Hp Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2018 to Oct 2026
- Last 24 months
- 34 permits filed
79 permits since 2000: 71 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 595 Mission St | ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment.Details
ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment. | $760,000 |
| Sep 18, 2026 | In progress issued Sep 2026 | 101 California St | 45th floor: reference#202607305820 mechanical and electrical for the projectDetails
45th floor: reference#202607305820 mechanical and electrical for the project | $44,335 |
| Aug 4, 2026 | Completed final sign-off Sep 2026 | 120 Kearny St | 23rd floor/suite 2350 - mechanical and electrical for project 202605121089Details
23rd floor/suite 2350 - mechanical and electrical for project 202605121089 | $180,000 |
| Jul 30, 2026 | In progress issued Aug 2026 | 101 California St | 45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072Details
45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072 | $254,000 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 101 California St | 25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550)Details
25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550) | |
| May 12, 2026 | Completed final sign-off Sep 2026 | 120 Kearny St | 23rd fl - interior tenant improvement which includes new partitions, finishes, fixtures and lighting. mep deferredDetails
23rd fl - interior tenant improvement which includes new partitions, finishes, fixtures and lighting. mep deferred | $780,000 |
| Apr 21, 2026 | Completed final sign-off Aug 2026 | 101 California St | 25/fl- ref 202602025031 to include mepDetails
25/fl- ref 202602025031 to include mep | |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 101 California St | 28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088Details
28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088 | $460,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 101 California St | 16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.Details
16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 101 California St | 24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.Details
24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 11, 2026 | Completed final sign-off Jul 2026 | 101 California St | 9th flr: suite 925: mech + electrical for 202512051085Details
9th flr: suite 925: mech + electrical for 202512051085 | $750,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 117 Greenwich St | ground fl- meps for pa # 2025-1021-7827Details
ground fl- meps for pa # 2025-1021-7827 | $300,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 101 California St | 25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitionsDetails
25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions | $120,000 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | 1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural.Details
1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural. | $65,000 |
| Dec 5, 2025 | Completed final sign-off Aug 2026 | 101 California St | 28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred.Details
28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred. | $850,000 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 101 California St | 9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred.Details
9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred. | $875,500 |
| Nov 5, 2025 | Completed final sign-off Dec 2025 | 101 California St | g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835Details
g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835 | $3,000 |
| Oct 21, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | 1st/f t.i. demo non-structural partitions & build new non-structural partitions, all new or revised mep & life safety work will be design vuild & submitted separatelyDetails
1st/f t.i. demo non-structural partitions & build new non-structural partitions, all new or revised mep & life safety work will be design vuild & submitted separately | $750,000 |
| Sep 11, 2025 | Completed final sign-off Feb 2026 | 760 Market St | 2/f: tenant improvement includes demolition of non-structural partitions, ceilings, light fixtures, doors, and finishes. construction of non-structural partitions, ceilings, light fixtures, doors, glazing, millwork, and finishes. accessibility upgrades at existing restrooms. mep defer.Details
2/f: tenant improvement includes demolition of non-structural partitions, ceilings, light fixtures, doors, and finishes. construction of non-structural partitions, ceilings, light fixtures, doors, glazing, millwork, and finishes. accessibility upgrades at existing restrooms. mep defer. | $606,664 |
| May 30, 2025 | Completed final sign-off Jul 2025 | 625 Quintara St | replace of e) deck, e) deck is damaged w/ dry rot @ rear. expand deckDetails
replace of e) deck, e) deck is damaged w/ dry rot @ rear. expand deck | $12,000 |
| May 29, 2025 | Completed final sign-off Jun 2025 | 120 Kearny St | 28th floor: mechanical revision to pa #202407257281 to change room idf 28078 to storage 28078. revision to include removal of nrci-prc-eDetails
28th floor: mechanical revision to pa #202407257281 to change room idf 28078 to storage 28078. revision to include removal of nrci-prc-e | |
| May 23, 2025 | Completed final sign-off Jul 2025 | 120 Kearny St | 35th/fl: revision to permit#2025-0110-8096 to include replacement of the door and finishes in the elevator lobby. interior tenant improvement 35/fl: removal of non-structural partitions and finishes. upgrades to restrooms for accessibility. mep, fire safety and sprinkler under seperate permit.Details
35th/fl: revision to permit#2025-0110-8096 to include replacement of the door and finishes in the elevator lobby. interior tenant improvement 35/fl: removal of non-structural partitions and finishes. upgrades to restrooms for accessibility. mep, fire safety and sprinkler under seperate permit. | |
| Apr 23, 2025 | Completed final sign-off Apr 2026 | 201 03rd St | 9/f: ti including- demo of non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. new construction includes new non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. upgrades to existing restrooms and construction of new accessibleDetails
9/f: ti including- demo of non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. new construction includes new non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. upgrades to existing restrooms and construction of new accessible | $3,967,600 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 120 Kearny St | 35/f, ste 3500. ref pa# 202501108096. electrical.Details
35/f, ste 3500. ref pa# 202501108096. electrical. | $149,000 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 101 California St | 42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electricalDetails
42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electrical | $25,061 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 55 Francisco St | project consists of minimal demo of (e) partitions, doors associated power/data floor finishes construction of (n) partitions, doors, power data, minimal relocation/new lighting, millwork, sink(s) toiet and finishes, mep, life safety and sprinkler system modifications are to be under seperate andDetails
project consists of minimal demo of (e) partitions, doors associated power/data floor finishes construction of (n) partitions, doors, power data, minimal relocation/new lighting, millwork, sink(s) toiet and finishes, mep, life safety and sprinkler system modifications are to be under seperate and | $480,000 |
| Feb 21, 2025 | Completed final sign-off Dec 2025 | 101 California St | ti fitout of (e) 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of useDetails
ti fitout of (e) 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of use | $42,500 |
| Jan 23, 2025 | Completed final sign-off Mar 2025 | 101 California St | mechanical and electrical work (ste 1925/19th fl) ref 2024.1121.5485Details
mechanical and electrical work (ste 1925/19th fl) ref 2024.1121.5485 | $105,000 |
| Jan 10, 2025 | Completed final sign-off Jul 2025 | 120 Kearny St | interior t.i: 35/f removal of non structural partitions and finishes, upgrade to restrooms for accessibilty. mep, fire, life safety and sprinkler under separate permit.Details
interior t.i: 35/f removal of non structural partitions and finishes, upgrade to restrooms for accessibilty. mep, fire, life safety and sprinkler under separate permit. | $650,000 |
| Dec 26, 2024 | Completed final sign-off Jun 2025 | 120 Kearny St | 28/fl: revision to pa#2024-0725-7281: to reduce size of breakroom 28101, move idf room, create wellness and storage room.Details
28/fl: revision to pa#2024-0725-7281: to reduce size of breakroom 28101, move idf room, create wellness and storage room. | $10,000 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 101 California St | 42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits.Details
42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits. | $75,000 |
| Dec 18, 2024 | Completed final sign-off Jul 2025 | 101 California St | 42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals.Details
42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals. | $250,000 |
| Dec 5, 2024 | Completed final sign-off Mar 2025 | 101 California St | ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018Details
ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018 | $11,000 |
| Nov 21, 2024 | Completed final sign-off Mar 2025 | 101 California St | suite 1925. scope of work on the 19th flr consist of interior demolition of mon-structural elements including but not neccessarily limited to interior partitions, doors, finishes, ceiling, lighting, power and data, construction including new interior of non structural partitions, doors, finishes,Details
suite 1925. scope of work on the 19th flr consist of interior demolition of mon-structural elements including but not neccessarily limited to interior partitions, doors, finishes, ceiling, lighting, power and data, construction including new interior of non structural partitions, doors, finishes, | $475,000 |
| Sep 12, 2024 | Completed final sign-off Apr 2025 | 222 Mason St | temporary equipment access panel for elevator refurbishment.Details
temporary equipment access panel for elevator refurbishment. | $36,000 |
| Aug 30, 2024 | Completed final sign-off Nov 2024 | 120 Kearny St | 31/f ste# 3100: interior ti - demolition of non-structural partitions, finishes, door assemblies, light fixtures, and millwork. mep, fire, life safety, and srpinkler under separate permit.Details
31/f ste# 3100: interior ti - demolition of non-structural partitions, finishes, door assemblies, light fixtures, and millwork. mep, fire, life safety, and srpinkler under separate permit. | $339,000 |
| Aug 5, 2024 | In progress issued Aug 2024 | 177 Stillman St | ref pa # 2024-0226-6507 utilities installed the fpw line not to our instruction. this permit is to get the information in the recordDetails
ref pa # 2024-0226-6507 utilities installed the fpw line not to our instruction. this permit is to get the information in the record | |
| Jul 26, 2024 | Completed final sign-off Nov 2024 | 1 California St | 27/f ste# 2775: subdivide (e) office into 2 offices. scope includes: new wall, door relocation of lighting & mechanicalDetails
27/f ste# 2775: subdivide (e) office into 2 offices. scope includes: new wall, door relocation of lighting & mechanical | $24,000 |
| Jul 25, 2024 | Completed final sign-off Jun 2025 | 120 Kearny St | t.i. to 28th/f included selective demo & contruction of non structural partitions, ceilings, finishes & power. associated mech, elec, & plumbing includedDetails
t.i. to 28th/f included selective demo & contruction of non structural partitions, ceilings, finishes & power. associated mech, elec, & plumbing included | $75,000 |
| Jul 23, 2024 | Completed final sign-off Oct 2024 | 120 Kearny St | 32/f-ste 3230: interior ti, removal and new non-structural partitions, finishes, relocated lighting. mechanical, electrical, fire life safety and sprinkler under separate permit.Details
32/f-ste 3230: interior ti, removal and new non-structural partitions, finishes, relocated lighting. mechanical, electrical, fire life safety and sprinkler under separate permit. | $195,000 |
| Jul 15, 2024 | Expired or cancelled withdrawn Aug 2024 | 303 02nd St | rev 202310319879- suite n135- mechanical and electrical changes to restaurantDetails
rev 202310319879- suite n135- mechanical and electrical changes to restaurant | |
| Jan 29, 2024 | Completed final sign-off Aug 2024 | 1 California St | 12/f-ste 1225: minor selective demo & constructionof non-structural partitions, glazing, electrical outlets, millwork and lighting, new drinking fountain. no change in occupancy use or area.Details
12/f-ste 1225: minor selective demo & constructionof non-structural partitions, glazing, electrical outlets, millwork and lighting, new drinking fountain. no change in occupancy use or area. | $185,538 |
| Dec 4, 2023 | Completed final sign-off Jan 2024 | 303 02nd St | construction of 1 non-structural demising wall between states. patch and match where neededDetails
construction of 1 non-structural demising wall between states. patch and match where needed | $100,000 |
| Nov 21, 2023 | In progress issued Dec 2023 | 360 03rd St | 1st fl ste 101: demolition of existing millwork & finishes. new construction of non-structural demsing wall, lighting & finishes.Details
1st fl ste 101: demolition of existing millwork & finishes. new construction of non-structural demsing wall, lighting & finishes. | $80,000 |
| Oct 31, 2023 | Completed final sign-off Aug 2024 | 303 02nd St | suite# 135 - t.i. of (e) space consisting of cafe kitchen and boh remodel w/ new kitchen, new partition walls. mep distribution modification.Details
suite# 135 - t.i. of (e) space consisting of cafe kitchen and boh remodel w/ new kitchen, new partition walls. mep distribution modification. | $250,000 |
| Sep 5, 2023 | Completed final sign-off Apr 2024 | 101 California St | 2/f new coffee bar, seating, window bar, security gate, mep.Details
2/f new coffee bar, seating, window bar, security gate, mep. | $176,000 |
| May 25, 2023 | Completed final sign-off Dec 2023 | 2390 Bush St | voluntary structural. repair work at church bell tower structural work includes replacment of carroded steel bracing which was added during the 1990 seismic rehabiltation of the church. accessiblility upgrades: signage at parking lot, restroom, restroom work. maher n/a.Details
voluntary structural. repair work at church bell tower structural work includes replacment of carroded steel bracing which was added during the 1990 seismic rehabiltation of the church. accessiblility upgrades: signage at parking lot, restroom, restroom work. maher n/a. | $1,185,000 |
| Apr 25, 2023 | Completed final sign-off Sep 2023 | 1 Montgomery St | 28th fl - ti to include selective demo and construction of non-structural partitions, ceilings, finishes and power and associated mechanical and electrical improvementsDetails
28th fl - ti to include selective demo and construction of non-structural partitions, ceilings, finishes and power and associated mechanical and electrical improvements | $100,000 |
| Apr 7, 2023 | Completed final sign-off Jun 2023 | 222 Mason St | partial reconfiguration of an existing tenant office space @ level 5. includes selective demo & and installation of walls, ceiling and doorsDetails
partial reconfiguration of an existing tenant office space @ level 5. includes selective demo & and installation of walls, ceiling and doors | $5,000 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 4 Embarcadero Center | 37th fl-ste 3720: non-structural demo tenant improvement (partial suite), incl non-struct partition removal & removing one door. life safety & sprinklers deferred. no ceiling work.Details
37th fl-ste 3720: non-structural demo tenant improvement (partial suite), incl non-struct partition removal & removing one door. life safety & sprinklers deferred. no ceiling work. | $85,456 |
| Feb 17, 2023 | Completed final sign-off Oct 2024 | 177 Stillman St | remove small mezzanine & wood stairs to large mezzxanine, provide door to large mezz, remove door to (e)office, enlarge opening/replace w/accessible door, replace broken window panes in-kind & (e)garage door, install warehouse storage racks, provide new sink, casework & refrigeratorDetails
remove small mezzanine & wood stairs to large mezzxanine, provide door to large mezz, remove door to (e)office, enlarge opening/replace w/accessible door, replace broken window panes in-kind & (e)garage door, install warehouse storage racks, provide new sink, casework & refrigerator | $150,000 |
| Dec 15, 2022 | Completed final sign-off Feb 2023 | 1 Embarcadero Center | 16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits.Details
16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits. | $80,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2023 | 44 02nd St | change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included.Details
change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included. | |
| Aug 1, 2022 | Completed final sign-off Oct 2022 | 1 Sansome St | 34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a.Details
34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a. | |
| Jun 27, 2022 | Completed final sign-off Oct 2022 | 1 Sansome St | 34th floor: t.i. : no change of use or occupancy. new non load bearing partitions, doors, electrical, mechanical air distribution, plmg, ceiling, lighting, and associated finishes. (life safty and sprinkler deffeed submittals)Details
34th floor: t.i. : no change of use or occupancy. new non load bearing partitions, doors, electrical, mechanical air distribution, plmg, ceiling, lighting, and associated finishes. (life safty and sprinkler deffeed submittals) | $739,000 |
| Nov 10, 2021 | Completed final sign-off May 2022 | 101 California St | 29th floor: minor t.i. with new partitions and doors, millworks, demising wall, and finishes. mep included in set.Details
29th floor: minor t.i. with new partitions and doors, millworks, demising wall, and finishes. mep included in set. | $950,000 |
| Nov 9, 2021 | Completed final sign-off Feb 2022 | 5050 Mission St | 1st fl - revision to pa 2021-0105-2098 and 2021-0802-5536 including the mechanical and electrical changes (suite c)Details
1st fl - revision to pa 2021-0105-2098 and 2021-0802-5536 including the mechanical and electrical changes (suite c) | $60,000 |
| Aug 2, 2021 | Completed final sign-off Feb 2022 | 5050 Mission St | 1/f: tenant improvement for senior center & dining hall.operating as community facility ref pa202101052098. maher n/a.Details
1/f: tenant improvement for senior center & dining hall.operating as community facility ref pa202101052098. maher n/a. | $234,000 |
| Mar 23, 2021 | Completed final sign-off Sep 2021 | 1255 Battery St | 4th fl - interior improvements to restrooms of building limited to finishes, plumbing fixture replacementDetails
4th fl - interior improvements to restrooms of building limited to finishes, plumbing fixture replacement | $150,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2022 | 5050 Mission St | shell & core improvement in ground fl vacant retail sapce. add ada bathrooms. install mezzanine, stairs to mezzanine. level floor with street. provide wheelchair lift. add 2nd exit.Details
shell & core improvement in ground fl vacant retail sapce. add ada bathrooms. install mezzanine, stairs to mezzanine. level floor with street. provide wheelchair lift. add 2nd exit. | $800,000 |
| Dec 9, 2020 | Never finaled issued Jan 2021, no final | 350 Mission St | partial removal and replacement of millwork in the dining room of (e) restaurant. project does not propose a change in use or occupancy. projects does not incl changes to mech or plumb. no changes to (e) kitchen. electrical scope is design build by gc.Details
partial removal and replacement of millwork in the dining room of (e) restaurant. project does not propose a change in use or occupancy. projects does not incl changes to mech or plumb. no changes to (e) kitchen. electrical scope is design build by gc. | $113,949 |
| Nov 10, 2020 | Completed final sign-off Feb 2021 | 1 California St | revision to pa #2020-0807-1367: adding (4) four phone booths to scope of work. included is structural attachment details etc. building fully sprinklered.Details
revision to pa #2020-0807-1367: adding (4) four phone booths to scope of work. included is structural attachment details etc. building fully sprinklered. | $17,100 |
| Nov 7, 2020 | Completed final sign-off Apr 2021 | 1255 Battery St | 4/f: non-structural internal dem per ab-017 space to remain vacant until all accessibility features are restored. separate electrical and plumbing permits requiredDetails
4/f: non-structural internal dem per ab-017 space to remain vacant until all accessibility features are restored. separate electrical and plumbing permits required | $60,000 |
| Sep 24, 2020 | Never finaled issued Nov 2020, no final | 170 Maiden Ln | suite 800: rev to pa202001292983, 201812138208 & 201808207774: installing (1) wall mounted fan coil, 1 condension unit and refrigerant piping.Details
suite 800: rev to pa202001292983, 201812138208 & 201808207774: installing (1) wall mounted fan coil, 1 condension unit and refrigerant piping. | $12,000 |
| Aug 7, 2020 | Completed final sign-off Feb 2021 | 1 California St | 30th flr. - t.i, demo of non-struct paritions & replace w/ new. meps included. life safety and sprinklers under separate permit. bldg fully sprinklered.Details
30th flr. - t.i, demo of non-struct paritions & replace w/ new. meps included. life safety and sprinklers under separate permit. bldg fully sprinklered. | $1,500,000 |
| Jan 29, 2020 | Completed final sign-off Jan 2022 | 170 Maiden Ln | revision to pa 201808207774. dimension changes to penthouse wall, 6th floor smoke door and other miscDetails
revision to pa 201808207774. dimension changes to penthouse wall, 6th floor smoke door and other misc | |
| Dec 3, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | revision to 201908290216 to correct reflected ceiling planDetails
revision to 201908290216 to correct reflected ceiling plan | |
| Nov 21, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | 2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal listDetails
2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal list | |
| Aug 29, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | 2/f - interior alteration of tenant space. minor remodel of 2500 sf ofc the 3560 sf (mep/fire/life safety under sep permit if needed). operable partition under separate permit.Details
2/f - interior alteration of tenant space. minor remodel of 2500 sf ofc the 3560 sf (mep/fire/life safety under sep permit if needed). operable partition under separate permit. | $600,000 |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 1265 Battery St | 4th fl mech and elec for 201902143000. revision to arch for background correctionsDetails
4th fl mech and elec for 201902143000. revision to arch for background corrections | $400,000 |
| Jul 25, 2019 | Completed final sign-off Dec 2019 | 259 Post St | scope or work includes accessibility upgrades o the 2nd floor for the restrooms and the elevators. barrier removalDetails
scope or work includes accessibility upgrades o the 2nd floor for the restrooms and the elevators. barrier removal | $15,000 |
| Jul 19, 2019 | Completed final sign-off Feb 2020 | 665 Sutter St | interior renovation finishes * lighting no mech or plm., in conjuctin woith 201907176128Details
interior renovation finishes * lighting no mech or plm., in conjuctin woith 201907176128 | $200,000 |
| Jul 17, 2019 | Completed final sign-off Feb 2020 | 524 Post St | interior renovation of (e) cafe. new kitchen equipment, lighting and finishes.Details
interior renovation of (e) cafe. new kitchen equipment, lighting and finishes. | $350,000 |
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 170 Maiden Ln | 5th flr electrical work for t.i pa 201902062272Details
5th flr electrical work for t.i pa 201902062272 | $32,000 |
| Mar 7, 2019 | Completed final sign-off Apr 2019 | 101 California St | selective demo of non load bearing partitions, ceiling, light fixture, millwork, plumbing and finishes. ste 150Details
selective demo of non load bearing partitions, ceiling, light fixture, millwork, plumbing and finishes. ste 150 | $23,235 |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 1265 Battery St | 4th flr. tenant improvement. demo (e) non-structural walls / ceiling and construct (n) non-structural walls, doors, frames, millwork, partial ceiling hardlid, soffits, floor finishes and mep incl 1 (n) shower room, 2 (n) mother's roomsDetails
4th flr. tenant improvement. demo (e) non-structural walls / ceiling and construct (n) non-structural walls, doors, frames, millwork, partial ceiling hardlid, soffits, floor finishes and mep incl 1 (n) shower room, 2 (n) mother's rooms | $1,760,000 |
| Feb 6, 2019 | Completed final sign-off Apr 2019 | 170 Maiden Ln | selective interior t.i. limited to construction of 2 new offices and modification of a conference room to make 2 smaller conference rooms and casework addition at extg break area. work on 5th floor. total work area 573 sq ftDetails
selective interior t.i. limited to construction of 2 new offices and modification of a conference room to make 2 smaller conference rooms and casework addition at extg break area. work on 5th floor. total work area 573 sq ft | $188,000 |
| Dec 13, 2018 | Completed final sign-off Jan 2022 | 170 Maiden Ln | replace maiden lane elevator door inkind. limited to street entrance only. elevator upgrade under 201808207774Details
replace maiden lane elevator door inkind. limited to street entrance only. elevator upgrade under 201808207774 | $5,000 |
| Aug 20, 2018 | Completed final sign-off Jan 2022 | 170 Maiden Ln | barrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit.Details
barrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit. | $500,000 |