Peacock Construction
- Based in
- Lafayette
- On San Francisco permits
- Jun 2013 to Sep 2026
- Last 24 months
- 96 permits filed
1,116 permits since 2000: 976 completed, 22 in progress, 103 never finaled, 15 expired or cancelled.
Of the 103 never-finaled permits, 14 are 3 to 5 years old, 61 are 5 to 10 years old, 28 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 1,116.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Oct 2026 | 1 Embarcadero Center | ste 1150 - electrical new light fixtures & associated controls, power & signal. ref pa 202608257086Details
ste 1150 - electrical new light fixtures & associated controls, power & signal. ref pa 202608257086 | $297,000 |
| Sep 14, 2026 | In progress issued Sep 2026 | 2 Embarcadero Center | 28/f: deferred submittal for pa # 202608116388Details
28/f: deferred submittal for pa # 202608116388 | $69,641 |
| Sep 14, 2026 | In progress issued Sep 2026 | 2 Embarcadero Center | 26/f: deferred submittal for pa # 202608116389Details
26/f: deferred submittal for pa # 202608116389 | $60,400 |
| Aug 27, 2026 | In progress issued Sep 2026 | 1 Market St | deffered m.e.p. for bpa#202604079021Details
deffered m.e.p. for bpa#202604079021 | $15,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 1 Embarcadero Center | 11th fl. suite 1150. t.i. includes demo of non structural partions and building new non structural partions. deferred mep fire protection and fire alarm (building is fully sprinklered)Details
11th fl. suite 1150. t.i. includes demo of non structural partions and building new non structural partions. deferred mep fire protection and fire alarm (building is fully sprinklered) | $362,527 |
| Aug 11, 2026 | In progress issued Sep 2026 | 2 Embarcadero Center | 28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixtures.Details
28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixtures. | $185,000 |
| Aug 11, 2026 | In progress issued Sep 2026 | 2 Embarcadero Center | 26th floor: t.i.demo of a non-structural partition, millwork, doors, finishes.Details
26th floor: t.i.demo of a non-structural partition, millwork, doors, finishes. | $185,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1 Post St | 10th fl deferred electrical under pa 202604280192/202607285653 new lighting, power & signal & branch circuitingDetails
10th fl deferred electrical under pa 202604280192/202607285653 new lighting, power & signal & branch circuiting | $70,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 150 Spear St | 12th floor: electrical under 202606032405. provide new lighting, power, signal and branch circuitng to existing panel.Details
12th floor: electrical under 202606032405. provide new lighting, power, signal and branch circuitng to existing panel. | $350,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 1 Post St | revision to 202604280192. demo existing door to main corridor in existing suite 1025.Details
revision to 202604280192. demo existing door to main corridor in existing suite 1025. | $15,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 150 Spear St | 12th floor: hvac modifications under reference # 202606032405Details
12th floor: hvac modifications under reference # 202606032405 | $300,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 155 05th St | revision to 202509165421. clinic: revise exam, treatment, office, storage and support area, reconfigure partitions, doors, ceilings, casework, sinks plumbing fixtures, mdical equip and room functions. asc: revise or, pacu, sterile processing, utility and support areas. reconfigure partitions, doorsDetails
revision to 202509165421. clinic: revise exam, treatment, office, storage and support area, reconfigure partitions, doors, ceilings, casework, sinks plumbing fixtures, mdical equip and room functions. asc: revise or, pacu, sterile processing, utility and support areas. reconfigure partitions, doors | |
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 1 Post St | 17/f, ste 1700: deferred electrical for pa# 202604028794- provide new lighting and branch circuiting. new power and signal branch. title 24.Details
17/f, ste 1700: deferred electrical for pa# 202604028794- provide new lighting and branch circuiting. new power and signal branch. title 24. | $15,000 |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 1 Post St | deferred mep for 20th floor office ti under permit 202602266553. ref: 202605272015/202602266553(me deferred)Details
deferred mep for 20th floor office ti under permit 202602266553. ref: 202605272015/202602266553(me deferred) | $150,000 |
| Jun 18, 2026 | Completed final sign-off Sep 2026 | 1 Post St | deferred mep for 19th floor office ti under permit 202602266548. 202605272012Details
deferred mep for 19th floor office ti under permit 202602266548. 202605272012 | $180,000 |
| Jun 16, 2026 | Completed final sign-off Aug 2026 | 1 Embarcadero Center | 20th floor, suite 2050: deferred electrical: office tenant retrofit: lighting fictures, and associated circuiting/controls, power & signals devices & associated wiring. ref pa# 202604239930.Details
20th floor, suite 2050: deferred electrical: office tenant retrofit: lighting fictures, and associated circuiting/controls, power & signals devices & associated wiring. ref pa# 202604239930. | $138,000 |
| Jun 16, 2026 | Completed final sign-off Aug 2026 | 1 Embarcadero Center | 20th/f ste# 2050: ref to t.i. 202604239930: hvac modification to support interior t.i. central equipment is e) to remainDetails
20th/f ste# 2050: ref to t.i. 202604239930: hvac modification to support interior t.i. central equipment is e) to remain | $209,000 |
| Jun 10, 2026 | In progress issued Sep 2026 | 4 Embarcadero Center | revision to bpa: 202308305620 - new casework, new kitchen and bar equipment, patch flooring.Details
revision to bpa: 202308305620 - new casework, new kitchen and bar equipment, patch flooring. | $25,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 150 Spear St | ste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep.Details
ste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep. | $1,500,000 |
| May 28, 2026 | Completed final sign-off Aug 2026 | 2 Embarcadero Center | 16/f: suites 1660/1680: title 24 electrical spec suite office tenant retrofit: lighting fixtures & assocated circuiting / controls, power & signal devices & associated wiring.Details
16/f: suites 1660/1680: title 24 electrical spec suite office tenant retrofit: lighting fixtures & assocated circuiting / controls, power & signal devices & associated wiring. | $150,000 |
| May 28, 2026 | Completed final sign-off Sep 2026 | 2 Embarcadero Center | ref. 202601224294, mechanical-rework of low side air distribution.Details
ref. 202601224294, mechanical-rework of low side air distribution. | $150,000 |
| May 27, 2026 | Completed final sign-off Sep 2026 | 1 Post St | level 20; revision to 202602266553 changing door fire rating from 90 min to 45 minDetails
level 20; revision to 202602266553 changing door fire rating from 90 min to 45 min | |
| May 27, 2026 | Completed final sign-off Sep 2026 | 1 Post St | revision to 202602266548 changing door fire rating from 90 min to 45 min.Details
revision to 202602266548 changing door fire rating from 90 min to 45 min. | |
| May 22, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | ref#: 202602186115; ste14b: t.i. installation of an exhaust fan serviing the single user restroom, elect and idf room. outside air fan serving air to hp1-1 thru 2-3. heat pumps to serve the new zones.air and water balancing of all modified systems. insulation of duck work and piping where req.(e)Details
ref#: 202602186115; ste14b: t.i. installation of an exhaust fan serviing the single user restroom, elect and idf room. outside air fan serving air to hp1-1 thru 2-3. heat pumps to serve the new zones.air and water balancing of all modified systems. insulation of duck work and piping where req.(e) | $245,000 |
| May 22, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls.Details
b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls. | $239,000 |
| May 12, 2026 | Completed final sign-off Jul 2026 | 601 California St | deferred electrical for suite 1210 office ti under permit 202601214264. 12th fl - office tenant retrofit lighting fixtures & associated circuiting controls power & signal devices & associated wiring.Details
deferred electrical for suite 1210 office ti under permit 202601214264. 12th fl - office tenant retrofit lighting fixtures & associated circuiting controls power & signal devices & associated wiring. | $40,000 |
| Apr 28, 2026 | In progress issued May 2026 | 1 Post St | partially renovate a portion of the 10th fl of the existing structure. scope includes selective demo of existing interior fit out. new interior construction to include new storage area in existing business suite, restroom fixtu and finishesDetails
partially renovate a portion of the 10th fl of the existing structure. scope includes selective demo of existing interior fit out. new interior construction to include new storage area in existing business suite, restroom fixtu and finishes | $393,639 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 1 Embarcadero Center | 20th floor/ suite 2050 t.i. include demo of non-structural partitions and building. new non-str partitions. all new or revise mep and life safety work will be design build and submitted separately. (bldg is fully sprinklered).Details
20th floor/ suite 2050 t.i. include demo of non-structural partitions and building. new non-str partitions. all new or revise mep and life safety work will be design build and submitted separately. (bldg is fully sprinklered). | $500,000 |
| Apr 22, 2026 | Completed final sign-off Sep 2026 | 44 Montgomery St | ste 4250 - mechanical only ref pa 202602196146Details
ste 4250 - mechanical only ref pa 202602196146 | $149,000 |
| Apr 7, 2026 | In progress issued May 2026 | 1 Market St | fl b7: interior renovation retail space w/ new non-structural partitions, storefront, ceiling, lighting, millwork & finishes.Details
fl b7: interior renovation retail space w/ new non-structural partitions, storefront, ceiling, lighting, millwork & finishes. | $50,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 1 Post St | 17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new finishes, and structural attachment of 4 existing phone booths.Details
17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new finishes, and structural attachment of 4 existing phone booths. | $175,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 601 California St | ref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls.Details
ref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls. | $15,000 |
| Feb 26, 2026 | Completed final sign-off Sep 2026 | 1 Post St | project scope is to renovate the 19th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meetingDetails
project scope is to renovate the 19th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meeting | $1,420,000 |
| Feb 26, 2026 | Completed final sign-off Sep 2026 | 1 Post St | project scope is to renovate the 20th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meetingDetails
project scope is to renovate the 20th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meeting | $1,420,000 |
| Feb 23, 2026 | In progress issued Apr 2026 | 2 Henry Adams St | recommencement and completion of work approved under pa #2022-0331-1273.Details
recommencement and completion of work approved under pa #2022-0331-1273. | $50,000 |
| Feb 19, 2026 | Completed final sign-off Sep 2026 | 44 Montgomery St | 42 flr. suite 4250. demolition of non-structural partitions, elect millwork finishes and ceilings and lighting. construction of new partitions power, lighting finishes and millwork including corridor and ada restroom upgrades. mep lifesafety sprinkler under separate permit. ref#: 202305248479.Details
42 flr. suite 4250. demolition of non-structural partitions, elect millwork finishes and ceilings and lighting. construction of new partitions power, lighting finishes and millwork including corridor and ada restroom upgrades. mep lifesafety sprinkler under separate permit. ref#: 202305248479. | $544,955 |
| Feb 18, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed onDetails
ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed on | $800,000 |
| Feb 18, 2026 | Completed final sign-off Aug 2026 | 155 05th St | 1/fl- ab17- soft demo scope for 1st floor demo only no proposed construction improvements. no demo to ceiling components until associated sprinkler permit is issuedDetails
1/fl- ab17- soft demo scope for 1st floor demo only no proposed construction improvements. no demo to ceiling components until associated sprinkler permit is issued | $199,000 |
| Feb 2, 2026 | Completed final sign-off May 2026 | 121 Spear St | b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices toDetails
b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices to | |
| Jan 22, 2026 | Completed final sign-off Sep 2026 | 2 Embarcadero Center | 16/fl- ti to (e) tenant space to provide spec suite. include non structrual demo of (e) ti and build out of (e) with non structrural partitions doors and sidelites, suspend ceilings, casework and finishesDetails
16/fl- ti to (e) tenant space to provide spec suite. include non structrual demo of (e) ti and build out of (e) with non structrural partitions doors and sidelites, suspend ceilings, casework and finishes | $500,000 |
| Jan 21, 2026 | Completed final sign-off Jul 2026 | 601 California St | 12th floor: oti minor upgrades to an existing occupied suite: 3 new offices with associated non-rated partitions; doors, frames, & hardware; power/data; etc new break area casewrok, appliances, & flooring. e improvement & finishes to otherwise remain; including clgs & lighting.Details
12th floor: oti minor upgrades to an existing occupied suite: 3 new offices with associated non-rated partitions; doors, frames, & hardware; power/data; etc new break area casewrok, appliances, & flooring. e improvement & finishes to otherwise remain; including clgs & lighting. | $260,000 |
| Jan 7, 2026 | Completed final sign-off May 2026 | 1 Post St | mechanical minor duct modifications, 2 new vav terminal units. electrical power lighting and signal, title 24. ref: 202507160873Details
mechanical minor duct modifications, 2 new vav terminal units. electrical power lighting and signal, title 24. ref: 202507160873 | $15,000 |
| Jan 6, 2026 | In progress issued May 2026 | 155 05th St | 1st fl ti for (n) clinic & ambulatory surgery center. work includes dental clinic with reception, waiting area, 4 operatories, 5 exam rooms, 1 recovery, 4 special care rooms, offices, lab & support areas. surgery center includes reception, pre/post op rooms, 6 ors, nurse stations.Details
1st fl ti for (n) clinic & ambulatory surgery center. work includes dental clinic with reception, waiting area, 4 operatories, 5 exam rooms, 1 recovery, 4 special care rooms, offices, lab & support areas. surgery center includes reception, pre/post op rooms, 6 ors, nurse stations. | $1,200,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 1 Post St | 30/f ste 3000: installation of (6) new phone booths and their associated anchoring. life and safety will be submitted separately.Details
30/f ste 3000: installation of (6) new phone booths and their associated anchoring. life and safety will be submitted separately. | $5,500 |
| Nov 13, 2025 | Completed final sign-off Aug 2026 | 1 Post St | electrical work (title 24) for pa 202509115099Details
electrical work (title 24) for pa 202509115099 | $15,000 |
| Nov 12, 2025 | Completed final sign-off May 2026 | 1 Post St | #1200: installation of 2 (e) phone booths & 4 new phone booths & their associated anchoring. life safety & sprinklers submit separately. all work shall comply w/ federal, state, & local codes including sf building code, cal title 24, & federal ada reg.Details
#1200: installation of 2 (e) phone booths & 4 new phone booths & their associated anchoring. life safety & sprinklers submit separately. all work shall comply w/ federal, state, & local codes including sf building code, cal title 24, & federal ada reg. | $6,500 |
| Nov 5, 2025 | Completed final sign-off Feb 2026 | 601 California St | 20th flr. revision to pa 202501309343 conference wall & pantry wall @ hallway reworked to be full ht glazing includes power & ceiling (light) redesign.Details
20th flr. revision to pa 202501309343 conference wall & pantry wall @ hallway reworked to be full ht glazing includes power & ceiling (light) redesign. | |
| Oct 31, 2025 | Completed final sign-off Mar 2026 | 1 Post St | ref pa# 202510036712 - 25th floor - ste# 2550: mep: new power, lighting, signal, and title 24 mechanical.Details
ref pa# 202510036712 - 25th floor - ste# 2550: mep: new power, lighting, signal, and title 24 mechanical. | |
| Oct 24, 2025 | Completed final sign-off Feb 2026 | 555 Market St | m.e.p only. ref pa#202505126219Details
m.e.p only. ref pa#202505126219 | $60,000 |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 601 California St | electrical deferred -601 california 14th floor. reference pa #202505227041. power, lighting and signal.Details
electrical deferred -601 california 14th floor. reference pa #202505227041. power, lighting and signal. | $15,000 |
| Oct 21, 2025 | Completed final sign-off Jan 2026 | 150 Spear St | 18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed tiDetails
18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed ti | $6,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | non load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343Details
non load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343 | $5,500 |
| Oct 16, 2025 | Completed final sign-off Nov 2025 | 601 California St | hvac to modify ti 202505227041. ste 1475Details
hvac to modify ti 202505227041. ste 1475 | $45,000 |
| Oct 3, 2025 | Completed final sign-off Mar 2026 | 1 Post St | suite 2550: demo and construction of copy room. millwork, demo of existing partitions, finish updates in break area, new wall finishes, new light fixtures and power. area of work is limited to these renovation.Details
suite 2550: demo and construction of copy room. millwork, demo of existing partitions, finish updates in break area, new wall finishes, new light fixtures and power. area of work is limited to these renovation. | $76,543 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | 12/f suite 1250: add ceiling supply grilles and return grilles. relocate 1 vav box, new duct distribution, air balancing. ref permit 202505086056.Details
12/f suite 1250: add ceiling supply grilles and return grilles. relocate 1 vav box, new duct distribution, air balancing. ref permit 202505086056. | $10,000 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | 12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged.Details
12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged. | |
| Sep 11, 2025 | Completed final sign-off Aug 2026 | 1 Post St | ste 1700: the project involves demolition and construction of new millwork island and kitchen cabinetry. new flooring and wall finishes, seismic anchoring of 2 phone booths, light fixtures and power.Details
ste 1700: the project involves demolition and construction of new millwork island and kitchen cabinetry. new flooring and wall finishes, seismic anchoring of 2 phone booths, light fixtures and power. | $43,000 |
| Sep 3, 2025 | Completed final sign-off Jun 2026 | 1 Post St | floor 2; mechanical and electrical for office ti permit pa#202506138672Details
floor 2; mechanical and electrical for office ti permit pa#202506138672 | $10,000 |
| Aug 27, 2025 | Completed final sign-off Jan 2026 | 222 02nd St | new non-load bearing interior furred walls. ceiling modification and new floor finish. electrical modification to support new recording studio. ref pa 202404240675Details
new non-load bearing interior furred walls. ceiling modification and new floor finish. electrical modification to support new recording studio. ref pa 202404240675 | $50,000 |
| Aug 26, 2025 | Completed final sign-off Nov 2025 | 601 California St | unit #1150 -deffered mechanical submital for pa #202505297441Details
unit #1150 -deffered mechanical submital for pa #202505297441 | $75,000 |
| Aug 13, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | 18th flr. deferred mechanical work for pa#: 202504285343.Details
18th flr. deferred mechanical work for pa#: 202504285343. | $154,000 |
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 3468 California St | 1st/f: installation of display monitors for databases. demo wallsDetails
1st/f: installation of display monitors for databases. demo walls | $10,000 |
| Jul 22, 2025 | Completed final sign-off Nov 2025 | 345 California St | 28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change.Details
28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change. | $320,000 |
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 601 California St | 11/fl-ref ti 202505297441- new power and signal devices new title 24 lighting.Details
11/fl-ref ti 202505297441- new power and signal devices new title 24 lighting. | $15,000 |
| Jul 18, 2025 | Completed final sign-off Oct 2025 | 601 California St | 20/f: lighting fixtures and associated circuiting / controls, power and signal devices and wiring. ref bpa 202501309343.Details
20/f: lighting fixtures and associated circuiting / controls, power and signal devices and wiring. ref bpa 202501309343. | $10,000 |
| Jul 16, 2025 | Completed final sign-off May 2026 | 1 Post St | demo and construction of 6 new rooms to include (n) partitions, (n) door, frames, hardware & sidelits; (n) power/data, (n) light fixtures/switches and (n) finishes; demo of partial break area millwork & reupholstering of (e) booths; areas of work is limited to these rooms. mep under separate permitDetails
demo and construction of 6 new rooms to include (n) partitions, (n) door, frames, hardware & sidelits; (n) power/data, (n) light fixtures/switches and (n) finishes; demo of partial break area millwork & reupholstering of (e) booths; areas of work is limited to these rooms. mep under separate permit | $76,543 |
| Jul 1, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | 18th floor: suite 1800 electrical for 202504285343.Details
18th floor: suite 1800 electrical for 202504285343. | $186,000 |
| Jun 13, 2025 | Completed final sign-off Jan 2026 | 1 Post St | 2/f: demolish the (e) 9000 sq ft tenant improvement- (2) separate tenants. new interior non-load bearing walls. new ada compliant restroom. new finishes throughout. mep deferred.Details
2/f: demolish the (e) 9000 sq ft tenant improvement- (2) separate tenants. new interior non-load bearing walls. new ada compliant restroom. new finishes throughout. mep deferred. | $1,000,000 |
| Jun 2, 2025 | Completed final sign-off Oct 2025 | 1 Post St | 11th fl, ste 1100 - electrical for pa 202502271256 new power & signal devices throughout the space new 2022 -24 compliant lighting & controlsDetails
11th fl, ste 1100 - electrical for pa 202502271256 new power & signal devices throughout the space new 2022 -24 compliant lighting & controls | $10,000 |
| May 29, 2025 | Completed final sign-off Nov 2025 | 601 California St | minor mofifications to (e) occupied suite, includes (1) reppurposed & (3) new offices with respective new power updated ceilings & lightning & finishes, etc as necessary, alson includes replacing (2) (e) doors and relocationg it equipment into new closet mech & elec, sprinkler & lifesagety underDetails
minor mofifications to (e) occupied suite, includes (1) reppurposed & (3) new offices with respective new power updated ceilings & lightning & finishes, etc as necessary, alson includes replacing (2) (e) doors and relocationg it equipment into new closet mech & elec, sprinkler & lifesagety under | $285,000 |
| May 27, 2025 | Completed final sign-off Sep 2025 | 135 Main St | 19th fl- upgrades to 19th fl multi use restrooms. accessibility upgrades. new finishes, fixtures and lightingDetails
19th fl- upgrades to 19th fl multi use restrooms. accessibility upgrades. new finishes, fixtures and lighting | $153,022 |
| May 22, 2025 | Completed final sign-off Nov 2025 | 601 California St | 14th fl/ suite 1475: minor demo and build-out in an existing suite. new entry doors/walls/lightening/ceiling tile/finishes/interior casework and sink. deferred mep on a seperate permit.Details
14th fl/ suite 1475: minor demo and build-out in an existing suite. new entry doors/walls/lightening/ceiling tile/finishes/interior casework and sink. deferred mep on a seperate permit. | $235,000 |
| May 13, 2025 | Completed final sign-off Aug 2025 | 1 Post St | 30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permitDetails
30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permit | $180,000 |
| May 12, 2025 | Completed final sign-off Feb 2026 | 555 Market St | t.i. on 3rd floor: add 2 offices and 1 confernce room. accessible path of travel upgrades in restrooms as noted. mep deferred.Details
t.i. on 3rd floor: add 2 offices and 1 confernce room. accessible path of travel upgrades in restrooms as noted. mep deferred. | $594,000 |
| May 8, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | 12th floor:consist of conbining suite 1230 to 1250 to create one suite. demo includes minimal demo of partitions, power/data, flooring, lighting, and finishes. construction includes minimal new partitions, doors, power, lighting, & finishes. mep, fire life safty, & sprinklers system modificationsDetails
12th floor:consist of conbining suite 1230 to 1250 to create one suite. demo includes minimal demo of partitions, power/data, flooring, lighting, and finishes. construction includes minimal new partitions, doors, power, lighting, & finishes. mep, fire life safty, & sprinklers system modifications | $184,000 |
| Apr 28, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | 18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit.Details
18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit. | $260,000 |
| Apr 22, 2025 | Completed final sign-off Jul 2025 | 1 Post St | (ste #400) deffered mechanical/electrical. ref pa# 202502140413Details
(ste #400) deffered mechanical/electrical. ref pa# 202502140413 | $90,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 601 California St | 14th fl suite 1450 ref pa# 2024-1224-7361: new vav @ meeting & arbitration room, new ductwork, new supply & return diffusers, new exhaust fan at copy room, relocate thermostats, air balanceDetails
14th fl suite 1450 ref pa# 2024-1224-7361: new vav @ meeting & arbitration room, new ductwork, new supply & return diffusers, new exhaust fan at copy room, relocate thermostats, air balance | $75,000 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 222 02nd St | commercial tenant improvement, 2 meeting rooms into 1 executive office. demo one wall. light power, and signal. remove and reinstall linear diffusersDetails
commercial tenant improvement, 2 meeting rooms into 1 executive office. demo one wall. light power, and signal. remove and reinstall linear diffusers | $150,000 |
| Feb 27, 2025 | Completed final sign-off Oct 2025 | 1 Post St | 11/f suite 1100: light demolition and construction of 3 new rooms to include new partitions, new door frame, hardware and side light. new power/data, new light fixtures/switches and finishes. area of work limitedto these new rooms. mep deferred.Details
11/f suite 1100: light demolition and construction of 3 new rooms to include new partitions, new door frame, hardware and side light. new power/data, new light fixtures/switches and finishes. area of work limitedto these new rooms. mep deferred. | $76,543 |
| Feb 27, 2025 | Completed final sign-off Nov 2025 | 44 Montgomery St | 5/fl- ti (n) non structural partitions, finishes and relocated lighting.Details
5/fl- ti (n) non structural partitions, finishes and relocated lighting. | $430,000 |
| Feb 24, 2025 | Completed final sign-off Oct 2025 | 601 California St | 14th fl, ste 1450 - new power & signal devices, title 24 ref pa 202412247361Details
14th fl, ste 1450 - new power & signal devices, title 24 ref pa 202412247361 | $187,000 |
| Feb 24, 2025 | Completed final sign-off Aug 2025 | 601 California St | 20th fl - new power & signal, title 24 ref pa 202410243631Details
20th fl - new power & signal, title 24 ref pa 202410243631 | $187,000 |
| Feb 14, 2025 | Completed final sign-off Jul 2025 | 1 Post St | suite 400; minor renovation to existing tenant improvement, new non load bearing partitions, relocated light. fixtures, relocated sink,. mep under separate permit.Details
suite 400; minor renovation to existing tenant improvement, new non load bearing partitions, relocated light. fixtures, relocated sink,. mep under separate permit. | $319,000 |
| Jan 31, 2025 | Completed final sign-off Apr 2025 | 150 Spear St | 17/f suite 1700 - hvac modifications to support interior ti. ref permit 202412136794Details
17/f suite 1700 - hvac modifications to support interior ti. ref permit 202412136794 | $10,000 |
| Jan 30, 2025 | Completed final sign-off Feb 2026 | 601 California St | 20/fl-build common corridors and suite entries to demise an unoccupied floor and build out one suite. suite constructon consistsof office, meetings rooms, workstatoins, break area phone rooms, etc. all (n) power/data, casework, acoustic ceiling, finishes etc throughout. mech included. elc deferred.Details
20/fl-build common corridors and suite entries to demise an unoccupied floor and build out one suite. suite constructon consistsof office, meetings rooms, workstatoins, break area phone rooms, etc. all (n) power/data, casework, acoustic ceiling, finishes etc throughout. mech included. elc deferred. | $835,000 |
| Jan 23, 2025 | In progress issued Jan 2025 | 149 09th St | to obtain final inspection for work approved under 202007109975, 202003167194. all work is complete.Details
to obtain final inspection for work approved under 202007109975, 202003167194. all work is complete. | |
| Jan 23, 2025 | Completed final sign-off Aug 2026 | 149 09th St | recommencement and completion of work approved unde 201904036993, 201902052065, 201912230318.Details
recommencement and completion of work approved unde 201904036993, 201902052065, 201912230318. | $369,026 |
| Jan 21, 2025 | In progress issued Jan 2025 | 55 Francisco St | 7/fl- convert (e) office space to common corridor electrical room. minor demo of non structrual partitions. minor consturction of (n) partitions. mech and electrical deferredDetails
7/fl- convert (e) office space to common corridor electrical room. minor demo of non structrual partitions. minor consturction of (n) partitions. mech and electrical deferred | $50,000 |
| Jan 14, 2025 | Completed final sign-off Apr 2025 | 150 Spear St | electrical ref 202412136794Details
electrical ref 202412136794 | $50,000 |
| Dec 24, 2024 | Completed final sign-off Oct 2025 | 601 California St | 14/fl- oti demising a vacant suite. minor demo followed by construction of meeting rooms, break area copy etc build out includes (n) non rated partitions, doors, frames, hardware, power/data casework/plumbing, ceiling/lighting, and (n) finishies throughout. any alteration to mep , sprinkler or flsDetails
14/fl- oti demising a vacant suite. minor demo followed by construction of meeting rooms, break area copy etc build out includes (n) non rated partitions, doors, frames, hardware, power/data casework/plumbing, ceiling/lighting, and (n) finishies throughout. any alteration to mep , sprinkler or fls | $735,000 |
| Dec 13, 2024 | Completed final sign-off Apr 2025 | 150 Spear St | 17th floor. interior t.i. new millwork in break area, new huddle rooms, new conference roo, new grid ceiling + lighting. demo ceilings in open office. mep deferredDetails
17th floor. interior t.i. new millwork in break area, new huddle rooms, new conference roo, new grid ceiling + lighting. demo ceilings in open office. mep deferred | $475,000 |
| Dec 4, 2024 | Completed final sign-off Feb 2025 | 33 New Montgomery St | 2nd floor: construction of new demizing wall separeting one suite into 2 (220 and 290). additional egress door provided for egress to 220.Details
2nd floor: construction of new demizing wall separeting one suite into 2 (220 and 290). additional egress door provided for egress to 220. | $25,000 |
| Nov 22, 2024 | Completed final sign-off Jul 2025 | 150 Spear St | 16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone boothsDetails
16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone booths | $98,576 |
| Nov 1, 2024 | Completed final sign-off Nov 2024 | 1050 Battery St | 2nd and 3rd flr. ab-017 interior demolition of floors. demolition of non-strutural parttions, finishes and lighting. ab-017 exception to requirements for disabled access to vacent spaces. suite shall remain unoccupied until tenant improvement is filed.Details
2nd and 3rd flr. ab-017 interior demolition of floors. demolition of non-strutural parttions, finishes and lighting. ab-017 exception to requirements for disabled access to vacent spaces. suite shall remain unoccupied until tenant improvement is filed. | $120,000 |
| Oct 24, 2024 | Completed final sign-off Aug 2025 | 601 California St | 20th flr: finishing shell- condition elevator lobby; extending lobby w/alcove for (n) drinking fountain; building (n) single-accomdation gender neutral restroom; finishing shell-condition core restrooms. any alteration to mep, sprinkler and fls systems to be under separate permit.Details
20th flr: finishing shell- condition elevator lobby; extending lobby w/alcove for (n) drinking fountain; building (n) single-accomdation gender neutral restroom; finishing shell-condition core restrooms. any alteration to mep, sprinkler and fls systems to be under separate permit. | $750,000 |
| Sep 26, 2024 | Completed final sign-off Aug 2025 | 601 California St | t.i on the 20/f. 9 new fire smoke dampers and associated rated duct enclosures serving the entire floor, served by core shaft locations. any modification to electrial, plumbing, sprinkler or fls systems to be under sep permit.Details
t.i on the 20/f. 9 new fire smoke dampers and associated rated duct enclosures serving the entire floor, served by core shaft locations. any modification to electrial, plumbing, sprinkler or fls systems to be under sep permit. | $195,000 |
| Sep 5, 2024 | Completed final sign-off Dec 2024 | 114 Sansome St | suite 500: installing 9 (e) furniture phone booths and anchoring on the 5th floor.Details
suite 500: installing 9 (e) furniture phone booths and anchoring on the 5th floor. | $11,520 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 1 Post St | 16/f: hvac modifications to support new power and signal devices. reference pa# 202405232837Details
16/f: hvac modifications to support new power and signal devices. reference pa# 202405232837 | $60,000 |
| Jul 11, 2024 | Completed final sign-off Aug 2024 | 1 Lombard St | ref pa# 2024-0328-8781 safe off a reinstall (3) existing radiator thermostats. provide new lighting a branch circuiting to existing panelDetails
ref pa# 2024-0328-8781 safe off a reinstall (3) existing radiator thermostats. provide new lighting a branch circuiting to existing panel | $60,000 |