Permit GraphSan Francisco building permits since 2000

Truebeck Construction

Contractor license
903798
State license record
Based in
San Mateo
On San Francisco permits
Jun 2008 to Sep 2026
Last 24 months
40 permits filed

609 permits since 2000: 463 completed, 26 in progress, 79 never finaled, 41 expired or cancelled.

Of the 79 never-finaled permits, 3 are 3 to 5 years old, 32 are 5 to 10 years old, 44 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 9Pergola or trellis 3Deck 3Stairs 32Kitchen remodel 9Bathroom remodel 13

Showing the 100 most recent of 609.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 4, 2026In progress
issued Sep 2026
600 Montgomery Stdemolition of some (e) doors, construction of new full-height partitions, doors, millwork, finishes, associated electrical power/lightning distribution, associated system distribution, associated plumbing, associated life-safety system changes.$1,500,000
Aug 20, 2026In progress
issued Sep 2026
530 Jackson Strevision pa#: 202512172080. issued for permit for ground floor store front and window replacement$850,000
Jun 9, 2026Completed
final sign-off Sep 2026
1275 Sacramento Strevision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping.
May 27, 2026In progress
issued May 2026
1 Harrison St6/fl- revisoin 202410173107 to include adding guardrail to 6th floor roof deck plan north parapet. in response to as built discovery that the parapet is less than 42" at roof deck
May 13, 2026In progress
filed May 2026, not yet issued
1501 Sunnydale Av(230 hahn st) - mep complied work related to bpa: 202212017477
Apr 7, 2026In progress
issued Apr 2026
1 Harrison Strevision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening.
Mar 27, 2026In progress
issued Apr 2026
1450 Owens Stpartial interior demolition of existing slab on level 1 ref bpa#2025-1223-2555- interior ti. ref bpa#202204202594 bulleting 8 revision sof 202012281760 core and shell$24,500
Mar 20, 2026In progress
issued May 2026
755 Ocean Avnew pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building.$523,000
Mar 18, 2026In progress
issued Jul 2026
3185 Washington Stremodel of existing private school building. project includes interior renovation work at basement and level-1 and seismic retrofit work. exterior work includes 2 new fixed fire rated windows at the rear facade, 1 at the first floor and 1 at the basement level$423,800
Mar 13, 2026In progress
issued Jun 2026
3185 Washington Stinterior demolition to prepare for alteration work under separate permit, paritions are non-structural.$144,549
Mar 11, 2026In progress
issued Mar 2026
1 Harrison Stdefferred green living wall submission associated with approved pa #202410173107$10,000
Feb 27, 2026In progress
issued Mar 2026
600 Montgomery Stdeferred submittal for 202512151771 for cold form steel framing.$150,000
Feb 12, 2026Completed
final sign-off Sep 2026
1275 Sacramento Strenovation of commercial kitchen restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passageway & alteration to utilities serving the area to be renovated$4,000,000
Feb 6, 2026In progress
filed Feb 2026, not yet issued
1 Harrison Stdeferred fire alarm submission associated with approved pa#2024-1017-3107
Jan 23, 2026In progress
issued Aug 2026
530 Jackson Stb lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door.$4,323,223
Jan 5, 2026In progress
issued Jul 2026
1450 Owens Stinterior ti to build-out offices, r & d laboratories & support spaces at levels 1, 5-7 of an (e) 7 story core & shell building.$26,400,000
Dec 15, 2025In progress
issued Jan 2026
600 Montgomery St39/f: interior alteration of new tenant fitout to include board room, storage rooms, enclosed and open offices, break room and all gender restrooms, with associated mep work, and selected demolition work.$3,500,000
Dec 15, 2025Completed
final sign-off Mar 2026
600 Montgomery Ststructural revision to pa# 202504245130 and pa# 202504144304, to reassign engineer of record for the coil unit anchorage.
Dec 8, 2025In progress
issued Feb 2026
1 Harrison Stdefferred exterior metal framing assocated with approved pa 202410173107.$10,000
Nov 3, 2025In progress
issued Nov 2025
1 Harrison Stwindscreen structural only submission associated with 202410173107
Aug 29, 2025In progress
issued Dec 2025
1 Harrison Stdefferred curtainwall: structural only submission assocated with approved pa 202410173107
Aug 15, 2025In progress
issued Sep 2025
1 Harrison Stmech and electrial upgrades install (n) ashp heating , hot water chiler and new panel hr$100,000
Jul 10, 2025In progress
issued Dec 2025
1 Harrison Stdeferred frp structural only submission associated with approved pa 202410082583.$20,000
Jun 23, 2025In progress
issued Aug 2025
1 Harrison St4th floor: tenant improvements includes new non-load bearing partitions, doors, ceiling, and finishes. mep included.$2,693,481
Jun 3, 2025In progress
filed Jun 2025, not yet issued
3220 Sacramento Stinterior demolition non structural. ti work is under pa#202501158356. ab-017 applies$50,000
May 29, 2025In progress
issued Jul 2025
1 Harrison Strevision to pa# 202410082583: misc structural updates.
May 6, 2025Completed
final sign-off Dec 2025
600 Montgomery Stpriority ab004 deferred review of structural scope associated with pa# 202504114225
Apr 14, 2025Completed
final sign-off Jun 2026
600 Montgomery St9th & 11th fl t.i. interior alteration of new tenant fit out included conference rooms, storag aeras, enclosed offices, lan rooms w/ associated mep & structural work$6,500,000
Apr 14, 2025Completed
final sign-off Jun 2026
600 Montgomery Stinterior alterations of new tenant fit out of levels 10,12, and 13 levels. to include conference rooms, and storage areas.$9,800,000
Apr 11, 2025Completed
final sign-off Mar 2026
600 Montgomery St23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)$5,500,000
Apr 3, 2025Completed
final sign-off Sep 2025
3220 Sacramento Stinterior renovation to convert (e) u-lab classroom to offices and student lounge. replacement of hvac unit w/ new erv,heat pumpunits, diffusers and grills.$500,000
Feb 25, 2025Completed
final sign-off Sep 2025
548 Delta Strevision 202402075425- to include- replace sheetrock at level 1 mezzanie area. replace (2) windows in kind at level 1 mezzanie and addition of (1) new window facing delta street.$40,000
Jan 30, 2025Completed
final sign-off Sep 2025
3150 Washington St1st/fl: interior renovation of existing music classrooms at level 1, 3rd /fl: replacing one framed wall with storefront at level 3 (non facing street).$1,000,000
Nov 19, 2024Completed
final sign-off Jan 2025
550 Terry A Francois Blrevision to pa 202210265236 & 202301301009 chane to special inspection checklist
Nov 14, 2024Completed
final sign-off Feb 2025
1450 Owens Stas built drawing to 202309076120 & 202012281760.a(n) notifier nfs2-3030, intelligent, addressable, network, voice fire alarm system is being installed as part of this (n)construction high rise-lab & office project.this project will be the installation of the fire alarm in the core areas of the bldg.
Nov 14, 2024In progress
issued Jul 2025
1 Harrison Sthorizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits.$13,300,000
Nov 5, 2024Completed
final sign-off Sep 2025
548 Delta Stref 202402075425- deffered micropile submission
Oct 16, 2024Completed
final sign-off Aug 2025
555 California St6th fl mep defferal submital for pa # 2024-0816-8893$750,000
Oct 10, 2024Completed
final sign-off Jan 2025
550 Terry A Francois Blrevision to pa#: 202307051465. change fuel line routing, move control panel, add manifold sump.
Oct 8, 2024In progress
issued May 2025
1 Harrison Stphase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107.$6,545,000
Sep 12, 2024Completed
final sign-off Mar 2025
1 Harrison Stdemo of interior partitions, ceilings, finishes on all floors. structural and architectural upgrades under sep permit$609,000
Aug 30, 2024Completed
final sign-off Dec 2024
550 Terry A Francois Bl2-4/fl-rev 202406184792- removal of raised access floor at north portion of buliding level 2,3,4$294,845
Aug 30, 2024Completed
final sign-off Dec 2024
550 Terry A Francois Bl5/fl-rev 202406215017- removal of raised access floor at north portion of buliding level 5$98,282
Aug 21, 2024Completed
final sign-off Feb 2025
1450 Owens Strevision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans
Aug 16, 2024Completed
final sign-off Aug 2025
555 California St6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit app$3,008,592
Aug 5, 2024Completed
final sign-off Jun 2025
550 Terry A Francois Blthe entire north tower roofing will be removed down to the slab and replaced. the existing rooftop ahu will be removed and replaced inkind. a new door will be added as an exit for the 4th floor terrace.$3,238,165
Jul 26, 2024Completed
final sign-off Feb 2025
1450 Owens Stthe 40.2 kw system will be comprised of (67)600w hanwha q.cell modules,(67)tigo rapid shutdows(1)36kw solectria inverter to meet the better roofs & green building code pv requirements for new building constructed under site pa # 202012281760.$200,000
Jul 26, 2024Completed
final sign-off Jan 2025
550 Terry A Francois Blrevision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design
Jun 21, 2024Completed
final sign-off Dec 2024
550 Terry A Francois Bl5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit$50,000
Jun 18, 2024Completed
final sign-off Dec 2024
550 Terry A Francois Blfloors 2,3, & 4th floors: non structural, interior demolition per ab-017. including interior non-bearing walls, doors, cabinetry, plumbing fixtures, floor finishes, ceiling hvac diffusers, and lighting fixtures. sprinkler ref pa #2024-0613-4429$180,000
Jun 4, 2024Completed
final sign-off Oct 2024
755 Ocean Avreplacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and power$500,000
May 30, 2024Completed
final sign-off Jan 2025
1450 Owens Stdeferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.$10,000
May 30, 2024Completed
final sign-off Oct 2024
301 Howard St14/f: commmercial interior tenant improvement including - demo of walls, doors, millwork, and finishes and build back of walls, doors, finishes, and acoustical ceiling.$177,500
Apr 11, 2024Completed
final sign-off Aug 2025
548 Delta Stsoft demo interior non strutural per ab-017 area to remain vacant until all accessibility factors restored under future permit$48,600
Mar 29, 2024Completed
final sign-off Dec 2024
550 Terry A Francois Bl1/fl-interior soft demo per ab:017 level 1 removal of architectural and mep as noted on drawings. all demolished mep will be safed back to risers. no occupancy until ti is completed per ab017.$20,000
Mar 15, 2024Completed
final sign-off May 2024
1450 Owens Strevision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination.
Feb 27, 2024Completed
final sign-off Dec 2024
755 Ocean Avall (e) mechanical units and associated duct work are to be removed to allow for support & assembly & upgrades. all (e) roofing and membrane will be removed and replaced with an sbs-modified 2 ply roofing system, along with new drains and overflow systems. new mechanical units and associated$200,000
Feb 7, 2024Completed
final sign-off Sep 2025
548 Delta Stto accommodate a "0-5yr" childcare center. will serve approximately 60 children in 4 classrooms: 1 infant, 1 toddler, & 2 pre-k. will contain a family resource center & teacher/staff lounge. interior demolition as req. non-bearing partitions, mep, replace (e) windows & doors. (n) lula elevator,$4,700,674
Oct 18, 2023Completed
final sign-off Dec 2023
901 16th Strevision to permit 202306139941. indicate as built elevator hoisteway hatch locations and product information for access of hoistway smoke detector per sffd
Sep 7, 2023Completed
final sign-off Feb 2025
1450 Owens Strevision to fa permit# 202012281760 s7. submittal smoke control panel drawing showing the reconfiguration of the ahus depiction.
Jul 31, 2023Completed
final sign-off Apr 2024
900 Pennsylvania Avalteration of (e) large refrigeration/freezer spaces, demo of (e) u nits & (e) slabs ongrade under units, install of new insulated slab, new refrigeration/freezer units w/high piled storage racks, & associated mep. revision apn#202006138695$925,000
Jul 26, 2023Completed
final sign-off May 2024
1450 Owens Strevision to pa# 202204202594 & pa# 202210043668. provide civil stormwater updates due to art sculpture addition and final scp comments.
Jul 5, 2023Never finaled
issued Aug 2023, no final
88 Maryland Stpid permit for the review of storm water control & non-potable water infrastructure associated with site pa #201908300403
Jul 5, 2023Completed
final sign-off Jan 2025
550 Terry A Francois Blscope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft.$2,500,000
Jun 13, 2023Completed
final sign-off Dec 2023
901 16th Strevision to bpa#20210111240s4 (arch/mep), revision work is to indicate elevator hoistway hatch, location & product information
Jun 13, 2023Completed
final sign-off Sep 2023
2567 Mission Strevision to 202212168551 & 202212208745: add (n) sink wellness rm on 1/f, upgrade (e) sinks in basement & 3rd fl break rms to re accessible. no cooling facilities & no catering service$30,000
Jun 2, 2023Completed
final sign-off Jan 2024
2567 Mission Strevision to 202212168551: to infill (e) glass block in 2 locations on the sidewalk
Apr 26, 2023Completed
final sign-off Mar 2025
444 Presidio Avunderpinning of existing structure in connection with work on the adjacent property at 3150 california street pa# 202205265118.$225,000
Apr 19, 2023Completed
final sign-off May 2025
1450 Owens Stmain lobby improvements at the main entrance to a 7-story warm shell and core lab/office building$800,000
Mar 20, 2023Completed
final sign-off Mar 2025
3150 California Stdemolish a 2-story, type 5b, retail & office building.$395,000
Mar 14, 2023Completed
final sign-off Sep 2023
2567 Mission Strevision to 202212168551 to memorialize (e)/proposed conditions of basement egress stair based filed conditions.
Feb 17, 2023Completed
final sign-off Jan 2025
550 Terry A Francois Blthe south portion of prj is core-shell,"warm shell only" renovation & being submitted for permit as a b-group occupancy. (e) building, both north & south portions, are b-group. (e) service elevator, elevator 5,will be upgraded to serve as a hazardous materials lift. life safety under separate permi$30,000,000
Feb 3, 2023Completed
final sign-off Oct 2024
640 Cesar Chavez Strevision to pa# 202207017644 to relocate hydrant due to puc request for utility access.
Jan 30, 2023Completed
final sign-off Jan 2025
550 Terry A Francois Blrevision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule.
Jan 26, 2023Completed
final sign-off Aug 2023
900 Pennsylvania Avrevision to pa #202202248636, to correct special inspection requirements based on eor instructions for special inspections requried for the scope of work.
Dec 20, 2022Completed
final sign-off Sep 2023
2567 Mission Stchange of planning use per commission motion 21202. no change of occupancy per building code. tenant improvement work includes renovation of 1st & 2nd floors, non-structural partitions, doors, finishes. mep deferred.$359,242
Dec 16, 2022Completed
final sign-off Sep 2023
2567 Mission Stminor t.i. basement & 3rd fl, an (e) building as non-profit organization office, no exterior changes except for repair & painting included graffiti removal @ primary facade.$613,730
Dec 1, 2022In progress
issued Oct 2025
1501 Sunnydale Avblock 3a/lot 3: ti of g/f commercial space for use as an early care and education (ece) center.ti. consists of interior non-structural partitions, finishes & exterior courtyard improvements; mep, fp, lv will be design-build & submitted under seperate permits; (base permit # 202106031523)$737,876
Nov 14, 2022Completed
final sign-off Jan 2024
901 16th Stpid review only per project sfpuc final stormwater control plan submittal comment. ref architecutre & mep submittal pa# 202101112460 s4.
Nov 10, 2022Completed
final sign-off Jun 2023
201 Mission Stfl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain.$27,000
Nov 3, 2022Completed
final sign-off Jan 2023
140 New Montgomery St18th fl - revision to pa 2022-0218-8310 to install dw, refrigerator & hot water heater$4,000
Oct 26, 2022Completed
final sign-off Jan 2025
550 Terry A Francois Blcut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.$416,000
Oct 4, 2022Completed
final sign-off May 2024
1450 Owens Strevision to pa#202204202594. update civil sewer and stormwater lateral to avoid existing joint utility trench along nelson rising lane.
Aug 30, 2022Completed
final sign-off Jan 2023
2300 26th Stinstallation of a single piece of equipemnt including seismic anchorage with associated blower on roof$150,000
Aug 25, 2022Completed
final sign-off Oct 2024
640 Cesar Chavez Stpid permit associated with storm water control plan and pa# 202105281321.
Aug 23, 2022Completed
final sign-off Aug 2023
550 Terry A Francois Blfloors 2 throughh 6: interior non-structural demo. all spaces being demolised will remain vacant per ab-017$50,000
Aug 10, 2022Completed
final sign-off Jul 2025
640 Cesar Chavez Strevision to pa#202105281321. revised south wall and occupant loading. revised west lot charger location and vehicle lift locations. other misc. details per plans.
Jul 27, 2022Completed
final sign-off Jan 2023
140 New Montgomery St18th fl: structural support/analysis for mep equipment in server room and anchorage details and analysis of loads on (e) structure.
Jun 6, 2022Completed
final sign-off Aug 2024
630 Cesar Chavez Stsite development includes installation of a fence w/gates, paving to support underground electrical conduit & infrastructure for electrical vehicle charging for fleet$340,000
May 26, 2022Completed
final sign-off Aug 2025
3150 California Sterect a 3 story with one basement, type 3b, education building containing a mix of science and general education classrooms, a maker space, a student center, faculty and staff offices, food service and athletic facilities. proposed demolition work shown here is to be filed under a stand alone permit$23,500,000
May 23, 2022Completed
final sign-off Nov 2022
1275 Sacramento Stremoval of non-structural partitions to combine 3 existing rooms into 1 new room. removal and replacement of existing finishes, fixtures and millwork. mep deferred$300,000
May 16, 2022Completed
final sign-off Jan 2023
901 16th Stdeferred submittal for micropiles as noted in seismic strengthening. ref pa# 202010055938.$10,000
May 5, 2022Completed
final sign-off Sep 2022
300 Gaven Stmechanical upgrades for the existing classroom building (edeli building) at the sf school.$50,000
May 5, 2022Completed
final sign-off Sep 2022
300 Gaven Stnew finishes, casework, and lighting on an existing music room at the sf school.$50,000
May 2, 2022Completed
final sign-off Aug 2022
1470 Owens Sttemporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st.$52,000
Apr 20, 2022Completed
final sign-off May 2024
1450 Owens Stcivil stormwater design and building plumbing design associated w/ pa #202012281760.$25,000
Apr 5, 2022Completed
final sign-off Aug 2022
260 10th Stpermit to apply new skim-coating of stucco plaster to entire building exterior of pioneer hall, to match (e) trowel finish and color in kind.$90,000
Mar 30, 2022Completed
final sign-off Nov 2022
260 10th Strenovation of an (e) multipurpose space with new athletic and a/v equipment and enlarging (e) 3ft wide door to 4ft wide door.$350,000
Mar 30, 2022Completed
final sign-off Jan 2024
901 16th Strevision to pa#202010055938. it includes work associated with the construction of a transformer vault and adjacent electrical room. transformer room equipment and electrical room equipment to be non-energized until permits associated with permit no. 202101112460 have been approved.$30,000
Feb 24, 2022Completed
final sign-off Jul 2023
900 Pennsylvania Avinstallation of a recessed floor scale. replacement of southern entry door in kind.$47,000