Shrader & Martinez Const. Inc
- Based in
- Sedona
- On San Francisco permits
- Oct 2000 to Sep 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 8 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 888 Tennessee St | no change in use. minor demolition of extg, cosmetic upgrades and minor upgrades to bring 1st floor restroom to compliance with current code. n/a for maherDetails
no change in use. minor demolition of extg, cosmetic upgrades and minor upgrades to bring 1st floor restroom to compliance with current code. n/a for maher | $5,000 |
| Sep 1, 2017 | Never finaled issued Oct 2017, no final | 888 Tennessee St | installation of metal shelving. typical unit is 18" or 24" deep x 48" wide x 99" tall. installation of pallet rack. 8' tall and 20' tall. n/a for maherDetails
installation of metal shelving. typical unit is 18" or 24" deep x 48" wide x 99" tall. installation of pallet rack. 8' tall and 20' tall. n/a for maher | $12,000 |
| Aug 2, 2017 | Completed final sign-off Oct 2017 | 888 Tennessee St | install new 19'x15' walk in cooler. n/a ordinance #155-13Details
install new 19'x15' walk in cooler. n/a ordinance #155-13 | $10,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 888 Tennessee St | revisions to pa 2015-0825-5222. minor revision to restroom #104. maher naDetails
revisions to pa 2015-0825-5222. minor revision to restroom #104. maher na | |
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 888 Tennessee St | 1st floor: ti- some light demo work of (e), cosmetic upgrades, and minor upgrades to bring restrooms to compliance with current code. per planning code 890.54(c) & 843.84. maher naDetails
1st floor: ti- some light demo work of (e), cosmetic upgrades, and minor upgrades to bring restrooms to compliance with current code. per planning code 890.54(c) & 843.84. maher na | $100,000 |
| Aug 19, 2015 | Expired or cancelled withdrawn Oct 2015 | 888 Tennessee St | change use from a printing shop to an e-commerce warehouse. t.i. work include somelight demolition of existing and cosmetic upgrades, upgrade first floor restrooms to compliance with current code. maher n/a.Details
change use from a printing shop to an e-commerce warehouse. t.i. work include somelight demolition of existing and cosmetic upgrades, upgrade first floor restrooms to compliance with current code. maher n/a. | $100,000 |
| Jul 2, 2010 | Never finaled issued Jul 2010, no final | 890 Market St | 2nd floor-demolition of (e) cash wrap & 3 light fixtures. install light track fixtures & floor infillDetails
2nd floor-demolition of (e) cash wrap & 3 light fixtures. install light track fixtures & floor infill | $15,000 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 865 Market St | revision to 200803126902: add new 1 hr fire rated wall and door at back mall hallway. relocate existing transformer to alcove above door at rear hall and bath.add 2x6 steel stud to strengthen platform. new light on emergency circuitDetails
revision to 200803126902: add new 1 hr fire rated wall and door at back mall hallway. relocate existing transformer to alcove above door at rear hall and bath.add 2x6 steel stud to strengthen platform. new light on emergency circuit | $5,000 |
| Apr 16, 2007 | Completed final sign-off Jul 2008 | 126 Post St | change scope of work, was to move exist roof top mech units,patch roof then build new steel frame support structural &place existing units back to orig location on new support structure.this was approv by bd 12/6/06.install new support for hvac. rev to 200507198062.Details
change scope of work, was to move exist roof top mech units,patch roof then build new steel frame support structural &place existing units back to orig location on new support structure.this was approv by bd 12/6/06.install new support for hvac. rev to 200507198062. | $50,000 |
| Feb 7, 2007 | Completed final sign-off Apr 2007 | 301 Sutter St | removal of awnings. repalce glass. remove transom. repaint exterior.Details
removal of awnings. repalce glass. remove transom. repaint exterior. | $250,000 |
| Oct 30, 2006 | Completed final sign-off Apr 2007 | 301 Sutter St | ground floor-demo (e) fixtures, finishes & partitions. construct new partitions, floor finishes, display fixtures. basement-demo (e) fixtures & toilet room. install new storage fixtures, construct new toilety room, (e) partition repair. install new handrails at (e) stair. mei under seperate permit.Details
ground floor-demo (e) fixtures, finishes & partitions. construct new partitions, floor finishes, display fixtures. basement-demo (e) fixtures & toilet room. install new storage fixtures, construct new toilety room, (e) partition repair. install new handrails at (e) stair. mei under seperate permit. | $90,000 |
| Dec 21, 2004 | Never finaled issued Mar 2005, no final | 2 Embarcadero Center | interior tenant alteration, new store front facade, new partitions, new ceiling & lights,new ductingDetails
interior tenant alteration, new store front facade, new partitions, new ceiling & lights,new ducting | $65,750 |
| Dec 11, 2003 | Completed final sign-off Apr 2004 | 3251 20th Av | ti remodel of retail store. ceiling bathroom. partitions doors. minor mechanical. electrical & plumbDetails
ti remodel of retail store. ceiling bathroom. partitions doors. minor mechanical. electrical & plumb | $177,415 |
| Dec 11, 2003 | Completed final sign-off May 2004 | 3251 20th Av | t.i emodel of (e) retail space @ mall. full bathrms. sales & non sales area.partitions doors, ceiliDetails
t.i emodel of (e) retail space @ mall. full bathrms. sales & non sales area.partitions doors, ceili | $281,940 |
| Oct 18, 2000 | Expired or cancelled expired Nov 2001 | 1559 Sloat Bl | one stop, commercial tenant improvementDetails
one stop, commercial tenant improvement | $148,652 |