exhaust floor 2-5.Details
ref# 201908279939 & 201908067976: deferred mep including grease exhaust fans&ducts, general exhaust & type 2 exhaust ducts. motorized operable windows for smoke control, restroom exhasut and rebalance existing restroom exhaust floor 2-5. | |
| Nov 25, 2019 | Completed final sign-off Dec 2019 | 300 Montgomery St | 6/f: ref app#201906183678: 1)cut, cap & mark for demo by others. all distribution ductwork & hot & cold deck mains. 2)extend cold deck main from adjacent space to nw suite. 3)install new heating hot water piping from 5th to 6th floor. provide 2 new cooling only & 3 nw vav reheat unitsDetails
6/f: ref app#201906183678: 1)cut, cap & mark for demo by others. all distribution ductwork & hot & cold deck mains. 2)extend cold deck main from adjacent space to nw suite. 3)install new heating hot water piping from 5th to 6th floor. provide 2 new cooling only & 3 nw vav reheat units | |
| Nov 15, 2019 | Completed final sign-off Mar 2021 | 101 Spear St | project scope includes the installation of atrium doors assembly structural frame support framing on ground level slab. reference pa# 2019-0828-0119Details
project scope includes the installation of atrium doors assembly structural frame support framing on ground level slab. reference pa# 2019-0828-0119 | $25,000 |
| Nov 14, 2019 | Completed final sign-off Mar 2020 | 300 Montgomery St | suite #200: interior t.i. removal of non structural partitions, new finishes and lighting.Details
suite #200: interior t.i. removal of non structural partitions, new finishes and lighting. | $800,000 |
| Nov 5, 2019 | Completed final sign-off Dec 2020 | 121 Spear St | ground fl. suite b-10 (hair salon) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, building is fully sprinkledDetails
ground fl. suite b-10 (hair salon) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, building is fully sprinkled | $200,000 |