Permit GraphSan Francisco building permits since 2000

Richlen Construction

Contractor license
570031
State license record
Based in
Pacheco
On San Francisco permits
Jan 2000 to Sep 2026
Last 24 months
62 permits filed

1,283 permits since 2000: 1,103 completed, 34 in progress, 62 never finaled, 84 expired or cancelled.

Of the 62 never-finaled permits, 1 is 3 to 5 years old, 25 are 5 to 10 years old, 36 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 1Pergola or trellis 2Deck 3Stairs 32Kitchen remodel 7Bathroom remodel 3

Showing the 100 most recent of 1,283.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 24, 2026In progress
filed Sep 2026, not yet issued
343 Sansome St9/fl- mechanical scope ti ductwork and air outlet modifications. (n) vav box , cooling only vav box. (n) lighting fixture and associated circuiting/controls. power and signal devices and associated wiring.$200,000
Sep 17, 2026In progress
issued Sep 2026
50 California Stexisting interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.$3,942,870
Sep 11, 2026In progress
issued Sep 2026
221 Main Stnew lobby level security improvements-installing turnstiles$250,000
Sep 11, 2026In progress
issued Sep 2026
201 Mission Stmech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref$337,875
Aug 25, 2026In progress
issued Sep 2026
201 Mission Stref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.$322,135
Aug 20, 2026In progress
issued Sep 2026
525 Market St15th fl - demo only permit (interior) accessibility per ab-017$30,000
Aug 20, 2026In progress
issued Sep 2026
50 California Stsuit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.$859,574
Jul 14, 2026In progress
issued Jul 2026
201 California Stste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel.$1,335,500
Jul 7, 2026Completed
final sign-off Jul 2026
201 California Stste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing.
Jun 25, 2026In progress
issued Jul 2026
221 Main Stdeferred electrical for 4th floor suite 400 office ti under permit 202604028757.$175,000
Jun 25, 2026In progress
issued Jul 2026
221 Main Stsuite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan.$75,000
Jun 24, 2026In progress
issued Aug 2026
201 Mission St14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.$285,000
Jun 23, 2026In progress
issued Jul 2026
650 California St27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals.$1,184,490
Jun 17, 2026Completed
final sign-off Jul 2026
201 Mission St23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.$56,543
Jun 5, 2026Completed
final sign-off Aug 2026
650 California St20th floor: mechanical and electrical work install 2 new cooling vav vox and ductwork air distribution. provide new lighting. ref 202602246378$100,000
Jun 4, 2026Completed
final sign-off Sep 2026
201 Mission St21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices.$127,465
Jun 4, 2026Completed
final sign-off Sep 2026
201 Mission St21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639$60,000
Jun 4, 2026Completed
final sign-off Aug 2026
201 Mission St22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.$190,288
Jun 4, 2026In progress
issued Jun 2026
575 Market St3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office.$20,125
May 20, 2026Completed
final sign-off Sep 2026
201 Mission St21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved$218,435
May 7, 2026In progress
issued Jun 2026
575 Market St3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes$200,000
Apr 23, 2026Completed
final sign-off Aug 2026
201 Mission Stfloor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.$341,000
Apr 7, 2026Completed
final sign-off Jul 2026
201 California St15th fl - provide new lighting @ ste 1500 ref pa 202510026577$190,000
Apr 2, 2026Completed
final sign-off Aug 2026
631 Howard Stbasement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)$197,607
Apr 2, 2026In progress
issued Apr 2026
221 Main St4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work.$238,237
Mar 19, 2026Completed
final sign-off Jul 2026
575 Market St30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610.$30,000
Mar 12, 2026In progress
issued Apr 2026
631 Howard Stbasement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing$155,000
Mar 9, 2026Completed
final sign-off Jun 2026
201 Mission Stsuite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.$25,000
Feb 24, 2026Completed
final sign-off Aug 2026
650 California Stste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferred$707,557
Feb 5, 2026Completed
final sign-off Mar 2026
201 Mission Stpatio demo. remove exisitng planting beds & security fencing$46,484
Jan 27, 2026Completed
final sign-off Jul 2026
575 Market St30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred.$194,288
Jan 22, 2026Completed
final sign-off Jul 2026
201 Mission St23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.$249,348
Jan 21, 2026Completed
final sign-off Jun 2026
201 Mission Stste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits$255,000
Dec 22, 2025Completed
final sign-off Aug 2026
631 Howard St2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms.$112,400
Dec 19, 2025In progress
issued Feb 2026
631 Howard Stbasement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibility$275,900
Dec 18, 2025In progress
issued Jul 2026
201 Mission St1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.$550,000
Dec 15, 2025In progress
issued Jul 2026
343 Sansome St#950: new t.i. on 9th floor:includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submittals to be deferred.$840,000
Dec 11, 2025Completed
final sign-off Aug 2026
901 Battery St1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.$1,000,000
Nov 19, 2025Completed
final sign-off Jan 2026
575 Market St39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.$10,000
Nov 7, 2025Completed
final sign-off Jan 2026
201 Mission St5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.
Nov 4, 2025Completed
final sign-off Jan 2026
50 California St35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete.
Oct 30, 2025Completed
final sign-off Jul 2026
201 Mission St23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.$657,000
Oct 22, 2025Completed
final sign-off Apr 2026
217 Montgomery Stebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.$125,000
Oct 16, 2025Completed
final sign-off May 2026
125 03rd Strevision 202503273212 for (n) storage room$5,000
Oct 15, 2025Completed
final sign-off Mar 2026
575 Market Stsuite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures$426,300
Oct 6, 2025Completed
final sign-off Jan 2026
201 Mission Stsuite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.$220,000
Oct 2, 2025Completed
final sign-off Jul 2026
201 California St15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred.$601,994
Aug 7, 2025Completed
final sign-off Sep 2025
343 Sansome St5/fl- ti 202507160889-lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring$20,000
Jul 17, 2025Completed
final sign-off Sep 2025
201 Mission Stsuite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures.$120,000
Jul 16, 2025Completed
final sign-off Sep 2025
343 Sansome Stsuite #550: demolition of non-structural partitions, reception desk, casework, light fixtures, and finishes. construction of non-structural partitions, doors, interior glazing system, casework, light fixtures and finishes. patch and repair existing ceilings as required. no plumbing fixtures.$144,000
Apr 16, 2025Completed
final sign-off Aug 2025
101 California Stsuite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred.$422,171
Mar 27, 2025Completed
final sign-off May 2026
125 03rd Stinterior renovation of (e) spa @ 5th & 6th floors.$652,844
Feb 7, 2025In progress
issued Feb 2025
50 California St2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.$14,000
Jan 29, 2025In progress
issued Mar 2025
73 Erie Strevision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail.
Jan 29, 2025In progress
issued Mar 2025
55 Erie Strevision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail
Jan 16, 2025Completed
final sign-off Jul 2025
1 California Sthvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783$871,153
Dec 12, 2024Completed
final sign-off Sep 2025
201 California St2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms).$400,000
Nov 6, 2024Completed
final sign-off Jun 2025
45 Fremont St34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom.$350,000
Oct 25, 2024Completed
final sign-off Jul 2025
1 California St2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferred$1,816,064
Oct 24, 2024Completed
final sign-off Dec 2024
201 Mission St13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work$40,000
Oct 3, 2024Completed
final sign-off Mar 2025
221 Main St5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel.$291,009
Oct 3, 2024Completed
final sign-off Dec 2024
225 Bush Stste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only
Oct 2, 2024Completed
final sign-off Dec 2024
201 Mission St13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area$139,748
Sep 26, 2024Completed
final sign-off Apr 2025
201 California Stinterior demoltion of 16/17 floor at 201 california. includes demo of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and flooring. per ab-017 occupancy/exiting to be address under separate permit. fire sprinkler pa 20240919112$533,583
Aug 15, 2024Completed
final sign-off Mar 2025
180 Howard St6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbing$139,924
Aug 12, 2024In progress
issued Jan 2025
998 Sansome Stabe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591$126,000
Aug 8, 2024In progress
issued Dec 2024
901 Battery Stabe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108$147,000
Aug 7, 2024Completed
final sign-off May 2025
50 California St24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred$195,721
Aug 5, 2024Completed
final sign-off Dec 2024
1 California St12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist)$115,538
Jul 30, 2024Completed
final sign-off Nov 2024
201 California St3/f: ti, adding 1-large office, 1-small wellness room and vestible, installign new ceiling, lighting, finshes and power. mep and life safety plans will be submitted as a separate permit. suite 325$266,000
Jul 24, 2024In progress
issued Aug 2024
225 Bush Stsuite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit.$322,998
Jun 24, 2024In progress
issued Jul 2024
50 California St35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.$192,560
Jun 11, 2024In progress
issued Mar 2025
650 California Stretire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system to$1,786,903
Jun 10, 2024Completed
final sign-off Nov 2024
275 Battery Stexisting suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical work$98,103
Jun 5, 2024Completed
final sign-off Dec 2024
345 California St29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system.$200,000
May 29, 2024Completed
final sign-off Nov 2024
345 California St11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor$300,000
Mar 26, 2024In progress
issued Mar 2024
401 Mason Stnew lighting in restrooms and lounge. pa #2021-0305-5990$30,000
Mar 20, 2024Completed
final sign-off Sep 2024
100 01st Strestaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes$75,000
Mar 14, 2024Completed
final sign-off May 2024
201 Mission Strevision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.
Feb 28, 2024Completed
final sign-off Jul 2024
201 California St6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferred$214,819
Feb 28, 2024Completed
final sign-off Jun 2024
201 Mission Stinterior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.$60,000
Feb 28, 2024Completed
final sign-off Jun 2024
201 Mission Stinterior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.$158,000
Feb 14, 2024Completed
final sign-off May 2024
201 Mission St18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or$216,353
Feb 8, 2024In progress
issued Feb 2024
221 Main St1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite$5,000
Feb 1, 2024Completed
final sign-off May 2024
201 Mission St22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.
Jan 4, 2024Completed
final sign-off Apr 2024
201 Mission Stadding ada passenger drop-off/ loading zone in parking lot.$500
Nov 9, 2023Completed
final sign-off Apr 2024
201 Mission Stsuite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.$486,433
Nov 9, 2023Completed
final sign-off May 2024
201 Mission St22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.$442,270
Nov 9, 2023Completed
final sign-off May 2024
201 Mission St7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.$504,622
Oct 25, 2023Completed
final sign-off Apr 2024
650 California St27th fl:interior demolition of select partitions, finishes, and ceilings. relocation of some (e) light fixtures to accomodate new layout. new construction includes new private offices and dropped ceiling with lighting. patching of (e) finishes. mep and fls are deffered submittals.$284,292
Aug 8, 2023Completed
final sign-off Feb 2024
188 Spear Stselective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.$225,000
Jul 28, 2023Completed
final sign-off Aug 2023
45 Fremont St28th flr: recommencement and completion of work approved under pa #201507222162.
Jun 26, 2023Completed
final sign-off Sep 2024
50 California St28th fl - demo of partitions, ceilings, finishes and millwork; remodel of (e) restrooms and elevator lobby. the space will remain unoccupied after this project. any future ti's will be under separate permit. no new plumbing fixtures$469,000
Jun 15, 2023Completed
final sign-off Jan 2026
50 California St35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel$289,880
Jun 8, 2023Completed
final sign-off Nov 2023
1 Bush Stelectrical and mechanical work for ti pa 2023-0322-4185 & 2022-1215-8405$125,000
Jun 5, 2023Completed
final sign-off Oct 2023
255 California St3rd fl ste 300: relocation of 1 door.$5,000
May 31, 2023Completed
final sign-off Apr 2024
650 California Stupgrades only to the building path of travel to meet current code compliances. ab-056. mep, fire/lifesafety and fire sprinkler system is under sep permit. includes primary bldg entry, parking, ev charging and elevators (restrooms at all levels not included)$30,000
May 26, 2023Completed
final sign-off Jul 2023
255 California Stsuite 450 - 4th flr: rev to 202212289257: adding office #458. minor t.i. with non-loading partitions, electrical and finishes. maher n/a. fire alarm/sprinklers on a separate permit, if applic.$40,000
May 17, 2023Completed
final sign-off Aug 2024
201 Toland Strevision to pa#: 202011189158 add a new 2hr rated pre-fabriated storage container at the covered dock to store 20% ipa.$15,000
Apr 25, 2023Completed
final sign-off Nov 2023
595 Market St23/f: interior ti of e business office space. work includes addition of no load bearing wall, network equipment room, mdf, doors, relocation of furniture and refresh of interior finishes. no structural work. no change in occupancy. no change in use or exterior work.$110,000