Commercial Interior Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Aug 2024
- Last 24 months
- 0 permits filed
281 permits since 2000: 248 completed, 20 never finaled, 13 expired or cancelled.
Of the 20 never-finaled permits, 7 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 281.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2024 | Completed final sign-off Jan 2025 | 201 03rd St | ground fl ref pa# 2024-0418-0226 new power and signal devices. new 2022 title 24 complaint lighting and controlsDetails
ground fl ref pa# 2024-0418-0226 new power and signal devices. new 2022 title 24 complaint lighting and controls | $20,000 |
| Apr 24, 2024 | Completed final sign-off Nov 2024 | 100 01st St | ref 202401083577-12/f office ti for mep trade work to include replace lighting fixtures, circuits, signal devices and rewiring. add and relocated ceiling diffusers and grills. add sidewall supply and grilles with new ducting. relocate (4) thermostats and air balancing.Details
ref 202401083577-12/f office ti for mep trade work to include replace lighting fixtures, circuits, signal devices and rewiring. add and relocated ceiling diffusers and grills. add sidewall supply and grilles with new ducting. relocate (4) thermostats and air balancing. | $75,000 |
| Apr 18, 2024 | Completed final sign-off Jan 2025 | 201 03rd St | construction of interior storefront system and doors in lobbyDetails
construction of interior storefront system and doors in lobby | $100,000 |
| Mar 18, 2024 | Completed final sign-off Oct 2024 | 100 01st St | 3/f: rev to pa# 2023-1221-2905; not to build the demising wallDetails
3/f: rev to pa# 2023-1221-2905; not to build the demising wall | |
| Jan 8, 2024 | Completed final sign-off Nov 2024 | 100 01st St | 12th fl: demo non-structural walls, ceiling, lighting, millwork, door, glazing, finishes. construct new non-structural walls, millwork, ceiling, lighting & finishes.Details
12th fl: demo non-structural walls, ceiling, lighting, millwork, door, glazing, finishes. construct new non-structural walls, millwork, ceiling, lighting & finishes. | $150,000 |
| Dec 21, 2023 | Completed final sign-off Oct 2024 | 100 01st St | 3/f: demolish e non structural walls, glazing, door, power and signal, patch and match finishes,construct demising wall, glazing and install a few light fixtures to match existing. rework hvac as reqDetails
3/f: demolish e non structural walls, glazing, door, power and signal, patch and match finishes,construct demising wall, glazing and install a few light fixtures to match existing. rework hvac as req | $150,000 |
| Oct 26, 2023 | Completed final sign-off Dec 2023 | 303 02nd St | 7th fl demolition of non structural partitions, ceiling, lighting & finishes. ref pa 2023-1025-9395Details
7th fl demolition of non structural partitions, ceiling, lighting & finishes. ref pa 2023-1025-9395 | $35,000 |
| Oct 26, 2023 | Completed final sign-off Dec 2023 | 303 02nd St | 8th fl demolition of non structural partitions, ceiling, lighting & finishes. ref pa 2023-1025-9395Details
8th fl demolition of non structural partitions, ceiling, lighting & finishes. ref pa 2023-1025-9395 | $25,000 |
| Apr 12, 2023 | Completed final sign-off Jun 2023 | 425 Bush St | instlal new ductwork and exhaust fan as shown on m2.1. no new fire smoke dampers, new opwer and signal devices in restrooms and new 2019 t24 compliant lighting and controls. ref pa# 202212228980 for arch work.Details
instlal new ductwork and exhaust fan as shown on m2.1. no new fire smoke dampers, new opwer and signal devices in restrooms and new 2019 t24 compliant lighting and controls. ref pa# 202212228980 for arch work. | $24,104 |
| Dec 22, 2022 | Completed final sign-off Jun 2023 | 425 Bush St | barrier removal project. demo & construction of men & women common restrooms will be upgraded to full compliance. demolition of non-load bearing walls.Details
barrier removal project. demo & construction of men & women common restrooms will be upgraded to full compliance. demolition of non-load bearing walls. | $175,000 |
| Sep 14, 2022 | Completed final sign-off Apr 2023 | 601 Montgomery St | 8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbingDetails
8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbing | $206,537 |
| Jun 9, 2021 | Never finaled issued Jun 2021, no final | 251 Post St | install a new exhaust fan for it room in ceiling. provide twist lock receptacles for new it equipment. install conduit from level 4 comms cupboard to new it equipmentDetails
install a new exhaust fan for it room in ceiling. provide twist lock receptacles for new it equipment. install conduit from level 4 comms cupboard to new it equipment | $5,000 |
| Apr 2, 2021 | Completed final sign-off Feb 2022 | 601 Montgomery St | 7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep.Details
7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep. | $338,903 |
| Apr 1, 2021 | Completed final sign-off Mar 2022 | 601 Montgomery St | 4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893.Details
4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893. | $308,451 |
| Oct 17, 2020 | Completed final sign-off Mar 2021 | 685 Market St | 1st floor: selective demolition of non load bearing walls, ceiling tile, lighting and floor finishes.Details
1st floor: selective demolition of non load bearing walls, ceiling tile, lighting and floor finishes. | $47,000 |
| Dec 12, 2019 | Completed final sign-off Jul 2020 | 601 Montgomery St | ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher naDetails
ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na | $254,249 |
| Nov 25, 2019 | Completed final sign-off May 2020 | 100 01st St | 25th flr: restroom upgrades @ men's restroom. reconfigure (e) urinal. provide new non-ada toilet stall, plumbing fixtures, & accessories. (e) lavatories & accessible stall to remain. construction @ copy/it area to include non-structural partitions. finishes to match (e). mep deferred.Details
25th flr: restroom upgrades @ men's restroom. reconfigure (e) urinal. provide new non-ada toilet stall, plumbing fixtures, & accessories. (e) lavatories & accessible stall to remain. construction @ copy/it area to include non-structural partitions. finishes to match (e). mep deferred. | $53,817 |
| Nov 25, 2019 | Completed final sign-off May 2020 | 88 Kearny St | suite 300: demo existing duct & hvac equipment as shown on 3m2.1, install new duct & hvac equipment as shown on 3m2.1, new lighting & controls for new phone rooms & new power & data for select furniture locaitons. no new fire/smoke dampers. ref arch pa #20906143455.Details
suite 300: demo existing duct & hvac equipment as shown on 3m2.1, install new duct & hvac equipment as shown on 3m2.1, new lighting & controls for new phone rooms & new power & data for select furniture locaitons. no new fire/smoke dampers. ref arch pa #20906143455. | $47,000 |
| Oct 23, 2019 | Completed final sign-off May 2020 | 601 Montgomery St | suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.Details
suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a. | $120,155 |
| Oct 17, 2019 | Completed final sign-off May 2020 | 90 New Montgomery St | 11/f: demo (e) duct & hvac equipment as shown on m20. install new duct/hvac equipment as shown on m2.1. no new fire smoke dampers. provide lighting ti of approx 6,891 sq. ft. office space. ref pa#201907155848 for architecturalDetails
11/f: demo (e) duct & hvac equipment as shown on m20. install new duct/hvac equipment as shown on m2.1. no new fire smoke dampers. provide lighting ti of approx 6,891 sq. ft. office space. ref pa#201907155848 for architectural | $325,000 |
| Oct 9, 2019 | Completed final sign-off Jan 2020 | 100 01st St | accessibility improvements to the restrooms on the 24th flr. barrier removal only. deferred: fire/life safety/mepDetails
accessibility improvements to the restrooms on the 24th flr. barrier removal only. deferred: fire/life safety/mep | $85,000 |
| Sep 17, 2019 | Completed final sign-off Dec 2019 | 88 Kearny St | add and relocate dissusers and registers, add and relcoate ductwork and air balance. ne new fire smk dampers are being added, lighting, power and signal, wiring and controls for office retrofit. replace pa# 201906173590 for arch workDetails
add and relocate dissusers and registers, add and relcoate ductwork and air balance. ne new fire smk dampers are being added, lighting, power and signal, wiring and controls for office retrofit. replace pa# 201906173590 for arch work | $65,000 |
| Jul 15, 2019 | Completed final sign-off May 2020 | 90 New Montgomery St | 11th floor: t.i. includes of non structural partitions and bldg new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maherDetails
11th floor: t.i. includes of non structural partitions and bldg new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $274,618 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 303 02nd St | 4th floor: includes removal of non-compliant modular ramps and door hardware, and installation of new compliant modular ramps and door hardware. n/a for maherDetails
4th floor: includes removal of non-compliant modular ramps and door hardware, and installation of new compliant modular ramps and door hardware. n/a for maher | $30,000 |
| Jun 17, 2019 | Completed final sign-off Dec 2019 | 88 Kearny St | 12th floor: modification of (e) tenant improvement to include select demolition of non load bearing walls, new light fixtures, new millwork, new finishesDetails
12th floor: modification of (e) tenant improvement to include select demolition of non load bearing walls, new light fixtures, new millwork, new finishes | $295,000 |
| Jun 14, 2019 | Completed final sign-off May 2020 | 88 Kearny St | ste 300 - modification of all existing ti - includes selective construction of non-load bearing walls, modified ceiling grid, light fixture, relocation, new office doors & frames and new finishesDetails
ste 300 - modification of all existing ti - includes selective construction of non-load bearing walls, modified ceiling grid, light fixture, relocation, new office doors & frames and new finishes | $72,000 |
| Apr 30, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | modify ductwork and equip as shown on 6m2.0. install new ductwork and mech equip as shown on 6.m2.1 no new fire smoke dampers in this project. ref 201903014165Details
modify ductwork and equip as shown on 6m2.0. install new ductwork and mech equip as shown on 6.m2.1 no new fire smoke dampers in this project. ref 201903014165 | $57,250 |
| Mar 22, 2019 | Expired or cancelled cancelled Jan 2026 | 720 Market St | 4th flr. inteiror demo of (e) non-structural parititon and new construciton of wall partitionsDetails
4th flr. inteiror demo of (e) non-structural parititon and new construciton of wall partitions | $63,696 |
| Mar 5, 2019 | Completed final sign-off Aug 2019 | 601 Montgomery St | suite 400 -deferred: life safety/fire sprinkler & alarm. 4th flr ti -demo includes non structural partitions, doors, casework, lighting & finishes. construction - non structural partitions, glazing, doors, lighting finishes & restroom accessibility upgrades and mepDetails
suite 400 -deferred: life safety/fire sprinkler & alarm. 4th flr ti -demo includes non structural partitions, doors, casework, lighting & finishes. construction - non structural partitions, glazing, doors, lighting finishes & restroom accessibility upgrades and mep | $488,049 |
| Mar 1, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | 6th fl; barrier removal at 6th fl. restroomsDetails
6th fl; barrier removal at 6th fl. restrooms | $20,000 |
| Mar 1, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | 6th fl. t.i. light demo of select walls (non structural) doors & finishes, providing new elec, lighting & power, providing new non rated walls, doors, lighting and finishesDetails
6th fl. t.i. light demo of select walls (non structural) doors & finishes, providing new elec, lighting & power, providing new non rated walls, doors, lighting and finishes | $400,000 |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 530 Bush St | 9th fl - demo ductwork equipment as shown on 9m2.0. install new low pressure ductwork and equipment as shown on 9m2.1. no new fre smoke dampers. ref pa 2018-1116-6086 for architectural workDetails
9th fl - demo ductwork equipment as shown on 9m2.0. install new low pressure ductwork and equipment as shown on 9m2.1. no new fre smoke dampers. ref pa 2018-1116-6086 for architectural work | $41,250 |
| Jan 14, 2019 | Completed final sign-off May 2019 | 500 Sutter St | suite 823. minor demo of (e) wall, casework, finishes. (e) ceiling to remain w/ new light fixtures throughout construction incl non-structural partitions, doors and finishes. restroom accessbility upgrades ref pa 201806131743Details
suite 823. minor demo of (e) wall, casework, finishes. (e) ceiling to remain w/ new light fixtures throughout construction incl non-structural partitions, doors and finishes. restroom accessbility upgrades ref pa 201806131743 | $185,476 |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 530 Bush St | 9th flr. t.i, light demo of select walls ( non-structural ) doors and finishes, electrical for lighting and power. installing (n) non-fire rated wall doors, lighting and finishesDetails
9th flr. t.i, light demo of select walls ( non-structural ) doors and finishes, electrical for lighting and power. installing (n) non-fire rated wall doors, lighting and finishes | $350,000 |
| Sep 12, 2018 | Completed final sign-off Nov 2018 | 100 01st St | 2nd fl: install new hvac ductwork and equipment as shown on 2m2.1. provide new lighting and branch circuiting to existing panel. no new fire smoke dampers. ref pa 2018-0607-1283Details
2nd fl: install new hvac ductwork and equipment as shown on 2m2.1. provide new lighting and branch circuiting to existing panel. no new fire smoke dampers. ref pa 2018-0607-1283 | $19,780 |
| Sep 12, 2018 | Completed final sign-off Dec 2018 | 100 01st St | demo and install hvac equipment and ductwork as shown on 3m2.1 provide new lighting and branch circuiting to (e) panel. maintain some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as required to new power & signal outlets. no new fsdsDetails
demo and install hvac equipment and ductwork as shown on 3m2.1 provide new lighting and branch circuiting to (e) panel. maintain some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as required to new power & signal outlets. no new fsds | $21,541 |
| Sep 12, 2018 | Completed final sign-off Dec 2018 | 100 01st St | add supply and return diffusers, relocate t-stat, add new ductwork, add transer fan and air balance. lighting, power and signal wiring, lighting controls. modifications to match the new architectural layout. no new fire smoke dampers. ref pa 2018-0719-5028Details
add supply and return diffusers, relocate t-stat, add new ductwork, add transer fan and air balance. lighting, power and signal wiring, lighting controls. modifications to match the new architectural layout. no new fire smoke dampers. ref pa 2018-0719-5028 | $35,800 |
| Aug 27, 2018 | Completed final sign-off Nov 2018 | 530 Bush St | 5th & 6th fl - demo of non-structural walls & door assembblies & finishes. construction of non-structural tenant improvementsDetails
5th & 6th fl - demo of non-structural walls & door assembblies & finishes. construction of non-structural tenant improvements | $40,000 |
| Jul 19, 2018 | Completed final sign-off Dec 2018 | 100 01st St | 22nd floor: mep, life safety, fire sprinklers & alarm deferred, demo of partitions, millwork finishes, ceiling & lighting fixtures, construction to include partions (non-structural) ceiling and tile, lighting fixtures & finishesDetails
22nd floor: mep, life safety, fire sprinklers & alarm deferred, demo of partitions, millwork finishes, ceiling & lighting fixtures, construction to include partions (non-structural) ceiling and tile, lighting fixtures & finishes | $218,000 |
| Jul 19, 2018 | Completed final sign-off Dec 2018 | 100 01st St | 3rd fl - merging with neighbor unit- finish removal, construction of new non-structural partitions, new finishes, restroom accessibility upgrades (tenant work) mep, sprinklers and fire alarm separte permits. demo number 201807164615Details
3rd fl - merging with neighbor unit- finish removal, construction of new non-structural partitions, new finishes, restroom accessibility upgrades (tenant work) mep, sprinklers and fire alarm separte permits. demo number 201807164615 | $123,992 |
| Jul 16, 2018 | Completed final sign-off Aug 2018 | 100 01st St | 3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suitesDetails
3rd flr. restroom accessibility upgrades; expansion into adjacent suite, limited partition demolition, new soffit between 2 suites | $30,000 |
| Jul 6, 2018 | Completed final sign-off Sep 2018 | 49 Geary St | ste 411 - modification of (e) ti to include construction of non-load bearing partitions, re-purposed office door & frame, salvage & re-use of existing materials if practicable. n/a for maher.Details
ste 411 - modification of (e) ti to include construction of non-load bearing partitions, re-purposed office door & frame, salvage & re-use of existing materials if practicable. n/a for maher. | $20,000 |
| Jun 7, 2018 | Completed final sign-off Nov 2018 | 100 01st St | 2nd fl - restroom upgrades. scope includes demo of (e) wall and column. provide new all gender restroom and urinal. plumbing fixtures and accessories as well as finishes, ceiling and lightingDetails
2nd fl - restroom upgrades. scope includes demo of (e) wall and column. provide new all gender restroom and urinal. plumbing fixtures and accessories as well as finishes, ceiling and lighting | $62,000 |
| May 2, 2018 | Completed final sign-off Oct 2018 | 901 Market St | 4th flr - installation of low pressure ductwork and installation of led 2x4 fixtures and title 24 controls in corridor per t-24. ref 201801299725 no new smk dampers maher naDetails
4th flr - installation of low pressure ductwork and installation of led 2x4 fixtures and title 24 controls in corridor per t-24. ref 201801299725 no new smk dampers maher na | $21,565 |
| Apr 25, 2018 | Completed final sign-off Mar 2019 | 901 Market St | 3rd floor: renovation of restroom approx. 393 sq ft. n/a for maherDetails
3rd floor: renovation of restroom approx. 393 sq ft. n/a for maher | $100,000 |
| Feb 21, 2018 | Completed final sign-off Apr 2018 | 100 01st St | restroom accessibility improvements on the 14th fl. scope of work includes install new stall partitions & new drinking fountain and re-install existing accessories to be code compliant.Details
restroom accessibility improvements on the 14th fl. scope of work includes install new stall partitions & new drinking fountain and re-install existing accessories to be code compliant. | $55,278 |
| Jan 29, 2018 | Completed final sign-off May 2018 | 901 Market St | 4th flr -move doorway frames and install new doors maher naDetails
4th flr -move doorway frames and install new doors maher na | $10,000 |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 901 Market St | 3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork.Details
3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork. | $100,000 |
| Dec 12, 2017 | Never finaled issued Jan 2018, no final | 901 Market St | 3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13Details
3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13 | $5,000 |
| Oct 11, 2017 | Never finaled issued Oct 2017, no final | 100 01st St | 25th fl: installation of 3 new fan powered boxes with electric heat, 2 new coding only vavs and new low pressure ductwork. one new fire smoke damper. ref 201608316421 & 201706300796.Details
25th fl: installation of 3 new fan powered boxes with electric heat, 2 new coding only vavs and new low pressure ductwork. one new fire smoke damper. ref 201608316421 & 201706300796. | $99,958 |
| Oct 11, 2017 | Completed final sign-off Dec 2017 | 100 01st St | 25/f- elevator lobby lighting and controls. ref 201706300796Details
25/f- elevator lobby lighting and controls. ref 201706300796 | $15,000 |
| Sep 28, 2017 | Completed final sign-off Dec 2017 | 1 Daniel Burnham Ct | #230- revision to 201709016651, plan reveision to layout of recepti9on 205, addition of data outlets, revision to toilet 209 finishes. n/a ordinance #155-13Details
#230- revision to 201709016651, plan reveision to layout of recepti9on 205, addition of data outlets, revision to toilet 209 finishes. n/a ordinance #155-13 | $280,000 |
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 1 Daniel Burnham Ct | 2nd fl, ste 230c plumbing, mechanical & electrical ti; 2nd floor. ref pa 2014-0901-6651. n/a ordinance #155-13Details
2nd fl, ste 230c plumbing, mechanical & electrical ti; 2nd floor. ref pa 2014-0901-6651. n/a ordinance #155-13 | $54,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2018 | 1 Daniel Burnham Ct | 2/f: non rated partitions and doors, new floor finishes, paint, casework maher not reqDetails
2/f: non rated partitions and doors, new floor finishes, paint, casework maher not req | $280,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 655 Montgomery St | 9/f: lighting and controls. ref 201706149368 for arch workDetails
9/f: lighting and controls. ref 201706149368 for arch work | $4,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 655 Montgomery St | 12/f: light fixtures and controls. ref 201706159507 for archDetails
12/f: light fixtures and controls. ref 201706159507 for arch | $20,028 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 731 Sansome St | 3rd floor - demolition of existing interior only ti. no exterior work. ab-017 applies. remain vacant & ti permit is required.Details
3rd floor - demolition of existing interior only ti. no exterior work. ab-017 applies. remain vacant & ti permit is required. | $25,000 |
| Jun 30, 2017 | Completed final sign-off Dec 2017 | 100 01st St | 25th floor - revision to pa 2016-0831-6421 - improvements to unoccupied office suite on the 25th floor: construction of elevator lobbyDetails
25th floor - revision to pa 2016-0831-6421 - improvements to unoccupied office suite on the 25th floor: construction of elevator lobby | $16,983 |
| Jun 15, 2017 | Never finaled issued Jun 2017, no final | 655 Montgomery St | 9th floor (suite 900): ti filed inder ab-017 for unoccupied space. demo, new partitions, ceiling, door and lighting. life saftey/mep under permitDetails
9th floor (suite 900): ti filed inder ab-017 for unoccupied space. demo, new partitions, ceiling, door and lighting. life saftey/mep under permit | $126,405 |
| Jun 15, 2017 | Completed final sign-off Oct 2017 | 655 Montgomery St | 12th fkr: ti in unoccupied suites filed under ab-017, demo, new ceiling and lighting, doors. life safety/mep under sep permitDetails
12th fkr: ti in unoccupied suites filed under ab-017, demo, new ceiling and lighting, doors. life safety/mep under sep permit | $208,367 |
| Jun 14, 2017 | Completed final sign-off Oct 2017 | 655 Montgomery St | 9th floor restroom fixture upgrades, furniture finishes, ceiling and lighting upgrades and ada compliance upgrades. this is a barrieer removal scope only with ab-017 in effect for unoccupied suiteDetails
9th floor restroom fixture upgrades, furniture finishes, ceiling and lighting upgrades and ada compliance upgrades. this is a barrieer removal scope only with ab-017 in effect for unoccupied suite | $74,460 |
| Mar 17, 2017 | Completed final sign-off Jun 2017 | 655 Montgomery St | 10th floor: lighting, power and signal, wiring lighting & receptacle controls. modification to the extg hvac systems to match new architectural layout. addition of one dual duct vav box with controls. addition of one vav box with controls and air balance. no nw fire smoke dampers. ref #201702240067Details
10th floor: lighting, power and signal, wiring lighting & receptacle controls. modification to the extg hvac systems to match new architectural layout. addition of one dual duct vav box with controls. addition of one vav box with controls and air balance. no nw fire smoke dampers. ref #201702240067 | $77,900 |
| Feb 28, 2017 | Completed final sign-off Apr 2017 | 201 Spear St | 7th flr: removal of non bearing interior partition. relocate (e) door maher naDetails
7th flr: removal of non bearing interior partition. relocate (e) door maher na | $3,762 |
| Feb 24, 2017 | Completed final sign-off Jun 2017 | 90 New Montgomery St | power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/aDetails
power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/a | $39,138 |
| Feb 24, 2017 | Completed final sign-off Jun 2017 | 655 Montgomery St | 10th flr: new partitions ti & spec suite partial floor, new open office and finishes. new light fixtures & electrical/tele/data. mep/fire/life safety under sep permitDetails
10th flr: new partitions ti & spec suite partial floor, new open office and finishes. new light fixtures & electrical/tele/data. mep/fire/life safety under sep permit | $217,481 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 655 Montgomery St | electrical unit per title 24. ref 201701066680 for architectural workDetails
electrical unit per title 24. ref 201701066680 for architectural work | $35,594 |
| Jan 27, 2017 | Completed final sign-off Feb 2017 | 201 03rd St | 6th fl - demolition of non structural partitions in non occupied spaces, ref 201701268006 for modification of sprinklers. per ab-017Details
6th fl - demolition of non structural partitions in non occupied spaces, ref 201701268006 for modification of sprinklers. per ab-017 | $31,894 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 100 01st St | 22nd floor: lighting, power, and signal wiring, lighting and receptacle controls. modification of (e) hvac systems to match the new arch. layout. scopes includes new vav box and water source heat pump for the idf closet. new fire smoke damper. ref. arch #2016-1017-0404.Details
22nd floor: lighting, power, and signal wiring, lighting and receptacle controls. modification of (e) hvac systems to match the new arch. layout. scopes includes new vav box and water source heat pump for the idf closet. new fire smoke damper. ref. arch #2016-1017-0404. | $60,000 |
| Jan 6, 2017 | Completed final sign-off Mar 2017 | 655 Montgomery St | 19th flr - suite 1950: interior ti - new non structural partitions, break area, finishes throughout. mep/fire/life safety under sep permit maher na ref 201606270945Details
19th flr - suite 1950: interior ti - new non structural partitions, break area, finishes throughout. mep/fire/life safety under sep permit maher na ref 201606270945 | $92,571 |
| Dec 13, 2016 | Never finaled issued Dec 2016, no final | 731 Sansome St | 5th floor: revision to 201610281369 - ada restroom change; n/a maherDetails
5th floor: revision to 201610281369 - ada restroom change; n/a maher | |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 90 New Montgomery St | 3rd floor: t.i. includes the demo of non structural partitions and build back of non structural partitions. mep, life safty and sprinklers under seperate permit. design build. (bldg fully sprinklered). n/a for maherDetails
3rd floor: t.i. includes the demo of non structural partitions and build back of non structural partitions. mep, life safty and sprinklers under seperate permit. design build. (bldg fully sprinklered). n/a for maher | $69,120 |
| Nov 16, 2016 | Completed final sign-off Feb 2017 | 100 01st St | 14th floor -per ab-017- demolition 0f (e) non-structural partitions, ceiling, lighting, floor finishes and any associated mechanical, plumbing and electrical in a full floor unoccupied office space. ref pa 2016-1115-2693Details
14th floor -per ab-017- demolition 0f (e) non-structural partitions, ceiling, lighting, floor finishes and any associated mechanical, plumbing and electrical in a full floor unoccupied office space. ref pa 2016-1115-2693 | $75,000 |
| Nov 10, 2016 | Completed final sign-off Mar 2017 | 100 01st St | 3rd flr: ref. ti 201601298401; title 24 work to include install one new linear diffuser,install new return air grilles,relocate supply diffusers,retrofit lighting & controls in corridor. no new fire smoke dampers.Details
3rd flr: ref. ti 201601298401; title 24 work to include install one new linear diffuser,install new return air grilles,relocate supply diffusers,retrofit lighting & controls in corridor. no new fire smoke dampers. | $75,000 |
| Oct 28, 2016 | Completed final sign-off Mar 2017 | 731 Sansome St | 5th flr: office ti - framing, mep and new finishes maher naDetails
5th flr: office ti - framing, mep and new finishes maher na | $375,000 |
| Oct 17, 2016 | Completed final sign-off Mar 2017 | 100 01st St | 22nd floor suite 2250 - partition demolition & finish removal. new non-structural partitions, glazing, doors, ceiling & tiles, less than 10% lighitng additoins, millwork & finishes. mep/life safety/sprinklers deferred.Details
22nd floor suite 2250 - partition demolition & finish removal. new non-structural partitions, glazing, doors, ceiling & tiles, less than 10% lighitng additoins, millwork & finishes. mep/life safety/sprinklers deferred. | $200,000 |
| Oct 12, 2016 | Completed final sign-off Mar 2017 | 100 01st St | ste. #300: lighting and mechanical work per title 24 ref pa 2016-0921-8339 for architectural. no new fire smoke dampersDetails
ste. #300: lighting and mechanical work per title 24 ref pa 2016-0921-8339 for architectural. no new fire smoke dampers | $176,748 |
| Oct 12, 2016 | Completed final sign-off Dec 2017 | 100 01st St | electrical work per title 24. ref pa 2016-0831-6421Details
electrical work per title 24. ref pa 2016-0831-6421 | $120,000 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 100 01st St | 3rd fl #300 - re-work of demising partition between (2) suites. demo of (e) lights, ceilings, partitions, finishes. non-structural partitions, glazing, doors, ceilings, lights, millwork and finishes. mep under separate permitDetails
3rd fl #300 - re-work of demising partition between (2) suites. demo of (e) lights, ceilings, partitions, finishes. non-structural partitions, glazing, doors, ceilings, lights, millwork and finishes. mep under separate permit | $800,000 |
| Aug 31, 2016 | Completed final sign-off Dec 2017 | 100 01st St | demo of existing lights, ceilings, partitoins, finishes. new non structural partitions, glazing, doors, ceilings,light fixtures, millwork, finishes and new smoke guard at elevator doors complying with dbi info sheet fs-07.lobby in high rise.Details
demo of existing lights, ceilings, partitoins, finishes. new non structural partitions, glazing, doors, ceilings,light fixtures, millwork, finishes and new smoke guard at elevator doors complying with dbi info sheet fs-07.lobby in high rise. | $725,000 |
| Aug 24, 2016 | Never finaled issued Oct 2016, no final | 655 Montgomery St | parking garage - this project involves clarification of a technical infeasibility previously defined as an unreasonable hardship under pa #201305096491. no barrier removal scope of work is included.Details
parking garage - this project involves clarification of a technical infeasibility previously defined as an unreasonable hardship under pa #201305096491. no barrier removal scope of work is included. | |
| Jun 15, 2016 | Completed final sign-off Jul 2016 | 150 Spear St | 8th floor - ductwork for modification of 3 offices. ref pa #201604215324 for architectural work. no new fire smoke dampers. n/a maher ordinanceDetails
8th floor - ductwork for modification of 3 offices. ref pa #201604215324 for architectural work. no new fire smoke dampers. n/a maher ordinance | $5,250 |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 655 Montgomery St | project consists of barrier removal. demo of restroom stall partitions, finishes and plumbing fixtures to be replaced with new. mep, life safety and sprinkler are under separate permit.Details
project consists of barrier removal. demo of restroom stall partitions, finishes and plumbing fixtures to be replaced with new. mep, life safety and sprinkler are under separate permit. | $70,000 |
| Apr 21, 2016 | Completed final sign-off Oct 2016 | 655 Montgomery St | ste 1010: lighting power and signal wiring lighting and receptacle controls modification of existing hvac to match new architectural layout. the addition of 1 dual duct vaqv vav box with controls and air balance. ref 201603232807Details
ste 1010: lighting power and signal wiring lighting and receptacle controls modification of existing hvac to match new architectural layout. the addition of 1 dual duct vaqv vav box with controls and air balance. ref 201603232807 | $104,000 |
| Apr 21, 2016 | Completed final sign-off Jul 2016 | 150 Spear St | 8th fl modification of existing tenant improvmennts to include selective demo and construction of non load bearing partitions, new and relocated doors, mech, elec, fire sp ls sep permitDetails
8th fl modification of existing tenant improvmennts to include selective demo and construction of non load bearing partitions, new and relocated doors, mech, elec, fire sp ls sep permit | $45,000 |
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 655 Montgomery St | #1010 - interior t.i. new non structural partitions, break area and finishes throughout. mep, fire, life safety and sprinkler under separate permit.Details
#1010 - interior t.i. new non structural partitions, break area and finishes throughout. mep, fire, life safety and sprinkler under separate permit. | $166,705 |
| Mar 18, 2016 | Never finaled issued Oct 2016, no final | 555 Montgomery St | 16th flr: lighting & mechanical work per title 24, reference permit appn. 201601217665 for architectural work, no new fire smoke dampers; maher n/aDetails
16th flr: lighting & mechanical work per title 24, reference permit appn. 201601217665 for architectural work, no new fire smoke dampers; maher n/a | $141,000 |
| Mar 14, 2016 | Expired or cancelled withdrawn Jun 2016 | 100 01st St | revision to pa 2015-1211-4852 verify exit signage in the elevator lobby and compliance with section 1008.1.9-12 for acrd reader in elevator lobby.Details
revision to pa 2015-1211-4852 verify exit signage in the elevator lobby and compliance with section 1008.1.9-12 for acrd reader in elevator lobby. | |
| Mar 10, 2016 | Completed final sign-off Mar 2017 | 100 01st St | 22nd floor: lighting and mechanical work per title 24. reference app#201512114852 for arch. work. no new fire smoke dampers.Details
22nd floor: lighting and mechanical work per title 24. reference app#201512114852 for arch. work. no new fire smoke dampers. | |
| Feb 25, 2016 | Completed final sign-off Jul 2016 | 555 Montgomery St | office ti on 15th floor only, interior renovation to remove ceiling height partition and install interior windows. no electrical, lighting, mechanical work. maher naDetails
office ti on 15th floor only, interior renovation to remove ceiling height partition and install interior windows. no electrical, lighting, mechanical work. maher na | $8,800 |
| Jan 29, 2016 | Completed final sign-off Mar 2017 | 100 01st St | 3rd fl ti demo accoustical tile ceiling grid new accoustical tile ceiling/grid. finsih upgrade. new or revised mep, ls, sprinklers design build if needed.Details
3rd fl ti demo accoustical tile ceiling grid new accoustical tile ceiling/grid. finsih upgrade. new or revised mep, ls, sprinklers design build if needed. | $350,000 |
| Jan 21, 2016 | Completed final sign-off Dec 2016 | 555 Montgomery St | 16th floor: ti - office ti: demo (e) conference room, office, file room; provide new open office, conference room, reconfigure lunch room & equioment room. fire life safety & mep under sep permitDetails
16th floor: ti - office ti: demo (e) conference room, office, file room; provide new open office, conference room, reconfigure lunch room & equioment room. fire life safety & mep under sep permit | $194,200 |
| Jan 20, 2016 | Completed final sign-off Jun 2016 | 255 California St | #700- electrical t-24 drawings. ref pa 2015-0817-4479. maher naDetails
#700- electrical t-24 drawings. ref pa 2015-0817-4479. maher na | |
| Jan 20, 2016 | Completed final sign-off May 2016 | 350 Rhode Island St | #300- electrical plans for t-24, ti pa# 2015-1102-1452. n/a ordinance #155-13Details
#300- electrical plans for t-24, ti pa# 2015-1102-1452. n/a ordinance #155-13 | |
| Dec 16, 2015 | Completed final sign-off Aug 2016 | 655 Montgomery St | 10th floor suite 1000 & 1075 interior tenant improvement. new non-structural partitions, & finishes throughout suite, no new fire smoke dampers. mechanical & electrical engineering included. life safety & sprinkler under separate permit.Details
10th floor suite 1000 & 1075 interior tenant improvement. new non-structural partitions, & finishes throughout suite, no new fire smoke dampers. mechanical & electrical engineering included. life safety & sprinkler under separate permit. | $337,000 |
| Dec 11, 2015 | Completed final sign-off Mar 2017 | 100 01st St | 22nd floor suite #2200 & 2250: combine 2 extg tenant suites into one larger suite, improvements inlcude non structural partitions, casework, ceiling, lights and finishes.Details
22nd floor suite #2200 & 2250: combine 2 extg tenant suites into one larger suite, improvements inlcude non structural partitions, casework, ceiling, lights and finishes. | $504,000 |
| Dec 11, 2015 | Completed final sign-off Mar 2017 | 100 01st St | 22nd floor: barrier free removal including upgrading restrooms to be compliant.Details
22nd floor: barrier free removal including upgrading restrooms to be compliant. | $15,000 |
| Dec 9, 2015 | Completed final sign-off Dec 2015 | 49 Geary St | suite #300: renovation of brown bag lunch area with associated electrical and plumbing work. non structural partitioning of storage space.Details
suite #300: renovation of brown bag lunch area with associated electrical and plumbing work. non structural partitioning of storage space. | $92,825 |
| Dec 1, 2015 | Completed final sign-off May 2016 | 100 01st St | 12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanicalDetails
12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanical | $100,000 |
| Nov 2, 2015 | Completed final sign-off May 2016 | 350 Rhode Island St | 3rd fl:project consists of selective demo of partitions, doors frames, power, ceiling , lighting & finishes. construction of new interior tenant partitions, doors/frames, power, data, ceiligh/lighting and finishes. suite is curently unoccupied. life safety, mechanical, electrical, plmg and sprinklerDetails
3rd fl:project consists of selective demo of partitions, doors frames, power, ceiling , lighting & finishes. construction of new interior tenant partitions, doors/frames, power, data, ceiligh/lighting and finishes. suite is curently unoccupied. life safety, mechanical, electrical, plmg and sprinkler | $700,000 |
| Oct 26, 2015 | Never finaled issued Oct 2015, no final | 685 Market St | 5th floor: selective demo of no load bearing partitions, ceiling and light fixture. suite to remain unoccupied until a ti is filed per ab17. maher naDetails
5th floor: selective demo of no load bearing partitions, ceiling and light fixture. suite to remain unoccupied until a ti is filed per ab17. maher na | $20,000 |