Intrepid Electronic Systems Inc
- Based in
- Crockett
- On San Francisco permits
- Dec 2004 to Nov 2025
- Last 24 months
- 6 permits filed
122 permits since 2000: 90 completed, 4 in progress, 19 never finaled, 9 expired or cancelled.
Of the 19 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 14 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 122.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2025 | Completed final sign-off Jan 2026 | 2 New Montgomery St | install one new one way private radio alarm system (rat) (aes)Details
install one new one way private radio alarm system (rat) (aes) | $1,000 |
| Nov 25, 2025 | In progress issued Nov 2025 | 2675 Geary Bl | 8 hvac units to be replace with 8 duct detectorsDetails
8 hvac units to be replace with 8 duct detectors | $5,000 |
| Aug 22, 2025 | In progress issued Aug 2025 | 2675 Geary Bl | suite e105- replace (1) (e) smoke detector with 1 (n) heat detector due to owners request and due to unwanted alarm activationsDetails
suite e105- replace (1) (e) smoke detector with 1 (n) heat detector due to owners request and due to unwanted alarm activations | |
| Jul 21, 2025 | Completed final sign-off Aug 2025 | 2400 Cesar Chavez St | commencement of work not started under previosly approved permit application #202301200492.Details
commencement of work not started under previosly approved permit application #202301200492. | |
| Feb 26, 2025 | In progress issued Mar 2025 | 300 Page St | install emergency responder radio coverage systemDetails
install emergency responder radio coverage system | $67,927 |
| Nov 4, 2024 | Completed final sign-off Apr 2025 | 4836 Mission St | fire alarm system t.i. for ground floor shell space build-out of 4840 mission street house a medicla clinic. system includes the following: 1 nac panel, 3 manual pull stations, 2 smoke detectors, 2 duct detector, 50 strobes, 12 horn/strobes.Details
fire alarm system t.i. for ground floor shell space build-out of 4840 mission street house a medicla clinic. system includes the following: 1 nac panel, 3 manual pull stations, 2 smoke detectors, 2 duct detector, 50 strobes, 12 horn/strobes. | $45,000 |
| Jun 20, 2024 | Completed final sign-off Aug 2025 | 2675 Geary Bl | fire alarm system monitoring conversionDetails
fire alarm system monitoring conversion | $3,500 |
| Apr 30, 2024 | Completed final sign-off Aug 2024 | 420 29th Av | fire only-audio test for all bedrooms/studio unitsDetails
fire only-audio test for all bedrooms/studio units | $1,500 |
| Feb 21, 2024 | In progress issued Feb 2024 | 1011 Turk St | fire alarm scope is on 2nd floor dispatch operations area as builts, ref 202309015795Details
fire alarm scope is on 2nd floor dispatch operations area as builts, ref 202309015795 | |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 1011 Turk St | fire alarm scope is on 2nd fl. dispatch operations area safe-off and demo out 9 devices to accomodate tenant improvement install new nac panel and 14 new nac devices, 2 smoke detectors and control of 2 new fsds. ref pa 202201065473Details
fire alarm scope is on 2nd fl. dispatch operations area safe-off and demo out 9 devices to accomodate tenant improvement install new nac panel and 14 new nac devices, 2 smoke detectors and control of 2 new fsds. ref pa 202201065473 | $12,000 |
| Mar 29, 2023 | Never finaled filed Mar 2023, never issued | 2814 Great Hy | fire alarm system installation, ventilation detection system notification.Details
fire alarm system installation, ventilation detection system notification. | $170,000 |
| Jan 20, 2023 | Completed final sign-off Aug 2025 | 2400 Cesar Chavez St | converting existing dact to a new rf communicator. all existing fire alarm system components and sequence of operation shall remain unchanged.Details
converting existing dact to a new rf communicator. all existing fire alarm system components and sequence of operation shall remain unchanged. | $1,000 |
| Jul 26, 2022 | Never finaled issued Oct 2022, no final | 1199 09th Av | new fire alarm system for new head house & greenhouse for the sf botanical gardens. manual fire alarm system with ada compliant notification devices. ref new construction 202102164730 & 202102164716Details
new fire alarm system for new head house & greenhouse for the sf botanical gardens. manual fire alarm system with ada compliant notification devices. ref new construction 202102164730 & 202102164716 | $20,000 |
| Apr 22, 2022 | Completed final sign-off Jun 2022 | 195 Kiska Rd | convert (e) dact to new rf communicator. all (e) f/a system components & sequence of operations shall remain unchangedDetails
convert (e) dact to new rf communicator. all (e) f/a system components & sequence of operations shall remain unchanged | |
| Apr 18, 2022 | Completed final sign-off Feb 2023 | 450 Guerrero St | converting (e) dact to a new rf communicator. all (e) fire alarm system components and sequence of operations shall remain unchanged.Details
converting (e) dact to a new rf communicator. all (e) fire alarm system components and sequence of operations shall remain unchanged. | $1,000 |
| Apr 18, 2022 | Completed final sign-off Jun 2022 | 901 Alabama St | converting existing dact to a new rf communicator. all extg fire alarm system component and sequence of operations shall remain unchanged.Details
converting existing dact to a new rf communicator. all extg fire alarm system component and sequence of operations shall remain unchanged. | $1,000 |
| Apr 13, 2022 | Completed final sign-off Sep 2023 | 380 Fulton St | converting existing dact to a new rf communicator. all existing fire alarm system components and sequence of operations shall remain unchanged.Details
converting existing dact to a new rf communicator. all existing fire alarm system components and sequence of operations shall remain unchanged. | $1,000 |
| Aug 30, 2021 | Completed final sign-off Sep 2021 | 1940 Harrison St | as-builts fire alarm system for pa201612285971. added monitoring of (e) water curtain sprinkler switches, clarified mounting heights of (e) bus bay horns/strobes.Details
as-builts fire alarm system for pa201612285971. added monitoring of (e) water curtain sprinkler switches, clarified mounting heights of (e) bus bay horns/strobes. | |
| Sep 25, 2020 | Expired or cancelled withdrawn Nov 2022 | 1064 Mission St | errcsDetails
errcs | $10,000 |
| Jan 9, 2019 | Completed final sign-off May 2019 | 90 Kiska Rd | fire sprinkler monitoring. sprinkler was installed under app#201511031602 (s-4).Details
fire sprinkler monitoring. sprinkler was installed under app#201511031602 (s-4). | |
| Dec 21, 2018 | Completed final sign-off Apr 2020 | 1941 Harrison St | demolish (e) f/a control unit, devices and cabling. provide new facu, devicies, and cabing per nfpa72.Details
demolish (e) f/a control unit, devices and cabling. provide new facu, devicies, and cabing per nfpa72. | $12,000 |
| Dec 20, 2018 | Never finaled filed Dec 2018, never issued | 1550 Evans Av | mou project. proj-19-0210. to erect new 3 stories, no basement, type ii-b, community center building & daycare facility with adjacent 1 story pavilion building. new parking lot & landscape on entire site. (a-3,b) ** maher: n/a **Details
mou project. proj-19-0210. to erect new 3 stories, no basement, type ii-b, community center building & daycare facility with adjacent 1 story pavilion building. new parking lot & landscape on entire site. (a-3,b) ** maher: n/a ** | $22,000,000 |
| Nov 6, 2017 | Completed final sign-off Mar 2018 | 800 Presidio Av | fire alarm system as builts. ref app#201204168406 s-4Details
fire alarm system as builts. ref app#201204168406 s-4 | $2,000 |
| Sep 19, 2017 | Completed final sign-off Sep 2017 | 392 Fulton St | fire alarm system as built for pa#201708114556Details
fire alarm system as built for pa#201708114556 | |
| Aug 11, 2017 | Completed final sign-off Sep 2017 | 392 Fulton St | fire alarm system modification for t.i. pa#201608185373, address change pa#201707212577 change of address.Details
fire alarm system modification for t.i. pa#201608185373, address change pa#201707212577 change of address. | $4,000 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 620 Gough St | to change address of permit application pa#201704194305 from 388 fulton street to 620 gough street 0785/061-062, reference m741987.Details
to change address of permit application pa#201704194305 from 388 fulton street to 620 gough street 0785/061-062, reference m741987. | |
| Apr 19, 2017 | Completed final sign-off Jul 2017 | 388 Fulton St | modify fire alarm system for restaurant t.i., relocate 1 horn/strobe, add 2 strobes. t.i. pa#2016-0601-8832Details
modify fire alarm system for restaurant t.i., relocate 1 horn/strobe, add 2 strobes. t.i. pa#2016-0601-8832 | $2,000 |
| Dec 28, 2016 | Completed final sign-off Mar 2020 | 151 Beach St | demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72.Details
demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72. | $95,074 |
| Dec 28, 2016 | Completed final sign-off May 2020 | 2500 Mariposa St | demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units and vesda system, devices and fire alarm cabling. per nfpa 72Details
demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units and vesda system, devices and fire alarm cabling. per nfpa 72 | $291,486 |
| Dec 28, 2016 | Completed final sign-off Sep 2021 | 1940 Harrison St | demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling, per nfpa72.Details
demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling, per nfpa72. | $343,991 |
| Dec 28, 2016 | Completed final sign-off May 2020 | 425 Geneva Av | demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72Details
demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72 | $343,991 |
| Dec 28, 2016 | Completed final sign-off Feb 2021 | 1849 Harrison St | demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72.Details
demolish (e) fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72. | $160,945 |
| Aug 11, 2016 | Completed final sign-off Dec 2017 | 199 Museum Wy | new addressable fire alarm system, includes sprinkler monitoring, elevator recall service, fire door release, full av coverage, manual pull stations at exits.Details
new addressable fire alarm system, includes sprinkler monitoring, elevator recall service, fire door release, full av coverage, manual pull stations at exits. | $50,000 |
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 1227 Hampshire St | (n) fire alarm system for (e) 50 unit apartment bldg includes connection to (e) waterflow switch, a/v device coverage w/ low frequency sounders in units. manual pull stations provided at stair landing & exits.Details
(n) fire alarm system for (e) 50 unit apartment bldg includes connection to (e) waterflow switch, a/v device coverage w/ low frequency sounders in units. manual pull stations provided at stair landing & exits. | $100,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 31 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 2 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 30 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 54 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 55 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 140 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 14 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 184 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 42 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 19 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 18 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 847 Innes Av | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 121 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 152 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. 100 sq ft addition to one 5 bd unit and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. 100 sq ft addition to one 5 bd unit and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 26 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 1 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. ada renovations.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. ada renovations. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 2 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 133 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 67 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. tenant improvements at services office.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. tenant improvements at services office. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 120 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. 100 sf expansion of one 4br unit. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. 100 sf expansion of one 4br unit. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 70 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 42 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 75 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. 100 sf expansion of two 5br units, and stand alone transh enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. 100 sf expansion of two 5br units, and stand alone transh enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 160 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 120 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 58 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Never finaled issued Jun 2016, no final | 101 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 82 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 1 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. community office & police sub-station.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. community office & police sub-station. | $1,750,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 43 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure.interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure.interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 19 Harbor Rd | rad priority. exterior rehab: roof, windows, paint. 100 sf expansion at two 4 bd units, and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. 100 sf expansion at two 4 bd units, and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 112 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 172 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 132 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. 100 sq ft expansion of two 5 bd units and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. 100 sq ft expansion of two 5 bd units and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 113 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 83 Northridge Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 100 Kiska Rd | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. add four addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. add four addresses. | $1,500,000 |
| May 29, 2015 | Never finaled issued May 2015, no final | 3298 25th St | "as builts" - fire alarm system replacement. remove monitoring of (e) waterflow switch. relocation of facp to lobby in lieu of renote annumicator. ref pa # 2015 0127 6796.Details
"as builts" - fire alarm system replacement. remove monitoring of (e) waterflow switch. relocation of facp to lobby in lieu of renote annumicator. ref pa # 2015 0127 6796. | |
| May 4, 2015 | Completed final sign-off Jun 2015 | 188 The Embarcadero | 2nd & 3rd floor - provide pre-action control panel for cross zones smoke detection for 2nd floor ups room & 3rd floor site core room. provide vesda, spot, alarm bell, hvac room shutdown, & pre-action activation. ref #2015.0427.4628 (pre-action sprinkler plan). n/a maher ordinanceDetails
2nd & 3rd floor - provide pre-action control panel for cross zones smoke detection for 2nd floor ups room & 3rd floor site core room. provide vesda, spot, alarm bell, hvac room shutdown, & pre-action activation. ref #2015.0427.4628 (pre-action sprinkler plan). n/a maher ordinance | $25,000 |
| Mar 18, 2015 | Never finaled issued Mar 2015, no final | 400 Sutter St | 3rd floor: fire alarm system modifications for 3/f t.i. consisting 2 duct smoke detectors, 2 strobes, 2 horn/strobes and add a notification alarm circuit power supply. t.i. pa#201501095333. n/a ordinance #155-13Details
3rd floor: fire alarm system modifications for 3/f t.i. consisting 2 duct smoke detectors, 2 strobes, 2 horn/strobes and add a notification alarm circuit power supply. t.i. pa#201501095333. n/a ordinance #155-13 | $8,000 |
| Feb 12, 2015 | Completed final sign-off Feb 2015 | 380 Fulton St | as built fire alarm system to orig permit 201303222886Details
as built fire alarm system to orig permit 201303222886 | |
| Jan 27, 2015 | Never finaled issued Feb 2015, no final | 3298 25th St | new fire alarm system. including mointoring of existing water flow switch, manual pull stations at exits and stair landings, horn & strobes for occupant notificatin, off site mointoring and smoke detector in corridors.Details
new fire alarm system. including mointoring of existing water flow switch, manual pull stations at exits and stair landings, horn & strobes for occupant notificatin, off site mointoring and smoke detector in corridors. | $50,000 |
| Oct 27, 2014 | Completed final sign-off May 2015 | 3590 19th St | new fire alarm system & elevator upgrade to group 4 including monitoring of existing water flow switch, elevator recall service, av coverage, manual pull stations at exits and stair landings.Details
new fire alarm system & elevator upgrade to group 4 including monitoring of existing water flow switch, elevator recall service, av coverage, manual pull stations at exits and stair landings. | $50,000 |
| Jun 26, 2014 | Completed final sign-off Jul 2014 | 450 Bryant St | modify existing fire alarm system. add 2 smoke detectors, 1 strobe, and relocate 1 horn/strobe combination due to tenant improvementDetails
modify existing fire alarm system. add 2 smoke detectors, 1 strobe, and relocate 1 horn/strobe combination due to tenant improvement | $1,500 |
| May 20, 2014 | Expired or cancelled withdrawn May 2014 | 380 Fulton St | new fire alarm/emergency communication system for the new fulton clubhouse for the boys and girls club of sf.Details
new fire alarm/emergency communication system for the new fulton clubhouse for the boys and girls club of sf. | $80,000 |
| Apr 10, 2014 | Completed final sign-off Nov 2014 | 201 Turk St | modification of existing fire alarm system for addition of hearing and visually impaired units on 5/f & 6/f, additional scope includes minor modifications to 8/f & 9/f & elevator interface to new elevator controller. n/a ordinance #155-13. t.i. pa# 201208137258Details
modification of existing fire alarm system for addition of hearing and visually impaired units on 5/f & 6/f, additional scope includes minor modifications to 8/f & 9/f & elevator interface to new elevator controller. n/a ordinance #155-13. t.i. pa# 201208137258 | $35,000 |
| Jan 30, 2013 | Completed final sign-off Oct 2013 | 500 Felton St | new addressable fire alarm and detection system including sprinkler monitoring, ada compiant audible and visual notification, duct smoke detectors for fsd control, partial smoke detection for storage spaces, electrical rooms, and facp protectionDetails
new addressable fire alarm and detection system including sprinkler monitoring, ada compiant audible and visual notification, duct smoke detectors for fsd control, partial smoke detection for storage spaces, electrical rooms, and facp protection | $25,000 |
| Jun 19, 2012 | Never finaled issued Jun 2012, no final | 449 Powell St | 4th floor fire alarm system modifications for tenant improvements -gallery space.Details
4th floor fire alarm system modifications for tenant improvements -gallery space. | $6,000 |
| Jun 19, 2012 | Never finaled issued Jun 2012, no final | 449 Powell St | 2nd & 3rd floor fire alarm system modifications tenant improvements. 2nd floor - s.f. visitors center, 3rd floor - glden gate grilleDetails
2nd & 3rd floor fire alarm system modifications tenant improvements. 2nd floor - s.f. visitors center, 3rd floor - glden gate grille | $15,000 |
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 420 29th Av | fire alarm system as built drawings. ref app 201007166849Details
fire alarm system as built drawings. ref app 201007166849 | |
| Mar 30, 2011 | Completed final sign-off Apr 2012 | 811 Stanyan St | new central station monitored manual & automatic fire alarm system including manual pull stations at exits, partial area smoke detection for exit corridor, laundry, kitchenette, storage & tel data rooms, audible/visual notification throughout.Details
new central station monitored manual & automatic fire alarm system including manual pull stations at exits, partial area smoke detection for exit corridor, laundry, kitchenette, storage & tel data rooms, audible/visual notification throughout. | $12,000 |
| Mar 4, 2011 | Completed final sign-off May 2011 | 234 Front St | new fire alarm system to provide elevator recall service fo rnew elevator includes audible/visual notification in elevator lobbies & restrooms.Details
new fire alarm system to provide elevator recall service fo rnew elevator includes audible/visual notification in elevator lobbies & restrooms. | $18,000 |
| Nov 30, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | to obtain final inspection for work approved under pa#200603076156 all work is complete.Details
to obtain final inspection for work approved under pa#200603076156 all work is complete. | |
| Nov 9, 2010 | Never finaled issued Nov 2010, no final | 101 Montgomery St | street space permit & mtaDetails
street space permit & mta | |
| Nov 9, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | to obtain final inspection for work approved under pa 200902273043. all work is complete.Details
to obtain final inspection for work approved under pa 200902273043. all work is complete. | |
| Jul 16, 2010 | Never finaled issued Jul 2010, no final | 420 29th Av | fire alarm system (enew) for new 20 units apartment complex.Details
fire alarm system (enew) for new 20 units apartment complex. | $70,000 |
| May 18, 2010 | Completed final sign-off Dec 2010 | 165 Turk St | provide a new fire alarm system for an (e) 27 units, low income apartment complex.Details
provide a new fire alarm system for an (e) 27 units, low income apartment complex. | $25,000 |
| May 14, 2010 | Completed final sign-off Nov 2011 | 1801 Green St | installation of new automatic and manual fire alarm system. system functions include partial area detection for property protection, elevator recall service and sprinkler system monitoring.Details
installation of new automatic and manual fire alarm system. system functions include partial area detection for property protection, elevator recall service and sprinkler system monitoring. | $13,000 |
| Mar 4, 2010 | Completed final sign-off Jul 2010 | 333 Eucalyptus Dr | modification to existing fire alarm system to accomodate shower room alterations. device quantities are on shop drawingsDetails
modification to existing fire alarm system to accomodate shower room alterations. device quantities are on shop drawings | $8,000 |
| Mar 4, 2010 | Never finaled issued Mar 2010, no final | 201 Leland Av | provision of new fire alarm system for new visitacion valley branch library. will monitor sprinkler system, provide ahu shutdown, provide audible and visual evactuation signals throughout building.Details
provision of new fire alarm system for new visitacion valley branch library. will monitor sprinkler system, provide ahu shutdown, provide audible and visual evactuation signals throughout building. | $10,000 |
| Nov 13, 2009 | Never finaled issued Nov 2009, no final | 1200 Taraval St | installation of new fire alarm system, consisting of 1-each fire alarm control panel with digital dialer, 3-smoke detectors, 1-heat detector, 3-maunal pull stations, 8-horn/strobes & 6-strobes.Details
installation of new fire alarm system, consisting of 1-each fire alarm control panel with digital dialer, 3-smoke detectors, 1-heat detector, 3-maunal pull stations, 8-horn/strobes & 6-strobes. | $10,000 |
| Nov 13, 2009 | Completed final sign-off Jan 2010 | 536 Central Av | installation of new fire alarm system for the new diamond youth shelter consisting of a control panel, 13 strobes, 14 horn/strobes, 8 manual pull stations, 4 heat detectors, 17 smoke detectors, elrevator recall service & sprinkler monitoringDetails
installation of new fire alarm system for the new diamond youth shelter consisting of a control panel, 13 strobes, 14 horn/strobes, 8 manual pull stations, 4 heat detectors, 17 smoke detectors, elrevator recall service & sprinkler monitoring | $12,000 |
| Oct 2, 2009 | Never finaled issued Oct 2009, no final | 185 Post St | to obtain final inspection for work approved under pa # 200801071981. allwork has been completed. (2nd, 3rd, 4th, & 5th floor)Details
to obtain final inspection for work approved under pa # 200801071981. allwork has been completed. (2nd, 3rd, 4th, & 5th floor) | |
| Jul 2, 2009 | Completed final sign-off Dec 2010 | 44 Mcallister St | provide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exitsDetails
provide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exits | $195,000 |
| May 29, 2009 | Completed final sign-off Dec 2009 | 4800 03rd St | new fire alarm system for a new 18 unit apartment building. the system will monitor sprinkler system. recall elevator, provide automatic and manual detection and provide audible and visible notification. see floor plans and device legend on drawings for quantity of devices.Details
new fire alarm system for a new 18 unit apartment building. the system will monitor sprinkler system. recall elevator, provide automatic and manual detection and provide audible and visible notification. see floor plans and device legend on drawings for quantity of devices. | $18,000 |
| Apr 21, 2009 | Completed final sign-off Nov 2009 | 640 Sutter St | fire alarm system modifications, phase 1 as built. added 3 manual pull stations, 1 smoke detector, 4 addressable dual input monitor module for sprinkler system switches. relocated devices per field conditions and revised 4th floor plan. addded 4 horn strobes to 4th fl. ref app 200808088788.Details
fire alarm system modifications, phase 1 as built. added 3 manual pull stations, 1 smoke detector, 4 addressable dual input monitor module for sprinkler system switches. relocated devices per field conditions and revised 4th floor plan. addded 4 horn strobes to 4th fl. ref app 200808088788. | $2,000 |