San Francisco Commercial Builders Inc
- Based in
- Lafayette
- On San Francisco permits
- Mar 2002 to Apr 2026
- Last 24 months
- 17 permits filed
218 permits since 2000: 186 completed, 2 in progress, 14 never finaled, 16 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 218.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2026 | Completed final sign-off Jul 2026 | 220 Montgomery St | ste 300 & 305: revision to permit 202512111596. a demising wall was shifted between the two suites just a bit and one office in suite 305 was omitted.Details
ste 300 & 305: revision to permit 202512111596. a demising wall was shifted between the two suites just a bit and one office in suite 305 was omitted. | $1,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 220 Montgomery St | basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair.Details
basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair. | $127,000 |
| Mar 12, 2026 | In progress issued May 2026 | 220 Montgomery St | suite #810-t.i. include demo of non structural partition walls, ceiling, construction of new partitions, ceiling, pwer & finishes, market ready condition of ste will be used for marketing of vacant ste & is not intended for occupancy at the time. seperate permits inc: fire/lifesafty/fire sprklr/mepDetails
suite #810-t.i. include demo of non structural partition walls, ceiling, construction of new partitions, ceiling, pwer & finishes, market ready condition of ste will be used for marketing of vacant ste & is not intended for occupancy at the time. seperate permits inc: fire/lifesafty/fire sprklr/mep | $125,000 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 220 Montgomery St | 3rd/f ste 360: t.i. demo of non structural partitions & ceiling. construction of new partitions, ceiling, power, finishes. market ready condition of ste will be used for markeing of occupancy under separate permit. mep/ fire under separate permitDetails
3rd/f ste 360: t.i. demo of non structural partitions & ceiling. construction of new partitions, ceiling, power, finishes. market ready condition of ste will be used for markeing of occupancy under separate permit. mep/ fire under separate permit | $136,000 |
| Dec 11, 2025 | Completed final sign-off Jul 2026 | 220 Montgomery St | 3/fl- suite 300 and 305- ti to include of non structrual partitions, ceiilngs,construct partitions, ceiling, power and finishes. market ready condition of suite will be used for marketing of vacant site and not intended for occupany changeDetails
3/fl- suite 300 and 305- ti to include of non structrual partitions, ceiilngs,construct partitions, ceiling, power and finishes. market ready condition of suite will be used for marketing of vacant site and not intended for occupany change | $136,000 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 350 California St | ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency.Details
ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency. | $6,000 |
| Sep 26, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | 10/fl-ste 1000-revision 202507080341- addition of storage roomDetails
10/fl-ste 1000-revision 202507080341- addition of storage room | $750 |
| Sep 3, 2025 | Completed final sign-off Jun 2026 | 369 Pine St | suite 518: ti to include demolition of non structural partitions, electrical & ceiling construction of new partitions, ceilings, power & finishes. market ready condition suite will be used for marketing of vacant suite and is not intended for occupancy at this time.Details
suite 518: ti to include demolition of non structural partitions, electrical & ceiling construction of new partitions, ceilings, power & finishes. market ready condition suite will be used for marketing of vacant suite and is not intended for occupancy at this time. | $136,000 |
| Sep 2, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | suite 410: t.i. improvement to include demolition of non - structural partitions, electrical and ceiling, construction of new partitions, ceiling, power, finishes and make restroom ada compliant. market ready condition suite will be used for marketing of vacant site and is not intended forDetails
suite 410: t.i. improvement to include demolition of non - structural partitions, electrical and ceiling, construction of new partitions, ceiling, power, finishes and make restroom ada compliant. market ready condition suite will be used for marketing of vacant site and is not intended for | $136,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | 6/fl- ste 610- ti to include demo of no structrual partitions and ceiling, construction of (n) partitions, ceiling, power and finishes under separate permit. mep and fire alarm/sprinkler on another permit.Details
6/fl- ste 610- ti to include demo of no structrual partitions and ceiling, construction of (n) partitions, ceiling, power and finishes under separate permit. mep and fire alarm/sprinkler on another permit. | $136,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | 6/fl- (n) common area for tenants to include demo of non sturctural partitions and ceiling, construction of (n) partitions, ceiling power and finishes. mep, fire, life safety, fire sprinklers to be filed separatelyDetails
6/fl- (n) common area for tenants to include demo of non sturctural partitions and ceiling, construction of (n) partitions, ceiling power and finishes. mep, fire, life safety, fire sprinklers to be filed separately | $136,000 |
| Aug 19, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | suite 1000 revision to pa #2025-0708-0341. change of ceiling from t-bar to opening ceiling.Details
suite 1000 revision to pa #2025-0708-0341. change of ceiling from t-bar to opening ceiling. | |
| Aug 4, 2025 | Completed final sign-off Jun 2026 | 410 Townsend St | 3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom upgrade. mep and fire life safety will be deferred submittal.Details
3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom upgrade. mep and fire life safety will be deferred submittal. | $213,630 |
| Jul 22, 2025 | Completed final sign-off Jun 2026 | 410 Townsend St | 2nd/f: new demsing wall to separate e) full floor tenant to 2 suites #201 & 202. new pantry & upgrade to e) shower at #202. new floor 2 restroom & building path of travel mep deferred.Details
2nd/f: new demsing wall to separate e) full floor tenant to 2 suites #201 & 202. new pantry & upgrade to e) shower at #202. new floor 2 restroom & building path of travel mep deferred. | $213,630 |
| Jul 8, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | suite 1000/10th fl: t.i. improvement include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling , power and finishes. to be submitted under seperate permit-fire-life-safety, fire sprinklers, mechanical, electrical and plumbing.Details
suite 1000/10th fl: t.i. improvement include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling , power and finishes. to be submitted under seperate permit-fire-life-safety, fire sprinklers, mechanical, electrical and plumbing. | $136,000 |
| Mar 27, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | 3/fl- ti to include demo non strutural partitions and ceiling construction of (n) partitions, ceiling power and fnishes. mep,fire/life safety /fire sprinklers to be submitted under separate permitsDetails
3/fl- ti to include demo non strutural partitions and ceiling construction of (n) partitions, ceiling power and fnishes. mep,fire/life safety /fire sprinklers to be submitted under separate permits | $95,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 747 Front St | revision 202408057928- changing the pass thru window within the same openingDetails
revision 202408057928- changing the pass thru window within the same opening | $1,000 |
| Oct 2, 2024 | Completed final sign-off May 2025 | 747 Front St | revision to approved pa # 202405091825: revise scope - revision to partition type c per elevation 8/a104.1 and details 2 & 4 a/a601.1.Details
revision to approved pa # 202405091825: revise scope - revision to partition type c per elevation 8/a104.1 and details 2 & 4 a/a601.1. | |
| Aug 5, 2024 | Completed final sign-off May 2025 | 747 Front St | ground fl change of use from gym to coffee shop ti to include minor electrical and plumbing. (n) pass through window.Details
ground fl change of use from gym to coffee shop ti to include minor electrical and plumbing. (n) pass through window. | $75,000 |
| Jul 15, 2024 | Completed final sign-off Dec 2024 | 220 Montgomery St | 16/f suite 1600: new power and lighting. ref permit 202404260893Details
16/f suite 1600: new power and lighting. ref permit 202404260893 | $56,000 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 369 Pine St | 7/f: tenant improvement to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes.Details
7/f: tenant improvement to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. | $150,000 |
| May 9, 2024 | Completed final sign-off May 2025 | 747 Front St | g/f: demise new tenant suite. mep deferred.Details
g/f: demise new tenant suite. mep deferred. | $96,000 |
| Apr 26, 2024 | Completed final sign-off Dec 2024 | 220 Montgomery St | 16th fl tenant improvement to include demo of non structural partitions and ceiling, construction of new partitons, power and finishes. 1703 sf suite 1600Details
16th fl tenant improvement to include demo of non structural partitions and ceiling, construction of new partitons, power and finishes. 1703 sf suite 1600 | $136,000 |
| Apr 8, 2024 | Completed final sign-off Jun 2025 | 333 08th St | installing banner sign "futniture consigument" double faced, sf. complt / planning nov 2022-003392 enf. awning amnesty programDetails
installing banner sign "futniture consigument" double faced, sf. complt / planning nov 2022-003392 enf. awning amnesty program | |
| Apr 8, 2024 | Completed final sign-off Jun 2025 | 301 08th St | installing banner sign"tai chi chuan" double faced, 31.5 sf. complt w/ planning nov 2022-003392 enf. awning amnesty programDetails
installing banner sign"tai chi chuan" double faced, 31.5 sf. complt w/ planning nov 2022-003392 enf. awning amnesty program | |
| Apr 8, 2024 | Completed final sign-off Jun 2025 | 333 08th St | installin banner sign "design consignment gallery" double faced, 31.5 sf. complt w/ planning nov 2022-003392 enf. awning amnesty progromDetails
installin banner sign "design consignment gallery" double faced, 31.5 sf. complt w/ planning nov 2022-003392 enf. awning amnesty progrom | |
| Apr 8, 2024 | Completed final sign-off Jun 2025 | 1197 Folsom St | installing wall sign "flooring sale" single faced, 242 sf. complt w/ planning nov 2022-003392 enf. awning amnesty programDetails
installing wall sign "flooring sale" single faced, 242 sf. complt w/ planning nov 2022-003392 enf. awning amnesty program | |
| Apr 8, 2024 | In progress filed Apr 2024, not yet issued | 301 08th St | installing banner sign "pole & dance" double faced, 31.5 sf. complt w/ planning nov 2022-003392 enf. awning amnesty programDetails
installing banner sign "pole & dance" double faced, 31.5 sf. complt w/ planning nov 2022-003392 enf. awning amnesty program | |
| Feb 14, 2024 | Completed final sign-off Jun 2024 | 220 Montgomery St | revision to permit 202312212965. addition of side plate to base plate for detail 5/s4.2. corrected callouts on s2.1Details
revision to permit 202312212965. addition of side plate to base plate for detail 5/s4.2. corrected callouts on s2.1 | $1,000 |
| Jan 10, 2024 | Completed final sign-off Oct 2024 | 747 Front St | 4th fl - consists of interior demo of non structural elements & ti office build out. office improvements consists of (n) offices, meeting rooms, lounge, shower (n) partitions, doors, finishes, ceilings & lighting. scope of work includes restroom ada accessibility upgrades. mep, life safety & fireDetails
4th fl - consists of interior demo of non structural elements & ti office build out. office improvements consists of (n) offices, meeting rooms, lounge, shower (n) partitions, doors, finishes, ceilings & lighting. scope of work includes restroom ada accessibility upgrades. mep, life safety & fire | $2,000,000 |
| Dec 21, 2023 | Completed final sign-off Jun 2024 | 220 Montgomery St | repair of corrosion damage to 2 existing steel columns at basement.Details
repair of corrosion damage to 2 existing steel columns at basement. | $10,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2023 | 580 California St | revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system.Details
revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system. | |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 220 Montgomery St | tenant improvement project. demo floor and ceiling finishes. remv kitchenette,selected full ht partitions and oors. remove e furrting partitoins around conc column and e plaster furring to expose e brick. remv exit signs.new kitchenette,finishes, plumbing,lighting, doors,glazing,partitions,rstrm upDetails
tenant improvement project. demo floor and ceiling finishes. remv kitchenette,selected full ht partitions and oors. remove e furrting partitoins around conc column and e plaster furring to expose e brick. remv exit signs.new kitchenette,finishes, plumbing,lighting, doors,glazing,partitions,rstrm up | $350,000 |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 580 California St | upgrades to building path of travel to meet code compliance. mep, fire/life safety & sprinkler system under separate permit. barrier removal.Details
upgrades to building path of travel to meet code compliance. mep, fire/life safety & sprinkler system under separate permit. barrier removal. | $80,000 |
| Jul 20, 2022 | Never finaled issued Aug 2022, no final | 995 Market St | main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit.Details
main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit. | $275,000 |
| Jul 11, 2022 | Completed final sign-off Oct 2022 | 220 Montgomery St | suite 300-a: demising suite 300-a into (2) separate suites w/addition of demising partitions/doors, 3/f accessible restroom upgrades in accordance w/disabled access 20% ruleDetails
suite 300-a: demising suite 300-a into (2) separate suites w/addition of demising partitions/doors, 3/f accessible restroom upgrades in accordance w/disabled access 20% rule | $61,440 |
| Jun 29, 2022 | Never finaled issued Sep 2022, no final | 1275 Market St | administrative permit to memorialize cafe for dph. no work under this permit ref work permit 201406279881/r1. operational assembly permit deferred.Details
administrative permit to memorialize cafe for dph. no work under this permit ref work permit 201406279881/r1. operational assembly permit deferred. | |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 580 California St | 23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.Details
23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit. | $190,000 |
| Mar 2, 2021 | Completed final sign-off Oct 2021 | 220 Bush St | 1/f: demolition of non structural partitions, stairs, millwork, light fixtures and finishes. construct non structural partitions, stairs, millwork. new power door operator and actuation bars at entry doors to remain lockers, ceilings, light fixtures and finishes.Details
1/f: demolition of non structural partitions, stairs, millwork, light fixtures and finishes. construct non structural partitions, stairs, millwork. new power door operator and actuation bars at entry doors to remain lockers, ceilings, light fixtures and finishes. | $367,000 |
| Aug 5, 2020 | Completed final sign-off Mar 2022 | 747 Front St | limited demo and new partitions, doors, power/data, finishes and lighting. new marquee and exterior address plate by others. new elevator cab upgrades. space is currently occupied. mep, life safety and sinage under seperate permit.Details
limited demo and new partitions, doors, power/data, finishes and lighting. new marquee and exterior address plate by others. new elevator cab upgrades. space is currently occupied. mep, life safety and sinage under seperate permit. | $340,000 |
| Mar 9, 2020 | Completed final sign-off Jun 2020 | 333 Pine St | 1st fl - demo of (e) partitions, ceiling, lights, millwork & associated plumbing fixtures. related accessible features to be provided under separate permit per ab-017Details
1st fl - demo of (e) partitions, ceiling, lights, millwork & associated plumbing fixtures. related accessible features to be provided under separate permit per ab-017 | $66,393 |
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 220 Montgomery St | commercial ti on 10 fl, suite 1060: includes new consturction of non-structural walls, casework, ceiling, lighting and finishes. maher naDetails
commercial ti on 10 fl, suite 1060: includes new consturction of non-structural walls, casework, ceiling, lighting and finishes. maher na | $379,500 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 1 Daniel Burnham Ct | 3rd fl/ste #300c - non structural demo, new non structural partitoins, doors, lighting, millwork, finishes. no change in area, occupancy or use. mep ls, sprinklers under sep permitDetails
3rd fl/ste #300c - non structural demo, new non structural partitoins, doors, lighting, millwork, finishes. no change in area, occupancy or use. mep ls, sprinklers under sep permit | $94,527 |
| Oct 29, 2019 | Completed final sign-off May 2020 | 470 Carolina St | t.i. of extg space for light manufacturing use. work includes non-structural walls and doors, new breakroom, lobby, bathrooms. mep and sffd sprinklers on seperate permits. n/a for maherDetails
t.i. of extg space for light manufacturing use. work includes non-structural walls and doors, new breakroom, lobby, bathrooms. mep and sffd sprinklers on seperate permits. n/a for maher | $1,200,000 |
| Aug 26, 2019 | Completed final sign-off Oct 2019 | 1275 Market St | provide guardrail for cane protection at diagianal bracing along market & 9th st. to comply with nov# 201962801Details
provide guardrail for cane protection at diagianal bracing along market & 9th st. to comply with nov# 201962801 | $5,000 |
| Aug 19, 2019 | Completed final sign-off Oct 2019 | 470 Carolina St | demolition of nonstructural extg interior partitions on 1st floor. per ab-017 space to remain vacant until all accessible features are restored. n/a for maher - no ceiling workDetails
demolition of nonstructural extg interior partitions on 1st floor. per ab-017 space to remain vacant until all accessible features are restored. n/a for maher - no ceiling work | $50,000 |
| May 1, 2019 | Completed final sign-off Oct 2019 | 220 Montgomery St | suite 1060. 10th flr t.i. demo & construct new non-structural partitions, doors, frames & hardware, casework, lighting & finishes. new rated & non-rated oors, new ceiling, restroom accessibility upgrades.Details
suite 1060. 10th flr t.i. demo & construct new non-structural partitions, doors, frames & hardware, casework, lighting & finishes. new rated & non-rated oors, new ceiling, restroom accessibility upgrades. | $216,000 |
| Mar 25, 2019 | Completed final sign-off Apr 2019 | 333 Pine St | accessibility upgrades at bldg entrance to comply with accessible business entrance program: provide and install new secure door mats, adjust door closers, request technical infisabilty for upgrade to extg sidewalk.Details
accessibility upgrades at bldg entrance to comply with accessible business entrance program: provide and install new secure door mats, adjust door closers, request technical infisabilty for upgrade to extg sidewalk. | $800 |
| Mar 25, 2019 | Completed final sign-off Apr 2019 | 369 Pine St | accessibility upgrades at bldg entrance to comply with accessible business entrance program: secure extg door mats, adjust door closers, request technical infisabilty for upgrade to extg sidewalk.Details
accessibility upgrades at bldg entrance to comply with accessible business entrance program: secure extg door mats, adjust door closers, request technical infisabilty for upgrade to extg sidewalk. | $400 |
| Jan 30, 2019 | Completed final sign-off Apr 2019 | 220 Montgomery St | commercial t.i. on the 17th floor which includes demolition of non structural partitions, doors, frames and hardware, casework, lighting and finishes. construction of new non-structural partitions, new doors, frames and hardware, new ceiling and lighting millwork and finishes.Details
commercial t.i. on the 17th floor which includes demolition of non structural partitions, doors, frames and hardware, casework, lighting and finishes. construction of new non-structural partitions, new doors, frames and hardware, new ceiling and lighting millwork and finishes. | $220,000 |
| Sep 6, 2018 | Completed final sign-off May 2019 | 1010 16th St | installation of non-structural partitions and (n) finishes. all work in suite # 1004.Details
installation of non-structural partitions and (n) finishes. all work in suite # 1004. | $65,000 |
| Jul 20, 2018 | Completed final sign-off Nov 2018 | 220 Montgomery St | fl8, ste 850: selective demo of non structural wall, lights, millwork, new non structural partitions, glazing, doors, millwork. no increase in area. no structural included. life safety/sprinklers deferred.Details
fl8, ste 850: selective demo of non structural wall, lights, millwork, new non structural partitions, glazing, doors, millwork. no increase in area. no structural included. life safety/sprinklers deferred. | $150,000 |
| May 15, 2018 | Completed final sign-off Aug 2018 | 1 Lombard St | suite 120: project consist of a ti. build out consist of demo of (e) partitions, power/data, finishes, ceiling & lighting and construction of new millwork, finishes, power/data, ceiling & lighting. mep & life safety drawings to be under sep permit. maher naDetails
suite 120: project consist of a ti. build out consist of demo of (e) partitions, power/data, finishes, ceiling & lighting and construction of new millwork, finishes, power/data, ceiling & lighting. mep & life safety drawings to be under sep permit. maher na | $230,000 |
| Mar 12, 2018 | Completed final sign-off May 2018 | 10 United Nations Pz | 1/f: demolish interior walls, ceiling grid & finished ceiling, (e) structure to remain. per ab-017. maher naDetails
1/f: demolish interior walls, ceiling grid & finished ceiling, (e) structure to remain. per ab-017. maher na | $35,000 |
| Feb 20, 2018 | Completed final sign-off Mar 2019 | 1355 03rd St | new dental office ti @ ground fl retail space of mixed use bldg: install new conc floor over metal deck; new partition walls, fixtures, finishes, mep. fire protection under sep permit. maher naDetails
new dental office ti @ ground fl retail space of mixed use bldg: install new conc floor over metal deck; new partition walls, fixtures, finishes, mep. fire protection under sep permit. maher na | $185,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 49 Geary St | #402. revision to current permitted office under pa 2017-0919-8939. finishes, full height (non load bearing) wallsDetails
#402. revision to current permitted office under pa 2017-0919-8939. finishes, full height (non load bearing) walls | $15,000 |
| Nov 14, 2017 | Completed final sign-off Apr 2018 | 220 Montgomery St | 4th floor #460 - non-structural demolition & construction of non-structural partitions, doors & glazing, lighting, electrical, ceiling & finishes. no increase in occupancy, use or area. design/build mech, elec, plbg, fire alarm & fire sprinkelrs under separate permit. n/a maher ordinanceDetails
4th floor #460 - non-structural demolition & construction of non-structural partitions, doors & glazing, lighting, electrical, ceiling & finishes. no increase in occupancy, use or area. design/build mech, elec, plbg, fire alarm & fire sprinkelrs under separate permit. n/a maher ordinance | $137,826 |
| Sep 19, 2017 | Completed final sign-off Jun 2018 | 49 Geary St | #402- modification & expansion of an (e) office to include selective demo & construct of non-load bearing partitions, modify (e) light fixtures & new including re-switching, new office doors & frames, salvage & reuse of (e) selected materials & new finishesDetails
#402- modification & expansion of an (e) office to include selective demo & construct of non-load bearing partitions, modify (e) light fixtures & new including re-switching, new office doors & frames, salvage & reuse of (e) selected materials & new finishes | $250,000 |
| Aug 22, 2017 | Completed final sign-off Dec 2017 | 369 Pine St | 3rd floor restroom upgrades. work scope includes removal of all existing finishes, plumbing fixtures, accessories, ceiling & lighting. provide new accessible toilet stalls, plumbing fixtures & accessories as well as new finsihes, ceiling & lighting.Details
3rd floor restroom upgrades. work scope includes removal of all existing finishes, plumbing fixtures, accessories, ceiling & lighting. provide new accessible toilet stalls, plumbing fixtures & accessories as well as new finsihes, ceiling & lighting. | $100,000 |
| Jun 27, 2017 | Completed final sign-off Dec 2017 | 580 California St | 11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit.Details
11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit. | $48,000 |
| Jun 15, 2017 | Completed final sign-off Dec 2017 | 220 Montgomery St | 4th flr- upgrades to (e) men's room; addition of women's restrm from (e) office suite 417. demo & construct non-structural prtitions, doors, ele, plbg, ceiling & finishes. no increase in area or change in occupancy. mep, sprinklers, l/s deferredDetails
4th flr- upgrades to (e) men's room; addition of women's restrm from (e) office suite 417. demo & construct non-structural prtitions, doors, ele, plbg, ceiling & finishes. no increase in area or change in occupancy. mep, sprinklers, l/s deferred | $120,000 |
| May 5, 2017 | Completed final sign-off May 2019 | 220 Montgomery St | 20th flr: furnish and install: new duct work, 2 new exhaust fans, 2 new supply fans, new air grilles & diffusers, 9 new vrf fan coils, 1 new vrf condesing unit, 1 new vrf branch selector, ddc, controls, insulation and air balance. ref 201610120080 maher naDetails
20th flr: furnish and install: new duct work, 2 new exhaust fans, 2 new supply fans, new air grilles & diffusers, 9 new vrf fan coils, 1 new vrf condesing unit, 1 new vrf branch selector, ddc, controls, insulation and air balance. ref 201610120080 maher na | $150,000 |
| Mar 24, 2017 | Completed final sign-off Aug 2017 | 234 Bush St | interior tenant improvment. non bearing partitions, doors, windows, mep fa fs on separate permits.Details
interior tenant improvment. non bearing partitions, doors, windows, mep fa fs on separate permits. | $75,000 |
| Mar 17, 2017 | Completed final sign-off Dec 2017 | 220 Montgomery St | ground floor suite 132 - commercial t.i. including two accessible restrooms with showers & elec. room. (e) space is vancant & will remain vacant until future t.i. under separate permit. no increase in occupancy use or area. design/build mep, life safety, & fire sprinkelrs under separate permit.Details
ground floor suite 132 - commercial t.i. including two accessible restrooms with showers & elec. room. (e) space is vancant & will remain vacant until future t.i. under separate permit. no increase in occupancy use or area. design/build mep, life safety, & fire sprinkelrs under separate permit. | $90,000 |
| Oct 31, 2016 | Never finaled issued Nov 2016, no final | 768 Brannan St | barrier removal at restroom within existing storage spaceDetails
barrier removal at restroom within existing storage space | $60,000 |
| Oct 12, 2016 | Completed final sign-off Apr 2017 | 220 Montgomery St | arch full floor 20th: non-structural demo of extg tenant space. construct non-structural partitions, doors, lighting, electrical, ceiling and finishes. restroom upgrades. 90 min doors in direction of egress for exit stairs and 20 min doors for elevator lobby. mep and fire under separate permit.Details
arch full floor 20th: non-structural demo of extg tenant space. construct non-structural partitions, doors, lighting, electrical, ceiling and finishes. restroom upgrades. 90 min doors in direction of egress for exit stairs and 20 min doors for elevator lobby. mep and fire under separate permit. | $570,000 |
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 1035 Market St | (n) non-load bearing, non-rated walls, doors & low partitions as specified (n) finishes (n) mechanical & electrical workDetails
(n) non-load bearing, non-rated walls, doors & low partitions as specified (n) finishes (n) mechanical & electrical work | $560,000 |
| Aug 24, 2016 | Completed final sign-off Sep 2016 | 220 Montgomery St | #301 3/f- demo of non-structural partitions, millwork and finishes. constructioin of non-structural partitions, door assembles, millwork and finishes. n/a ordinance #155-13Details
#301 3/f- demo of non-structural partitions, millwork and finishes. constructioin of non-structural partitions, door assembles, millwork and finishes. n/a ordinance #155-13 | $85,000 |
| Aug 24, 2016 | Completed final sign-off Jan 2017 | 220 Montgomery St | suite #144: revision to app#201606240784: construct 2 common 1-hr f.r. cooridor and restrooms with demising wall to seperate the two suites and install new doors, cieling and closets.Details
suite #144: revision to app#201606240784: construct 2 common 1-hr f.r. cooridor and restrooms with demising wall to seperate the two suites and install new doors, cieling and closets. | |
| Jul 15, 2016 | Completed final sign-off Dec 2016 | 425 California St | 21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit.Details
21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit. | $100,000 |
| Jul 7, 2016 | Completed final sign-off Oct 2016 | 369 Pine St | 7th fl restroom barrier removal. replace tile, fixtures, lighting, plumbing. existing sprinkler and fls to remain existingDetails
7th fl restroom barrier removal. replace tile, fixtures, lighting, plumbing. existing sprinkler and fls to remain existing | $80,000 |
| Jun 24, 2016 | Completed final sign-off Jan 2017 | 220 Montgomery St | suite 144, construct (2) common 1 hr fr corridor and restrooms with demising wall to separate the 2 suites. associated doors ceilings and closets. maher naDetails
suite 144, construct (2) common 1 hr fr corridor and restrooms with demising wall to separate the 2 suites. associated doors ceilings and closets. maher na | $185,000 |
| Jun 24, 2016 | Expired or cancelled withdrawn Apr 2018 | 220 Montgomery St | suite 144/148 - ceiling support grid attached to underside of 2nd floor beams. old plater ceiling was removed. new grid provides for new ceiling support from beams only. maher naDetails
suite 144/148 - ceiling support grid attached to underside of 2nd floor beams. old plater ceiling was removed. new grid provides for new ceiling support from beams only. maher na | $30,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 560 Davis St | commercial ti on 1st floor: includes new partitions, doors & frames, minor veiling work & finishes. maher naDetails
commercial ti on 1st floor: includes new partitions, doors & frames, minor veiling work & finishes. maher na | $50,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 220 Montgomery St | demo suite #132: remove existing interior walls, ceilings systems, light fixtures & cap off floor mounted electrical boxes of suite 132; maher n/a. vacant space - ti separte permitsDetails
demo suite #132: remove existing interior walls, ceilings systems, light fixtures & cap off floor mounted electrical boxes of suite 132; maher n/a. vacant space - ti separte permits | $32,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 220 Montgomery St | demo ste 144: remove existing interior walls, doors, ceilings and light fixtures ; maher n/a ti separate permit.Details
demo ste 144: remove existing interior walls, doors, ceilings and light fixtures ; maher n/a ti separate permit. | $35,000 |
| Apr 29, 2016 | Completed final sign-off Jun 2016 | 55 Stockton St | construct approx 49 l.f. non-bearing partition. install millwork, cabinetry, finishes. refinish extg floor. install outlets. no lighting add or alteration point.Details
construct approx 49 l.f. non-bearing partition. install millwork, cabinetry, finishes. refinish extg floor. install outlets. no lighting add or alteration point. | $150,000 |
| Apr 14, 2016 | Completed final sign-off Jul 2016 | 220 Montgomery St | 3rd floor: replace extg tile, fixtures and lighting. n/a for maher. barrier removal.Details
3rd floor: replace extg tile, fixtures and lighting. n/a for maher. barrier removal. | $95,000 |
| Jul 30, 2015 | Completed final sign-off Aug 2015 | 49 Geary St | modification of extg t.i. to include construction of non-load bearing partitions, relocate and reswitch one light fixture, one new office door, frame & sidellight, new countertop and new sink at extg location, and new finishes. suite # 500Details
modification of extg t.i. to include construction of non-load bearing partitions, relocate and reswitch one light fixture, one new office door, frame & sidellight, new countertop and new sink at extg location, and new finishes. suite # 500 | $51,273 |
| Jul 20, 2015 | Completed final sign-off Oct 2015 | 252 05th St | change of occupancy from m to b occupancy - fire time tenant improvement for a retail space at ground floor shopping center. landlord is provided shell space intended for a retail. new work includes interior lighitng, mech, plumbing & electrical work. ref pa #201106017202.Details
change of occupancy from m to b occupancy - fire time tenant improvement for a retail space at ground floor shopping center. landlord is provided shell space intended for a retail. new work includes interior lighitng, mech, plumbing & electrical work. ref pa #201106017202. | $185,000 |
| May 11, 2015 | Completed final sign-off Sep 2015 | 1 Lombard St | #200- demolition of some existing offices, rebuild some offices, existing lighting to remain. n/a ordinance #155-13Details
#200- demolition of some existing offices, rebuild some offices, existing lighting to remain. n/a ordinance #155-13 | $150,000 |
| Apr 2, 2015 | Completed final sign-off Jul 2016 | 220 Montgomery St | ground floor #148 - demolition of structural partitions, millwork, accoustical ceiling. n/a maher ordinance; separate ti permit; a017 applies.Details
ground floor #148 - demolition of structural partitions, millwork, accoustical ceiling. n/a maher ordinance; separate ti permit; a017 applies. | $15,000 |
| Mar 4, 2015 | Expired or cancelled withdrawn Apr 2015 | 220 Montgomery St | suite 148: demolition of interior partiton walls and finishesDetails
suite 148: demolition of interior partiton walls and finishes | $15,000 |
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 150 Chestnut St | demolition of non load bearing partitons, carpet and wainscotting. ab-17 vacant spaceDetails
demolition of non load bearing partitons, carpet and wainscotting. ab-17 vacant space | $15,000 |
| Jan 28, 2015 | Completed final sign-off Jun 2015 | 65 Post St | documentation of as built conditions. revision to app#201308164551 and 201311252804. vacant space. all accessiblity will be done per ab-017 under t.i. permit. no work to be done under this permit.Details
documentation of as built conditions. revision to app#201308164551 and 201311252804. vacant space. all accessiblity will be done per ab-017 under t.i. permit. no work to be done under this permit. | |
| Jan 12, 2015 | Completed final sign-off Feb 2015 | 1 Lombard St | build wood platforms for hvac equipment of existing roof. n/a ordinance #155-13. mep under separate permitDetails
build wood platforms for hvac equipment of existing roof. n/a ordinance #155-13. mep under separate permit | $2,500 |
| Jan 7, 2015 | Completed final sign-off Feb 2015 | 1 Lombard St | ste 200. miner demolition of extg t.i. to include selective demolition of non-load bearing partitions, ceiling and hvac. n/a for the maher.Details
ste 200. miner demolition of extg t.i. to include selective demolition of non-load bearing partitions, ceiling and hvac. n/a for the maher. | $10,000 |
| Jan 6, 2015 | Never finaled issued Feb 2015, no final | 14 10th St | tenant improvement project to build out gr floor space as hair salon. fire sprinkler work permittedDetails
tenant improvement project to build out gr floor space as hair salon. fire sprinkler work permitted | $85,000 |
| Dec 9, 2014 | Completed final sign-off Aug 2015 | 720 Market St | interior tenant improvement, non load bearing partitions, minor plumbing, electrical and mechanical.Details
interior tenant improvement, non load bearing partitions, minor plumbing, electrical and mechanical. | $195,000 |
| Nov 20, 2014 | Completed final sign-off Dec 2014 | 350 California St | project is limited to the basement level fountain pump/storage room ceiling. repair and relace damaged concealed spine ceiling grid and tile with new to match existing or existing building stock. accessibility upgrade exempted per section 11b-203.5-machinery space. n/a for maher.Details
project is limited to the basement level fountain pump/storage room ceiling. repair and relace damaged concealed spine ceiling grid and tile with new to match existing or existing building stock. accessibility upgrade exempted per section 11b-203.5-machinery space. n/a for maher. | $5,000 |
| Oct 22, 2014 | Completed final sign-off Jun 2015 | 49 Geary St | #350: interior t.i. demolition, non bearing partition wall, doors, flooring, millwork, ceilings, lighting.Details
#350: interior t.i. demolition, non bearing partition wall, doors, flooring, millwork, ceilings, lighting. | $41,000 |
| Aug 15, 2014 | Completed final sign-off Nov 2014 | 135 Post St | demolition of one interior non-load bearing partition. construction of one non-load bearing wall, new lighting and switches, new finish millwork. n/a for maher.Details
demolition of one interior non-load bearing partition. construction of one non-load bearing wall, new lighting and switches, new finish millwork. n/a for maher. | $6,000 |
| Aug 14, 2014 | Expired or cancelled cancelled Jan 2026 | 650 Davis St | bldg 2, 1/f- tenant improvements including removal 1 construction of non-structural framed walls, doors, minor electrical, painting & ceiling repairs.Details
bldg 2, 1/f- tenant improvements including removal 1 construction of non-structural framed walls, doors, minor electrical, painting & ceiling repairs. | $27,600 |
| Aug 8, 2014 | Completed final sign-off Oct 2014 | 662 Davis St | tenant inprovements including removal & construction of non-structual framed walls. doors, minor electorial, painting & acoustical ceiling repair; maher n/aDetails
tenant inprovements including removal & construction of non-structual framed walls. doors, minor electorial, painting & acoustical ceiling repair; maher n/a | $65,000 |
| Jul 29, 2014 | Completed final sign-off Dec 2014 | 345 California St | ste #170: expanding existing dental office into adjacent vacant space; maher n/aDetails
ste #170: expanding existing dental office into adjacent vacant space; maher n/a | $300,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 580 California St | #1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a.Details
#1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a. | $58,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 220 Montgomery St | 6th flr: install (2) transfer fans, maher n/aDetails
6th flr: install (2) transfer fans, maher n/a | $5,500 |
| Jun 20, 2014 | Completed final sign-off Oct 2014 | 220 Montgomery St | 6th floor suite 640 - revision to appl #2014.0214.8542 - addition of (office) non-structural partitions, doors & glazing. elec, ceiling finish & relocation of existing light fixtures. additoin of 1 light. no increase in area. mech & fire sprinklering under separate permit. n/a maher ordinanceDetails
6th floor suite 640 - revision to appl #2014.0214.8542 - addition of (office) non-structural partitions, doors & glazing. elec, ceiling finish & relocation of existing light fixtures. additoin of 1 light. no increase in area. mech & fire sprinklering under separate permit. n/a maher ordinance | $100,000 |
| Jun 20, 2014 | Completed final sign-off Oct 2014 | 220 Bush St | 3rd floor suite 370 - revision to appl #2013.1209.3650 - addition of (breakout office) non-structural partitions, doors & glazing. relocation of some lights & addition of some outlets. no increase in area. elec & fire sprinklering under separate permit.Details
3rd floor suite 370 - revision to appl #2013.1209.3650 - addition of (breakout office) non-structural partitions, doors & glazing. relocation of some lights & addition of some outlets. no increase in area. elec & fire sprinklering under separate permit. | $90,000 |
| Apr 25, 2014 | Completed final sign-off Sep 2014 | 303 02nd St | t.i. to change use to a new fasat casual restaurant at gound floor. existing space is a shell space. work include commercial kitchen, seating area, interior lightings, mech., pluming and electrical work. no type 1 hood . maher n/a.Details
t.i. to change use to a new fasat casual restaurant at gound floor. existing space is a shell space. work include commercial kitchen, seating area, interior lightings, mech., pluming and electrical work. no type 1 hood . maher n/a. | $400,000 |