Peacock Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2015
- Last 24 months
- 0 permits filed
890 permits since 2000: 763 completed, 60 never finaled, 67 expired or cancelled.
Of the 60 never-finaled permits, 60 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 890.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2015 | Completed final sign-off Sep 2016 | 221 Main St | 5th flr: t.i. includes demolition of non load bearing partitions & door assemblies, new partitions millwork, finishes new ceiling. mep & fire life safety under separate permit. maher n/aDetails
5th flr: t.i. includes demolition of non load bearing partitions & door assemblies, new partitions millwork, finishes new ceiling. mep & fire life safety under separate permit. maher n/a | $890,000 |
| Nov 19, 2015 | Completed final sign-off Sep 2016 | 221 Main St | 14/f: interior non structural demo. new partitions, millwork, finishes, ceiling. maher not req. ref 201512114898Details
14/f: interior non structural demo. new partitions, millwork, finishes, ceiling. maher not req. ref 201512114898 | $405,000 |
| Jun 27, 2014 | Completed final sign-off Jun 2015 | 2559 Van Ness Av | work to convert new space to work out gym includes new ada showers, restrooms, mepDetails
work to convert new space to work out gym includes new ada showers, restrooms, mep | $630,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 10 Jackson St | removal of double entry doors and perimiter glazing and swap locations, remove perimiter upper glazing panels, replace with panels to match ajacent lower panels. rev. to pa#201405296964. n/a ordinance #155-13.Details
removal of double entry doors and perimiter glazing and swap locations, remove perimiter upper glazing panels, replace with panels to match ajacent lower panels. rev. to pa#201405296964. n/a ordinance #155-13. | $12,500 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 450 Sansome St | title 24 electrical for 201406259497Details
title 24 electrical for 201406259497 | $20,000 |
| Jun 26, 2014 | Completed final sign-off Jan 2015 | 731 Market St | m.e.p. for pa#201406057611Details
m.e.p. for pa#201406057611 | $225,000 |
| Jun 25, 2014 | Completed final sign-off Sep 2014 | 450 Sansome St | demo selected non structural partitions, construct new non structural partitions, new millwork. sprinkler, lifesafety, mep under separate permit maher n/aDetails
demo selected non structural partitions, construct new non structural partitions, new millwork. sprinkler, lifesafety, mep under separate permit maher n/a | $168,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 720 Market St | selective demo and construction of non-structural partitions, new ceiling grid, stairs and relocate light fixtures. mep, sprinkler and life safety-under separate permit.Details
selective demo and construction of non-structural partitions, new ceiling grid, stairs and relocate light fixtures. mep, sprinkler and life safety-under separate permit. | $51,500 |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 450 Sansome St | demo of selected non-structural partitions, millwork, ceiling tile. new compliant millwork, ceiling tile, lights and carpet. mep, fire sprinkler and life safety - under separate permit. n/a ordinance #155-13.Details
demo of selected non-structural partitions, millwork, ceiling tile. new compliant millwork, ceiling tile, lights and carpet. mep, fire sprinkler and life safety - under separate permit. n/a ordinance #155-13. | $173,000 |
| Jun 5, 2014 | Completed final sign-off Mar 2015 | 731 Market St | change of use to church from office. construct new non-structural partitions, ceiling grid and tile, new lighting fixtures, new doors and frames, millwork, sinks and finishes, add hvac unit on roof. mep, sprinkler and fire alram under separate permit. maher n/a.Details
change of use to church from office. construct new non-structural partitions, ceiling grid and tile, new lighting fixtures, new doors and frames, millwork, sinks and finishes, add hvac unit on roof. mep, sprinkler and fire alram under separate permit. maher n/a. | $700,000 |
| Jun 4, 2014 | Completed final sign-off Sep 2014 | 3 Embarcadero Center | construction of a non-rated partition to block stair & seperate 25/f from 26/f. n/a ordinance #155-13Details
construction of a non-rated partition to block stair & seperate 25/f from 26/f. n/a ordinance #155-13 | $50,000 |
| Jun 3, 2014 | Completed final sign-off Nov 2014 | 500 Treat Av | suite 100 & 200 - renovate non bearing interior partitions. renovate cabinets, appliances in ekitchenettes. elec under sep permit. no change to bldg envelope, no change to e wc's or shared corridorDetails
suite 100 & 200 - renovate non bearing interior partitions. renovate cabinets, appliances in ekitchenettes. elec under sep permit. no change to bldg envelope, no change to e wc's or shared corridor | $235,000 |
| May 30, 2014 | Completed final sign-off Feb 2016 | 244 California St | office tenant improvement: demo non-structural partitions, construct new non-structural partitons. relocate door and frame. replace sink and counter top. install new ceiling grid and tile. new lighting. mechanical & electrical, fire/life safety: under separate permit. n/a ordinance #155-13Details
office tenant improvement: demo non-structural partitions, construct new non-structural partitons. relocate door and frame. replace sink and counter top. install new ceiling grid and tile. new lighting. mechanical & electrical, fire/life safety: under separate permit. n/a ordinance #155-13 | $63,000 |
| May 29, 2014 | Completed final sign-off Dec 2014 | 10 Jackson St | office tenant improvement: demo and construciton of non structural partitions , new accustical ceilings, new light fixtures, doors, & frames, finishes. mep and sprinklers under seperate permit.n/a maherDetails
office tenant improvement: demo and construciton of non structural partitions , new accustical ceilings, new light fixtures, doors, & frames, finishes. mep and sprinklers under seperate permit.n/a maher | $159,140 |
| May 29, 2014 | Completed final sign-off Nov 2014 | 450 Sansome St | mechanical for permit # 201404223843, provide air distribution for spec. suite space. n/a maherDetails
mechanical for permit # 201404223843, provide air distribution for spec. suite space. n/a maher | $61,500 |
| May 21, 2014 | Completed final sign-off Aug 2015 | 731 Market St | selective demo and construction of non structural partitons, modify existing ceiling gid. new doors and frames, millwork, rework lighting. sprinkler, life safety, mep under sep permitDetails
selective demo and construction of non structural partitons, modify existing ceiling gid. new doors and frames, millwork, rework lighting. sprinkler, life safety, mep under sep permit | $81,000 |
| May 21, 2014 | Completed final sign-off Aug 2014 | 1 Maritime Pz | convert storage room into mothers room, enclose storage rooms 2438, 2448, and copy rooms 2439, 2449. sprinkler, mech under sep permitDetails
convert storage room into mothers room, enclose storage rooms 2438, 2448, and copy rooms 2439, 2449. sprinkler, mech under sep permit | $41,500 |
| May 21, 2014 | Completed final sign-off Aug 2014 | 1 Maritime Pz | convert conference room 2518 into 2 offices. build 1 non structural partition, add 1 new door and frame, misc electrical and data. maher 155-13 not requiredDetails
convert conference room 2518 into 2 offices. build 1 non structural partition, add 1 new door and frame, misc electrical and data. maher 155-13 not required | $18,000 |
| May 13, 2014 | Never finaled issued May 2014, no final | 450 Sansome St | 4th floor: electrical t-24 for app#201404223843. n/a for the maher ordinance #155-13Details
4th floor: electrical t-24 for app#201404223843. n/a for the maher ordinance #155-13 | $48,000 |
| May 13, 2014 | Completed final sign-off Jul 2014 | 444 Battery St | revision to app#201404143167. demo of extg resterooms, including 2 sinks. one shower, build back to new configuration to meet ada, add one urinal and 1 water closet. new finishes and lighting. n/a for the maher ordinance #155-13.Details
revision to app#201404143167. demo of extg resterooms, including 2 sinks. one shower, build back to new configuration to meet ada, add one urinal and 1 water closet. new finishes and lighting. n/a for the maher ordinance #155-13. | $30,000 |
| May 13, 2014 | Completed final sign-off Jun 2014 | 444 Battery St | electrical t-24 for pa# 201404143167, n/a maherDetails
electrical t-24 for pa# 201404143167, n/a maher | $12,000 |
| May 6, 2014 | Completed final sign-off Jun 2014 | 450 Sansome St | demo selected non structural partitions, construct new non structural partitons, new door and frame, patch finishes effected by demo. mep sprinklers under sep permit. n/a for maker.Details
demo selected non structural partitions, construct new non structural partitons, new door and frame, patch finishes effected by demo. mep sprinklers under sep permit. n/a for maker. | $32,000 |
| May 6, 2014 | Completed final sign-off Jun 2014 | 560 Davis St | demo of non structural partitions, electrical and finishes. reconfigure existing lighting, new finishes.mep, sprinkler under sep permitDetails
demo of non structural partitions, electrical and finishes. reconfigure existing lighting, new finishes.mep, sprinkler under sep permit | $28,860 |
| May 2, 2014 | Completed final sign-off Jul 2014 | 456 Montgomery St | 22nd flr #2200 - demo (e) reception area, erect new glazed partitions at entry & former reception, modify (e) 120v elect were needed, re-carpet & re-paint selected areas. no hvac,lighting of plumbing. compliance w/ordinance #155-13 not required. life safety, sprinklers, mep if req, on separate.Details
22nd flr #2200 - demo (e) reception area, erect new glazed partitions at entry & former reception, modify (e) 120v elect were needed, re-carpet & re-paint selected areas. no hvac,lighting of plumbing. compliance w/ordinance #155-13 not required. life safety, sprinklers, mep if req, on separate. | $165,000 |
| May 1, 2014 | Never finaled issued Jun 2014, no final | 50 Beale St | demolition of partitions, and new partitons doors and lighting relocation. mechanical, electrical, plumbing and sprinkler under separate permit and deferred submittal. maher 155-13 not required.Details
demolition of partitions, and new partitons doors and lighting relocation. mechanical, electrical, plumbing and sprinkler under separate permit and deferred submittal. maher 155-13 not required. | $52,325 |
| May 1, 2014 | Completed final sign-off Jan 2015 | 731 Market St | basement:this work is limitted to cold shell modifications including the construction of a trash room, janitor's room, engineering office, and the addition of an elevator vestibule and connecting corridors. t.i. under seperate permit. ab-017; ada deferred to future t.i.Details
basement:this work is limitted to cold shell modifications including the construction of a trash room, janitor's room, engineering office, and the addition of an elevator vestibule and connecting corridors. t.i. under seperate permit. ab-017; ada deferred to future t.i. | $75,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 650 California St | 32/f - demo of non structural partition, new non structural partition, reswitch lighting. patch existing finishes. maher 155-13 not requiredDetails
32/f - demo of non structural partition, new non structural partition, reswitch lighting. patch existing finishes. maher 155-13 not required | $12,000 |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 560 Davis St | g/f- refresh finishes, replace 5 light fixtures with energy efficient light fixtures, replace existing conferece room glazing with new butt joint glazing. maher 155-13 not reqDetails
g/f- refresh finishes, replace 5 light fixtures with energy efficient light fixtures, replace existing conferece room glazing with new butt joint glazing. maher 155-13 not req | $30,000 |
| Apr 23, 2014 | Completed final sign-off Aug 2014 | 1 Embarcadero Center | demo new non structural partitions, outlets, doors. no ceiling or lighting work. no change in occupancy, use or areaDetails
demo new non structural partitions, outlets, doors. no ceiling or lighting work. no change in occupancy, use or area | $40,000 |
| Apr 23, 2014 | Completed final sign-off Aug 2014 | 400 02nd St | office tenant improvement: minor demolition of non structural partition new partitions, millwork and adjusted lighting, mep & life safety on separate permits. compliance with ord 155-13 not requiredDetails
office tenant improvement: minor demolition of non structural partition new partitions, millwork and adjusted lighting, mep & life safety on separate permits. compliance with ord 155-13 not required | $197,400 |
| Apr 22, 2014 | Never finaled issued Apr 2014, no final | 450 Sansome St | 4th floor: new non-structural partitions, new accoustical ceilings, new millworks and sign. mep, sprinkler, life safety under separate permitDetails
4th floor: new non-structural partitions, new accoustical ceilings, new millworks and sign. mep, sprinkler, life safety under separate permit | $119,500 |
| Apr 18, 2014 | Completed final sign-off Jul 2014 | 475 Sansome St | electrical t-24 for app#201403120504Details
electrical t-24 for app#201403120504 | $15,000 |
| Apr 17, 2014 | Completed final sign-off Jun 2014 | 1 Maritime Pz | convert open office 307 and 308 to private offices 307 and 308. construct new non structural partitions, doors, and frames. na for maher ordiance.Details
convert open office 307 and 308 to private offices 307 and 308. construct new non structural partitions, doors, and frames. na for maher ordiance. | $10,000 |
| Apr 17, 2014 | Completed final sign-off Nov 2014 | 44 Montgomery St | demo non structural partiton, infill partiton, patch ceiling. mech, elec, sprinkler, life safety under sep permit. n/a ordinance #155-13.Details
demo non structural partiton, infill partiton, patch ceiling. mech, elec, sprinkler, life safety under sep permit. n/a ordinance #155-13. | $8,000 |
| Apr 14, 2014 | Completed final sign-off Jun 2014 | 1 Maritime Pz | revision 201401075694 and 201401246991 add 2 offices at open office #707. new non structural walls, doors and frames. mep, sprinkler and life safety under separate permitDetails
revision 201401075694 and 201401246991 add 2 offices at open office #707. new non structural walls, doors and frames. mep, sprinkler and life safety under separate permit | $20,000 |
| Apr 14, 2014 | Completed final sign-off Jun 2014 | 444 Battery St | revision to 201401307456. construct new non structural walls, new doors, and frames per new layout. mech,ele, ls, sep permit. update address from 363 washington to 444 battery. same block/lot. maher 155-13 not required.Details
revision to 201401307456. construct new non structural walls, new doors, and frames per new layout. mech,ele, ls, sep permit. update address from 363 washington to 444 battery. same block/lot. maher 155-13 not required. | $37,000 |
| Apr 9, 2014 | Completed final sign-off Jun 2014 | 353 Sacramento St | demo selected non structural partitions, new non structural partitions, relocate lighting fixtures, doors and frames, new millwork. mep, sprinkler, life safety under separate permit. n/a ordinance #155-13Details
demo selected non structural partitions, new non structural partitions, relocate lighting fixtures, doors and frames, new millwork. mep, sprinkler, life safety under separate permit. n/a ordinance #155-13 | $131,500 |
| Apr 7, 2014 | Never finaled issued Apr 2014, no final | 560 Davis St | 2nd floor: mechanical and electrical for pa#201401226827. n/a ordinance #155-13.Details
2nd floor: mechanical and electrical for pa#201401226827. n/a ordinance #155-13. | $30,000 |
| Mar 12, 2014 | Completed final sign-off Jun 2014 | 475 Sansome St | 8th floor suite 850 - demo of selected non-structural partitoins, doors & sidelights, replace entry doors & frame, new lighting. mep, sprinkler, life-safety under separate permit. compliance with ordinance #155-13 not requiredDetails
8th floor suite 850 - demo of selected non-structural partitoins, doors & sidelights, replace entry doors & frame, new lighting. mep, sprinkler, life-safety under separate permit. compliance with ordinance #155-13 not required | $103,700 |
| Mar 11, 2014 | Completed final sign-off May 2014 | 3 Embarcadero Center | 14th floor: non-structural demo. new non-structural partitions, lighting, electrical, finishes. no change in occupancy use, area. mep under seperate permit. n/a for the maher ordinance #155-13Details
14th floor: non-structural demo. new non-structural partitions, lighting, electrical, finishes. no change in occupancy use, area. mep under seperate permit. n/a for the maher ordinance #155-13 | $125,000 |
| Feb 19, 2014 | Completed final sign-off Jul 2014 | 131 Steuart St | 4th floor restroom: barrier removal. work includes reversing door swings of toilet partition and providing power door opener for toilet partition doors. compliance with ordinance #155-13 not requiredDetails
4th floor restroom: barrier removal. work includes reversing door swings of toilet partition and providing power door opener for toilet partition doors. compliance with ordinance #155-13 not required | $3,000 |
| Feb 18, 2014 | Completed final sign-off Apr 2014 | 100 Spear St | 10th floor: t.i. includes demo of non structural partitions and build back of non- structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and submitted seperately. bldg is fully sprinklered.n/a for the maher ordinance #155-13Details
10th floor: t.i. includes demo of non structural partitions and build back of non- structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and submitted seperately. bldg is fully sprinklered.n/a for the maher ordinance #155-13 | $128,000 |
| Feb 11, 2014 | Completed final sign-off Jun 2017 | 450 Sansome St | remodel of selected area of (e) ground floor lobby to perform cosmetic upgrades. complinace with ordinance no.155-13 not required. excavation <50 cu yd. fire/mec/elect/under separate permitDetails
remodel of selected area of (e) ground floor lobby to perform cosmetic upgrades. complinace with ordinance no.155-13 not required. excavation <50 cu yd. fire/mec/elect/under separate permit | $185,000 |
| Feb 5, 2014 | Completed final sign-off Mar 2014 | 601 California St | 7th floor, suite 750: demo of non-structural partitions and associated power/data. new non-structural partitions, glazing, millwork, light fixtures. mep and life safty under seperate permit.Details
7th floor, suite 750: demo of non-structural partitions and associated power/data. new non-structural partitions, glazing, millwork, light fixtures. mep and life safty under seperate permit. | $15,400 |
| Jan 30, 2014 | Completed final sign-off Jun 2014 | 363 Washington St | demo of non-structural partitions, construct new non-structural partitions to form 4 ndw offices. mechanical, electrical, life safety under seperate permit.n/a for the maher ordinance #155-13Details
demo of non-structural partitions, construct new non-structural partitions to form 4 ndw offices. mechanical, electrical, life safety under seperate permit.n/a for the maher ordinance #155-13 | $54,000 |
| Jan 27, 2014 | Completed final sign-off Jul 2014 | 131 Steuart St | tenant improvement work on 5th floor: work includes selective demolition, provide new wall & ceiling insulation on (e) walls. relocation of power outlets, patching of affected finishes. compliance with ordiance no 153-13 not required.Details
tenant improvement work on 5th floor: work includes selective demolition, provide new wall & ceiling insulation on (e) walls. relocation of power outlets, patching of affected finishes. compliance with ordiance no 153-13 not required. | $26,000 |
| Jan 24, 2014 | Completed final sign-off May 2014 | 71 Stevenson St | 9th floor - demo of existing doors, frames & hardware & construction of new doors, frames & hardward.Details
9th floor - demo of existing doors, frames & hardware & construction of new doors, frames & hardward. | $20,000 |
| Jan 24, 2014 | Completed final sign-off Jul 2014 | 1 Maritime Pz | 7th floor -revision to appl #2014.0107.5694: change location of new offices, add demo of selected non-structural partitions. mep, sprinkler, life-safety under separate permit. compliance with ordinance #155-13 not required.Details
7th floor -revision to appl #2014.0107.5694: change location of new offices, add demo of selected non-structural partitions. mep, sprinkler, life-safety under separate permit. compliance with ordinance #155-13 not required. | $5,000 |
| Jan 23, 2014 | Completed final sign-off Mar 2014 | 601 California St | mechanical and electrical revision for 201312063506Details
mechanical and electrical revision for 201312063506 | $30,000 |
| Jan 22, 2014 | Completed final sign-off May 2014 | 560 Davis St | 2nd floor suite 200 - demo of existing non-structural partitions & finishes, construct new non-structural partitions, finishes, lighting, & rated corridor. m.e.p. sprinkler, & life safety under separate permit.compliance wiht ordinance #155-13 not req'd.Details
2nd floor suite 200 - demo of existing non-structural partitions & finishes, construct new non-structural partitions, finishes, lighting, & rated corridor. m.e.p. sprinkler, & life safety under separate permit.compliance wiht ordinance #155-13 not req'd. | $210,000 |
| Jan 22, 2014 | Completed final sign-off Mar 2014 | 250 Montgomery St | 7th floor:new work consist of 2 new offices, doors, frames, and hardware. new millwork, new power, data and finishes throughout. space is currently unoccupied. any mep and sprinkler upgrades will be under seperate permits.Details
7th floor:new work consist of 2 new offices, doors, frames, and hardware. new millwork, new power, data and finishes throughout. space is currently unoccupied. any mep and sprinkler upgrades will be under seperate permits. | $20,000 |
| Jan 10, 2014 | Completed final sign-off Mar 2016 | 450 Sansome St | compliance with ordinance no. 15-133 not required. excation less than 50 cu yard or no excavation: demo of non structural partitions, ceilings, lighting to remain. build new non structural wall, relocate doors and frames, new electrical. f/a and sprinklers under separate permit.Details
compliance with ordinance no. 15-133 not required. excation less than 50 cu yard or no excavation: demo of non structural partitions, ceilings, lighting to remain. build new non structural wall, relocate doors and frames, new electrical. f/a and sprinklers under separate permit. | $105,000 |
| Jan 7, 2014 | Never finaled issued Jan 2014, no final | 1 Maritime Pz | demo of non-structural partition, construct new non-structural partitions in various areas. patch and repair adjacent ceilings and finishes. mep. sprinkler, life safety under seperate permit.Details
demo of non-structural partition, construct new non-structural partitions in various areas. patch and repair adjacent ceilings and finishes. mep. sprinkler, life safety under seperate permit. | $50,000 |
| Jan 7, 2014 | Completed final sign-off Mar 2014 | 2 Embarcadero Center | demo of selected ceiling high non-structural partitions, install new entry door and sidelight, install floor to ceiling glass at existing office fronts, construct new non-structural partitions to form new conference room. mep and life safety to be done under seperate permit.Details
demo of selected ceiling high non-structural partitions, install new entry door and sidelight, install floor to ceiling glass at existing office fronts, construct new non-structural partitions to form new conference room. mep and life safety to be done under seperate permit. | $175,000 |
| Dec 20, 2013 | Completed final sign-off Jun 2015 | 580 California St | 5th fl:demo of existing office interiors including demo of existing non load bearing partitons, ceiling grid, light fixtures,floor finishes, millwork, and plumbing fixtures. design build life safety drawings for fire, life safety. no exterior work . no known hazardous materials on site - per ab-017Details
5th fl:demo of existing office interiors including demo of existing non load bearing partitons, ceiling grid, light fixtures,floor finishes, millwork, and plumbing fixtures. design build life safety drawings for fire, life safety. no exterior work . no known hazardous materials on site - per ab-017 | $220,000 |
| Dec 20, 2013 | Completed final sign-off Jun 2014 | 201 Spear St | 16th floor:install new non-structural wall with new door and frame. door to have card reader, new finishes at door location. electrical and life safety under seperate permit.Details
16th floor:install new non-structural wall with new door and frame. door to have card reader, new finishes at door location. electrical and life safety under seperate permit. | $12,500 |
| Dec 17, 2013 | Completed final sign-off Jul 2014 | 731 Market St | this work is limited to the addition of one maintenance room including new partitions, doors, and lighting.this work introduces new bldg service space part of the cold shell build out of the basement level.electrical work is defffered submittal.Details
this work is limited to the addition of one maintenance room including new partitions, doors, and lighting.this work introduces new bldg service space part of the cold shell build out of the basement level.electrical work is defffered submittal. | $15,000 |
| Dec 13, 2013 | Completed final sign-off Apr 2014 | 731 Market St | revision to appl #2013.1105.1118 - rating of (e) elevation machine room & structure.Details
revision to appl #2013.1105.1118 - rating of (e) elevation machine room & structure. | $2,000 |
| Dec 13, 2013 | Completed final sign-off Mar 2014 | 405 Howard St | demo only of selected items per lease termination agreement, selected doors, and non-structural walls and reception desk (per ab-017). space will remain vacant.Details
demo only of selected items per lease termination agreement, selected doors, and non-structural walls and reception desk (per ab-017). space will remain vacant. | $6,400 |
| Dec 6, 2013 | Completed final sign-off Mar 2014 | 601 California St | 17th floor #1700 & 1701 - demo non-structural partitions, power & teledata, millwork, finishes & door/frames, new non-structural demising wall, doors/frames, millwork, finishes, power teledata, light relocation, currently unoccupies. mep, sprinklers & fire alarm sep. permitDetails
17th floor #1700 & 1701 - demo non-structural partitions, power & teledata, millwork, finishes & door/frames, new non-structural demising wall, doors/frames, millwork, finishes, power teledata, light relocation, currently unoccupies. mep, sprinklers & fire alarm sep. permit | $121,528 |
| Dec 4, 2013 | Never finaled issued Dec 2013, no final | 150 Spear St | 16th floor: demo and construction of selected non load bearing partitions, minor ceiling grid repair,new light fixtures. mech, elec, sprinkler, life safety under seperate permit.Details
16th floor: demo and construction of selected non load bearing partitions, minor ceiling grid repair,new light fixtures. mech, elec, sprinkler, life safety under seperate permit. | $285,000 |
| Nov 26, 2013 | Completed final sign-off Jun 2015 | 3 Embarcadero Center | ground floor:remove existing escalators located in retail common area. minor modification to building floor to accomodate new escalators. escalator design and engineering is not insluded in this permit. f/a and sprinklers under separate permit.Details
ground floor:remove existing escalators located in retail common area. minor modification to building floor to accomodate new escalators. escalator design and engineering is not insluded in this permit. f/a and sprinklers under separate permit. | $300,000 |
| Nov 20, 2013 | Completed final sign-off Feb 2014 | 250 Montgomery St | 10th fl: new wall at existing conference room as shown on plan. ceiling lighting and other utilities to remain. mep ls separate permitDetails
10th fl: new wall at existing conference room as shown on plan. ceiling lighting and other utilities to remain. mep ls separate permit | $13,971 |
| Nov 15, 2013 | Completed final sign-off Jun 2014 | 250 Montgomery St | 16th floor:new work consists of new ceiling ht. partitions, doors, frames, and hardware, new millwork, new power/data, plmg and finishes throughout. space is currently unoccupied. any mep and srpinkler upgrade will be under seperate permits.Details
16th floor:new work consists of new ceiling ht. partitions, doors, frames, and hardware, new millwork, new power/data, plmg and finishes throughout. space is currently unoccupied. any mep and srpinkler upgrade will be under seperate permits. | $310,000 |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 450 Sansome St | 13th floor tenant improvement for umqua bank offices including new partitions, new doors & finish upgrades. sprinkler and f/a under seperate permit.Details
13th floor tenant improvement for umqua bank offices including new partitions, new doors & finish upgrades. sprinkler and f/a under seperate permit. | $400,000 |
| Nov 5, 2013 | Completed final sign-off Jan 2015 | 731 Market St | revision 1: modification to structural framing per as-built conditions; set-back of ground level storefront, revisiotn to 201307222423Details
revision 1: modification to structural framing per as-built conditions; set-back of ground level storefront, revisiotn to 201307222423 | $2,500 |
| Oct 29, 2013 | Completed final sign-off Jan 2014 | 505 Montgomery St | 23rd floor: mechanical and electrical, t-24 for work done under app#201308144252- sprinklers and fire alarmDetails
23rd floor: mechanical and electrical, t-24 for work done under app#201308144252- sprinklers and fire alarm | $42,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 111 Sutter St | revision and addendum to 201307031066: modification of existing tenant improvements to include new electrical scope and ceiling work.Details
revision and addendum to 201307031066: modification of existing tenant improvements to include new electrical scope and ceiling work. | $20,000 |
| Oct 17, 2013 | Completed final sign-off Nov 2013 | 345 Stockton St | construct box panel for mounting of art work in 2 locationsDetails
construct box panel for mounting of art work in 2 locations | $6,000 |
| Oct 11, 2013 | Completed final sign-off Dec 2013 | 1 Embarcadero Center | 5th fl:demo of selected non-structural partitions, construct new non-structural partitions, new & relocate lighting, new & relocate doors, frames. minor rework of hvac to accomadate nw layout, minor sprinkler relocation per nw layout. new & relocate life safety. srpinkler work under seperate permit.Details
5th fl:demo of selected non-structural partitions, construct new non-structural partitions, new & relocate lighting, new & relocate doors, frames. minor rework of hvac to accomadate nw layout, minor sprinkler relocation per nw layout. new & relocate life safety. srpinkler work under seperate permit. | $173,000 |
| Oct 2, 2013 | Completed final sign-off Nov 2013 | 525 Market St | 2nd floor #250 - selective demo of non-structural partitions, doors & frames, new doors & frames.Details
2nd floor #250 - selective demo of non-structural partitions, doors & frames, new doors & frames. | $8,500 |
| Oct 1, 2013 | Completed final sign-off Nov 2013 | 150 Spear St | demolition and construction of selected non structural partitons. demo of existing accoustical ceilings, replace with new ceilings. mep, sprinkler, life safety sep permitDetails
demolition and construction of selected non structural partitons. demo of existing accoustical ceilings, replace with new ceilings. mep, sprinkler, life safety sep permit | $200,000 |
| Oct 1, 2013 | Never finaled issued Oct 2013, no final | 201 Mission St | suite 1310:construction of interior non load bearing partitions, doors and finishes. minor modifications to extg lighting and switches affected by scope. restroom accessibility upgrades. no exterior work.Details
suite 1310:construction of interior non load bearing partitions, doors and finishes. minor modifications to extg lighting and switches affected by scope. restroom accessibility upgrades. no exterior work. | $57,850 |
| Sep 17, 2013 | Completed final sign-off Aug 2015 | 250 Montgomery St | basement level: scope of work consists of demolition of interior non structural partitions and construction of a new ada compliant restrooms and shower on bsmnt level & a new restibule on the on the ground level. space is currently unoccupied. change from higher ed classroom to fitness cc9/24.Details
basement level: scope of work consists of demolition of interior non structural partitions and construction of a new ada compliant restrooms and shower on bsmnt level & a new restibule on the on the ground level. space is currently unoccupied. change from higher ed classroom to fitness cc9/24. | $70,000 |
| Sep 17, 2013 | Completed final sign-off Jul 2014 | 250 Montgomery St | basement level: per ab-017. demolition of interior non structural partitions and doors and construction of a new hallway on the basement level and doors and construction of a new hallway on the basement level & a new storage closet on the ground level. space is currently unoccupied, any mep and sDetails
basement level: per ab-017. demolition of interior non structural partitions and doors and construction of a new hallway on the basement level and doors and construction of a new hallway on the basement level & a new storage closet on the ground level. space is currently unoccupied, any mep and s | $35,000 |
| Sep 9, 2013 | Completed final sign-off Mar 2014 | 50 Beale St | 1st floor -new interior t.i to create an atm lobby within (e) bank. new partition, doors & windows, flooring. installation of atm machine & electrical. no new lighting. relocation of 1 ceiling register & additional new return. fire alarm under seperate permitDetails
1st floor -new interior t.i to create an atm lobby within (e) bank. new partition, doors & windows, flooring. installation of atm machine & electrical. no new lighting. relocation of 1 ceiling register & additional new return. fire alarm under seperate permit | $28,000 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 100 California St | 10th floor-mechanical & electrical t-24 for pa# 2013-0605-8759Details
10th floor-mechanical & electrical t-24 for pa# 2013-0605-8759 | $400,000 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 100 California St | 10th floor-revision to pa# 2013-0605-8759-change room label from it room to telecom closet. remove drinking fountain.Details
10th floor-revision to pa# 2013-0605-8759-change room label from it room to telecom closet. remove drinking fountain. | |
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 200 Pine St | construct new room in open office area. toilet accessibility upgrades to 20%. mep under separate permit.Details
construct new room in open office area. toilet accessibility upgrades to 20%. mep under separate permit. | $2,500 |
| Aug 26, 2013 | Completed final sign-off Feb 2014 | 475 Sansome St | 5th fl. t.i. demo non structural partitions, doors, and side lites, construct new non structral partitons, new doors, frames, sidelites. mep, sprinkler, life safety separate permitDetails
5th fl. t.i. demo non structural partitions, doors, and side lites, construct new non structral partitons, new doors, frames, sidelites. mep, sprinkler, life safety separate permit | $292,000 |
| Aug 16, 2013 | Completed final sign-off Mar 2014 | 1 Embarcadero Center | 28th floor:non-structural demo. new non structural partitions, electrical, millwork, finishes. no change is occupancy use area. mep, life safty, sprinkler under sep. permit.Details
28th floor:non-structural demo. new non structural partitions, electrical, millwork, finishes. no change is occupancy use area. mep, life safty, sprinkler under sep. permit. | $110,000 |
| Aug 14, 2013 | Completed final sign-off Dec 2013 | 201 Spear St | demolition/construction of non-structural, non rated ceiling height partitions. existing light fixture relocations, new power/tele/data, new finishes. minor disabled access upgrades at men's/women's restroom, m.e.p. life safety & sprinklers under seperate permit.Details
demolition/construction of non-structural, non rated ceiling height partitions. existing light fixture relocations, new power/tele/data, new finishes. minor disabled access upgrades at men's/women's restroom, m.e.p. life safety & sprinklers under seperate permit. | $138,600 |
| Aug 14, 2013 | Completed final sign-off Dec 2013 | 505 Montgomery St | 23r floor:demo of selected non-structural partitions, new non structural partitions and glazing. new cabinets, doors, electrical, new finishes. mep, sprinkler, and life safety under seperate permit.Details
23r floor:demo of selected non-structural partitions, new non structural partitions and glazing. new cabinets, doors, electrical, new finishes. mep, sprinkler, and life safety under seperate permit. | $332,500 |
| Aug 12, 2013 | Never finaled issued Sep 2013, no final | 100 Spear St | 14th flr: tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkledDetails
14th flr: tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkled | $90,000 |
| Aug 12, 2013 | Completed final sign-off Mar 2014 | 100 Spear St | 2/f- t.i. include demolishing of non structural partitions and build (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety are design build submitted seperately, fully sprinkler.Details
2/f- t.i. include demolishing of non structural partitions and build (n) non structural partitions. all new or revised hvac, electrical, plumbing and life safety are design build submitted seperately, fully sprinkler. | $275,000 |
| Aug 12, 2013 | Never finaled issued Sep 2013, no final | 100 Spear St | 3rd flr: ste 325, tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkledDetails
3rd flr: ste 325, tenant improvement include the demolishing of non structural partitions and building new non structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be design- build and submitted separately./ bldg fully sprinkled | $215,000 |
| Aug 12, 2013 | Never finaled issued Sep 2013, no final | 100 Spear St | ground floor suite 120 & 130 t.i. include the demolishing of non-structural partitions & building new non-structural partitions. all new or revised hvac, electrical, pldg & life safety will be design build & submitted separately. bldg fully sprinklered.Details
ground floor suite 120 & 130 t.i. include the demolishing of non-structural partitions & building new non-structural partitions. all new or revised hvac, electrical, pldg & life safety will be design build & submitted separately. bldg fully sprinklered. | $100,000 |
| Aug 12, 2013 | Never finaled issued Sep 2013, no final | 100 Spear St | (11th fl) t.i. include the demolishing of non-structural partitions and builidng new non-structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design build and submitted separately. bldg is fully sprinklered.Details
(11th fl) t.i. include the demolishing of non-structural partitions and builidng new non-structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design build and submitted separately. bldg is fully sprinklered. | $320,000 |
| Aug 12, 2013 | Completed final sign-off Mar 2014 | 100 Spear St | 4th floor elevator lobby & corridor improvements include finishes, all new or revised hvac, electrical, plbg & life safety work will be design build & sumbitted separately, bldg fully sprinklered.Details
4th floor elevator lobby & corridor improvements include finishes, all new or revised hvac, electrical, plbg & life safety work will be design build & sumbitted separately, bldg fully sprinklered. | $90,000 |
| Jul 31, 2013 | Never finaled issued Aug 2013, no final | 100 Drumm St | 1st & 2nd floors-exploratory soft demo of inter non structural partitions & abandoned mechanical equipment within (e) vacant tenant suites. future t.i for restuarant under seperate permit. no work to (e) sprinkler & fire protection system or base building structural elements-per ab-017Details
1st & 2nd floors-exploratory soft demo of inter non structural partitions & abandoned mechanical equipment within (e) vacant tenant suites. future t.i for restuarant under seperate permit. no work to (e) sprinkler & fire protection system or base building structural elements-per ab-017 | $17,000 |
| Jul 26, 2013 | Completed final sign-off Nov 2013 | 3180 18th St | installation of self supported bicycle storage rack in a private parking lot, not visible to the publicDetails
installation of self supported bicycle storage rack in a private parking lot, not visible to the public | $9,700 |
| Jul 23, 2013 | Completed final sign-off Dec 2013 | 100 California St | 10th floor: demo of non-structural partitions, ceilings, construct new non-structural partitions, new ceilings, and finishes. mep, life safety, sprinkler to be done under sep permit.Details
10th floor: demo of non-structural partitions, ceilings, construct new non-structural partitions, new ceilings, and finishes. mep, life safety, sprinkler to be done under sep permit. | $921,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2015 | 731 Market St | new stevenson street entry with new lobby and canopy; storefront, interior entry stair into basement, and enclosure of 1 existing exit stair. core and shell per ab-017. ti under separate permit.Details
new stevenson street entry with new lobby and canopy; storefront, interior entry stair into basement, and enclosure of 1 existing exit stair. core and shell per ab-017. ti under separate permit. | $324,425 |
| Jul 22, 2013 | Completed final sign-off May 2014 | 731 Market St | new 1-hr fire rated enclosure at future pump room (part of sprinkler retrofit), includes new 60 min. entry door in basement level. core and shell work. t.i. work under separate permit.Details
new 1-hr fire rated enclosure at future pump room (part of sprinkler retrofit), includes new 60 min. entry door in basement level. core and shell work. t.i. work under separate permit. | $3,500 |
| Jul 19, 2013 | Completed final sign-off Jan 2014 | 353 Sacramento St | 23rd floor-demo of non structural walls, construct new non structural walls, bnew doors & frames, millwork, finishes & carpet. relocate lighting. mep, sprinklers & life safety under seperate permitsDetails
23rd floor-demo of non structural walls, construct new non structural walls, bnew doors & frames, millwork, finishes & carpet. relocate lighting. mep, sprinklers & life safety under seperate permits | $816,000 |
| Jul 19, 2013 | Completed final sign-off Aug 2013 | 795 Folsom St | 2nd floor-constructnew non structural non rated demising wall, re-work lighting & life safety as requiredDetails
2nd floor-constructnew non structural non rated demising wall, re-work lighting & life safety as required | $10,500 |
| Jul 18, 2013 | Completed final sign-off Nov 2013 | 150 Spear St | on 5th floor - demo of selected non-structural partitions, construct new non-structural partitions. demise two existing suites into 3 new doors and frames. repair ceiling grid, add new light & reswitch.Details
on 5th floor - demo of selected non-structural partitions, construct new non-structural partitions. demise two existing suites into 3 new doors and frames. repair ceiling grid, add new light & reswitch. | $75,000 |
| Jul 17, 2013 | Completed final sign-off Dec 2013 | 353 Sacramento St | 4th floor:demo of non structural walls, construction of non structural walls, new doors and finishes. sprinkler and lifesafty under seperate permit if required.Details
4th floor:demo of non structural walls, construction of non structural walls, new doors and finishes. sprinkler and lifesafty under seperate permit if required. | $130,000 |
| Jul 15, 2013 | Completed final sign-off Oct 2013 | 1 Market St | 15th floor interior tenant improvement - minor demolition, new partition, door, patching of finishes, relocate switch & card reader.Details
15th floor interior tenant improvement - minor demolition, new partition, door, patching of finishes, relocate switch & card reader. | $36,000 |
| Jul 12, 2013 | Completed final sign-off Jun 2014 | 475 Sansome St | demo of non-structural partitions, doors & side lights, construct new non structural partitions, new door, frames & lighting. mep. sprinkler, life safety under seperate permit.Details
demo of non-structural partitions, doors & side lights, construct new non structural partitions, new door, frames & lighting. mep. sprinkler, life safety under seperate permit. | $178,000 |