Turner Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 31 permits filed
944 permits since 2000: 674 completed, 21 in progress, 114 never finaled, 135 expired or cancelled.
Of the 114 never-finaled permits, 8 are 3 to 5 years old, 35 are 5 to 10 years old, 71 are over 10 years old. 9 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 944.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | deferred mep for pa#2026-0302-6788 suite 350.Details
deferred mep for pa#2026-0302-6788 suite 350. | $500,000 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | revision to pa#: 202509084794, to separate suites 100 to 200.Details
revision to pa#: 202509084794, to separate suites 100 to 200. | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | deferred mep for 202608206913 suite 150.Details
deferred mep for 202608206913 suite 150. | $187,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 100 California St | to obtain final inspection for work approved under pa#: 202503071771. all work is complete.Details
to obtain final inspection for work approved under pa#: 202503071771. all work is complete. | |
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 100 California St | pa#: 202602135930. update one line diagaram.Details
pa#: 202602135930. update one line diagaram. | |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 100 California St | revision to bpa#202503283322. removal of the remaining t-24 informationDetails
revision to bpa#202503283322. removal of the remaining t-24 information | |
| May 12, 2026 | Completed final sign-off Sep 2026 | 100 California St | removal of the mep systems and dimensioning/noting of the existing drains withing the planter. revision to 2025-0328-3322.Details
removal of the mep systems and dimensioning/noting of the existing drains withing the planter. revision to 2025-0328-3322. | |
| Mar 25, 2026 | In progress issued Mar 2026 | 100 California St | revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus ductDetails
revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus duct | |
| Mar 23, 2026 | Completed final sign-off Sep 2026 | 100 California St | revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to be cleaned of plaster, patched and finished. (n) rated enclosure for (n) hss column.Details
revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to be cleaned of plaster, patched and finished. (n) rated enclosure for (n) hss column. | |
| Mar 16, 2026 | Completed final sign-off Sep 2026 | 100 California St | revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls.Details
revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls. | |
| Mar 9, 2026 | In progress issued Jun 2026 | 1 Beach St | ground floor: deferred mep to pa #202508294258Details
ground floor: deferred mep to pa #202508294258 | $1,292,400 |
| Mar 2, 2026 | In progress issued Apr 2026 | 1 Beach St | 3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferredDetails
3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferred | $1,809,790 |
| Feb 13, 2026 | In progress issued Mar 2026 | 100 California St | revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearanceDetails
revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearance | |
| Jan 28, 2026 | In progress issued Feb 2026 | 1 Beach St | ste 300 - deferred mep to 202511240285Details
ste 300 - deferred mep to 202511240285 | $700,000 |
| Jan 20, 2026 | Completed final sign-off Sep 2026 | 100 California St | the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening.Details
the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening. | $55,000 |
| Jan 12, 2026 | In progress issued Feb 2026 | 1 Beach St | level 1 and level 2: suites 100 and 200. deferred mep for 202509084794Details
level 1 and level 2: suites 100 and 200. deferred mep for 202509084794 | $2,146,752 |
| Jan 12, 2026 | In progress issued Feb 2026 | 1 Beach St | 2nd fl, ste 250 deferred mep for pa 202509084793Details
2nd fl, ste 250 deferred mep for pa 202509084793 | $731,160 |
| Nov 24, 2025 | In progress issued Dec 2025 | 1 Beach St | suite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred.Details
suite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred. | $1,400,000 |
| Sep 8, 2025 | In progress issued Dec 2025 | 1 Beach St | 1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit.Details
1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit. | $4,266,704 |
| Sep 8, 2025 | In progress issued Dec 2025 | 1 Beach St | 2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferredDetails
2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred | $1,469,928 |
| Aug 29, 2025 | In progress issued Mar 2026 | 1 Beach St | g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public useDetails
g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use | $2,620,700 |
| Apr 9, 2025 | Completed final sign-off Sep 2026 | 100 California St | alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.Details
alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way. | $1,300,000 |
| Mar 27, 2025 | Completed final sign-off Jun 2025 | 3525 California St | disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.Details
disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. | $3,000 |
| Mar 26, 2025 | Completed final sign-off Sep 2026 | 350 Saint Josephs Av | fire alarm system migration at the kaiser (cn31-05) medical office building; migrating to new equipment - 1 control panel, 1 nac power supply, remote annunciator, 8 pull stations, 14 modules, 4 smoke detectors, 13 duct smoke detectors, 28 strobes, 22 horn/strobes, and 10 horns. no ref permit app#.Details
fire alarm system migration at the kaiser (cn31-05) medical office building; migrating to new equipment - 1 control panel, 1 nac power supply, remote annunciator, 8 pull stations, 14 modules, 4 smoke detectors, 13 duct smoke detectors, 28 strobes, 22 horn/strobes, and 10 horns. no ref permit app#. | $665,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 100 California St | rev 2023-1005-8107: demo & replacement of (e) structural slab to hoist new switchgear into place on the basement level.Details
rev 2023-1005-8107: demo & replacement of (e) structural slab to hoist new switchgear into place on the basement level. | $98,147 |
| Feb 12, 2025 | Completed final sign-off Dec 2025 | 3533 California St | t.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parkingDetails
t.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parking | $3,500,000 |
| Feb 5, 2025 | Completed final sign-off May 2025 | 3533 California St | interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanicalDetails
interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanical | $100,000 |
| Dec 17, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room.Details
revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room. | $20,000 |
| Dec 6, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing onlyDetails
deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only | $497,168 |
| Nov 13, 2024 | Completed final sign-off Mar 2025 | 331 Powell St | 13th fl - deferred permit for anchorange of fixed and /or mobile shelving units. ref pa 202410243677Details
13th fl - deferred permit for anchorange of fixed and /or mobile shelving units. ref pa 202410243677 | $50,000 |
| Oct 24, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.Details
tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal. | $145,500 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | 2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates.Details
2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates. | $50,000 |
| Aug 15, 2024 | Completed final sign-off May 2025 | 331 Powell St | deferred electrical from pa# 2024-0710-618 includes exterior lighting and controlsDetails
deferred electrical from pa# 2024-0710-618 includes exterior lighting and controls | $19,775 |
| Aug 9, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only.Details
revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only. | |
| Jul 10, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | replace (e) exterior entrance doors & side lights, repair adjacent exterior walls & addition of exterior canopy lighting at (e) canopy. provide power door operator at accessible restroom.Details
replace (e) exterior entrance doors & side lights, repair adjacent exterior walls & addition of exterior canopy lighting at (e) canopy. provide power door operator at accessible restroom. | $120,000 |
| Jun 27, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | 2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.Details
2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. | $960,000 |
| Jun 14, 2024 | Completed final sign-off Jul 2026 | 2350 Geary Bl | fire alarm system migration @ the kaiser(cn31-03)medical office bldg;migrant to (n) equipment, 1 control panel,11 pull stations, 7 modules,75 smoke detectors,15 heat detectors,43 strobes,12 chime/strobes, and 22 chimes.Details
fire alarm system migration @ the kaiser(cn31-03)medical office bldg;migrant to (n) equipment, 1 control panel,11 pull stations, 7 modules,75 smoke detectors,15 heat detectors,43 strobes,12 chime/strobes, and 22 chimes. | $1,345,515 |
| Jun 11, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | 1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.Details
1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers. | $2,236,032 |
| Jun 7, 2024 | Completed final sign-off Mar 2025 | 111 Pine St | tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevationsDetails
tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevations | $308,000 |
| May 31, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | revision to permit 202402075406. revision will be on 1/f and cellar interiorDetails
revision to permit 202402075406. revision will be on 1/f and cellar interior | |
| Feb 7, 2024 | In progress issued Apr 2024 | 560 Mission St | revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.Details
revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices. | $200,000 |
| Feb 7, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.Details
gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. | $2,100,000 |
| Feb 2, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | 1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.Details
1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017. | $120,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i.Details
work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i. | $80,000 |
| Oct 5, 2023 | In progress issued Dec 2023 | 100 California St | switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.Details
switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel. | $190,000 |
| Aug 28, 2023 | In progress issued Nov 2023 | 560 Mission St | 27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical workDetails
27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work | $115,000 |
| Jul 28, 2023 | In progress issued Mar 2024 | 986 Mission St | g/f: interior tenant improvement including new non-load bearing walls, sofit & finishes, replacing light fixtures & modifying switching, adding electrical outlets, add exhaust fan at trash room, panic hardware at existing exit doors.Details
g/f: interior tenant improvement including new non-load bearing walls, sofit & finishes, replacing light fixtures & modifying switching, adding electrical outlets, add exhaust fan at trash room, panic hardware at existing exit doors. | $150,000 |
| Jun 29, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | rev to pa 202006198935 to address new stair landings. exterior work.Details
rev to pa 202006198935 to address new stair landings. exterior work. | |
| Jun 13, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935Details
cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935 | $1,220,734 |
| Jun 13, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935Details
replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935 | |
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 39 Tehama St | remove & replcace in-kind plaza area topping slab 69' 6"x 59' 3".Details
remove & replcace in-kind plaza area topping slab 69' 6"x 59' 3". | $55,000 |
| Nov 1, 2022 | Completed final sign-off May 2023 | 101 California St | deferred submittal of exterior penthouse framing ref pa# 2021-0628-3370Details
deferred submittal of exterior penthouse framing ref pa# 2021-0628-3370 | $174,000 |
| Nov 1, 2022 | Completed final sign-off May 2023 | 101 California St | metal stairs deferred submittal for 202106283370Details
metal stairs deferred submittal for 202106283370 | $152,000 |
| Sep 12, 2022 | Completed final sign-off Dec 2023 | 33 Tehama St | any work that requires building permpit will be submitted under a separate application. fire alarm safety systems damaged by water incident 06/30/2022. speaker strobes, smoke control system, e lighting, g-gen, monitoring, transfer, errcs, 2-way comm, smoke detectors, eposDetails
any work that requires building permpit will be submitted under a separate application. fire alarm safety systems damaged by water incident 06/30/2022. speaker strobes, smoke control system, e lighting, g-gen, monitoring, transfer, errcs, 2-way comm, smoke detectors, epos | |
| Sep 8, 2022 | Expired or cancelled withdrawn Sep 2025 | 50 Main St | to construct a 88-story, 808 dwelling units, type 1-a building.Details
to construct a 88-story, 808 dwelling units, type 1-a building. | $180,239,092 |
| Sep 8, 2022 | Expired or cancelled withdrawn May 2026 | 50 Main St | to demolish existing parking garage. 2-story, 1-basement, type i.Details
to demolish existing parking garage. 2-story, 1-basement, type i. | |
| Sep 6, 2022 | Completed final sign-off Nov 2022 | 100 California St | 1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319.Details
1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319. | $20,000 |
| Sep 6, 2022 | Completed final sign-off May 2023 | 100 California St | 6th fl: elevator lobby & common corridors, includes (n) lighting plan. existing circuits to be revised. incluides title 24 for new lighting. fire alarm submitted separately. ref pa# 202205063724.Details
6th fl: elevator lobby & common corridors, includes (n) lighting plan. existing circuits to be revised. incluides title 24 for new lighting. fire alarm submitted separately. ref pa# 202205063724. | $25,000 |
| Sep 6, 2022 | Completed final sign-off May 2023 | 100 California St | 13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes (n) lighting, also includes (n) mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620.Details
13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes (n) lighting, also includes (n) mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620. | $50,000 |
| Aug 26, 2022 | Completed final sign-off Feb 2024 | 33 Tehama St | to comply with amended notice of violation 202291731 to capture additional water damage occured on 08/10/22. *see 202207188677 for initial nov* remediation and repair of finishes/partitions in: corridors levels: -2 & -1, stairs 2 and associated vestibules levels: 36, amenity spaces level 3 & 35,Details
to comply with amended notice of violation 202291731 to capture additional water damage occured on 08/10/22. *see 202207188677 for initial nov* remediation and repair of finishes/partitions in: corridors levels: -2 & -1, stairs 2 and associated vestibules levels: 36, amenity spaces level 3 & 35, | $1,000,000 |
| Jul 19, 2022 | Completed final sign-off May 2024 | 101 California St | revise scr will comply and match existing smoke control system at 101 california st sf, ca. ref pa# 202006198935.Details
revise scr will comply and match existing smoke control system at 101 california st sf, ca. ref pa# 202006198935. | |
| Jul 18, 2022 | Completed final sign-off Feb 2024 | 33 Tehama St | comply with nov#202291731 dd 06/06/22 repair and replace water damaged systems-electrical elevator, low voltage, internet , phone, cable & security as wel as finishes/rated partitions in elevator lobby levels : -3-35 corridors levels: 1-35 stairs, stair 2 and associated vestibules levels :1-35,Details
comply with nov#202291731 dd 06/06/22 repair and replace water damaged systems-electrical elevator, low voltage, internet , phone, cable & security as wel as finishes/rated partitions in elevator lobby levels : -3-35 corridors levels: 1-35 stairs, stair 2 and associated vestibules levels :1-35, | |
| Jun 28, 2022 | Never finaled issued Aug 2022, no final | 77 Beale St | work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.Details
work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler. | $728,548 |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 215 Market St | interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area.Details
interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area. | $89,500 |
| Jun 7, 2022 | Completed final sign-off May 2023 | 101 California St | defferred submittal: fiber-reinforced ploymer strengthening for pa# 2021 0628 3370.Details
defferred submittal: fiber-reinforced ploymer strengthening for pa# 2021 0628 3370. | $92,922 |
| May 6, 2022 | Completed final sign-off Dec 2022 | 100 California St | 6th floor: building upgrade includes common area corridor- elevator lobby. scope does not include the removal of any structural partitions. all new or revised meps, life saftey work will be by design build and if needed will be submitted seperately.Details
6th floor: building upgrade includes common area corridor- elevator lobby. scope does not include the removal of any structural partitions. all new or revised meps, life saftey work will be by design build and if needed will be submitted seperately. | $95,000 |
| Mar 29, 2022 | Completed final sign-off Oct 2022 | 2225 Folsom St | replacement of damaged bottom chord of 1 bowstring truss (in-kind or better); replacmenet of damaged diagonal member of 1 bowstring truss (in-kind or better); shoring of roof and truss members during construction;Details
replacement of damaged bottom chord of 1 bowstring truss (in-kind or better); replacmenet of damaged diagonal member of 1 bowstring truss (in-kind or better); shoring of roof and truss members during construction; | $107,500 |
| Mar 7, 2022 | Completed final sign-off Nov 2022 | 100 California St | 1/f: building upgrades include new fully accessible g/f restrooms . scope does not include the removal of any structural partitions. all new or revised meps and life safety work/design build if need under separate permits.Details
1/f: building upgrades include new fully accessible g/f restrooms . scope does not include the removal of any structural partitions. all new or revised meps and life safety work/design build if need under separate permits. | $199,000 |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 340 Townsend St | renovation of 2nd generation commerical interior office space. work includes structural reinforing as required by structural drawings. revisions to permit 202107134301 and 202107134269Details
renovation of 2nd generation commerical interior office space. work includes structural reinforing as required by structural drawings. revisions to permit 202107134301 and 202107134269 | $70,000 |
| Feb 15, 2022 | Expired or cancelled withdrawn Sep 2025 | 77 Beale St | renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.Details
renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign. | $105,596,280 |
| Feb 9, 2022 | Completed final sign-off Nov 2022 | 100 California St | 13th flr. t.i. includes demo of non struc partitions and new non struc partitions. all new or revised mep, life safety and sprinkler work will be design build and submitted under sep permits. bldg is fully sprinklered.Details
13th flr. t.i. includes demo of non struc partitions and new non struc partitions. all new or revised mep, life safety and sprinkler work will be design build and submitted under sep permits. bldg is fully sprinklered. | $150,000 |
| Dec 6, 2021 | Completed final sign-off May 2023 | 101 California St | 8th lvel annex space improvements. paving, planting, lighting, and trellis.Details
8th lvel annex space improvements. paving, planting, lighting, and trellis. | $912,467 |
| Oct 22, 2021 | Never finaled issued Jan 2022, no final | 1 California St | 24th fl interior tenant improvement - demo & construction of non-structural partitions, doors, ceilings, electrical, hvac & finishes.Details
24th fl interior tenant improvement - demo & construction of non-structural partitions, doors, ceilings, electrical, hvac & finishes. | $600,000 |
| Oct 22, 2021 | Never finaled issued Jan 2022, no final | 1 California St | 25th fl: interior ti - includes demo & construction of non structural partitions, doors, ceilings, electrical, plumbing, hvac & finishes.Details
25th fl: interior ti - includes demo & construction of non structural partitions, doors, ceilings, electrical, plumbing, hvac & finishes. | $600,000 |
| Oct 15, 2021 | Completed final sign-off Jun 2023 | 101 California St | rev to pa 202006198935 canopy drain gutters amd plumbing drains and plazaDetails
rev to pa 202006198935 canopy drain gutters amd plumbing drains and plaza | |
| Oct 15, 2021 | Completed final sign-off May 2022 | 560 Mission St | 19/f: demolition of non structural partitions, doors, ceilings, lighting millwork and finishes. limited construction of temporary light fixtures. no change in occupancy/use. mep, sprinkler and life safety under separate permit. - sprinkler permit for demo/ceiling removal: 202112144336Details
19/f: demolition of non structural partitions, doors, ceilings, lighting millwork and finishes. limited construction of temporary light fixtures. no change in occupancy/use. mep, sprinkler and life safety under separate permit. - sprinkler permit for demo/ceiling removal: 202112144336 | $117,746 |
| Oct 4, 2021 | Completed final sign-off May 2023 | 101 California St | g/f: composite strengthening to (e) playa area concrete beams. maher n/a.Details
g/f: composite strengthening to (e) playa area concrete beams. maher n/a. | $12,000 |
| Sep 24, 2021 | Never finaled issued Nov 2021, no final | 101 California St | lobby art installation of hanging wires to (e) metal beamsDetails
lobby art installation of hanging wires to (e) metal beams | $3,000 |
| Sep 22, 2021 | Never finaled issued Nov 2021, no final | 560 Mission St | ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.Details
ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep. | $1,500,000 |
| Aug 26, 2021 | Completed final sign-off May 2023 | 101 California St | 8/f: hvac & electrical modifications for new elevator and stairsDetails
8/f: hvac & electrical modifications for new elevator and stairs | $11,000 |
| Aug 23, 2021 | Completed final sign-off May 2023 | 101 California St | modify & replace existing windows washing davits for new window washing eq. modify/replace guardrails at 8th level roof.Details
modify & replace existing windows washing davits for new window washing eq. modify/replace guardrails at 8th level roof. | |
| Jul 19, 2021 | Expired or cancelled cancelled Jul 2024 | 598 Brannan St | temporary excavation. shoring system for the brannan st project. the excavation with cuts up to 25', will be shored using a soil mixed cut off walls w/ tiebacjs on all sides of the excation. refer to 201909060913. 201909060914.Details
temporary excavation. shoring system for the brannan st project. the excavation with cuts up to 25', will be shored using a soil mixed cut off walls w/ tiebacjs on all sides of the excation. refer to 201909060913. 201909060914. | |
| Jul 12, 2021 | Completed final sign-off Sep 2021 | 2180 Harrison St | t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.Details
t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system. | $195,000 |
| Jun 30, 2021 | Never finaled issued Sep 2021, no final | 2270 Folsom St | includes installation of card readers at 1st fl. elevator & 1st fl. stairwell doorDetails
includes installation of card readers at 1st fl. elevator & 1st fl. stairwell door | $50,000 |
| Jun 28, 2021 | Completed final sign-off May 2023 | 101 California St | modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layerDetails
modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layer | $4,669,527 |
| Feb 4, 2021 | Never finaled issued Oct 2021, no final | 30 Otis St | the proposed project is an alteration of the lobby bar previously approved under pa# 2016-11-28-3577 s3 (arch / mep).Details
the proposed project is an alteration of the lobby bar previously approved under pa# 2016-11-28-3577 s3 (arch / mep). | |
| Sep 14, 2020 | Never finaled issued Oct 2020, no final | 598 Brannan St | deferred submittal to pa 201909060913 & 201909060914. pile loading tests for building 1 & 2.Details
deferred submittal to pa 201909060913 & 201909060914. pile loading tests for building 1 & 2. | $183,000 |
| Aug 24, 2020 | Completed final sign-off Oct 2021 | 1600 Owens St | this project is to convert an existing shell space on level 2 into a non-oshpd clinic space. comprised of a pet-ct scan room and related supporting spaces. the scope of work also includes the installation of the pet-ct scanner and associated equipment. interior work only. no exterior work.Details
this project is to convert an existing shell space on level 2 into a non-oshpd clinic space. comprised of a pet-ct scan room and related supporting spaces. the scope of work also includes the installation of the pet-ct scanner and associated equipment. interior work only. no exterior work. | $2,500,000 |
| Aug 24, 2020 | Completed final sign-off Jan 2023 | 1600 Owens St | project area: 2,307sf; this project is to convert an existing shell space on level 2 into a non-oshpd clinic space comprised of a pet-ct scan room, equipment, and related supporting spaces. interior work only. not exterior work.Details
project area: 2,307sf; this project is to convert an existing shell space on level 2 into a non-oshpd clinic space comprised of a pet-ct scan room, equipment, and related supporting spaces. interior work only. not exterior work. | $4,400,000 |
| Jul 10, 2020 | Completed final sign-off Jul 2021 | 2180 Harrison St | pg&e service center ti for conf rm, office, locker rms & 4 break conter, demo/new non-bearing patitions, modification (e) fire sprinkler/alarm system, new flor play lay out, new plumb and electrical, hvac system.Details
pg&e service center ti for conf rm, office, locker rms & 4 break conter, demo/new non-bearing patitions, modification (e) fire sprinkler/alarm system, new flor play lay out, new plumb and electrical, hvac system. | $2,000,000 |
| Jun 19, 2020 | Never finaled issued Jul 2021, no final | 101 California St | improvements to the exterior plaza & interior spaces. exterior renovation: (n)landscaping, water features, fixtures, kiosk, paving, cladding around mech vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop.Details
improvements to the exterior plaza & interior spaces. exterior renovation: (n)landscaping, water features, fixtures, kiosk, paving, cladding around mech vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop. | $31,349,352 |
| May 18, 2020 | Completed final sign-off Jun 2021 | 645 Bryant St | demolition of a type 3 1 story industrialDetails
demolition of a type 3 1 story industrial | $5,000 |
| Mar 10, 2020 | Never finaled issued Nov 2020, no final | 1 Post St | revision to pa 2017-1013-1240 to update overhead coiling door info at room service 104Details
revision to pa 2017-1013-1240 to update overhead coiling door info at room service 104 | |
| Feb 18, 2020 | Never finaled issued Mar 2021, no final | 1 Post St | revision to pa #201710131240 & 201907095381, to update framing & door configuration at elevator lobby north exit. update lighting & security camera locations, door, hardware updates, & updated details for door operator pedestal.card readers are being installed, vif complianceDetails
revision to pa #201710131240 & 201907095381, to update framing & door configuration at elevator lobby north exit. update lighting & security camera locations, door, hardware updates, & updated details for door operator pedestal.card readers are being installed, vif compliance | $45,000 |
| Feb 11, 2020 | Completed final sign-off Jun 2021 | 590 Brannan St | to demolish a 2-story warehouse with office and retail.Details
to demolish a 2-story warehouse with office and retail. | $40,000 |
| Feb 11, 2020 | Never finaled issued Mar 2021, no final | 649 Bryant St | excavation and grading for demo of (e) surface parking lotDetails
excavation and grading for demo of (e) surface parking lot | $10,000 |
| Dec 23, 2019 | Never finaled issued Mar 2021, no final | 98 12th St | interior t.i. for theater & ballet including installation of finishes, furnishing, equiptment & lighting. the project includes mep branching installation tying into the permitted under shell systems & main distribution under pa# 2016-1128-3577.Details
interior t.i. for theater & ballet including installation of finishes, furnishing, equiptment & lighting. the project includes mep branching installation tying into the permitted under shell systems & main distribution under pa# 2016-1128-3577. | |
| Sep 20, 2019 | Completed final sign-off Dec 2019 | 4 Embarcadero Center | revision to pa #201905291924 & 201906183730. as builts for mpe system for 25th fl.Details
revision to pa #201905291924 & 201906183730. as builts for mpe system for 25th fl. | |
| Sep 19, 2019 | Never finaled issued Oct 2019, no final | 555 California St | 30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety systemDetails
30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system | $100,000 |
| Sep 19, 2019 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | 25/f - ste 2500 - rev to pa# 201906183730; eliminate partiton from breakroom and rearrange layout of work area. mep under separate permit. new ceilings. fire alarm & sprinkler under sep permit.Details
25/f - ste 2500 - rev to pa# 201906183730; eliminate partiton from breakroom and rearrange layout of work area. mep under separate permit. new ceilings. fire alarm & sprinkler under sep permit. | $5,000 |