Ybj Construction Services
- Based in
- Fremont
- On San Francisco permits
- Jan 2009 to Apr 2023
- Last 24 months
- 0 permits filed
42 permits since 2000: 30 completed, 12 never finaled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2023 | Completed final sign-off Aug 2023 | 401 Mason St | to comply with: 202294795: access and perform on dry rot of subfloor above the bar location at the green room.Details
to comply with: 202294795: access and perform on dry rot of subfloor above the bar location at the green room. | $35,000 |
| Mar 4, 2020 | Completed final sign-off Mar 2020 | 400 Geary St | revision to 2020-0228-5723 to correct address. floor repair adjacent to walk in to condensation from cooler. repair in kind per sfbc 106a.2Details
revision to 2020-0228-5723 to correct address. floor repair adjacent to walk in to condensation from cooler. repair in kind per sfbc 106a.2 | |
| Feb 28, 2020 | Completed final sign-off Mar 2020 | 401 Geary St | walk in freezer/cooler wall repair and floor (existing). repair in-kind per sfbc 106a.2Details
walk in freezer/cooler wall repair and floor (existing). repair in-kind per sfbc 106a.2 | $3,500 |
| Oct 3, 2019 | Never finaled issued Oct 2019, no final | 1201 Ocean Av | co2 tank - (n) installation and relocation in reference to original remodel permit. ref 201906264445Details
co2 tank - (n) installation and relocation in reference to original remodel permit. ref 201906264445 | |
| Jun 26, 2019 | Completed final sign-off Apr 2020 | 1201 Ocean Av | remodel of dining area and kitchen, (n) restrooms and removal of all (e) ada barriers. (e) facade will be replaced w/ (n) mechanical limited to (n) fan & relocation of registers. electrical limited to (n) lighting in dining area. (n) cooking equipment (n) ansul system f/a, ansul defferralDetails
remodel of dining area and kitchen, (n) restrooms and removal of all (e) ada barriers. (e) facade will be replaced w/ (n) mechanical limited to (n) fan & relocation of registers. electrical limited to (n) lighting in dining area. (n) cooking equipment (n) ansul system f/a, ansul defferral | $750,000 |
| Sep 19, 2018 | Completed final sign-off Dec 2019 | 2370 California St | remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popoutDetails
remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popout | $250,000 |
| Jul 17, 2018 | Never finaled issued Jul 2018, no final | 5411 03rd St | recent interior fire damaged portion of the restaurant playplace. 50% of the joists and roof deck are to be replaced. 1 glulam beam to be replaced. ref 201703091060. no change of scope to original permit.Details
recent interior fire damaged portion of the restaurant playplace. 50% of the joists and roof deck are to be replaced. 1 glulam beam to be replaced. ref 201703091060. no change of scope to original permit. | $50,000 |
| Feb 26, 2018 | Completed final sign-off Apr 2019 | 345 Bay Shore Bl | revision to app#201703030624. changes include minor revisions in storage and dorr swing in restroom. new patio perimeter new menu board at drive thru and new parapet at rear wall. n/a for maher.Details
revision to app#201703030624. changes include minor revisions in storage and dorr swing in restroom. new patio perimeter new menu board at drive thru and new parapet at rear wall. n/a for maher. | |
| Nov 21, 2017 | Completed final sign-off Dec 2018 | 855 Brannan St | t.i. for coffee/tea shop. installation of new interior partitions, finishes, fixtures, furniture, caswork, millwork, equipment. mech difuser and duct installation. elec: new power/data along with lighting throughout. plumbing: new toilets, floor sinks, floor drains, hand sinks, 3 compartment sink,Details
t.i. for coffee/tea shop. installation of new interior partitions, finishes, fixtures, furniture, caswork, millwork, equipment. mech difuser and duct installation. elec: new power/data along with lighting throughout. plumbing: new toilets, floor sinks, floor drains, hand sinks, 3 compartment sink, | $115,000 |
| Mar 31, 2017 | Completed final sign-off Jan 2019 | 272 Ofarrell St | erect projecting, electric, double faced sign.Details
erect projecting, electric, double faced sign. | $1,500 |
| Mar 31, 2017 | Completed final sign-off Jan 2019 | 272 O'farrell St | erect wall, electric, single faced sign.Details
erect wall, electric, single faced sign. | $2,000 |
| Mar 31, 2017 | Completed final sign-off Sep 2018 | 272 O'farrell St | change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred.Details
change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred. | $110,000 |
| Mar 13, 2017 | Completed final sign-off Aug 2018 | 1100 Fillmore St | new exterior facade upgrade, new refresh to dioning area & ceiling ada barrier removal within the bld footprint & siteDetails
new exterior facade upgrade, new refresh to dioning area & ceiling ada barrier removal within the bld footprint & site | $175,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2019 | 5411 03rd St | (n) exteropr facade upgrade. (n) refresh to dining area & ceiling, ada barrier removal within the building footprint & site. n/a ordinance #155-13Details
(n) exteropr facade upgrade. (n) refresh to dining area & ceiling, ada barrier removal within the building footprint & site. n/a ordinance #155-13 | $175,000 |
| Mar 9, 2017 | Completed final sign-off Jan 2019 | 5454 Mission St | new exterior facade upgrade. new refresh to dining area & ceiling ada barrier removal within the bld footprint & siteDetails
new exterior facade upgrade. new refresh to dining area & ceiling ada barrier removal within the bld footprint & site | $175,000 |
| Mar 3, 2017 | Completed final sign-off Apr 2019 | 345 Bay Shore Bl | new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher naDetails
new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher na | $375,000 |
| Jun 23, 2016 | Completed final sign-off Jan 2017 | 302 Potrero Av | facade upgrade, decor upgrade for dining area, ada barrier removal from site & building and demolish (e) trash enclosure and construct new one. maher naDetails
facade upgrade, decor upgrade for dining area, ada barrier removal from site & building and demolish (e) trash enclosure and construct new one. maher na | $300,000 |
| Oct 21, 2015 | Completed final sign-off May 2016 | 235 Front St | erect electric, wall, single-faced, indirect, replacement sign.Details
erect electric, wall, single-faced, indirect, replacement sign. | $5,500 |
| Sep 16, 2015 | Completed final sign-off Apr 2016 | 145 Jefferson St | decore upgrade, ada barrier removal, store front alteration. n/a ordinance #155-13Details
decore upgrade, ada barrier removal, store front alteration. n/a ordinance #155-13 | $190,000 |
| Jul 7, 2015 | Completed final sign-off May 2016 | 235 Front St | decor upgrades, ada removal from dining and restrooms. kitchen upgrade. exterior work under separate permit. n/a for maherDetails
decor upgrades, ada removal from dining and restrooms. kitchen upgrade. exterior work under separate permit. n/a for maher | $300,000 |
| May 14, 2015 | Completed final sign-off May 2016 | 235 Front St | upgrade existing facade. ** maher: compliance with ordinance no# 155-13 not required **Details
upgrade existing facade. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 255 Winston Dr | upgrade existing facades, upgrade existing dining area with new decor, upgrade restrooms to meet ada requirements, minor kitchen updates.Details
upgrade existing facades, upgrade existing dining area with new decor, upgrade restrooms to meet ada requirements, minor kitchen updates. | $150,000 |
| Feb 9, 2015 | Completed final sign-off Apr 2015 | 441 Sutter St | revision to app#201312184521. scope is to relocate kitchen equipment and related mep. add under counter dishwasher and add structural anchorage for freestanding kiosks.Details
revision to app#201312184521. scope is to relocate kitchen equipment and related mep. add under counter dishwasher and add structural anchorage for freestanding kiosks. | $50,000 |
| Dec 23, 2014 | Completed final sign-off Apr 2015 | 441 Sutter St | revision to pa #201409055577. relocate select equpment to basement and reconfigure customer service area including layout. sprinklers, including lighting layout and refrid cool and relocate associated mechanical equipment. fire alarm separate permits.Details
revision to pa #201409055577. relocate select equpment to basement and reconfigure customer service area including layout. sprinklers, including lighting layout and refrid cool and relocate associated mechanical equipment. fire alarm separate permits. | |
| Sep 5, 2014 | Completed final sign-off Apr 2015 | 441 Sutter St | revision to pa# 2013/12/18/4521-r2. revision consisting reducing scope of alteration to 2nd level & securement of access to 2nd level & relocation of roof top hvac equipment.Details
revision to pa# 2013/12/18/4521-r2. revision consisting reducing scope of alteration to 2nd level & securement of access to 2nd level & relocation of roof top hvac equipment. | $6,000 |
| Apr 23, 2014 | Completed final sign-off Mar 2015 | 35 Powell St | interior remodel of extg ground floor restaurant, including upgrading accessibility compliance at customer ordering counter, queue area, seating, new furniture and finishes.Details
interior remodel of extg ground floor restaurant, including upgrading accessibility compliance at customer ordering counter, queue area, seating, new furniture and finishes. | $90,000 |
| Dec 18, 2013 | Completed final sign-off Apr 2015 | 441 Sutter St | t.i of (e) structure consisting of new finishes throughout & upgrading plumbing, mechanical & electrical systems for proposed use & addition of an elevator for accessibility to all levels. existing storefront door to be removed and relocatedDetails
t.i of (e) structure consisting of new finishes throughout & upgrading plumbing, mechanical & electrical systems for proposed use & addition of an elevator for accessibility to all levels. existing storefront door to be removed and relocated | $550,000 |
| Dec 2, 2013 | Never finaled issued Jan 2014, no final | 2805 Mission St | deferred submittal item for pa#2013-04-29-5706. exterior trellis/canopy systens.Details
deferred submittal item for pa#2013-04-29-5706. exterior trellis/canopy systens. | $20,000 |
| Nov 20, 2013 | Never finaled issued Nov 2013, no final | 2805 Mission St | revision to permit # 2013-0429-5706 - structural - detail 9/s2.0 revisedDetails
revision to permit # 2013-0429-5706 - structural - detail 9/s2.0 revised | |
| Nov 15, 2013 | Never finaled issued Nov 2013, no final | 2805 Mission St | revisions to pa#2013-04-29-5706. mechanical. reduced scope of work. (2) new/replaced btu in lieu of original (5) new/replacement, (1) removed.Details
revisions to pa#2013-04-29-5706. mechanical. reduced scope of work. (2) new/replaced btu in lieu of original (5) new/replacement, (1) removed. | |
| Jun 17, 2013 | Completed final sign-off Jan 2014 | 2739 Taylor St | change ownership from burger king to jack in the box, new interior walls on each side of (e) counter. signage under separate permit. dining rm-remove & replace furniture & art work. no work is stated for 2nd floor. utilitize (e) electrical for new equipment. exterior signage under separate permit.Details
change ownership from burger king to jack in the box, new interior walls on each side of (e) counter. signage under separate permit. dining rm-remove & replace furniture & art work. no work is stated for 2nd floor. utilitize (e) electrical for new equipment. exterior signage under separate permit. | $100,000 |
| Apr 29, 2013 | Completed final sign-off Apr 2014 | 2805 Mission St | exterior facade renovation. removal of mansard to be replaced with parapet & overhang, new glazing, modify planters to reduced height, new lighting, entry canopies; interior renovation; new seating layout & decoration, kitchen upgrade, new interior lighting, bathroom renovationDetails
exterior facade renovation. removal of mansard to be replaced with parapet & overhang, new glazing, modify planters to reduced height, new lighting, entry canopies; interior renovation; new seating layout & decoration, kitchen upgrade, new interior lighting, bathroom renovation | $300,000 |
| Feb 28, 2013 | Never finaled issued Mar 2013, no final | 3900 Geary Bl | install electric single faced wall signDetails
install electric single faced wall sign | $1,250 |
| Feb 28, 2013 | Never finaled issued Mar 2013, no final | 3900 Geary Bl | install electric single faced sign above new awningDetails
install electric single faced sign above new awning | $1,250 |
| Feb 28, 2013 | Never finaled issued Mar 2013, no final | 3900 Geary Bl | install electric wall single faced sign above new awningDetails
install electric wall single faced sign above new awning | $1,250 |
| Feb 28, 2013 | Never finaled issued Mar 2013, no final | 3900 Geary Bl | install onecorrugated metal fascia panel on wall - electric wallDetails
install onecorrugated metal fascia panel on wall - electric wall | $200 |
| Feb 28, 2013 | Never finaled issued Mar 2013, no final | 3900 Geary Bl | install one menu board (wall sign) (electric single faced wall sign)Details
install one menu board (wall sign) (electric single faced wall sign) | $1,250 |
| Feb 28, 2013 | Never finaled issued Mar 2013, no final | 3900 Geary Bl | #101 - install three (3) awnings (burger king).Details
#101 - install three (3) awnings (burger king). | $12,380 |
| Dec 8, 2009 | Completed final sign-off Aug 2010 | 680 Mission St | revision to appl #200908265626 -mechanical system from type ii to type i. two hour 3m wrap and suppression system under separate permit.Details
revision to appl #200908265626 -mechanical system from type ii to type i. two hour 3m wrap and suppression system under separate permit. | |
| Aug 26, 2009 | Completed final sign-off Aug 2010 | 680 Mission St | construction of fully accessible restaurant in ground floor commercial space of existing mix-use residential/commercial bldg (high-rise).Details
construction of fully accessible restaurant in ground floor commercial space of existing mix-use residential/commercial bldg (high-rise). | $400,000 |
| Jun 29, 2009 | Never finaled issued Jun 2009, no final | 680 Mission St | demo interior partition walls/ non bearing walls in compliance with ab 017 exception to requirements for disabled access to vacant spaceDetails
demo interior partition walls/ non bearing walls in compliance with ab 017 exception to requirements for disabled access to vacant space | $4,000 |
| Jan 9, 2009 | Completed final sign-off Feb 2009 | 2016 Fillmore St | install new class ii kitchen hood & exhaust system & associated make-up air system including new roof mounted exhaust & supply fansDetails
install new class ii kitchen hood & exhaust system & associated make-up air system including new roof mounted exhaust & supply fans | $5,000 |