609 permits since 2000: 463 completed, 26 in progress, 79 never finaled, 41 expired or cancelled.
Of the 79 never-finaled permits, 3 are 3 to 5 years old, 32 are 5 to 10 years old, 44 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 609.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 600 Montgomery St | demolition of some (e) doors, construction of new full-height partitions, doors, millwork, finishes, associated electrical power/lightning distribution, associated system distribution, associated plumbing, associated life-safety system changes. | $1,500,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 530 Jackson St | revision pa#: 202512172080. issued for permit for ground floor store front and window replacement | $850,000 |
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 1275 Sacramento St | revision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping. | |
| May 27, 2026 | In progress issued May 2026 | 1 Harrison St | 6/fl- revisoin 202410173107 to include adding guardrail to 6th floor roof deck plan north parapet. in response to as built discovery that the parapet is less than 42" at roof deck | |
| May 13, 2026 | In progress filed May 2026, not yet issued | 1501 Sunnydale Av | (230 hahn st) - mep complied work related to bpa: 202212017477 | |
| Apr 7, 2026 | In progress issued Apr 2026 | 1 Harrison St | revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening. | |
| Mar 27, 2026 | In progress issued Apr 2026 | 1450 Owens St | partial interior demolition of existing slab on level 1 ref bpa#2025-1223-2555- interior ti. ref bpa#202204202594 bulleting 8 revision sof 202012281760 core and shell | $24,500 |
| Mar 20, 2026 | In progress issued May 2026 | 755 Ocean Av | new pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building. | $523,000 |
| Mar 18, 2026 | In progress issued Jul 2026 | 3185 Washington St | remodel of existing private school building. project includes interior renovation work at basement and level-1 and seismic retrofit work. exterior work includes 2 new fixed fire rated windows at the rear facade, 1 at the first floor and 1 at the basement level | $423,800 |
| Mar 13, 2026 | In progress issued Jun 2026 | 3185 Washington St | interior demolition to prepare for alteration work under separate permit, paritions are non-structural. | $144,549 |
| Mar 11, 2026 | In progress issued Mar 2026 | 1 Harrison St | defferred green living wall submission associated with approved pa #202410173107 | $10,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 600 Montgomery St | deferred submittal for 202512151771 for cold form steel framing. | $150,000 |
| Feb 12, 2026 | Completed final sign-off Sep 2026 | 1275 Sacramento St | renovation of commercial kitchen restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passageway & alteration to utilities serving the area to be renovated | $4,000,000 |
| Feb 6, 2026 | In progress filed Feb 2026, not yet issued | 1 Harrison St | deferred fire alarm submission associated with approved pa#2024-1017-3107 | |
| Jan 23, 2026 | In progress issued Aug 2026 | 530 Jackson St | b lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door. | $4,323,223 |
| Jan 5, 2026 | In progress issued Jul 2026 | 1450 Owens St | interior ti to build-out offices, r & d laboratories & support spaces at levels 1, 5-7 of an (e) 7 story core & shell building. | $26,400,000 |
| Dec 15, 2025 | In progress issued Jan 2026 | 600 Montgomery St | 39/f: interior alteration of new tenant fitout to include board room, storage rooms, enclosed and open offices, break room and all gender restrooms, with associated mep work, and selected demolition work. | $3,500,000 |
| Dec 15, 2025 | Completed final sign-off Mar 2026 | 600 Montgomery St | structural revision to pa# 202504245130 and pa# 202504144304, to reassign engineer of record for the coil unit anchorage. | |
| Dec 8, 2025 | In progress issued Feb 2026 | 1 Harrison St | defferred exterior metal framing assocated with approved pa 202410173107. | $10,000 |
| Nov 3, 2025 | In progress issued Nov 2025 | 1 Harrison St | windscreen structural only submission associated with 202410173107 | |
| Aug 29, 2025 | In progress issued Dec 2025 | 1 Harrison St | defferred curtainwall: structural only submission assocated with approved pa 202410173107 | |
| Aug 15, 2025 | In progress issued Sep 2025 | 1 Harrison St | mech and electrial upgrades install (n) ashp heating , hot water chiler and new panel hr | $100,000 |
| Jul 10, 2025 | In progress issued Dec 2025 | 1 Harrison St | deferred frp structural only submission associated with approved pa 202410082583. | $20,000 |
| Jun 23, 2025 | In progress issued Aug 2025 | 1 Harrison St | 4th floor: tenant improvements includes new non-load bearing partitions, doors, ceiling, and finishes. mep included. | $2,693,481 |
| Jun 3, 2025 | In progress filed Jun 2025, not yet issued | 3220 Sacramento St | interior demolition non structural. ti work is under pa#202501158356. ab-017 applies | $50,000 |
| May 29, 2025 | In progress issued Jul 2025 | 1 Harrison St | revision to pa# 202410082583: misc structural updates. | |
| May 6, 2025 | Completed final sign-off Dec 2025 | 600 Montgomery St | priority ab004 deferred review of structural scope associated with pa# 202504114225 | |
| Apr 14, 2025 | Completed final sign-off Jun 2026 | 600 Montgomery St | 9th & 11th fl t.i. interior alteration of new tenant fit out included conference rooms, storag aeras, enclosed offices, lan rooms w/ associated mep & structural work | $6,500,000 |
| Apr 14, 2025 | Completed final sign-off Jun 2026 | 600 Montgomery St | interior alterations of new tenant fit out of levels 10,12, and 13 levels. to include conference rooms, and storage areas. | $9,800,000 |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 600 Montgomery St | 23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130) | $5,500,000 |
| Apr 3, 2025 | Completed final sign-off Sep 2025 | 3220 Sacramento St | interior renovation to convert (e) u-lab classroom to offices and student lounge. replacement of hvac unit w/ new erv,heat pumpunits, diffusers and grills. | $500,000 |
| Feb 25, 2025 | Completed final sign-off Sep 2025 | 548 Delta St | revision 202402075425- to include- replace sheetrock at level 1 mezzanie area. replace (2) windows in kind at level 1 mezzanie and addition of (1) new window facing delta street. | $40,000 |
| Jan 30, 2025 | Completed final sign-off Sep 2025 | 3150 Washington St | 1st/fl: interior renovation of existing music classrooms at level 1, 3rd /fl: replacing one framed wall with storefront at level 3 (non facing street). | $1,000,000 |
| Nov 19, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | revision to pa 202210265236 & 202301301009 chane to special inspection checklist | |
| Nov 14, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | as built drawing to 202309076120 & 202012281760.a(n) notifier nfs2-3030, intelligent, addressable, network, voice fire alarm system is being installed as part of this (n)construction high rise-lab & office project.this project will be the installation of the fire alarm in the core areas of the bldg. | |
| Nov 14, 2024 | In progress issued Jul 2025 | 1 Harrison St | horizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits. | $13,300,000 |
| Nov 5, 2024 | Completed final sign-off Sep 2025 | 548 Delta St | ref 202402075425- deffered micropile submission | |
| Oct 16, 2024 | Completed final sign-off Aug 2025 | 555 California St | 6th fl mep defferal submital for pa # 2024-0816-8893 | $750,000 |
| Oct 10, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | revision to pa#: 202307051465. change fuel line routing, move control panel, add manifold sump. | |
| Oct 8, 2024 | In progress issued May 2025 | 1 Harrison St | phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107. | $6,545,000 |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 1 Harrison St | demo of interior partitions, ceilings, finishes on all floors. structural and architectural upgrades under sep permit | $609,000 |
| Aug 30, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | 2-4/fl-rev 202406184792- removal of raised access floor at north portion of buliding level 2,3,4 | $294,845 |
| Aug 30, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | 5/fl-rev 202406215017- removal of raised access floor at north portion of buliding level 5 | $98,282 |
| Aug 21, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | revision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans | |
| Aug 16, 2024 | Completed final sign-off Aug 2025 | 555 California St | 6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit app | $3,008,592 |
| Aug 5, 2024 | Completed final sign-off Jun 2025 | 550 Terry A Francois Bl | the entire north tower roofing will be removed down to the slab and replaced. the existing rooftop ahu will be removed and replaced inkind. a new door will be added as an exit for the 4th floor terrace. | $3,238,165 |
| Jul 26, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | the 40.2 kw system will be comprised of (67)600w hanwha q.cell modules,(67)tigo rapid shutdows(1)36kw solectria inverter to meet the better roofs & green building code pv requirements for new building constructed under site pa # 202012281760. | $200,000 |
| Jul 26, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design | |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | 5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit | $50,000 |
| Jun 18, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | floors 2,3, & 4th floors: non structural, interior demolition per ab-017. including interior non-bearing walls, doors, cabinetry, plumbing fixtures, floor finishes, ceiling hvac diffusers, and lighting fixtures. sprinkler ref pa #2024-0613-4429 | $180,000 |
| Jun 4, 2024 | Completed final sign-off Oct 2024 | 755 Ocean Av | replacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and power | $500,000 |
| May 30, 2024 | Completed final sign-off Jan 2025 | 1450 Owens St | deferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation. | $10,000 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 301 Howard St | 14/f: commmercial interior tenant improvement including - demo of walls, doors, millwork, and finishes and build back of walls, doors, finishes, and acoustical ceiling. | $177,500 |
| Apr 11, 2024 | Completed final sign-off Aug 2025 | 548 Delta St | soft demo interior non strutural per ab-017 area to remain vacant until all accessibility factors restored under future permit | $48,600 |
| Mar 29, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | 1/fl-interior soft demo per ab:017 level 1 removal of architectural and mep as noted on drawings. all demolished mep will be safed back to risers. no occupancy until ti is completed per ab017. | $20,000 |
| Mar 15, 2024 | Completed final sign-off May 2024 | 1450 Owens St | revision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination. | |
| Feb 27, 2024 | Completed final sign-off Dec 2024 | 755 Ocean Av | all (e) mechanical units and associated duct work are to be removed to allow for support & assembly & upgrades. all (e) roofing and membrane will be removed and replaced with an sbs-modified 2 ply roofing system, along with new drains and overflow systems. new mechanical units and associated | $200,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2025 | 548 Delta St | to accommodate a "0-5yr" childcare center. will serve approximately 60 children in 4 classrooms: 1 infant, 1 toddler, & 2 pre-k. will contain a family resource center & teacher/staff lounge. interior demolition as req. non-bearing partitions, mep, replace (e) windows & doors. (n) lula elevator, | $4,700,674 |
| Oct 18, 2023 | Completed final sign-off Dec 2023 | 901 16th St | revision to permit 202306139941. indicate as built elevator hoisteway hatch locations and product information for access of hoistway smoke detector per sffd | |
| Sep 7, 2023 | Completed final sign-off Feb 2025 | 1450 Owens St | revision to fa permit# 202012281760 s7. submittal smoke control panel drawing showing the reconfiguration of the ahus depiction. | |
| Jul 31, 2023 | Completed final sign-off Apr 2024 | 900 Pennsylvania Av | alteration of (e) large refrigeration/freezer spaces, demo of (e) u nits & (e) slabs ongrade under units, install of new insulated slab, new refrigeration/freezer units w/high piled storage racks, & associated mep. revision apn#202006138695 | $925,000 |
| Jul 26, 2023 | Completed final sign-off May 2024 | 1450 Owens St | revision to pa# 202204202594 & pa# 202210043668. provide civil stormwater updates due to art sculpture addition and final scp comments. | |
| Jul 5, 2023 | Never finaled issued Aug 2023, no final | 88 Maryland St | pid permit for the review of storm water control & non-potable water infrastructure associated with site pa #201908300403 | |
| Jul 5, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | scope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft. | $2,500,000 |
| Jun 13, 2023 | Completed final sign-off Dec 2023 | 901 16th St | revision to bpa#20210111240s4 (arch/mep), revision work is to indicate elevator hoistway hatch, location & product information | |
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 2567 Mission St | revision to 202212168551 & 202212208745: add (n) sink wellness rm on 1/f, upgrade (e) sinks in basement & 3rd fl break rms to re accessible. no cooling facilities & no catering service | $30,000 |
| Jun 2, 2023 | Completed final sign-off Jan 2024 | 2567 Mission St | revision to 202212168551: to infill (e) glass block in 2 locations on the sidewalk | |
| Apr 26, 2023 | Completed final sign-off Mar 2025 | 444 Presidio Av | underpinning of existing structure in connection with work on the adjacent property at 3150 california street pa# 202205265118. | $225,000 |
| Apr 19, 2023 | Completed final sign-off May 2025 | 1450 Owens St | main lobby improvements at the main entrance to a 7-story warm shell and core lab/office building | $800,000 |
| Mar 20, 2023 | Completed final sign-off Mar 2025 | 3150 California St | demolish a 2-story, type 5b, retail & office building. | $395,000 |
| Mar 14, 2023 | Completed final sign-off Sep 2023 | 2567 Mission St | revision to 202212168551 to memorialize (e)/proposed conditions of basement egress stair based filed conditions. | |
| Feb 17, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | the south portion of prj is core-shell,"warm shell only" renovation & being submitted for permit as a b-group occupancy. (e) building, both north & south portions, are b-group. (e) service elevator, elevator 5,will be upgraded to serve as a hazardous materials lift. life safety under separate permi | $30,000,000 |
| Feb 3, 2023 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | revision to pa# 202207017644 to relocate hydrant due to puc request for utility access. | |
| Jan 30, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule. | |
| Jan 26, 2023 | Completed final sign-off Aug 2023 | 900 Pennsylvania Av | revision to pa #202202248636, to correct special inspection requirements based on eor instructions for special inspections requried for the scope of work. | |
| Dec 20, 2022 | Completed final sign-off Sep 2023 | 2567 Mission St | change of planning use per commission motion 21202. no change of occupancy per building code. tenant improvement work includes renovation of 1st & 2nd floors, non-structural partitions, doors, finishes. mep deferred. | $359,242 |
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 2567 Mission St | minor t.i. basement & 3rd fl, an (e) building as non-profit organization office, no exterior changes except for repair & painting included graffiti removal @ primary facade. | $613,730 |
| Dec 1, 2022 | In progress issued Oct 2025 | 1501 Sunnydale Av | block 3a/lot 3: ti of g/f commercial space for use as an early care and education (ece) center.ti. consists of interior non-structural partitions, finishes & exterior courtyard improvements; mep, fp, lv will be design-build & submitted under seperate permits; (base permit # 202106031523) | $737,876 |
| Nov 14, 2022 | Completed final sign-off Jan 2024 | 901 16th St | pid review only per project sfpuc final stormwater control plan submittal comment. ref architecutre & mep submittal pa# 202101112460 s4. | |
| Nov 10, 2022 | Completed final sign-off Jun 2023 | 201 Mission St | fl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain. | $27,000 |
| Nov 3, 2022 | Completed final sign-off Jan 2023 | 140 New Montgomery St | 18th fl - revision to pa 2022-0218-8310 to install dw, refrigerator & hot water heater | $4,000 |
| Oct 26, 2022 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo. | $416,000 |
| Oct 4, 2022 | Completed final sign-off May 2024 | 1450 Owens St | revision to pa#202204202594. update civil sewer and stormwater lateral to avoid existing joint utility trench along nelson rising lane. | |
| Aug 30, 2022 | Completed final sign-off Jan 2023 | 2300 26th St | installation of a single piece of equipemnt including seismic anchorage with associated blower on roof | $150,000 |
| Aug 25, 2022 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | pid permit associated with storm water control plan and pa# 202105281321. | |
| Aug 23, 2022 | Completed final sign-off Aug 2023 | 550 Terry A Francois Bl | floors 2 throughh 6: interior non-structural demo. all spaces being demolised will remain vacant per ab-017 | $50,000 |
| Aug 10, 2022 | Completed final sign-off Jul 2025 | 640 Cesar Chavez St | revision to pa#202105281321. revised south wall and occupant loading. revised west lot charger location and vehicle lift locations. other misc. details per plans. | |
| Jul 27, 2022 | Completed final sign-off Jan 2023 | 140 New Montgomery St | 18th fl: structural support/analysis for mep equipment in server room and anchorage details and analysis of loads on (e) structure. | |
| Jun 6, 2022 | Completed final sign-off Aug 2024 | 630 Cesar Chavez St | site development includes installation of a fence w/gates, paving to support underground electrical conduit & infrastructure for electrical vehicle charging for fleet | $340,000 |
| May 26, 2022 | Completed final sign-off Aug 2025 | 3150 California St | erect a 3 story with one basement, type 3b, education building containing a mix of science and general education classrooms, a maker space, a student center, faculty and staff offices, food service and athletic facilities. proposed demolition work shown here is to be filed under a stand alone permit | $23,500,000 |
| May 23, 2022 | Completed final sign-off Nov 2022 | 1275 Sacramento St | removal of non-structural partitions to combine 3 existing rooms into 1 new room. removal and replacement of existing finishes, fixtures and millwork. mep deferred | $300,000 |
| May 16, 2022 | Completed final sign-off Jan 2023 | 901 16th St | deferred submittal for micropiles as noted in seismic strengthening. ref pa# 202010055938. | $10,000 |
| May 5, 2022 | Completed final sign-off Sep 2022 | 300 Gaven St | mechanical upgrades for the existing classroom building (edeli building) at the sf school. | $50,000 |
| May 5, 2022 | Completed final sign-off Sep 2022 | 300 Gaven St | new finishes, casework, and lighting on an existing music room at the sf school. | $50,000 |
| May 2, 2022 | Completed final sign-off Aug 2022 | 1470 Owens St | temporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st. | $52,000 |
| Apr 20, 2022 | Completed final sign-off May 2024 | 1450 Owens St | civil stormwater design and building plumbing design associated w/ pa #202012281760. | $25,000 |
| Apr 5, 2022 | Completed final sign-off Aug 2022 | 260 10th St | permit to apply new skim-coating of stucco plaster to entire building exterior of pioneer hall, to match (e) trowel finish and color in kind. | $90,000 |
| Mar 30, 2022 | Completed final sign-off Nov 2022 | 260 10th St | renovation of an (e) multipurpose space with new athletic and a/v equipment and enlarging (e) 3ft wide door to 4ft wide door. | $350,000 |
| Mar 30, 2022 | Completed final sign-off Jan 2024 | 901 16th St | revision to pa#202010055938. it includes work associated with the construction of a transformer vault and adjacent electrical room. transformer room equipment and electrical room equipment to be non-energized until permits associated with permit no. 202101112460 have been approved. | $30,000 |
| Feb 24, 2022 | Completed final sign-off Jul 2023 | 900 Pennsylvania Av | installation of a recessed floor scale. replacement of southern entry door in kind. | $47,000 |