98 permits since 2000: 60 completed, 5 in progress, 26 never finaled, 7 expired or cancelled.
Of the 26 never-finaled permits, 13 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Sep 2026 | 5 Freelon St | revision to bpa#202510016468. revised demo includes additional removal of interior & exterior doors, interior partitions, ceilings, light fixtures, casework & interior finishes. revised construction includes addition of (n) interior partitions for revised layout, interiot/exterior doors & hardware.Details
revision to bpa#202510016468. revised demo includes additional removal of interior & exterior doors, interior partitions, ceilings, light fixtures, casework & interior finishes. revised construction includes addition of (n) interior partitions for revised layout, interiot/exterior doors & hardware. | |
| Oct 1, 2025 | In progress issued Jan 2026 | 5 Freelon St | ti for partial demo of (e) doors, partitions, ceiling, lighting, electrical and tel/data receptacles, stairs and finishes at both floors of a two story low rise office building. construction of (n) partitions, doors, glazing, ceiling, lighting, electrical andtel/data receptacles. project modifiesDetails
ti for partial demo of (e) doors, partitions, ceiling, lighting, electrical and tel/data receptacles, stairs and finishes at both floors of a two story low rise office building. construction of (n) partitions, doors, glazing, ceiling, lighting, electrical andtel/data receptacles. project modifies | $1,200,000 |
| Mar 20, 2025 | In progress filed Mar 2025, not yet issued | 680 08th St | rear ramp-volutary modify the (e) ramp at the rear parking lot to comply with current access standards, including (n) concrete extensions and topping (n) guardrail and wheel guide (n) battery powered actuated door closer and new signageDetails
rear ramp-volutary modify the (e) ramp at the rear parking lot to comply with current access standards, including (n) concrete extensions and topping (n) guardrail and wheel guide (n) battery powered actuated door closer and new signage | $100,000 |
| Mar 13, 2024 | In progress filed Mar 2024, not yet issued | 680 08th St | remodel 1 exit stair: replace (e) handrails. raise tops of guards to 42" above nosings. reinstall (e) doors to swing in direction of exit travel. install contrasting color nosing strips. level & reinforce (e) bottom landing to swing in direction of exit travel. remove (e) hatch door & patch opening.Details
remodel 1 exit stair: replace (e) handrails. raise tops of guards to 42" above nosings. reinstall (e) doors to swing in direction of exit travel. install contrasting color nosing strips. level & reinforce (e) bottom landing to swing in direction of exit travel. remove (e) hatch door & patch opening. | $5,000 |
| Feb 13, 2024 | Completed final sign-off Jul 2025 | 1725 Kearny St | remodel kitchen and 2 baths at unit #2, 2nd fl level. install new cabinets and appliances and finishes. no structural work proposed. no work to exterior.Details
remodel kitchen and 2 baths at unit #2, 2nd fl level. install new cabinets and appliances and finishes. no structural work proposed. no work to exterior. | $100,000 |
| Dec 14, 2023 | Completed final sign-off Nov 2024 | 145 Missouri St | revision to apprvoed pa 2022-0516-4293 to make rear deck wall solid first 42", remove rear door and overhang that is over property lineDetails
revision to apprvoed pa 2022-0516-4293 to make rear deck wall solid first 42", remove rear door and overhang that is over property line | |
| Nov 22, 2023 | Completed final sign-off Sep 2025 | 1700 Waller St | revision to pa# 202011209416. change to plywood shearwall nailing & holdowns.Details
revision to pa# 202011209416. change to plywood shearwall nailing & holdowns. | |
| Nov 20, 2023 | Completed final sign-off Nov 2024 | 145 Missouri St | like for like replacement of 2 extg windows in extg bathroom, new windows will be the same size, same location, color, and style of extg window. max u-factor 0.30.Details
like for like replacement of 2 extg windows in extg bathroom, new windows will be the same size, same location, color, and style of extg window. max u-factor 0.30. | $2,000 |
| Sep 27, 2023 | In progress issued Oct 2023 | 245 05th St | unit# 110: remodel existing residential/commercial space at 1/f add new enclosed office and wet bar, 2/f add new residential kitchen and bathroom, upgrade unisex restroom for disabled access, replace doors at existing bedroom.Details
unit# 110: remodel existing residential/commercial space at 1/f add new enclosed office and wet bar, 2/f add new residential kitchen and bathroom, upgrade unisex restroom for disabled access, replace doors at existing bedroom. | $64,000 |
| Aug 9, 2023 | Completed final sign-off Nov 2025 | 1700 Waller St | soft story retrofit per ab 094Details
soft story retrofit per ab 094 | $20,000 |
| Jul 5, 2023 | Expired or cancelled cancelled Jan 2026 | 680 08th St | to comply with abe# 202206081338, including partial sidewalk replacement & power door operator installation. voluntary upgrade of secondary entrances, including partial sidewalk replacement & installation of a wheelchair lift.Details
to comply with abe# 202206081338, including partial sidewalk replacement & power door operator installation. voluntary upgrade of secondary entrances, including partial sidewalk replacement & installation of a wheelchair lift. | $50,000 |
| Mar 2, 2023 | Completed final sign-off Mar 2023 | 221 04th St | rev to pa# 2022-0815-0511: revise the da checklist and apply the 20% rule for accessible improvements.Details
rev to pa# 2022-0815-0511: revise the da checklist and apply the 20% rule for accessible improvements. | |
| Oct 7, 2022 | Completed final sign-off May 2023 | 435 Brannan St | ti at first floor, convert existing rooms into a conference room, remodel kitchen, provide disabled accessible unisex restroom and add accessible drinking fountain and acessible handwash sink.add ada push button at entrance in kindDetails
ti at first floor, convert existing rooms into a conference room, remodel kitchen, provide disabled accessible unisex restroom and add accessible drinking fountain and acessible handwash sink.add ada push button at entrance in kind | $115,000 |
| Aug 15, 2022 | Completed final sign-off Mar 2023 | 221 04th St | ti including 5 new offices and 1 meeting room no structural or plumbing scope. change of use groud floorDetails
ti including 5 new offices and 1 meeting room no structural or plumbing scope. change of use groud floor | $73,604 |
| May 16, 2022 | Completed final sign-off Nov 2024 | 145 Missouri St | correct nov#201808381, for rear porch deck that is built in kind over the property line. rear porch deck will be built to observe property line.per variance decision(2019-007159var), privacy screen will also be built to preserve the rear neighbor's privacy.Details
correct nov#201808381, for rear porch deck that is built in kind over the property line. rear porch deck will be built to observe property line.per variance decision(2019-007159var), privacy screen will also be built to preserve the rear neighbor's privacy. | $5,000 |
| Mar 16, 2022 | Completed final sign-off Feb 2023 | 854 Folsom St | t.i. at 2nd floor. add new conferance room and reception room. disabled access path of travel upgrade at 2nd floor restrooms.Details
t.i. at 2nd floor. add new conferance room and reception room. disabled access path of travel upgrade at 2nd floor restrooms. | $45,000 |
| Jan 15, 2021 | Completed final sign-off Sep 2021 | 2301 Market St | 2/f group studio: demo (e) interior non bearing partitions, doors, frames, hardware, flooring and ramp. finish improvements to include new flooring to match level and finish. new infill partition at (e) door opening, finishes to existing.Details
2/f group studio: demo (e) interior non bearing partitions, doors, frames, hardware, flooring and ramp. finish improvements to include new flooring to match level and finish. new infill partition at (e) door opening, finishes to existing. | $16,830 |
| Dec 15, 2020 | Expired or cancelled expired Sep 2026 | 2301 Market St | demo damaged columns, storefront & glazing; install (n) columns, repair & replace storefront systemDetails
demo damaged columns, storefront & glazing; install (n) columns, repair & replace storefront system | $22,535 |
| Aug 22, 2020 | Completed final sign-off Nov 2021 | 350 Brannan St | property owner improvements to existing level 1 spec suite. selective demolition, construction of interior non-load bearing partitions, doors, sidelites, ceilings, lighting and interior finishes. minor accessibility improvments at spec suite enrty doors. mep scope deferred submittal.Details
property owner improvements to existing level 1 spec suite. selective demolition, construction of interior non-load bearing partitions, doors, sidelites, ceilings, lighting and interior finishes. minor accessibility improvments at spec suite enrty doors. mep scope deferred submittal. | $194,550 |
| Jul 10, 2020 | Completed final sign-off Apr 2021 | 625 Market St | 8/f: t.i includes demo of non structural partitions and bldg new non structural partitions. new accessible shower room and new mother's room are being added as a bldg amenity. all new or revised meps, life safety and sprinkler if neede will be design build and submitted under seperately.Details
8/f: t.i includes demo of non structural partitions and bldg new non structural partitions. new accessible shower room and new mother's room are being added as a bldg amenity. all new or revised meps, life safety and sprinkler if neede will be design build and submitted under seperately. | $95,000 |
| Jun 9, 2020 | Completed final sign-off Apr 2021 | 2185 Chestnut St | new lighting, new finishes, accessibility upgrades to (e) fitting rooms, modifications to (e) employee restroom to accommodate fitting room upgrades, install tenant retail fixtures. maher n/a.Details
new lighting, new finishes, accessibility upgrades to (e) fitting rooms, modifications to (e) employee restroom to accommodate fitting room upgrades, install tenant retail fixtures. maher n/a. | $42,000 |
| Jan 17, 2020 | Never finaled issued Mar 2020, no final | 111 New Montgomery St | 2nd fl - interior demo of doors, partitions, ceiling and finishes. new construction to include new partitions, doors, ceilings, lighting. mechanical and electrical work included.Details
2nd fl - interior demo of doors, partitions, ceiling and finishes. new construction to include new partitions, doors, ceilings, lighting. mechanical and electrical work included. | $240,000 |
| Nov 4, 2019 | Expired or cancelled cancelled Jan 2026 | 900 Kearny St | 7th fl, ste 700 - title 24 compliant: install 2 occupancy sensor, install 1 gfci outlet. install 2 led light fixture. ref pa 2019-0617-3510 and 2019-0905-0719Details
7th fl, ste 700 - title 24 compliant: install 2 occupancy sensor, install 1 gfci outlet. install 2 led light fixture. ref pa 2019-0617-3510 and 2019-0905-0719 | $4,000 |
| Oct 29, 2019 | Never finaled issued Jun 2020, no final | 2306 Market St | replace existing elevator with newDetails
replace existing elevator with new | $6,500 |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 625 Market St | 15th floor t.i includes the demo of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered.Details
15th floor t.i includes the demo of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered. | $450,000 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 900 Kearny St | ste 700: office tenant improvement to include construction of offices, mech, elec, plumbimg, & fire sprinklerDetails
ste 700: office tenant improvement to include construction of offices, mech, elec, plumbimg, & fire sprinkler | $450,000 |
| Jun 10, 2019 | Completed final sign-off Sep 2021 | 1365 04th St | ti - interior only install of new cabinetry, non-bearing walls, partitions, break room, some new floors, some ceiling, mech, electrical & fire protection/srpinkler work deferred and under separate permitDetails
ti - interior only install of new cabinetry, non-bearing walls, partitions, break room, some new floors, some ceiling, mech, electrical & fire protection/srpinkler work deferred and under separate permit | $75,000 |
| May 30, 2019 | Completed final sign-off Jun 2020 | 260 California St | 10th flr ti includes new non structural partitions, mep, life safety and sprinklers under sep permit; demo permit 201901311695Details
10th flr ti includes new non structural partitions, mep, life safety and sprinklers under sep permit; demo permit 201901311695 | $600,000 |
| May 16, 2019 | Never finaled issued May 2019, no final | 900 Kearny St | 5th & 7th fl.-renovation of 4 restrooms, fixtures, finishes & lightingDetails
5th & 7th fl.-renovation of 4 restrooms, fixtures, finishes & lighting | $40,000 |
| Mar 8, 2019 | Completed final sign-off Jun 2019 | 1940 Broadway | #2e -widen existing door opening from 2'6 to 5'4 between kitchen and dining in non-structural partiton. relocate kitchen cabinets on that wall to west wall.Details
#2e -widen existing door opening from 2'6 to 5'4 between kitchen and dining in non-structural partiton. relocate kitchen cabinets on that wall to west wall. | $4,000 |
| Dec 12, 2018 | Completed final sign-off May 2019 | 900 Kearny St | suite# 700: demolition of existing interoir tenant improvements per ab-017.Details
suite# 700: demolition of existing interoir tenant improvements per ab-017. | $5,000 |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 900 Kearny St | ste. 500: replace e suite doors and 1 elec outlet. revision to pa#2018-06-26-2931Details
ste. 500: replace e suite doors and 1 elec outlet. revision to pa#2018-06-26-2931 | $1,500 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 1278 Market St | install projecting double faced sign "rams" 1278-1298 marketDetails
install projecting double faced sign "rams" 1278-1298 market | $500 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 1278 Market St | install projecting double faced sign "ananda fuara" 1278-1298 marketDetails
install projecting double faced sign "ananda fuara" 1278-1298 market | $1,500 |
| Nov 6, 2018 | Completed final sign-off Dec 2018 | 625 Market St | revision to pa 201503130876. penthouse & roof. elevator upgrade, revision per fire inspectorDetails
revision to pa 201503130876. penthouse & roof. elevator upgrade, revision per fire inspector | |
| Oct 19, 2018 | Completed final sign-off Dec 2018 | 625 Market St | to obtain final inspection for work approved under pa# 201408224472 & 201503130876. all work is complete.Details
to obtain final inspection for work approved under pa# 201408224472 & 201503130876. all work is complete. | |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 900 Kearny St | revision to pa 201806262931. suite 500. add electronic door openers to 2 toilet stallsDetails
revision to pa 201806262931. suite 500. add electronic door openers to 2 toilet stalls | $3,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 501 Folsom St | enlarge (e) 1st and 2nd flr restrooms. add 2 unisex shower at 1st flr. disabled access upgrades at path of travel incl entrance door push plates and elevator buttons, relocate intercom and card reader at (e) entrancesDetails
enlarge (e) 1st and 2nd flr restrooms. add 2 unisex shower at 1st flr. disabled access upgrades at path of travel incl entrance door push plates and elevator buttons, relocate intercom and card reader at (e) entrances | $175,000 |
| Jun 26, 2018 | Completed final sign-off Jul 2019 | 900 Kearny St | 5th floor: architectural only (ele, plmbg, sprinklers by others) create space for offices.Details
5th floor: architectural only (ele, plmbg, sprinklers by others) create space for offices. | $125,000 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 435 Brannan St | revision to pa #201612024033. revision to breakroom layout. no change of use from existing warehouse use.Details
revision to pa #201612024033. revision to breakroom layout. no change of use from existing warehouse use. | |
| Mar 22, 2018 | Completed final sign-off Jun 2019 | 4355 Geary Bl | ground floor: t.i. of 3035 sq ft office. scope of work to include the following: remove (e) ceiling, new non bearing partitions, new finishes including casework ada restroom upgrades. mech, elec, & sprinklers system deferred under separate permit.Details
ground floor: t.i. of 3035 sq ft office. scope of work to include the following: remove (e) ceiling, new non bearing partitions, new finishes including casework ada restroom upgrades. mech, elec, & sprinklers system deferred under separate permit. | $250,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 4355 Geary Bl | remove non bearing partitions select (e) cabinetry, selected doors, store front lighting, flooring/finishes, suspended ceiling and (e) plm fixtures/cap utilities per ab-017. ti under sep permit inc - mech/ele/fire protectionDetails
remove non bearing partitions select (e) cabinetry, selected doors, store front lighting, flooring/finishes, suspended ceiling and (e) plm fixtures/cap utilities per ab-017. ti under sep permit inc - mech/ele/fire protection | $12,500 |
| Jan 29, 2018 | Completed final sign-off Oct 2018 | 435 Brannan St | revision of interior deck and ramp layout from permit app#201612024033Details
revision of interior deck and ramp layout from permit app#201612024033 | $1,000 |
| Jan 24, 2018 | Completed final sign-off Oct 2018 | 435 Brannan St | title 24 ref 201612024033, electrical maher not reqDetails
title 24 ref 201612024033, electrical maher not req | $30,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 1001 Brannan St | to renew expired pa # 09623266 & 09701776 previously approved for a final inspection all work is completeDetails
to renew expired pa # 09623266 & 09701776 previously approved for a final inspection all work is complete | |
| Dec 7, 2017 | Completed final sign-off Dec 2017 | 1001 Brannan St | renew pa#8819017, 9207545, 9608418 to schedule final inspections.Details
renew pa#8819017, 9207545, 9608418 to schedule final inspections. | |
| Dec 7, 2017 | Completed final sign-off Dec 2017 | 1001 Brannan St | renew 9610210 and 9704171 for final inspetionDetails
renew 9610210 and 9704171 for final inspetion | |
| Nov 20, 2017 | Expired or cancelled withdrawn Nov 2017 | 555 Clay St | revision to pa #201709056824. relocate door at exit passageway. revise kitchen layout. revise ceiling assembly. maher naDetails
revision to pa #201709056824. relocate door at exit passageway. revise kitchen layout. revise ceiling assembly. maher na | |
| Oct 20, 2017 | Expired or cancelled cancelled Jun 2018 | 435 Brannan St | change of use from warehouse to 2,500 sq ft cafe/retail & warehouseDetails
change of use from warehouse to 2,500 sq ft cafe/retail & warehouse | $25,000 |
| Sep 28, 2017 | Completed final sign-off Feb 2018 | 1001 Brannan St | replace e food service equipment, new front service counter, replace e light fixtures, new flooring and wall finishes. upgrade e electrical and plumbing to code as req maher not req. (e) hvac system to remain.Details
replace e food service equipment, new front service counter, replace e light fixtures, new flooring and wall finishes. upgrade e electrical and plumbing to code as req maher not req. (e) hvac system to remain. | $69,318 |
| Sep 5, 2017 | Never finaled issued Sep 2017, no final | 555 Clay St | removal of interior, non load bearing partitions, remove stair, replace finishes and fixtures.n/a for maherDetails
removal of interior, non load bearing partitions, remove stair, replace finishes and fixtures.n/a for maher | $30,000 |
| Apr 5, 2017 | Completed final sign-off Jul 2018 | 1800 Mission St | 1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13Details
1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13 | |
| Mar 29, 2017 | Completed final sign-off Oct 2017 | 781 Beach St | interior renovations of (e) spaces into museum with accessory retail; new restrooms, breakroom, archival storage, library, workshop and administrative office. maher n/aDetails
interior renovations of (e) spaces into museum with accessory retail; new restrooms, breakroom, archival storage, library, workshop and administrative office. maher n/a | $239,000 |
| Dec 2, 2016 | Completed final sign-off Oct 2018 | 435 Brannan St | suite# 110: light demo, elec distr, lighting, restrooms, breakroom, partitions. life safety deferred. ** maher: n/a **Details
suite# 110: light demo, elec distr, lighting, restrooms, breakroom, partitions. life safety deferred. ** maher: n/a ** | $250,000 |
| Oct 28, 2016 | Completed final sign-off Nov 2017 | 1800 Mission St | administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance.Details
administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance. | $84,000 |
| Jun 22, 2016 | Never finaled issued Aug 2016, no final | 260 California St | demolition of (e) non-structural interior partitions, millwork, electrical, ceilings & lighting. removal of structural column & install new non-structural interior partitions, millwork, electrical, ceiling & lighting & installation of new structural support avoce ceiling at area of demo'd columnDetails
demolition of (e) non-structural interior partitions, millwork, electrical, ceilings & lighting. removal of structural column & install new non-structural interior partitions, millwork, electrical, ceiling & lighting & installation of new structural support avoce ceiling at area of demo'd column | $50,000 |
| Feb 3, 2016 | Completed final sign-off Aug 2016 | 1292 Market St | change of use from liquor store to counseling offices at (e) ground level space. ti - includes new interior partitions for new offices, new suspended ceiling system and lighting, new accessible unisex toilet.mep/fire/life safety under sep permitDetails
change of use from liquor store to counseling offices at (e) ground level space. ti - includes new interior partitions for new offices, new suspended ceiling system and lighting, new accessible unisex toilet.mep/fire/life safety under sep permit | $106,550 |
| Dec 2, 2015 | Completed final sign-off May 2016 | 1321 Mission St | ground fl: panoramic interests office building & unit mock up for sales purposes. modulab unit mock up in temporary sales office.Details
ground fl: panoramic interests office building & unit mock up for sales purposes. modulab unit mock up in temporary sales office. | $35,000 |
| Nov 24, 2015 | Never finaled issued Nov 2015, no final | 1282 Market St | interior lighting for tenant improvement for 201510089267Details
interior lighting for tenant improvement for 201510089267 | $6,500 |
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 148 Townsend St | revision to 2015-0915-7044 t24 calculation and reflected ceiling plan revisions. layout changes to toilet room removal of showerDetails
revision to 2015-0915-7044 t24 calculation and reflected ceiling plan revisions. layout changes to toilet room removal of shower | |
| Oct 9, 2015 | Completed final sign-off Feb 2016 | 39 Drumm St | install new single stall fully compliant unisex restroom. no mep, no structural. work under this permitDetails
install new single stall fully compliant unisex restroom. no mep, no structural. work under this permit | $28,500 |
| Oct 8, 2015 | Never finaled issued Oct 2015, no final | 1282 Market St | tenant improvement existng gr fl office space. new interior partitions for offices and workspaces, new suspended ceiling, new disabled access ramp, new womes accessible toilet rm, disabled access upgrade of existing mens toilet rm. no exterior changes lighting, mech & life safety under sep permtDetails
tenant improvement existng gr fl office space. new interior partitions for offices and workspaces, new suspended ceiling, new disabled access ramp, new womes accessible toilet rm, disabled access upgrade of existing mens toilet rm. no exterior changes lighting, mech & life safety under sep permt | $175,000 |
| Oct 6, 2015 | Completed final sign-off Nov 2016 | 111 New Montgomery St | basement:demolition of extg storage rm. door, recept, & unused plmg in a bldg's basement. to comply with n.o.v.#200233951 dated 10-7-02. maher naDetails
basement:demolition of extg storage rm. door, recept, & unused plmg in a bldg's basement. to comply with n.o.v.#200233951 dated 10-7-02. maher na | $1,500 |
| Oct 2, 2015 | Never finaled issued Jan 2016, no final | 111 New Montgomery St | tenant improvement to existing office building, floor 3. demo existing doors, partitons, ceiling/lighting, elec finishes. new partitions, doors, ceiling lighting elec. upgrade e restrooes to comply with add and title 24. new hvac sep permit maher not reqDetails
tenant improvement to existing office building, floor 3. demo existing doors, partitons, ceiling/lighting, elec finishes. new partitions, doors, ceiling lighting elec. upgrade e restrooes to comply with add and title 24. new hvac sep permit maher not req | $300,000 |
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 148 Townsend St | tenant improvement to expand existing suite on 3rd fl. 3, new conference rooms, new accessible toilet rooms, new closets, new ceiling mounted curtains. compliance with maher ordinance no 155-13 not required.Details
tenant improvement to expand existing suite on 3rd fl. 3, new conference rooms, new accessible toilet rooms, new closets, new ceiling mounted curtains. compliance with maher ordinance no 155-13 not required. | $105,000 |
| Aug 14, 2015 | Expired or cancelled withdrawn Mar 2017 | 405 10th St | install shipping containers on (e) vacant parking lot & provide new creative space per sali zoning. install windows, doors, partitions, electrical, lighting & plumbing & finishes at all 3 floors. (total s.f. is 5,280). maher ord n/a.Details
install shipping containers on (e) vacant parking lot & provide new creative space per sali zoning. install windows, doors, partitions, electrical, lighting & plumbing & finishes at all 3 floors. (total s.f. is 5,280). maher ord n/a. | $300,000 |
| Jul 10, 2015 | Never finaled issued Dec 2016, no final | 1278 Market St | (n) storefront system @ ground fl, (n) disabled accessible entrance doors @ (e) location, repair clerestory windows, (n) cement plaster finish @ ground fl along market & larkin w/ stone tile below window sill, disabled upgrade @ ground fl toilet rooms.Details
(n) storefront system @ ground fl, (n) disabled accessible entrance doors @ (e) location, repair clerestory windows, (n) cement plaster finish @ ground fl along market & larkin w/ stone tile below window sill, disabled upgrade @ ground fl toilet rooms. | $300,000 |
| Mar 13, 2015 | Completed final sign-off Dec 2018 | 625 Market St | penthouse & roofing: revision to pa#201408224472, existing 2 hr. rated wall to remain, infill ventilation area opened up for machine installation. remove existing roof ventilator and replace with metal cap.Details
penthouse & roofing: revision to pa#201408224472, existing 2 hr. rated wall to remain, infill ventilation area opened up for machine installation. remove existing roof ventilator and replace with metal cap. | |
| Feb 25, 2015 | Completed final sign-off Sep 2015 | 675 Townsend St | t.i. (e) retail space & vacant adjacent retail space for new larger retail space. work includes new non bearing partitions, renovate toilet room, new storage room, new floor and wall finishes throughout. mechanical & lighting, fire sprinkler & fire alarm under seperate permit, n/a ordinance #155-13Details
t.i. (e) retail space & vacant adjacent retail space for new larger retail space. work includes new non bearing partitions, renovate toilet room, new storage room, new floor and wall finishes throughout. mechanical & lighting, fire sprinkler & fire alarm under seperate permit, n/a ordinance #155-13 | $150,000 |
| Jan 5, 2015 | Never finaled issued Jan 2015, no final | 1389 Underwood Av | repair in kind area damaged by fire including roof sheathing, roof joists, and pony walls as required by structural engineerDetails
repair in kind area damaged by fire including roof sheathing, roof joists, and pony walls as required by structural engineer | $10,000 |
| Oct 21, 2014 | Completed final sign-off Jan 2015 | 260 California St | ste 500: interior remodel of part of e eoffice for marketing purpose including minor demo of ceilings, millwork, flooring, wall along exterior wall, installation new doors, walls, lighting and finishes. electrical and mechanical under sep permitDetails
ste 500: interior remodel of part of e eoffice for marketing purpose including minor demo of ceilings, millwork, flooring, wall along exterior wall, installation new doors, walls, lighting and finishes. electrical and mechanical under sep permit | $95,000 |
| Sep 12, 2014 | Completed final sign-off Feb 2015 | 1425 Vallejo St | kitchen - new cabinets, top, appliances, no structural; no alteration of wall, window and doorDetails
kitchen - new cabinets, top, appliances, no structural; no alteration of wall, window and door | $12,000 |
| Aug 22, 2014 | Completed final sign-off Dec 2018 | 625 Market St | new elevator equip. & machine room. new raised mech. deck new ventilation opening at roof over (el) room. bldg (new) floor and non structural partitions. all new or revised hvac, electrical, plmg will be design-build and submitted for permit seperately if needed. bldg is fully sprinklered.Details
new elevator equip. & machine room. new raised mech. deck new ventilation opening at roof over (el) room. bldg (new) floor and non structural partitions. all new or revised hvac, electrical, plmg will be design-build and submitted for permit seperately if needed. bldg is fully sprinklered. | $1,100,000 |
| Jun 3, 2014 | Completed final sign-off Jul 2015 | 1001 Brannan St | removal of sauna and steam room wall in men's shower room non-load bearing partial ht wall. 4 new showers, 2 accessible roll-in showers. finish upgrades in wet areas and shower rooms. n/a for the maher ordinance #155-13Details
removal of sauna and steam room wall in men's shower room non-load bearing partial ht wall. 4 new showers, 2 accessible roll-in showers. finish upgrades in wet areas and shower rooms. n/a for the maher ordinance #155-13 | $100,000 |
| May 23, 2014 | Never finaled issued May 2014, no final | 501 Folsom St | new disabled accesible shower to be added at the 4th floor toilet room and provide accessibility upgrade on the path of travel per plansDetails
new disabled accesible shower to be added at the 4th floor toilet room and provide accessibility upgrade on the path of travel per plans | $21,000 |
| May 7, 2014 | Never finaled issued May 2014, no final | 5513 Mission St | replace seven windows within existing opennings. vinyl at sides. aluminum double hung to sides of fixed picture window. vinyl elsewhere.; repl 2 front sliders with 2 alu, max u factor .40Details
replace seven windows within existing opennings. vinyl at sides. aluminum double hung to sides of fixed picture window. vinyl elsewhere.; repl 2 front sliders with 2 alu, max u factor .40 | $3,500 |
| Apr 24, 2014 | Never finaled issued Oct 2014, no final | 111 New Montgomery St | demo (e) doors partitions, ceiling, lighting, electrical, tel/data receptacles, conduits, cabling & finishes throughout the floor. new construction includes new partitions, doors, ceiling, lighting, electrical, tel/data receptacles, conduit & cabling. new heat pumps under seperate permit,Details
demo (e) doors partitions, ceiling, lighting, electrical, tel/data receptacles, conduits, cabling & finishes throughout the floor. new construction includes new partitions, doors, ceiling, lighting, electrical, tel/data receptacles, conduit & cabling. new heat pumps under seperate permit, | $300,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 5513 Mission St | interior remodel: add one full bath room at 2nd floor.Details
interior remodel: add one full bath room at 2nd floor. | $11,350 |
| Mar 6, 2014 | Completed final sign-off Jun 2014 | 5513 Mission St | remodel kitchen (125 sf)& bath (50 sf) . new cabinets, sink, disposal, plugs, dishwasher. lighting plugs, no chang ein rough-ins @kitchen. new vanity, toilet, sink, finishes, no change in rough-in, new shower w/pan, new tub @ bath. work @ 2nd floor resident only. no structural, no work @ 1st floor.Details
remodel kitchen (125 sf)& bath (50 sf) . new cabinets, sink, disposal, plugs, dishwasher. lighting plugs, no chang ein rough-ins @kitchen. new vanity, toilet, sink, finishes, no change in rough-in, new shower w/pan, new tub @ bath. work @ 2nd floor resident only. no structural, no work @ 1st floor. | $25,000 |
| Jan 29, 2014 | Completed final sign-off Oct 2014 | 875 Stevenson St | change of use. suite 100. (n)demishing wals for 3 studios,men's&womens locker rms,staffbreak&laundry rms.4personal traing/pt rms&offices.(n)acoustical ceilings&suspended ceilings. interim control area. sprinkler and fire alarm seperate permit.Details
change of use. suite 100. (n)demishing wals for 3 studios,men's&womens locker rms,staffbreak&laundry rms.4personal traing/pt rms&offices.(n)acoustical ceilings&suspended ceilings. interim control area. sprinkler and fire alarm seperate permit. | $800,000 |
| Dec 30, 2013 | Completed final sign-off Mar 2014 | 680 08th St | to erect electric wall signDetails
to erect electric wall sign | $13,000 |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 680 08th St | new signage on existing awningDetails
new signage on existing awning | $1,000 |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 680 08th St | t.i. of extg wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level extg floors and soffit above hood display. mechanical under separate permit.Details
t.i. of extg wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level extg floors and soffit above hood display. mechanical under separate permit. | $400,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 680 08th St | disabled access path of travel barrier removal at g/f including main entrance east side, parking lot entrance, ramp at parking lot, 3 disabled accessible parking spaces, exterior directional signs, ground floor mens & womens toilet rooms and drinking fountain.Details
disabled access path of travel barrier removal at g/f including main entrance east side, parking lot entrance, ramp at parking lot, 3 disabled accessible parking spaces, exterior directional signs, ground floor mens & womens toilet rooms and drinking fountain. | $29,000 |
| Jun 21, 2013 | Never finaled issued Sep 2013, no final | 711 Market St | relocate office entrance/existing front doors. relocate skylights on 2nd floor officeDetails
relocate office entrance/existing front doors. relocate skylights on 2nd floor office | $8,000 |
| Apr 26, 2013 | Completed final sign-off Jul 2013 | 660 Market St | 5th floor-t.i include demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building is not sprinkleredDetails
5th floor-t.i include demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building is not sprinklered | $60,000 |
| Apr 19, 2013 | Completed final sign-off Sep 2013 | 2310 43rd Av | no structural work, new kitchen cabinets, new sink, remove & replace bathroom fixtures in 2 bathrooms.Details
no structural work, new kitchen cabinets, new sink, remove & replace bathroom fixtures in 2 bathrooms. | $9,000 |
| Apr 8, 2013 | Completed final sign-off Jul 2013 | 983 Cayuga Av | legalize two bedrooms, one and half bathrooms on 1st floor.Details
legalize two bedrooms, one and half bathrooms on 1st floor. | $40,000 |
| Apr 4, 2013 | Completed final sign-off Jul 2013 | 983 Cayuga Av | comply with nov# 201394921 dated 4/1/13-no structural work. new cabinets, sink, electrical, lighting fixtures. partial abatement ot legalize kitchen remodel on upper level, 1 bathrm remodeling, 1 half bathrm remodel on upper level. no change in walls or opeing layout. seperate permit for lower levelDetails
comply with nov# 201394921 dated 4/1/13-no structural work. new cabinets, sink, electrical, lighting fixtures. partial abatement ot legalize kitchen remodel on upper level, 1 bathrm remodeling, 1 half bathrm remodel on upper level. no change in walls or opeing layout. seperate permit for lower level | $22,700 |
| Jun 15, 2012 | Completed final sign-off Sep 2012 | 555 04th St | install and vent bathroom exhaust fan, install heat pump, install indoor fan coil and supply ducting. ref 201206072145Details
install and vent bathroom exhaust fan, install heat pump, install indoor fan coil and supply ducting. ref 201206072145 | $14,500 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 555 04th St | t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit.Details
t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit. | $145,000 |
| May 23, 2012 | Completed final sign-off Oct 2012 | 680 08th St | space #163-correction of notice of violation #200839192 for (e) wholesale-retail door showroom. work includes non bearing partitons, lighting, disabled access upgrade at restrooms. new display cooktop/kitchette. no change to mechanical, no structural work. fire sprinkler under seperate permitDetails
space #163-correction of notice of violation #200839192 for (e) wholesale-retail door showroom. work includes non bearing partitons, lighting, disabled access upgrade at restrooms. new display cooktop/kitchette. no change to mechanical, no structural work. fire sprinkler under seperate permit | $156,700 |
| Mar 24, 2011 | Expired or cancelled cancelled Jan 2026 | 550 10th St | 1)new accessible exit at division st.2)install new glass infill in extg overhead door openings at 10th st.3)change door swings. 4)associated disabled access upgrades.5)elect.under seperate permit.Details
1)new accessible exit at division st.2)install new glass infill in extg overhead door openings at 10th st.3)change door swings. 4)associated disabled access upgrades.5)elect.under seperate permit. | $40,000 |
| Nov 17, 2010 | Completed final sign-off Feb 2011 | 1737 Post St | tenant improvment of existing vacant retail space into new retail bakery at suite 383. disabled access upgrade to path of travel. no structural work. no change to lighting and mechDetails
tenant improvment of existing vacant retail space into new retail bakery at suite 383. disabled access upgrade to path of travel. no structural work. no change to lighting and mech | $18,465 |
| Aug 5, 2009 | Completed final sign-off Sep 2009 | 174 Valencia St | legalize (e) mezzanine above office/cashier area. storage only. ref. appl. #2007/0112/1596.Details
legalize (e) mezzanine above office/cashier area. storage only. ref. appl. #2007/0112/1596. | $20,000 |
| Jul 1, 2009 | Completed final sign-off Sep 2009 | 174 Valencia St | additional framing plan to approved pa# 2007.01.12.1596. add new 4x12 headers for the restroom. reinforce (e) beam above office with new 2x8 lvl's. new 6x8 lvl header above office openingDetails
additional framing plan to approved pa# 2007.01.12.1596. add new 4x12 headers for the restroom. reinforce (e) beam above office with new 2x8 lvl's. new 6x8 lvl header above office opening | $1,000 |
| Feb 6, 2009 | Completed final sign-off Nov 2010 | 555 Howard St | to obtain final inspection for work approved under app#200802215297 all work has been completed.Details
to obtain final inspection for work approved under app#200802215297 all work has been completed. | |
| Feb 6, 2009 | Never finaled issued Feb 2009, no final | 555 Howard St | to obtain final inspection for work approved under app#200702275019 all work has been completed.Details
to obtain final inspection for work approved under app#200702275019 all work has been completed. |