Dome Construction Corp
- Based in
- So. San Francisco
- On San Francisco permits
- Aug 2003 to Apr 2026
- Last 24 months
- 20 permits filed
836 permits since 2000: 663 completed, 8 in progress, 95 never finaled, 70 expired or cancelled.
Of the 95 never-finaled permits, 3 are 3 to 5 years old, 43 are 5 to 10 years old, 49 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 836.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 595 Market St | 22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844Details
22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844 | |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 595 Market St | 20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850Details
20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850 | |
| Apr 13, 2026 | In progress issued Jun 2026 | 1800 Owens St | floor 4 to 7: upgrading the finishes to existing elevator lobbies. 1st floor: replacing floor finished and installing new shower glass doors in existing restrooms. for general building accessible upgrades. ref#2202406255203Details
floor 4 to 7: upgrading the finishes to existing elevator lobbies. 1st floor: replacing floor finished and installing new shower glass doors in existing restrooms. for general building accessible upgrades. ref#2202406255203 | $300,000 |
| Apr 3, 2026 | Completed final sign-off Jul 2026 | 595 Market St | revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931Details
revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931 | |
| Apr 3, 2026 | Completed final sign-off Jul 2026 | 595 Market St | revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilingsDetails
revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings | |
| Apr 1, 2026 | Completed final sign-off Jun 2026 | 595 Market St | 12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039Details
12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039 | $200,000 |
| Mar 16, 2026 | In progress issued Jul 2026 | 1800 Owens St | sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity.Details
sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity. | $255,000 |
| Feb 26, 2026 | Completed final sign-off Jul 2026 | 595 Market St | 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferredDetails
20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred | $1,168,299 |
| Feb 26, 2026 | Completed final sign-off Jul 2026 | 595 Market St | 22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawingDetails
22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing | $1,097,019 |
| Jan 28, 2026 | In progress issued Feb 2026 | 1 Warriors Wy | revision to pa#: 202506058032; blue office library modifications enclosed desk areas to make them into phone rooms, updated egress, construction, lighting locations, power locations, finishes.Details
revision to pa#: 202506058032; blue office library modifications enclosed desk areas to make them into phone rooms, updated egress, construction, lighting locations, power locations, finishes. | |
| Dec 17, 2025 | Completed final sign-off Mar 2026 | 595 Market St | 12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work.Details
12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work. | $700,000 |
| Dec 17, 2025 | Completed final sign-off Mar 2026 | 595 Market St | 12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permitDetails
12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permit | $350,000 |
| Dec 17, 2025 | Completed final sign-off Mar 2026 | 595 Market St | 13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work.Details
13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work. | $630,000 |
| Oct 3, 2025 | In progress issued May 2026 | 1800 Owens St | 1st fl lobby renovations in sectors 2 and 4.Details
1st fl lobby renovations in sectors 2 and 4. | $1,612,328 |
| Jul 9, 2025 | In progress issued Sep 2025 | 750 Florida St | new pg&e electrical service upgrade to the (e) senior dog rescue with new underground transformer fault in the public sidewalk and onsine design build electrical service equipmentDetails
new pg&e electrical service upgrade to the (e) senior dog rescue with new underground transformer fault in the public sidewalk and onsine design build electrical service equipment | $500,000 |
| Jun 5, 2025 | In progress issued Nov 2025 | 1 Warriors Wy | level 100 (blue) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occupancyDetails
level 100 (blue) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occupancy | $1,070,000 |
| Feb 19, 2025 | Completed final sign-off Nov 2025 | 2 Bryant St | 1st/f interior t.i. with demo of non bearing partition, new ceiling, lighting, new finishes. upgrade with meps.Details
1st/f interior t.i. with demo of non bearing partition, new ceiling, lighting, new finishes. upgrade with meps. | $1,100,000 |
| Nov 6, 2024 | Completed final sign-off Feb 2025 | 1800 Owens St | evacuation map signage for the 6th and 7th flDetails
evacuation map signage for the 6th and 7th fl | |
| Oct 25, 2024 | Completed final sign-off Feb 2025 | 1800 Owens St | rev 202212128137- clarify lab sink counter heightDetails
rev 202212128137- clarify lab sink counter height | |
| Oct 16, 2024 | In progress issued Mar 2025 | 600 California St | 2/f & 3/f: relocate (e) pre-fabricated telephone booths. install seismic strapping.Details
2/f & 3/f: relocate (e) pre-fabricated telephone booths. install seismic strapping. | $40,000 |
| Jul 10, 2024 | Completed final sign-off Jul 2025 | 1800 Owens St | rev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancyDetails
rev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancy | |
| Apr 3, 2024 | In progress issued Jun 2024 | 333 Bush St | 4/f: construction of (3) new phone rooms in existing office. mechanical, electrical, life safety, and sprinkler will be separate permit. no change to (e) occupancy or egress. path of travel approved under pa 202308305609. restrooms approved under pa 202002144567Details
4/f: construction of (3) new phone rooms in existing office. mechanical, electrical, life safety, and sprinkler will be separate permit. no change to (e) occupancy or egress. path of travel approved under pa 202308305609. restrooms approved under pa 202002144567 | $35,000 |
| Mar 29, 2024 | Completed final sign-off Jan 2025 | 750 Florida St | rev to pa# 2022-0607-5743 add exterior ships ladder for access to elevator machine room penthouse as required by california state elevator unit. submitted as local equivalency for roof access stair per ab-005. work includes architectural,structural & lighting modifications.Details
rev to pa# 2022-0607-5743 add exterior ships ladder for access to elevator machine room penthouse as required by california state elevator unit. submitted as local equivalency for roof access stair per ab-005. work includes architectural,structural & lighting modifications. | $50,000 |
| Mar 28, 2024 | Completed final sign-off Jan 2025 | 750 Florida St | rev to pa# 2022-0607-5743 to (1) omit emergency back up power to elevator (2) modify electrical systems for solar design by new venoder prime electrice, (3) chang fire rating of battery backup room b106 incidental use to be 2hr. work includes architectural and electrical modifications solar deferredDetails
rev to pa# 2022-0607-5743 to (1) omit emergency back up power to elevator (2) modify electrical systems for solar design by new venoder prime electrice, (3) chang fire rating of battery backup room b106 incidental use to be 2hr. work includes architectural and electrical modifications solar deferred | |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 2525 03rd St | construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external workDetails
construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external work | $75,000 |
| Mar 6, 2024 | Completed final sign-off Apr 2024 | 1800 Owens St | evacuation maps for 202207188717Details
evacuation maps for 202207188717 | |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 Vicente St | safety retrofit of open interior stairways at williams cottage in the form of aluminum storefront with fixed tempered glass panelsDetails
safety retrofit of open interior stairways at williams cottage in the form of aluminum storefront with fixed tempered glass panels | $44,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 Vicente St | safety retrofit of open interior stairways at stow cottage in the form of aluminum storefront with fixed tempered glass panelsDetails
safety retrofit of open interior stairways at stow cottage in the form of aluminum storefront with fixed tempered glass panels | $50,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 Vicente St | safety retrofit of open interior stairways at halleck cottage in the form of aluminum storefront with fixed tempered glass panelsDetails
safety retrofit of open interior stairways at halleck cottage in the form of aluminum storefront with fixed tempered glass panels | $50,000 |
| Sep 14, 2023 | Completed final sign-off Aug 2024 | 1800 Owens St | revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5Details
revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5 | |
| Jun 16, 2023 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | shop drawings and details for interior metal platform and stairway for pa# 202306099728 & 20220523388Details
shop drawings and details for interior metal platform and stairway for pa# 202306099728 & 20220523388 | |
| Jun 9, 2023 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | revision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep.Details
revision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep. | $150,000 |
| Jun 6, 2023 | Completed final sign-off Aug 2023 | 3625 24th St | voluntary structural upgrades. patching affected finishes and ada upgrades at main entry.Details
voluntary structural upgrades. patching affected finishes and ada upgrades at main entry. | $65,000 |
| May 5, 2023 | Completed final sign-off Oct 2023 | 350 Parnassus Av | revison to permit# 2022-1116-6678. remove non-bearing wall, reduction of scopeDetails
revison to permit# 2022-1116-6678. remove non-bearing wall, reduction of scope | |
| Apr 11, 2023 | Completed final sign-off Aug 2024 | 350 Parnassus Av | mep work for 202212087889. rooftop mechanical equipment added with ductwork to floors below.Details
mep work for 202212087889. rooftop mechanical equipment added with ductwork to floors below. | $756,000 |
| Mar 21, 2023 | Completed final sign-off Jun 2023 | 750 Florida St | structural only, beam shear strengthening using fiber polymer reinforcement fir (e) 2nd level concrete beams to support e & n structural loads per 202204061682. deferred sprinklers & alarmsDetails
structural only, beam shear strengthening using fiber polymer reinforcement fir (e) 2nd level concrete beams to support e & n structural loads per 202204061682. deferred sprinklers & alarms | $25,000 |
| Mar 2, 2023 | Completed final sign-off Oct 2023 | 350 Parnassus Av | mechanical work (mep) for 3rd fl. ref pa# 2022-1205-7671Details
mechanical work (mep) for 3rd fl. ref pa# 2022-1205-7671 | $360,000 |
| Mar 2, 2023 | Completed final sign-off Oct 2023 | 350 Parnassus Av | mechanical work (mep) for 4th fl. ref pa# 2022-1116-6678Details
mechanical work (mep) for 4th fl. ref pa# 2022-1116-6678 | $360,000 |
| Dec 12, 2022 | Completed final sign-off Jul 2025 | 1800 Owens St | sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.Details
sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements. | $5,750,000 |
| Dec 8, 2022 | Completed final sign-off Aug 2024 | 350 Parnassus Av | building infrastructure work only. rooftop mechanical equipment and duct runs to floors below via both fire-rated stairwells top to bottom for voluntary stair pressurization. not visible not historical. mep/fire life safety under sep permits.Details
building infrastructure work only. rooftop mechanical equipment and duct runs to floors below via both fire-rated stairwells top to bottom for voluntary stair pressurization. not visible not historical. mep/fire life safety under sep permits. | $165,000 |
| Dec 5, 2022 | Completed final sign-off Nov 2023 | 350 Parnassus Av | revision to bpa#202202117832 3/f, new interior, nonbearing partitions, new kitchenette, new restroomsDetails
revision to bpa#202202117832 3/f, new interior, nonbearing partitions, new kitchenette, new restrooms | $85,800 |
| Nov 30, 2022 | Completed final sign-off Dec 2022 | 555 Buckingham Wy | revision to permit 202107063809. restroom conversion to storage room #112, decreasing in cost.Details
revision to permit 202107063809. restroom conversion to storage room #112, decreasing in cost. | |
| Nov 16, 2022 | Completed final sign-off Dec 2023 | 350 Parnassus Av | interior work only: 4th floor demolition of non-bearing partition walls, adding new non-bearing walls and new kitchenette and restrooms.Details
interior work only: 4th floor demolition of non-bearing partition walls, adding new non-bearing walls and new kitchenette and restrooms. | $135,125 |
| Aug 1, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.Details
tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements. | $6,000,000 |
| Jul 25, 2022 | Completed final sign-off Mar 2024 | 1800 Owens St | selective demo in preparation for t.i of the 4-7th floor in sector 1 of an (e) 12-story bldg. no structural demo. to comply with ab-017.Details
selective demo in preparation for t.i of the 4-7th floor in sector 1 of an (e) 12-story bldg. no structural demo. to comply with ab-017. | $125,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | level 6-7: addition of shafts and duct riser only in sector 1 of building.Details
level 6-7: addition of shafts and duct riser only in sector 1 of building. | $250,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | level 4-5: addition of shafts and duct riser only in sector 1 of building.Details
level 4-5: addition of shafts and duct riser only in sector 1 of building. | $240,000 |
| Jul 1, 2022 | Completed final sign-off May 2023 | 2525 03rd St | mechanical, electrical, and plumbing work for approved pa# 202205063728.Details
mechanical, electrical, and plumbing work for approved pa# 202205063728. | $750,000 |
| Jun 30, 2022 | Completed final sign-off Jan 2025 | 750 Florida St | alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes **Details
alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes ** | $4,800,000 |
| May 6, 2022 | Completed final sign-off May 2023 | 2525 03rd St | renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.Details
renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work. | $3,242,000 |
| May 2, 2022 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | tenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330Details
tenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330 | $3,315,697 |
| Apr 27, 2022 | Expired or cancelled cancelled Jan 2026 | 2505 03rd St | interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep workDetails
interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep work | $3,242 |
| Apr 6, 2022 | Completed final sign-off Jan 2025 | 750 Florida St | interior only sow:core and shell seismic/strl improvements. accessibility upgrades deferred per ab-017. tenant improvements and change of use under separate application bpa#2022-0607-5743. deferred:m/e/p, fire protection, life safety & frp reinforcement. building fully fire sprinklered per nfpa-13.Details
interior only sow:core and shell seismic/strl improvements. accessibility upgrades deferred per ab-017. tenant improvements and change of use under separate application bpa#2022-0607-5743. deferred:m/e/p, fire protection, life safety & frp reinforcement. building fully fire sprinklered per nfpa-13. | $600,000 |
| Mar 28, 2022 | Completed final sign-off Mar 2023 | 750 Florida St | exploratory investigation and selective demo of (e) finishes, lighting, plumbing and heating prior to interior renovation. no structural or egress modifications in the scope. no ceiling workDetails
exploratory investigation and selective demo of (e) finishes, lighting, plumbing and heating prior to interior renovation. no structural or egress modifications in the scope. no ceiling work | $50,000 |
| Feb 11, 2022 | Expired or cancelled expired Nov 2023 | 350 Parnassus Av | 3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017.Details
3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017. | $49,000 |
| Jan 31, 2022 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | mechanical & electrical work for approved permit 202112073858Details
mechanical & electrical work for approved permit 202112073858 | |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 3 Embarcadero Center | administrative permit. obtaining a fire assemble permit. no work to be done on this permitDetails
administrative permit. obtaining a fire assemble permit. no work to be done on this permit | |
| Jan 25, 2022 | Never finaled issued Mar 2022, no final | 1100 Van Ness Av | revision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. revise plumbing to co2 manifold in storage room + drops in tissue culture lab. rev to een & cda.Details
revision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. revise plumbing to co2 manifold in storage room + drops in tissue culture lab. rev to een & cda. | |
| Dec 7, 2021 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | add a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening.Details
add a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening. | $422,726 |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 222 02nd St | (floors 5,9,13): revision for dph review only for reference permit 202110190713Details
(floors 5,9,13): revision for dph review only for reference permit 202110190713 | |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 222 02nd St | (floors: 7,15): revision for dph review only for reference permit 20210806539Details
(floors: 7,15): revision for dph review only for reference permit 20210806539 | |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 222 02nd St | 11/f: revision for dph review only for reference permit 202108176544Details
11/f: revision for dph review only for reference permit 202108176544 | |
| Nov 30, 2021 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | change of use from commercial kitchen "catering" to "food development laboratory" to support research into food texture and flavor. no work to be done under this permit. ref t.i permit 201508043322.Details
change of use from commercial kitchen "catering" to "food development laboratory" to support research into food texture and flavor. no work to be done under this permit. ref t.i permit 201508043322. | |
| Oct 19, 2021 | Never finaled issued Oct 2021, no final | 222 02nd St | flrs 5,9,13: revision to permit 202106182800. modifiy floor plans in mother's rooms to accomidate deisgn conflictDetails
flrs 5,9,13: revision to permit 202106182800. modifiy floor plans in mother's rooms to accomidate deisgn conflict | |
| Oct 18, 2021 | Completed final sign-off Jun 2022 | 1155 Bryant St | revision to app#202110140490 structural review only for sump pump and ac unit with mechanical curb detail added to roof.Details
revision to app#202110140490 structural review only for sump pump and ac unit with mechanical curb detail added to roof. | $45,000 |
| Oct 14, 2021 | Completed final sign-off Jun 2022 | 1155 Bryant St | interior work only: renovation @ 1st and 3rd fl. adding a few non bearing walls, mep under separate permit. fire alarm/sprinklers under sep permits, if applic.Details
interior work only: renovation @ 1st and 3rd fl. adding a few non bearing walls, mep under separate permit. fire alarm/sprinklers under sep permits, if applic. | $225,000 |
| Sep 16, 2021 | Completed final sign-off Nov 2023 | 685 Market St | t.i. of the extg space on the ground floor of 685 market. this consists of nw mep systems and finishes for 2 nw bars & a liquor store. nw wood flooring, wall paneling, ceilings, metal hand rails, millwork concrete infill & new restauarant.Details
t.i. of the extg space on the ground floor of 685 market. this consists of nw mep systems and finishes for 2 nw bars & a liquor store. nw wood flooring, wall paneling, ceilings, metal hand rails, millwork concrete infill & new restauarant. | $2,300,000 |
| Sep 1, 2021 | Completed final sign-off Dec 2021 | 3 Embarcadero Center | restroom upgrades, alter 1 toilet facility. mep deferred.Details
restroom upgrades, alter 1 toilet facility. mep deferred. | $172,418 |
| Aug 26, 2021 | Expired or cancelled withdrawn Oct 2021 | 1155 Bryant St | renovate prototyping space, lab space, food research lab space & related prototyping. work at 1/f & 3/f. 2/f (e) to remain. special equip installation interface details are required for this project. account furnished equip, e.g. lab benchwork & furnishings. special equip rm, wash equip, autoclaves,Details
renovate prototyping space, lab space, food research lab space & related prototyping. work at 1/f & 3/f. 2/f (e) to remain. special equip installation interface details are required for this project. account furnished equip, e.g. lab benchwork & furnishings. special equip rm, wash equip, autoclaves, | $2,669,004 |
| Aug 17, 2021 | Never finaled issued Sep 2021, no final | 222 02nd St | 11th floor break room and conference room improvement, finishes, non rated partitions ceiling assembly and light fixtures,mep under sep permit.Details
11th floor break room and conference room improvement, finishes, non rated partitions ceiling assembly and light fixtures,mep under sep permit. | $250,000 |
| Aug 9, 2021 | Completed final sign-off Sep 2022 | 360 Spear St | mep for pa 2021 0112 2527Details
mep for pa 2021 0112 2527 | |
| Aug 6, 2021 | Never finaled issued Sep 2021, no final | 222 02nd St | floor 7th and 15th only. refresh work to wellness and break room. improvements to non-rated partitions, finishes, ceiling assembly, and lighting fixtures mep under seperate permit.Details
floor 7th and 15th only. refresh work to wellness and break room. improvements to non-rated partitions, finishes, ceiling assembly, and lighting fixtures mep under seperate permit. | $500,000 |
| Jul 7, 2021 | Completed final sign-off Sep 2021 | 555 Buckingham Wy | soft demo of partitions ceiling for ti work under pa# 202107063809. per ab-017.Details
soft demo of partitions ceiling for ti work under pa# 202107063809. per ab-017. | $48,000 |
| Jul 6, 2021 | Completed final sign-off Dec 2022 | 555 Buckingham Wy | full floor ti - new partitions, ceiling, lighting, mep new finishes and break roomDetails
full floor ti - new partitions, ceiling, lighting, mep new finishes and break room | $935,287 |
| Jun 18, 2021 | Never finaled issued Jul 2021, no final | 222 02nd St | 5th, 9th, 13th fl: refresh work for mothers rm/micro kitchen/breakroom mostly finishes. new non-rated partitions. mep under separate permit. ref to pa 201806010758 (9th fl) & 201804176543 (13th fl). fire alarm/sprinklers under sep permits.Details
5th, 9th, 13th fl: refresh work for mothers rm/micro kitchen/breakroom mostly finishes. new non-rated partitions. mep under separate permit. ref to pa 201806010758 (9th fl) & 201804176543 (13th fl). fire alarm/sprinklers under sep permits. | $650,000 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 3 Embarcadero Center | suite r3112: revision to bpa#202012161174. remove casework & coffee shtutles on sales floor. add new casework, bean to cup & ice machine at sales floor. revise espresso machine to be relocated to new casework, remove work tables, coffee brewer & shelving in warming pantryDetails
suite r3112: revision to bpa#202012161174. remove casework & coffee shtutles on sales floor. add new casework, bean to cup & ice machine at sales floor. revise espresso machine to be relocated to new casework, remove work tables, coffee brewer & shelving in warming pantry | |
| Jun 2, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | floors 36/37/38: rev to pa201806121688 & 202002184644 - (n) door release at doors with card readers. new ada compliant sliding door levers. maher n/aDetails
floors 36/37/38: rev to pa201806121688 & 202002184644 - (n) door release at doors with card readers. new ada compliant sliding door levers. maher n/a | $1,000 |
| May 26, 2021 | Never finaled issued Jun 2021, no final | 1100 Van Ness Av | record set-sffd: only for review of previously approved drawings which were incorrectly n/a'd by sffd. this is a record set to document sffd review & approval of the t.i. submittal drawings. ref. t.i. #2020-0825-2611Details
record set-sffd: only for review of previously approved drawings which were incorrectly n/a'd by sffd. this is a record set to document sffd review & approval of the t.i. submittal drawings. ref. t.i. #2020-0825-2611 | |
| May 11, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered.Details
adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered. | $15,000 |
| May 10, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered.Details
adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered. | |
| Apr 27, 2021 | Completed final sign-off Nov 2021 | 2101 Mission St | ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes.Details
ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes. | $636,000 |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit application(s): 201805088541; 201811014759; 201811014753.Details
to obtain final inspection for work approved under permit application(s): 201805088541; 201811014759; 201811014753. | $15,600 |
| Apr 14, 2021 | Completed final sign-off Apr 2022 | 2101 Mission St | suite #304: non-structural interior only demolition per ab-017, area to remain vacant until all accessibility features have been restored.Details
suite #304: non-structural interior only demolition per ab-017, area to remain vacant until all accessibility features have been restored. | $15,000 |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit application# 201910215030: 201909272893.Details
to obtain final inspection for work approved under permit application# 201910215030: 201909272893. | |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit application # 201808288554: 201712277416.Details
to obtain final inspection for work approved under permit application # 201808288554: 201712277416. | $1,000 |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit application(s): 201811014758: 201802090939: 201804247247.Details
to obtain final inspection for work approved under permit application(s): 201811014758: 201802090939: 201804247247. | |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit application(s): 201808288555: 201801088085: 201712277415.Details
to obtain final inspection for work approved under permit application(s): 201808288555: 201801088085: 201712277415. | $1,000 |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit application# 201801199077.Details
to obtain final inspection for work approved under permit application# 201801199077. | $30,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | to obtain final inspection for work approved under permit no(s): 201808288551: 201805088538: 201802090935: all work is completed.Details
to obtain final inspection for work approved under permit no(s): 201808288551: 201805088538: 201802090935: all work is completed. | $1,000 |
| Mar 25, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | 37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a.Details
37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a. | |
| Mar 11, 2021 | Completed final sign-off Oct 2022 | 650 California St | demo of existing interconnecting stairway.infill of slab at previous stair opening. light finishDetails
demo of existing interconnecting stairway.infill of slab at previous stair opening. light finish | $200,000 |
| Jan 13, 2021 | Completed final sign-off Apr 2021 | 222 02nd St | replace 3 wshps, like for like.Details
replace 3 wshps, like for like. | $100,000 |
| Jan 12, 2021 | Completed final sign-off Sep 2022 | 360 Spear St | priority processing per ab-004. t.i. non-structural demo, new interior non-loading bearing partitions, new doors, and new ceilings. new elect,plumbing, mech work to be tie into existing building utilitie. new interior finishes and millwork.Details
priority processing per ab-004. t.i. non-structural demo, new interior non-loading bearing partitions, new doors, and new ceilings. new elect,plumbing, mech work to be tie into existing building utilitie. new interior finishes and millwork. | $3,131,492 |
| Dec 18, 2020 | Completed final sign-off Sep 2021 | 415 Mission St | revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation.Details
revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation. | |
| Dec 16, 2020 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area.Details
suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area. | $150,000 |
| Nov 23, 2020 | Expired or cancelled cancelled Jul 2023 | 475 Sansome St | determine occ load for assembly space. fire review only, administrative permit only for occupant load. revision to: 2020-0110-1681.Details
determine occ load for assembly space. fire review only, administrative permit only for occupant load. revision to: 2020-0110-1681. | |
| Nov 20, 2020 | Completed final sign-off Mar 2021 | 333 Bush St | 4th fl: demolition of non-structural elements including 1 exterior glazing panel & addition of new swing door & sidelight for acccess to terrace.Details
4th fl: demolition of non-structural elements including 1 exterior glazing panel & addition of new swing door & sidelight for acccess to terrace. | $35,000 |
| Nov 6, 2020 | Completed final sign-off Mar 2021 | 333 Bush St | 4/f: deffered mep for 202002144567. maher n/a.Details
4/f: deffered mep for 202002144567. maher n/a. | |
| Sep 30, 2020 | Expired or cancelled cancelled Nov 2024 | 415 Mission St | rev to pa# 201806121688 - partial demo of interior partitions, installation of new partitions new finishes throughout, paint and floor coverings installation of card readers at various locations, changes in egress path, mech rewiring deffusers and addition of transfer grills, mech e fixturesDetails
rev to pa# 201806121688 - partial demo of interior partitions, installation of new partitions new finishes throughout, paint and floor coverings installation of card readers at various locations, changes in egress path, mech rewiring deffusers and addition of transfer grills, mech e fixtures | |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 211 Main St | 16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a.Details
16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a. | $2,597,000 |