Cobuild Construction Services Inc
- Based in
- Castro Valley
- On San Francisco permits
- Jun 2016 to May 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2025 | Completed final sign-off Oct 2025 | 350 Parnassus Av | 3rd/f: interior work only, 3rd fl new non-bearing partition & new sinkDetails
3rd/f: interior work only, 3rd fl new non-bearing partition & new sink | $12,500 |
| Dec 2, 2021 | Completed final sign-off Feb 2023 | 2612 Ocean Av | t.i. : new carpet, casework, grab bars, tile, countertops. t.i. existing bathroom mech to remain.Details
t.i. : new carpet, casework, grab bars, tile, countertops. t.i. existing bathroom mech to remain. | $175,000 |
| Oct 17, 2019 | Completed final sign-off May 2020 | 500 Sutter St | floors 2/5/8: each floor install new accessible drinking fountain based on approved pre-app letter issued on 04/24/2019. maher n/a.Details
floors 2/5/8: each floor install new accessible drinking fountain based on approved pre-app letter issued on 04/24/2019. maher n/a. | $15,000 |
| Apr 12, 2019 | Completed final sign-off Dec 2019 | 1 Thomas More Wy | at east wing convert (e) bathing room to laundry room. one location on each 2nd and 3rd floors. (e) exhaust to remain. replace plm, add vents for dryers. relocate (e) ele outletsDetails
at east wing convert (e) bathing room to laundry room. one location on each 2nd and 3rd floors. (e) exhaust to remain. replace plm, add vents for dryers. relocate (e) ele outlets | $20,000 |
| Nov 29, 2018 | Completed final sign-off May 2019 | 795 08th Av | #101: tenant entrance doors and storefront windows to be replaced with better performing systems to match existing. ada push plates to be installed. security gate at alcove to match adjacent extg gates/fences.Details
#101: tenant entrance doors and storefront windows to be replaced with better performing systems to match existing. ada push plates to be installed. security gate at alcove to match adjacent extg gates/fences. | $66,509 |
| May 29, 2018 | Completed final sign-off Jul 2018 | 1 Thomas More Wy | structural revision to 201803073138 - colums/beams showns on original plans do not exist. new post and beam to support (e) ceiling/floor framing above maher naDetails
structural revision to 201803073138 - colums/beams showns on original plans do not exist. new post and beam to support (e) ceiling/floor framing above maher na | $5,200 |
| May 18, 2018 | Completed final sign-off Nov 2018 | 1 Thomas More Wy | divsion of a 2 bedrroom assisted care unit into 2 separate units. no change in occupancyDetails
divsion of a 2 bedrroom assisted care unit into 2 separate units. no change in occupancy | $25,000 |
| Mar 7, 2018 | Completed final sign-off Jul 2018 | 1 Thomas More Wy | interior renovation (a/mep) of lowest floor of west wing from assisted living to dementia care. no change in occpancy group. 11 studio units renovated to 9 memory care sleeping rooms (6 private, 3 shared) an office, common use toilet rm, dining rm, staff use warming kitchenDetails
interior renovation (a/mep) of lowest floor of west wing from assisted living to dementia care. no change in occpancy group. 11 studio units renovated to 9 memory care sleeping rooms (6 private, 3 shared) an office, common use toilet rm, dining rm, staff use warming kitchen | $150,000 |
| Aug 24, 2017 | Completed final sign-off Mar 2018 | 1429 Mendell St | revision to pa 2017-0510-6163 (already reviewed by dph), primary entry - ramp - ada compliantDetails
revision to pa 2017-0510-6163 (already reviewed by dph), primary entry - ramp - ada compliant | |
| May 22, 2017 | Completed final sign-off Jan 2020 | 3220 Fulton St | relocation of several ceiling height partitions; new interior finishes; kitchenette casework to be upgraded to ada. all lighting, hvac & sprinklers to remainDetails
relocation of several ceiling height partitions; new interior finishes; kitchenette casework to be upgraded to ada. all lighting, hvac & sprinklers to remain | $100,000 |
| Jun 30, 2016 | Completed final sign-off Sep 2016 | 25 Van Ness Av | minor renovation of extg theater lobby to include new paint, carpet, furnishings, replace lighting and repair sprinklers. minor partition adjustment.Details
minor renovation of extg theater lobby to include new paint, carpet, furnishings, replace lighting and repair sprinklers. minor partition adjustment. | $149,312 |