Anthony Cataldo
- Listed as
- architect, designer
- Firm
- Ware Malcomb
- Based in
- Pleasanton
- On San Francisco permits
- Nov 2006 to Dec 2025
74 permits since 2000 (architect on 71 permits, designer on 3 permits): 55 completed, 1 in progress, 14 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | In progress issued Dec 2025 | 425 01st St | unit 3803- kitchen remodel to include (n) counters and removal of 4 foot wall.Details
unit 3803- kitchen remodel to include (n) counters and removal of 4 foot wall. | $2,000 | |
| Jan 15, 2025 | Completed final sign-off Jul 2025 | 301 Toland St | Bcci Construction Company | second generation t.i. vehicle maintanance. garage includes: 2 gender neutral restrooms, security room, caged storage, office, mdf room, prefab phone booths, arch. structural and mep as needed for above scope.Details
second generation t.i. vehicle maintanance. garage includes: 2 gender neutral restrooms, security room, caged storage, office, mdf room, prefab phone booths, arch. structural and mep as needed for above scope. | $1,400,000 |
| Jan 12, 2018 | Completed final sign-off Oct 2018 | 201 California St | Peacock Construction | revision to pa 2017-1122-4690 - revising location of demising wall, extending finishes and partitions, ste 1550Details
revision to pa 2017-1122-4690 - revising location of demising wall, extending finishes and partitions, ste 1550 | $10,000 |
| Dec 12, 2017 | Completed final sign-off Jan 2018 | 150 California St | Principal Builders Inc. | 14th floor - demolition of existing 80 sq ft breakroom & admin area to remove one partition, replace millwork, & ceiling. n/a maher ordinanceDetails
14th floor - demolition of existing 80 sq ft breakroom & admin area to remove one partition, replace millwork, & ceiling. n/a maher ordinance | $20,600 |
| Nov 22, 2017 | Completed final sign-off Oct 2018 | 201 California St | Peacock Construction | 15th floor: minor lighting, demo and construction of new interior partitions, glazing (interior), doors/frames, lighting, power, millwork and sinks. there is no structural work . maher naDetails
15th floor: minor lighting, demo and construction of new interior partitions, glazing (interior), doors/frames, lighting, power, millwork and sinks. there is no structural work . maher na | $149,028 |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 201 California St | Peacock Construction | demo e copyroom, new construction to demising paritions and suite exit. non structural elec and finishes included maher not reqDetails
demo e copyroom, new construction to demising paritions and suite exit. non structural elec and finishes included maher not req | $25,000 |
| Jun 28, 2017 | Never finaled issued Jul 2017, no final | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | #1490 - demo 2 conf rms,2 offices,1 coffee area,1 reception area, supply/storage. selective demo (e) doors, non-rated partitions, ceiling grid & tile. new break rm, 3 new conf rms, 1 it room & open office, new finishes, power, ceiling & lighting throughout, new int partition. mep/life safety deferrDetails
#1490 - demo 2 conf rms,2 offices,1 coffee area,1 reception area, supply/storage. selective demo (e) doors, non-rated partitions, ceiling grid & tile. new break rm, 3 new conf rms, 1 it room & open office, new finishes, power, ceiling & lighting throughout, new int partition. mep/life safety deferr | $200,000 |
| May 26, 2017 | Completed final sign-off Mar 2018 | 201 California St | Peacock Construction | the scope of this project includes: demo of non-structural partitions, built-in millwork, power//signal, ceiling tile/grid, lighting fixture, & finishes. new non-structural interior partiions, interior tempered glass sidelight, accessible millwork, plmg, ceiling grid/tile, lighting fixtures,Details
the scope of this project includes: demo of non-structural partitions, built-in millwork, power//signal, ceiling tile/grid, lighting fixture, & finishes. new non-structural interior partiions, interior tempered glass sidelight, accessible millwork, plmg, ceiling grid/tile, lighting fixtures, | $189,000 |
| May 25, 2017 | Never finaled issued Jun 2017, no final | 260 Potrero Av | Davaco Inc. | remodel of (e) space to enchance appearance and customer experience. no structural or exterior changesDetails
remodel of (e) space to enchance appearance and customer experience. no structural or exterior changes | $30,000 |
| Jan 10, 2017 | Completed final sign-off Apr 2017 | 33 New Montgomery St | Field Construction Inc. | 9th floor - revision to pa #201611162845: additional ada upgrades to men & women's restroom. n/a maher ordinanceDetails
9th floor - revision to pa #201611162845: additional ada upgrades to men & women's restroom. n/a maher ordinance | |
| Nov 16, 2016 | Completed final sign-off Apr 2017 | 33 New Montgomery St | Field Construction Inc. | preconstruction demo of interior non bearing walls, interior glazing, millwork, ceiling grid tile and lighting, doors an frames also include new lighting fixtures. new double door entry. n/a for maher.Details
preconstruction demo of interior non bearing walls, interior glazing, millwork, ceiling grid tile and lighting, doors an frames also include new lighting fixtures. new double door entry. n/a for maher. | $125,000 |
| Sep 27, 2016 | Never finaled issued Nov 2016, no final | 260 California St | Wells Electrical, Inc | 12th floor (penthouse) - title 24 lighting only. ref pa #201606220563.Details
12th floor (penthouse) - title 24 lighting only. ref pa #201606220563. | $5,000 |
| Aug 5, 2016 | Completed final sign-off Dec 2016 | 201 California St | Peacock Construction | 15th floor suite 1500 - pre-construction demolitions of interior non-bearing walls, interior glazing, millwork, finishes & frames. (per ab-017) n/a maher ordinance. ti/mep/life safety deferred.Details
15th floor suite 1500 - pre-construction demolitions of interior non-bearing walls, interior glazing, millwork, finishes & frames. (per ab-017) n/a maher ordinance. ti/mep/life safety deferred. | $20,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 33 New Montgomery St | Bevilacqua & Sons | 17th flr: revision to ref pa 2016 0325 3066: revised location of 2 doors. addition of card readers. maher naDetails
17th flr: revision to ref pa 2016 0325 3066: revised location of 2 doors. addition of card readers. maher na | |
| Jun 28, 2016 | Completed final sign-off Jun 2017 | 201 California St | R.M.R. Construction Company | non illuminated blade signDetails
non illuminated blade sign | $10,000 |
| Jun 28, 2016 | Completed final sign-off Jul 2017 | 201 California St | R.M.R. Construction Company | replace existing exterior tile at building entry0 with new tile and walk off mat. replace existing exterior metal address numbers. add vinyl address numbers to existing glass doors. maher not reqDetails
replace existing exterior tile at building entry0 with new tile and walk off mat. replace existing exterior metal address numbers. add vinyl address numbers to existing glass doors. maher not req | $113,000 |
| Jun 24, 2016 | Never finaled issued Jul 2016, no final | 33 New Montgomery St | Bevilacqua & Sons | 17/f- revision to existing t.i. pa#201603253066, change to room layout on (e) permit including walls, doors, frames etc. ceiling, lighting. no structural work. n/a ordinance #155-13Details
17/f- revision to existing t.i. pa#201603253066, change to room layout on (e) permit including walls, doors, frames etc. ceiling, lighting. no structural work. n/a ordinance #155-13 | |
| Jun 24, 2016 | Expired or cancelled cancelled Jan 2026 | 201 California St | g/f, tenant directory- install new built in bench & plantr, replace existing glass tenant signage. no exterior or structural work. n/a ordinance #155-13Details
g/f, tenant directory- install new built in bench & plantr, replace existing glass tenant signage. no exterior or structural work. n/a ordinance #155-13 | $76,388 | |
| Jun 22, 2016 | Never finaled issued Aug 2016, no final | 260 California St | Yerba Buena Builders Inc | demolition of (e) non-structural interior partitions, millwork, electrical, ceilings & lighting. removal of structural column & install new non-structural interior partitions, millwork, electrical, ceiling & lighting & installation of new structural support avoce ceiling at area of demo'd columnDetails
demolition of (e) non-structural interior partitions, millwork, electrical, ceilings & lighting. removal of structural column & install new non-structural interior partitions, millwork, electrical, ceiling & lighting & installation of new structural support avoce ceiling at area of demo'd column | $50,000 |
| Jun 2, 2016 | Completed final sign-off Sep 2017 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | 4th fl, suite 450: addition of a new full height non-rated interior partition. new interior door & 1 light fixture. no structural work associated with thie permit. life safety under seperate permitDetails
4th fl, suite 450: addition of a new full height non-rated interior partition. new interior door & 1 light fixture. no structural work associated with thie permit. life safety under seperate permit | $35,000 |
| Mar 24, 2016 | Completed final sign-off Jan 2017 | 33 New Montgomery St | Bevilacqua & Sons | 2nd flr: demo (e) non rated non structural interior construction and construction of non rated, non structural interior partitions, doors, millwork, electrical, ceiling, and lighting. no structural work. maher naDetails
2nd flr: demo (e) non rated non structural interior construction and construction of non rated, non structural interior partitions, doors, millwork, electrical, ceiling, and lighting. no structural work. maher na | $208,604 |
| Feb 16, 2016 | Completed final sign-off May 2016 | 633 Folsom St | Dome Construction Corp | new partitions(2) new doors, one with sidelite & electrical. no structuralDetails
new partitions(2) new doors, one with sidelite & electrical. no structural | $40,000 |
| Feb 8, 2016 | Never finaled issued Mar 2016, no final | 201 California St | Rudolph Commercial Interiors Inc, Rci | 15th and 16th floors: the scope of this project is to demolished a stair and slab to be in filled.Details
15th and 16th floors: the scope of this project is to demolished a stair and slab to be in filled. | $84,211 |
| Oct 21, 2015 | Never finaled issued Nov 2015, no final | 1485 Bay Shore Bl | Brandon Construction Inc | addition of (2) office & (1) storage room, new electrical & data. minor ceiling work, addition of chain link fence in storage area. n/a maher ordinanceDetails
addition of (2) office & (1) storage room, new electrical & data. minor ceiling work, addition of chain link fence in storage area. n/a maher ordinance | $80,000 |
| Oct 9, 2015 | Never finaled issued Feb 2016, no final | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | #1400- the scope of this project is second generation t.i. to include new interior partitions, glazing, door/frame, lighting, millwork & electrical. existing ada compliant restroom to remain. n/a ordinance #155-13Details
#1400- the scope of this project is second generation t.i. to include new interior partitions, glazing, door/frame, lighting, millwork & electrical. existing ada compliant restroom to remain. n/a ordinance #155-13 | $421,280 |
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 888 Tennessee St | Shrader & Martinez Const. Inc | 1st floor: ti- some light demo work of (e), cosmetic upgrades, and minor upgrades to bring restrooms to compliance with current code. per planning code 890.54(c) & 843.84. maher naDetails
1st floor: ti- some light demo work of (e), cosmetic upgrades, and minor upgrades to bring restrooms to compliance with current code. per planning code 890.54(c) & 843.84. maher na | $100,000 |
| Aug 19, 2015 | Expired or cancelled withdrawn Oct 2015 | 888 Tennessee St | Shrader & Martinez Const. Inc | change use from a printing shop to an e-commerce warehouse. t.i. work include somelight demolition of existing and cosmetic upgrades, upgrade first floor restrooms to compliance with current code. maher n/a.Details
change use from a printing shop to an e-commerce warehouse. t.i. work include somelight demolition of existing and cosmetic upgrades, upgrade first floor restrooms to compliance with current code. maher n/a. | $100,000 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 33 New Montgomery St | Peacock Construction | 2nd generation ti in an existing building to include new interior partitions, glazing, doors/frames, new lighting and millworkDetails
2nd generation ti in an existing building to include new interior partitions, glazing, doors/frames, new lighting and millwork | $151,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2015 | 201 California St | Rudolph Commercial Interiors Inc, Rci | 2nd flr: a patio upgrade to include a new perimeter fencing, new outdoor furniture, & exhaust covers; maher n/a. mep deferred.Details
2nd flr: a patio upgrade to include a new perimeter fencing, new outdoor furniture, & exhaust covers; maher n/a. mep deferred. | $150,000 |
| Jul 2, 2015 | Completed final sign-off Mar 2016 | 33 New Montgomery St | Peacock Construction | suite 1400 and 1420: preconstruction demolition of interior non-bearing walls, interior glazing, ceiling grid/tile and lights, doors and frames. no removal of structural elements. n/a for maher. ab-017 applies.Details
suite 1400 and 1420: preconstruction demolition of interior non-bearing walls, interior glazing, ceiling grid/tile and lights, doors and frames. no removal of structural elements. n/a for maher. ab-017 applies. | $47,000 |
| Jul 2, 2015 | Completed final sign-off Dec 2015 | 201 California St | Rudolph Commercial Interiors Inc, Rci | second generation t.i. including new partitions, milwork, doors/frames, and ceiling/lighting. restrooms are to be upgraded to be fully ada compliant.n/a for maher.Details
second generation t.i. including new partitions, milwork, doors/frames, and ceiling/lighting. restrooms are to be upgraded to be fully ada compliant.n/a for maher. | $215,220 |
| Jul 2, 2015 | Completed final sign-off Sep 2015 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | suite 350:second generation t.i. including new interior partitions, doors/frames, and lighting & millwork. n/a for maher.Details
suite 350:second generation t.i. including new interior partitions, doors/frames, and lighting & millwork. n/a for maher. | $168,225 |
| Jun 23, 2015 | Expired or cancelled withdrawn Jan 2022 | 875 Howard St | ground floor convert accessory office to general office. 2nd floor - convert 13,400 st from institutional use ( adult education) to office use. the remainder of 2nd floor are already in office use. combined office 25,750 sf.Details
ground floor convert accessory office to general office. 2nd floor - convert 13,400 st from institutional use ( adult education) to office use. the remainder of 2nd floor are already in office use. combined office 25,750 sf. | ||
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | 11th floor ,suite 1150 tenant improvement to include new inteiror partitions, glazing, doors & frames. there is no structural work associated with this scope of work. exisitng ada compliant restrooms to remain. n/a maher ordinanceDetails
11th floor ,suite 1150 tenant improvement to include new inteiror partitions, glazing, doors & frames. there is no structural work associated with this scope of work. exisitng ada compliant restrooms to remain. n/a maher ordinance | $242,625 |
| Jun 16, 2015 | Completed final sign-off Jul 2018 | 475 Brannan St | Skyline Construction | 4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinanceDetails
4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinance | $925,462 |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision to app#201501065010 and 201404183640. revision per field verifications. structural revisions and new skylight and addition of floor drain. n/a for the maher.Details
revision to app#201501065010 and 201404183640. revision per field verifications. structural revisions and new skylight and addition of floor drain. n/a for the maher. | |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | revision to app#201501065041 and 201404183636. revision per field verifications. structural only. n/a for maher.Details
revision to app#201501065041 and 201404183636. revision per field verifications. structural only. n/a for maher. | |
| Jun 2, 2015 | Completed final sign-off Apr 2016 | 450 Mission St | Source Planning And Construction Inc | 2nd flr: new interior partitions, doors, interior glazing, flooring, ele/hvac/plumb improvements. new fully compliant restrooms. remove (n) int. glazing frm scope; maher naDetails
2nd flr: new interior partitions, doors, interior glazing, flooring, ele/hvac/plumb improvements. new fully compliant restrooms. remove (n) int. glazing frm scope; maher na | $50,000 |
| Jan 13, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | submittal for storage rack layout and anchorage details. ** maher: compliance with ordinance no# 155-13 not required **Details
submittal for storage rack layout and anchorage details. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 13, 2015 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | submittal for storage rack layout & anchorage details. ** maher: compliance with ordinance no# 155-13 not required **Details
submittal for storage rack layout & anchorage details. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 7, 2015 | Expired or cancelled cancelled Jan 2026 | 735 Battery St | Dome Construction Corp | addition of (2) interior doors, interior partition & card reader, no structural work occurs; maher n/a.Details
addition of (2) interior doors, interior partition & card reader, no structural work occurs; maher n/a. | $33,239 |
| Jan 6, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision appl. 201404183640. interior t.i. improvement revisions. new staircase and elevator and removal of existing. 663 s.f. of infill to second floor. new lighting fixture layout and removal of new skylights. maher n/a.Details
revision appl. 201404183640. interior t.i. improvement revisions. new staircase and elevator and removal of existing. 663 s.f. of infill to second floor. new lighting fixture layout and removal of new skylights. maher n/a. | $325,000 |
| Dec 30, 2014 | Completed final sign-off Aug 2015 | 33 New Montgomery St | Peacock Construction | 3rd floor:remodel of extg elevator lobby. work to include removal and replacement of extg finishes and lights/ceiling. minor restroom ada work to be performed. no structural or exterior work. n/a for the maher.Details
3rd floor:remodel of extg elevator lobby. work to include removal and replacement of extg finishes and lights/ceiling. minor restroom ada work to be performed. no structural or exterior work. n/a for the maher. | $54,122 |
| Dec 30, 2014 | Completed final sign-off Jan 2017 | 33 New Montgomery St | Peacock Construction | exterior lobby renovation: exterior new metal entry canopy site work. (e) entry points,concrete sidewalk slab cuts and (n) stone floor finish. n/a for the maher.Details
exterior lobby renovation: exterior new metal entry canopy site work. (e) entry points,concrete sidewalk slab cuts and (n) stone floor finish. n/a for the maher. | $144,500 |
| Dec 30, 2014 | Completed final sign-off Aug 2015 | 33 New Montgomery St | Peacock Construction | suite 520 5th floor:second generation t.i. including new partitions doors, glazing, new grid and tile throughout extg breakroom millwork to remain. extg ada compliant restroom to remian. no structural or exterior work. n/a for the maher.Details
suite 520 5th floor:second generation t.i. including new partitions doors, glazing, new grid and tile throughout extg breakroom millwork to remain. extg ada compliant restroom to remian. no structural or exterior work. n/a for the maher. | $185,405 |
| Dec 30, 2014 | Completed final sign-off Aug 2015 | 33 New Montgomery St | Peacock Construction | 5th floor:remodel of extg elevator lobby. work to include removal and replacement of extg finishes and lights/ceiling. minor restroom ada work to be performed. no structural or exterior work. n/a for the maher.Details
5th floor:remodel of extg elevator lobby. work to include removal and replacement of extg finishes and lights/ceiling. minor restroom ada work to be performed. no structural or exterior work. n/a for the maher. | $57,585 |
| Dec 30, 2014 | Completed final sign-off Jan 2017 | 33 New Montgomery St | Peacock Construction | lobby:second generation work to include new finishes, new millwork and new ceiling soffitt. n/a for the maher.Details
lobby:second generation work to include new finishes, new millwork and new ceiling soffitt. n/a for the maher. | $187,850 |
| Nov 25, 2014 | Completed final sign-off Aug 2015 | 33 New Montgomery St | Peacock Construction | 10th fl (suite 1090): 2nd generation ti including new interior paritons, glazing, door/frames, lighting and millwork. existing ada compliant restrooms to remain. no structural associated with the scope.Details
10th fl (suite 1090): 2nd generation ti including new interior paritons, glazing, door/frames, lighting and millwork. existing ada compliant restrooms to remain. no structural associated with the scope. | $324,980 |
| Nov 25, 2014 | Completed final sign-off Apr 2015 | 33 New Montgomery St | Peacock Construction | 10th fl: demo of existing elevator lobby finishes, doors, frames and lighting. installation of new finishes, doors/frames and lighting. mech, elec, and fire under sep permit. ada upgrade to existing restrooms. no structural work; maher n/aDetails
10th fl: demo of existing elevator lobby finishes, doors, frames and lighting. installation of new finishes, doors/frames and lighting. mech, elec, and fire under sep permit. ada upgrade to existing restrooms. no structural work; maher n/a | $155,020 |
| Nov 18, 2014 | Never finaled issued Nov 2014, no final | 33 New Montgomery St | Peacock Construction | alteration of existing interior partitions, glazing, door/frames, lighting and millwork, no structural work, 5,206 sq.ft. demo as per ab-17. n/a ordinance #155-13.Details
alteration of existing interior partitions, glazing, door/frames, lighting and millwork, no structural work, 5,206 sq.ft. demo as per ab-17. n/a ordinance #155-13. | $17,650 |
| Sep 5, 2014 | Completed final sign-off Apr 2015 | 441 Sutter St | Ybj Construction Services | revision to pa# 2013/12/18/4521-r2. revision consisting reducing scope of alteration to 2nd level & securement of access to 2nd level & relocation of roof top hvac equipment.Details
revision to pa# 2013/12/18/4521-r2. revision consisting reducing scope of alteration to 2nd level & securement of access to 2nd level & relocation of roof top hvac equipment. | $6,000 |
| Aug 27, 2014 | Never finaled issued Oct 2014, no final | 50 Fell St | Bcci Construction Company | historical & non-historical items include demo of (e) brick ramp. addition of 2 new doors. addition of ada ramp. site grading & landscaping & play yard. ** maher: compliance with ordinance no# 155-13 not required **Details
historical & non-historical items include demo of (e) brick ramp. addition of 2 new doors. addition of ada ramp. site grading & landscaping & play yard. ** maher: compliance with ordinance no# 155-13 not required ** | $395,000 |
| Aug 19, 2014 | Completed final sign-off Jan 2015 | 50 Hawthorne St | Bcci Construction Company | revision to pa# 201404082674 adding non-load bearing partition @ basmenet, add doors & closet at 1/f reception, remove millwork.Details
revision to pa# 201404082674 adding non-load bearing partition @ basmenet, add doors & closet at 1/f reception, remove millwork. | $35,000 |
| Apr 18, 2014 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on the 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a.Details
open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on the 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a. | $1,050,000 |
| Apr 18, 2014 | Completed final sign-off Nov 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | pre construction demolition unde ab-017 including demolition of interior non bearing walls, doors, open wood stairs and portions of floors for future work. linked with pa #201404183630, 2598 taylor street permit(compliance with maher ord no.155-13 not required). t.i. of pa#201404183636Details
pre construction demolition unde ab-017 including demolition of interior non bearing walls, doors, open wood stairs and portions of floors for future work. linked with pa #201404183630, 2598 taylor street permit(compliance with maher ord no.155-13 not required). t.i. of pa#201404183636 | $150,000 |
| Apr 18, 2014 | Completed final sign-off Nov 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | pre construction demolition under ab - 017, including demolition of interior non bearing walls, doors, open wood stairs and portion of floors for future work. linked with pa #200404183627, 2552 taylor street permit (compliance with maher ord. no.155-13 not required). t.i. of pa#201404183640Details
pre construction demolition under ab - 017, including demolition of interior non bearing walls, doors, open wood stairs and portion of floors for future work. linked with pa #200404183627, 2552 taylor street permit (compliance with maher ord. no.155-13 not required). t.i. of pa#201404183640 | $150,000 |
| Apr 18, 2014 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a. new bldg entry &Details
open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a. new bldg entry & | $1,050,000 |
| Apr 8, 2014 | Completed final sign-off Jan 2015 | 50 Hawthorne St | Bcci Construction Company | interior tenant improvement on first floor including new partitions, doors, ceilings and millwork. mechanical, electrical, structural, life safety & sprinklers under seperate permit.Details
interior tenant improvement on first floor including new partitions, doors, ceilings and millwork. mechanical, electrical, structural, life safety & sprinklers under seperate permit. | $1,000,920 |
| Feb 6, 2014 | Completed final sign-off Feb 2015 | 50 Fell St | Bcci Construction Company | minor demolition per ab-017. building to remain unoccupied. compliance with ordinance 155-13 not required.Details
minor demolition per ab-017. building to remain unoccupied. compliance with ordinance 155-13 not required. | $100,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2015 | 50 Fell St | Bcci Construction Company | compliance with ordinance no.155-13 not required. excavation <50 cu.yd. exterior work to include modification of existing ramp & addition of new ramp, replacement of (3) existing doors & new interior ramps & refurbish (e) windows.Details
compliance with ordinance no.155-13 not required. excavation <50 cu.yd. exterior work to include modification of existing ramp & addition of new ramp, replacement of (3) existing doors & new interior ramps & refurbish (e) windows. | $265,000 |
| Dec 18, 2013 | Completed final sign-off Apr 2015 | 441 Sutter St | Ybj Construction Services | t.i of (e) structure consisting of new finishes throughout & upgrading plumbing, mechanical & electrical systems for proposed use & addition of an elevator for accessibility to all levels. existing storefront door to be removed and relocatedDetails
t.i of (e) structure consisting of new finishes throughout & upgrading plumbing, mechanical & electrical systems for proposed use & addition of an elevator for accessibility to all levels. existing storefront door to be removed and relocated | $550,000 |
| Dec 18, 2013 | Completed final sign-off Feb 2015 | 50 Fell St | Bcci Construction Company | interior ti for a new daycare facility in a bldg w/ two inter- connected wings. this permit is for work in the east wing. mep, structural, ls, sprinkler & exterior work under separate permit. maher ordinance-extended is not required.Details
interior ti for a new daycare facility in a bldg w/ two inter- connected wings. this permit is for work in the east wing. mep, structural, ls, sprinkler & exterior work under separate permit. maher ordinance-extended is not required. | $390,000 |
| Nov 9, 2012 | Completed final sign-off Jun 2013 | 150 Spear St | Peacock Construction Inc | new non rated full height walls, new ceiling heights wals, new glazing, new doors, new millwork, new electrical, new plumbing, new finishes for a second generation t.i.Details
new non rated full height walls, new ceiling heights wals, new glazing, new doors, new millwork, new electrical, new plumbing, new finishes for a second generation t.i. | $155,681 |
| Jan 11, 2012 | Never finaled issued Jun 2012, no final | 200 Paul Av | Bcci Construction Company | new entry lobby with security desk, interior upgrade finishes & fixtures. new exterior cladding, higher parpapet walls aluminum panel & stucco.Details
new entry lobby with security desk, interior upgrade finishes & fixtures. new exterior cladding, higher parpapet walls aluminum panel & stucco. | $1,500,000 |
| Jun 17, 2011 | Completed final sign-off Nov 2011 | 475 The Embarcadero | Peacock Construction Inc | 1st floor bldg 2 - remodel existing bathrooms to comply with ada new finishes. (barrier removal)Details
1st floor bldg 2 - remodel existing bathrooms to comply with ada new finishes. (barrier removal) | $60,000 |
| Jun 17, 2011 | Never finaled issued Jun 2011, no final | 660 Davis St | Peacock Construction Inc | 1st floor remodel existing bathrooms to comply with ada new finishes. (barrier removal)Details
1st floor remodel existing bathrooms to comply with ada new finishes. (barrier removal) | $60,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | revision to 201101067968 adding one sink per bathroom still maintaining ada compliance.Details
revision to 201101067968 adding one sink per bathroom still maintaining ada compliance. | $5,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | building 3: revision to 201012207019. remodel 2 accomodate 2 sinks and still comply with ada codeDetails
building 3: revision to 201012207019. remodel 2 accomodate 2 sinks and still comply with ada code | $10,000 |
| Oct 28, 2010 | Completed final sign-off Jan 2011 | 875 Howard St | Turner Construction Co | revision to pa# 2010.06.25.5345. addition of 2 won doors at first floor shown as delta 5 dated 10/04/10. these have been approved during a pre application meeting.Details
revision to pa# 2010.06.25.5345. addition of 2 won doors at first floor shown as delta 5 dated 10/04/10. these have been approved during a pre application meeting. | $20,000 |
| Aug 10, 2010 | Never finaled issued Aug 2010, no final | 300 California St | D A Pope Inc | suite 600: scope of work to be second generation tenant improvement on the 6th. flr. to consist of 2,898 s.f. remodel area. space to include non-bearing partitions for offices, small break room & conf. rm.Details
suite 600: scope of work to be second generation tenant improvement on the 6th. flr. to consist of 2,898 s.f. remodel area. space to include non-bearing partitions for offices, small break room & conf. rm. | $230,000 |
| Jun 25, 2010 | Completed final sign-off Apr 2011 | 875 Howard St | Turner Construction Co | 1st & 2nd flrs a second generation tenant improvement within existing building including the addition of walls and doors.Details
1st & 2nd flrs a second generation tenant improvement within existing building including the addition of walls and doors. | $3,600,000 |
| Jun 4, 2010 | Completed final sign-off Sep 2010 | 875 Howard St | Turner Construction Co | 1st and 2nd floors: demo interior only including ceiling, partitions, etc (vacant space per ab-017 exception to requirements for disabled access.)Details
1st and 2nd floors: demo interior only including ceiling, partitions, etc (vacant space per ab-017 exception to requirements for disabled access.) | $43,000 |
| Sep 11, 2009 | Completed final sign-off Mar 2010 | 149 New Montgomery St | Novo Construction Inc | new partition walls, new break room, electrrical, mechanical & plumbing work. no exterior work. no structural removal.Details
new partition walls, new break room, electrrical, mechanical & plumbing work. no exterior work. no structural removal. | $775,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 2400 Cesar Chavez St | Intrepid Electronic Systems Inc | scope to provide & install a new fire alarm system building. 100% sprinkler phase 1-office only, phase 2-warehouse on seperate permit.Details
scope to provide & install a new fire alarm system building. 100% sprinkler phase 1-office only, phase 2-warehouse on seperate permit. | $40,000 |