Rod Massoudi
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Massoudi Consulting Engineer
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
153 permits since 2000 (engineer on 130 permits, architect on 21 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 95 completed, 22 in progress, 10 never finaled, 26 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 153.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 76 Tiffany Av | reconfiguration of (e) posts in the garage for car parking. all work interior.Details
reconfiguration of (e) posts in the garage for car parking. all work interior. | $10,000 | |
| Aug 5, 2026 | In progress issued Aug 2026 | 838 Duncan St | Pinnacle Construction And Development In | waterproof (e) retaining walls in the rear yard and provide additional drainage improvementsDetails
waterproof (e) retaining walls in the rear yard and provide additional drainage improvements | $20,000 |
| Jun 1, 2026 | In progress filed Jun 2026, not yet issued | 241 Arleta Av | erect 3-story, type 5b, single family dwelling and adu.Details
erect 3-story, type 5b, single family dwelling and adu. | $1,500,000 | |
| Jun 1, 2026 | In progress filed Jun 2026, not yet issued | 241 Arleta Av | udu legalization of existing rear structure.Details
udu legalization of existing rear structure. | $20,000 | |
| May 22, 2026 | In progress issued Aug 2026 | 148 Marston Av | Matthew Kelly Construction Inc | voluntary structural strengthening, partial foundation replacement, new front awning and replacement of the (e) front staircase, siding, windows and enlarged front door.Details
voluntary structural strengthening, partial foundation replacement, new front awning and replacement of the (e) front staircase, siding, windows and enlarged front door. | $50,000 |
| Apr 23, 2026 | Completed final sign-off Jun 2026 | 1114 Judah St | Pinnacle Construction And Development In | (e) street facing windows and front door to be replaced in-kind, (n) insulation and (n) lighting @ 2nd floor.Details
(e) street facing windows and front door to be replaced in-kind, (n) insulation and (n) lighting @ 2nd floor. | $10,000 |
| Apr 21, 2026 | Completed final sign-off Oct 2026 | 3425 Divisadero St | Connemara Fine Trim Inc Dba Highland Bui | reduce as-built roof deck to comply w/ notice of violation, (n) modified footrpint to match that approved per bpa# 9715654.Details
reduce as-built roof deck to comply w/ notice of violation, (n) modified footrpint to match that approved per bpa# 9715654. | $45,000 |
| Mar 25, 2026 | In progress filed Mar 2026, not yet issued | 2739 Geary Bl | Pinnacle Construction And Development In | front building: conversion of (e) partial 2nd floor to accommodate 1 new adu unit per state adu program.Details
front building: conversion of (e) partial 2nd floor to accommodate 1 new adu unit per state adu program. | $37,674 |
| Jan 16, 2026 | Expired or cancelled cancelled Mar 2026 | 2739 Geary Bl | Pinnacle Construction And Development In | revision 202111041853 to replace 8 (e) windows at front adu and removal fire rated walls & existing exterior walls to be remainedDetails
revision 202111041853 to replace 8 (e) windows at front adu and removal fire rated walls & existing exterior walls to be remained | $7,500 |
| Dec 22, 2025 | In progress issued Aug 2026 | 108 Wawona St | Coit Construction | remodel of (e) garage to provide additional conditioned space and interior remodel at 1st floor.Details
remodel of (e) garage to provide additional conditioned space and interior remodel at 1st floor. | $100,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 1847 47th Av | Flmc Development Corp Dba Adamo Campagna | foundation repair and interior remodel to provide additional conditioned space at 1st floor (garage level)Details
foundation repair and interior remodel to provide additional conditioned space at 1st floor (garage level) | $50,000 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 1510 Dolores St | Matthew Kelly Construction Inc | rev 2025-1112-9411 to include the removal in-kind of (e) dry rot framing at the rear of the building.Details
rev 2025-1112-9411 to include the removal in-kind of (e) dry rot framing at the rear of the building. | |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 1510 Dolores St | Matthew Kelly Construction Inc | replace e drop beam and retaining wall at the rear of rear garage.Details
replace e drop beam and retaining wall at the rear of rear garage. | $21,000 |
| Sep 9, 2025 | Completed final sign-off Jan 2026 | 1114 Judah St | Pinnacle Construction And Development In | new 2nd floor deck at rear yard, new patio door.Details
new 2nd floor deck at rear yard, new patio door. | $15,000 |
| Sep 2, 2025 | In progress issued Sep 2025 | 2290 47th Av | revision to 202401315025; replace interior stairs, revise (n) heat pump w (n) boiler for hydronic heating, replace (e) end adjacent to stairs, provide new end under (n) entry way.Details
revision to 202401315025; replace interior stairs, revise (n) heat pump w (n) boiler for hydronic heating, replace (e) end adjacent to stairs, provide new end under (n) entry way. | $5,000 | |
| Jul 30, 2025 | Completed final sign-off Jan 2026 | 1114 Judah St | Pinnacle Construction And Development In | revision to permits 202503182448 and 202506068137 to include the replacement of (e) foundation along the east wall of the garage.Details
revision to permits 202503182448 and 202506068137 to include the replacement of (e) foundation along the east wall of the garage. | |
| Jul 16, 2025 | In progress issued Jul 2025 | 505 Franconia St | Pacific Gates Construction | revision to 202408158731 to relocate fixtures at 2nd fl bathroom (no structural changes proposed. no change in number of fixture)Details
revision to 202408158731 to relocate fixtures at 2nd fl bathroom (no structural changes proposed. no change in number of fixture) | |
| Jul 15, 2025 | In progress issued Aug 2025 | 601 Banks St | revision to approved 202303294645. to reduce the number of posts in the basement family room.Details
revision to approved 202303294645. to reduce the number of posts in the basement family room. | $15,000 | |
| Jul 15, 2025 | Completed final sign-off Nov 2025 | 531 Jessie St | Elite Builders | removal of unpermitted mezzanine and kitchen. restore to approved floor plan per bpa 201201252854. no structural or exterior changes proposed. building remains vacantDetails
removal of unpermitted mezzanine and kitchen. restore to approved floor plan per bpa 201201252854. no structural or exterior changes proposed. building remains vacant | $10,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 779 Head St | Matthew Kelly Construction Inc | replace front exterior stairsDetails
replace front exterior stairs | $3,000 |
| Jun 6, 2025 | Completed final sign-off Jan 2026 | 1114 Judah St | Pinnacle Construction And Development In | revision to pa# 202503182448 to replace e) foundatio along north & east walls of the living rm & revise garage layout to switch fixture locations, no fixture count changeDetails
revision to pa# 202503182448 to replace e) foundatio along north & east walls of the living rm & revise garage layout to switch fixture locations, no fixture count change | $15,000 |
| May 28, 2025 | In progress issued Jun 2025 | 1199 Valencia St | Gregory Davis Construction Incgregory Da | replace (e) concrete slab on grade in the basementDetails
replace (e) concrete slab on grade in the basement | $20,000 |
| May 7, 2025 | Completed final sign-off Nov 2025 | 611 Miramar Av | Gracon Construction Inc | revision to pa # 2024-1213-6785 to add two full (n) skylights and relocate water heater and furnaceDetails
revision to pa # 2024-1213-6785 to add two full (n) skylights and relocate water heater and furnace | |
| May 7, 2025 | Completed final sign-off Jul 2026 | 43 Cordova St | Mg And Jc Concrete Inc. | partial perimeter foundation replacement along south and east wall of the structure. voluntary structural strengtheningDetails
partial perimeter foundation replacement along south and east wall of the structure. voluntary structural strengthening | $30,000 |
| May 5, 2025 | In progress filed May 2025, not yet issued | 861 37th Av | 1/f: conversion of existing storage room to office space.Details
1/f: conversion of existing storage room to office space. | $15,000 | |
| May 5, 2025 | Completed final sign-off May 2025 | 2531 14th Av | Quan Remodeling Company | rev permit# 202303244357: as-builts revision. ref permits 202309217077, 202308114229.Details
rev permit# 202303244357: as-builts revision. ref permits 202309217077, 202308114229. | |
| Mar 18, 2025 | Completed final sign-off Jan 2026 | 1114 Judah St | Pinnacle Construction And Development In | 1/f: remodel of (e) single family home to provide additional habitable space at 1st floor.Details
1/f: remodel of (e) single family home to provide additional habitable space at 1st floor. | $110,000 |
| Mar 14, 2025 | Expired or cancelled withdrawn May 2025 | 531 Jessie St | comply with dcp enf no.2024-009508enf: removal of unpermitted mezzanine, legalization of kitchen, change of occupany, establish community facility use (institutional use). no structural or exterior changes proposed.Details
comply with dcp enf no.2024-009508enf: removal of unpermitted mezzanine, legalization of kitchen, change of occupany, establish community facility use (institutional use). no structural or exterior changes proposed. | $30,000 | |
| Jan 30, 2025 | Completed final sign-off Feb 2025 | 445 Bush St | Rdl Construction, Inc. | intstall 3 (n) pre-manufactured phone boothsDetails
intstall 3 (n) pre-manufactured phone booths | $7,000 |
| Jan 23, 2025 | Completed final sign-off Aug 2026 | 1932 Taylor St | Bevilacqua & Sons | voluntary foundation wall retrofit along aladdin terrace.Details
voluntary foundation wall retrofit along aladdin terrace. | $80,000 |
| Dec 13, 2024 | Completed final sign-off Mar 2025 | 801 38th Av | Initial Construction | relocation of (e) interior wall to accommodate expansion of (e) garage door.Details
relocation of (e) interior wall to accommodate expansion of (e) garage door. | $25,000 |
| Dec 13, 2024 | Completed final sign-off Nov 2025 | 611 Miramar Av | Gracon Construction Inc | remodel (e) garage to provide additional conditioned space and interior remodel of (e) 2nd floor; 2nd fl: to add closets in 3 bedrooms, infill a staircase, remodel a staircase, and remodel (e) kitchen and (2) bathsDetails
remodel (e) garage to provide additional conditioned space and interior remodel of (e) 2nd floor; 2nd fl: to add closets in 3 bedrooms, infill a staircase, remodel a staircase, and remodel (e) kitchen and (2) baths | $250,000 |
| Dec 10, 2024 | In progress filed Dec 2024, not yet issued | 201 11th St | g/f & b/f- tenant improvement to existing commercial building. no stuctural changes or exterior changes proposed. new work rooms and meeting rooms.Details
g/f & b/f- tenant improvement to existing commercial building. no stuctural changes or exterior changes proposed. new work rooms and meeting rooms. | $1,185,579 | |
| Oct 30, 2024 | Completed final sign-off Apr 2025 | 46 Alpine Tr | Matthew Kelly Construction Inc | voluntary seismic strengthening of the ground floor by installing holdowns and plywood sheathing to area shown. no foundation/excavation work.Details
voluntary seismic strengthening of the ground floor by installing holdowns and plywood sheathing to area shown. no foundation/excavation work. | $15,000 |
| Oct 28, 2024 | In progress issued Dec 2024 | 252 Cumberland St | permit to comply with planning enforcement notice 2021-005279. changes to ground floor to establish second unit including (n)1 hour wall, (n) 20 minute doors (n) kitchen remodel, conversion of former wine storage to (n) bedroom addition of trellis above entry at front facade, addition of parapetDetails
permit to comply with planning enforcement notice 2021-005279. changes to ground floor to establish second unit including (n)1 hour wall, (n) 20 minute doors (n) kitchen remodel, conversion of former wine storage to (n) bedroom addition of trellis above entry at front facade, addition of parapet | $200,834 | |
| Sep 14, 2024 | In progress issued May 2025 | 505 Franconia St | Pacific Gates Construction | add a newly framed conditioned 1st floor over crawl space at the existing ground floor, and interior remodel of 2nd floor.Details
add a newly framed conditioned 1st floor over crawl space at the existing ground floor, and interior remodel of 2nd floor. | $150,000 |
| Aug 6, 2024 | Completed final sign-off Oct 2024 | 3899 Jackson St | Velero Inc | voluntary perimeter foundation strengthening along south wall of the garageDetails
voluntary perimeter foundation strengthening along south wall of the garage | $25,000 |
| Jul 31, 2024 | Expired or cancelled cancelled Aug 2024 | 1803 Broadway | interior kitchen remodel of (e) front units at 2nd, 3rd, and 4th floor.Details
interior kitchen remodel of (e) front units at 2nd, 3rd, and 4th floor. | $75,000 | |
| Jul 3, 2024 | Completed final sign-off Sep 2026 | 2325 Larkin St | Gnetzer General Contractor | kitchen remodel on 2nd fl. remove (e) kitchen for (n) office room on 1st flDetails
kitchen remodel on 2nd fl. remove (e) kitchen for (n) office room on 1st fl | $30,000 |
| May 31, 2024 | Completed final sign-off Oct 2024 | 48 Barcelona Av | Tri General Builders | replacement of two (e) front unoccupied balconies with juliet balconies at the 2nd and 3rd floorDetails
replacement of two (e) front unoccupied balconies with juliet balconies at the 2nd and 3rd floor | $6,000 |
| Apr 24, 2024 | Completed final sign-off Mar 2026 | 1619 Funston Av | Leafair Construction | remodel of extg single family home. new bedroom at ground floor. kitchen remodel at 2nd floor.Details
remodel of extg single family home. new bedroom at ground floor. kitchen remodel at 2nd floor. | $50,000 |
| Apr 4, 2024 | Expired or cancelled suspend Nov 2024 | 524 10th Av | remodel & horizontal addition to (e) single family home.Details
remodel & horizontal addition to (e) single family home. | $125,000 | |
| Apr 4, 2024 | Completed final sign-off Jul 2025 | 75 Pierce St | Nurture Source Partners Llc | revision to p/a 2024-0201-5097 repair and inkind replacement of (e) exterior 1st fl deck and stairs at rear yard.Details
revision to p/a 2024-0201-5097 repair and inkind replacement of (e) exterior 1st fl deck and stairs at rear yard. | $15,000 |
| Mar 29, 2024 | Completed final sign-off Jun 2024 | 1650 Quesada Av | Seths Crew | move dropped beam into ceiling. bring structure up to code. add shear wall in kitchen and garage. add new footing. no exterior workDetails
move dropped beam into ceiling. bring structure up to code. add shear wall in kitchen and garage. add new footing. no exterior work | $10,000 |
| Feb 16, 2024 | Completed final sign-off Jan 2025 | 43 Cordova St | Mg And Jc Concrete Inc. | partial perimeter foundation replacement along north garage wall and reconfiguration of (e) posts in the garage for car parking.Details
partial perimeter foundation replacement along north garage wall and reconfiguration of (e) posts in the garage for car parking. | $10,000 |
| Jan 31, 2024 | In progress issued May 2025 | 2290 47th Av | horizontal addition and rmeodel of (e) single family home to provide additional habitable space at 1/f. new living rm, bedroom and full bath on 1/f, new roof deck at 2/fDetails
horizontal addition and rmeodel of (e) single family home to provide additional habitable space at 1/f. new living rm, bedroom and full bath on 1/f, new roof deck at 2/f | $125,000 | |
| Sep 21, 2023 | Completed final sign-off May 2025 | 2531 14th Av | Quan Remodeling Company | structural revision to approved bpa# 202308114229 to proposed framing.Details
structural revision to approved bpa# 202308114229 to proposed framing. | |
| Sep 1, 2023 | Never finaled filed Sep 2023, never issued | 217 Sawyer St | (n) accessory dwelling unit @ 1st floor per ca government code 65852.2Details
(n) accessory dwelling unit @ 1st floor per ca government code 65852.2 | $70,000 | |
| Aug 11, 2023 | Completed final sign-off May 2025 | 2531 14th Av | Quan Remodeling Company | revision to pa202303244357 to accommodate 2nd fl lightwell infill with bathroom remodel and 1st fl (e) post removal and (n) landing at (e) interior stairs.Details
revision to pa202303244357 to accommodate 2nd fl lightwell infill with bathroom remodel and 1st fl (e) post removal and (n) landing at (e) interior stairs. | $40,000 |
| Jul 14, 2023 | Completed final sign-off Aug 2025 | 432 22nd Av | Pinnacle Construction And Development In | remodel to provide conditioned space on 1/f and new rear deck @ 2/fDetails
remodel to provide conditioned space on 1/f and new rear deck @ 2/f | $150,000 |
| Jul 14, 2023 | Completed final sign-off Feb 2024 | 130 Pinehurst Wy | revision to pa# 202210144434, to change water heater to tankless water heater and heating system to wall heater (no othechanges proposed).Details
revision to pa# 202210144434, to change water heater to tankless water heater and heating system to wall heater (no othechanges proposed). | ||
| May 5, 2023 | Expired or cancelled cancelled Jan 2026 | 946 Stockton St | unit 12d - 12th fl: revision to bpa#202206106095, remove proposed single-zone & multi-zone heat pump system.Details
unit 12d - 12th fl: revision to bpa#202206106095, remove proposed single-zone & multi-zone heat pump system. | ||
| May 5, 2023 | Completed final sign-off Apr 2024 | 582 Diamond St | Matthew Kelly Construction Inc | revision to bpa#202304175882, in-kind replacement of flooring/ceiling/drywall due to water damage, new hvac system.Details
revision to bpa#202304175882, in-kind replacement of flooring/ceiling/drywall due to water damage, new hvac system. | $20,000 |
| May 4, 2023 | Completed final sign-off Aug 2025 | 2227 Lombard St | L O D Construction, Superb Builders & Custom Made Cabinetry | remodel (2) units, bathrooms, kitchens, addition of lower room & bathrooms, additional (2) bathrooms-(1) each unit. no exterior facade work.Details
remodel (2) units, bathrooms, kitchens, addition of lower room & bathrooms, additional (2) bathrooms-(1) each unit. no exterior facade work. | $350,000 |
| Mar 29, 2023 | In progress issued Jan 2024 | 601 Banks St | Moore Custom Builders Incorporated | remodel to (e) sfd to provide additional conditioned space at basement and legalization of 1st floor front addition.Details
remodel to (e) sfd to provide additional conditioned space at basement and legalization of 1st floor front addition. | $40,000 |
| Mar 24, 2023 | Completed final sign-off May 2025 | 2531 14th Av | Quan Remodeling Company | remodel of (e) single family home and conversion of ground fl. garage space to provide conditioned spaceDetails
remodel of (e) single family home and conversion of ground fl. garage space to provide conditioned space | $150,000 |
| Feb 3, 2023 | Completed final sign-off Mar 2024 | 145 Northwood Dr | Edri Construction Inc *See Notes*, A M Rocca Inc. | 1) remodeling of a single family dwelling. 2) relocate interior stair. 3) remodeling (e) kitchen. 4) replace (e) rear window/door at 2/f deck. 5) provide (n) rear deck over (e) conc. slab and new rear folding door at 1/f. 6) remove (e) window at 2/f closet.Details
1) remodeling of a single family dwelling. 2) relocate interior stair. 3) remodeling (e) kitchen. 4) replace (e) rear window/door at 2/f deck. 5) provide (n) rear deck over (e) conc. slab and new rear folding door at 1/f. 6) remove (e) window at 2/f closet. | $60,000 |
| Jan 31, 2023 | In progress issued Aug 2024 | 292 Arleta Av | Construction Unlimited | erect a 3-story, type 5b, multi-family building containing 2 new dwelling units per sb-9 and 1 new accessory dwelling unit at 1st floor per ca gov code 65852.2.Details
erect a 3-story, type 5b, multi-family building containing 2 new dwelling units per sb-9 and 1 new accessory dwelling unit at 1st floor per ca gov code 65852.2. | $282,000 |
| Jan 31, 2023 | In progress issued Aug 2024 | 292 Arleta Av | demolish a one-story, type 5b, singel family building.Details
demolish a one-story, type 5b, singel family building. | $40,000 | |
| Nov 29, 2022 | Expired or cancelled cancelled Aug 2026 | 295 Mangels Av | P3 Builders | remodel to (e) single family home to provide additional conditioned space @ 1st floor.Details
remodel to (e) single family home to provide additional conditioned space @ 1st floor. | $100,000 |
| Nov 22, 2022 | Completed final sign-off Mar 2024 | 130 Pinehurst Wy | revision to approved bpa# 202209092171, to replace (e) window at rear wall of basement at (e) single family home.Details
revision to approved bpa# 202209092171, to replace (e) window at rear wall of basement at (e) single family home. | $5,000 | |
| Nov 17, 2022 | Completed final sign-off May 2023 | 1554 28th Av | Matthew Kelly Construction Inc | foundation revision to pa 202101072278 to retrofit (e) concrete footingd under (e) steel beam at the 1st floor.Details
foundation revision to pa 202101072278 to retrofit (e) concrete footingd under (e) steel beam at the 1st floor. | $5,000 |
| Nov 9, 2022 | In progress issued Jan 2025 | 557 23rd Av | demolition of (e) structure at rear. to be replaced with adu under pa# 202211096168Details
demolition of (e) structure at rear. to be replaced with adu under pa# 202211096168 | $50,000 | |
| Nov 9, 2022 | In progress issued Jan 2025 | 557 23rd Av | erect new 1-story, type vb, streamlined detached 1 unit adu per ca government code 65852.2 at rear. demo of existing detached rear single family dwelling under separate pa# 202211096167.Details
erect new 1-story, type vb, streamlined detached 1 unit adu per ca government code 65852.2 at rear. demo of existing detached rear single family dwelling under separate pa# 202211096167. | $225,000 | |
| Oct 18, 2022 | Expired or cancelled expired Jun 2024 | 1748 Fell St | interior remodel of 1750 fell, unit b. no exterior or structural changes proposedDetails
interior remodel of 1750 fell, unit b. no exterior or structural changes proposed | $20,000 | |
| Oct 14, 2022 | Completed final sign-off Feb 2024 | 130 Pinehurst Wy | Delvin Garcia Construction-A Partnership | new accessory dwelling unit @ basement floor per ordiance 162-16.no structural work.Details
new accessory dwelling unit @ basement floor per ordiance 162-16.no structural work. | $60,000 |
| Sep 9, 2022 | Completed final sign-off Feb 2024 | 130 Pinehurst Wy | remodel e single family home to provide additional conditioned space at ground fl. storage, 1 full bath, office, family rm, 2 new windows front, new windows side and rear window replacementsDetails
remodel e single family home to provide additional conditioned space at ground fl. storage, 1 full bath, office, family rm, 2 new windows front, new windows side and rear window replacements | $125,000 | |
| Aug 26, 2022 | Completed final sign-off Aug 2023 | 455 Prentiss St | Matthew Kelly Construction Inc | revision to approved pa#2022-0610-6069 to add (n) spread footing and retrofit (e) as built retaining wall footing.Details
revision to approved pa#2022-0610-6069 to add (n) spread footing and retrofit (e) as built retaining wall footing. | |
| Aug 3, 2022 | Expired or cancelled expired Jun 2024 | 1748 Fell St | revision to 202105130312 mandatory soft story retrofit for foundation replacement along grid line dDetails
revision to 202105130312 mandatory soft story retrofit for foundation replacement along grid line d | ||
| Jul 1, 2022 | Completed final sign-off Jul 2023 | 2300 Leavenworth St | Terence Mcmahon Construction | restoration of permitted roof deck under bpa 7801260 to address nov202014261.Details
restoration of permitted roof deck under bpa 7801260 to address nov202014261. | $7,500 |
| Jun 10, 2022 | Completed final sign-off Aug 2023 | 455 Prentiss St | Matthew Kelly Construction Inc | interior and kitchen remodel to (e) single family houseDetails
interior and kitchen remodel to (e) single family house | $40,000 |
| May 25, 2022 | Completed final sign-off Apr 2023 | 2290 47th Av | extend roof structure to enclose stairwell. add skylight at rear being enclosed.Details
extend roof structure to enclose stairwell. add skylight at rear being enclosed. | $7,000 | |
| May 3, 2022 | Completed final sign-off Jun 2022 | 4323 19th St | Kasas Builders Inc | as-built revision to pa# 201908068022. for the relocation of fire door at garage. update framing & hd @ grid 4 @ foundation & 2nd fl framing plan.Details
as-built revision to pa# 201908068022. for the relocation of fire door at garage. update framing & hd @ grid 4 @ foundation & 2nd fl framing plan. | |
| Apr 11, 2022 | Completed final sign-off Feb 2023 | 212 02nd Av | revision to pa# 202201276811. remodel 3rd floor. remove some interior walls.Details
revision to pa# 202201276811. remodel 3rd floor. remove some interior walls. | $15,000 | |
| Mar 31, 2022 | Completed final sign-off Aug 2023 | 455 Prentiss St | Matthew Kelly Construction Inc | voluntary structural repair associated with approved pa #201203095763Details
voluntary structural repair associated with approved pa #201203095763 | $20,000 |
| Feb 11, 2022 | Expired or cancelled cancelled Jan 2026 | 1029 Geary St | to comply with accessible business entrance program per ordinance 51-16 to (e) commercial unit.Details
to comply with accessible business entrance program per ordinance 51-16 to (e) commercial unit. | $10,000 | |
| Jan 26, 2022 | Expired or cancelled cancelled Jan 2026 | 345 Eddy St | to comply with abe ord 51-16 for (e) commercial unitDetails
to comply with abe ord 51-16 for (e) commercial unit | $10,000 | |
| Dec 14, 2021 | Never finaled issued Dec 2022, no final | 1950 Franklin St | Doherty Restoration, Inc. | addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: noDetails
addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: no | $345,000 |
| Dec 2, 2021 | Completed final sign-off Aug 2022 | 962 Valencia St | C C I Commercial Construction & Improv | dry rot repair of damaged structural elements on the ground floor. ref pa 2021-1102-1612Details
dry rot repair of damaged structural elements on the ground floor. ref pa 2021-1102-1612 | $40,000 |
| Nov 23, 2021 | Completed final sign-off Oct 2023 | 108 Orizaba Av | replace existing retaining wall per nov 201928801Details
replace existing retaining wall per nov 201928801 | $20,000 | |
| Nov 23, 2021 | Completed final sign-off Dec 2023 | 114 Orizaba Av | replace existing retaining wall per nov 201928811.Details
replace existing retaining wall per nov 201928811. | $20,000 | |
| Nov 16, 2021 | Completed final sign-off Apr 2023 | 251 Raymond Av | Construction Unlimited | remodel (e) single family home. provide additoinial habitable space.Details
remodel (e) single family home. provide additoinial habitable space. | $60,000 |
| Nov 4, 2021 | Expired or cancelled cancelled Mar 2026 | 2739 Geary Bl | Construction Unlimited | conversion of (e) partial 2nd floor to accommodate one (n) accessory dwelling unit @ front building. per ca government code 65852.2 site permit: noDetails
conversion of (e) partial 2nd floor to accommodate one (n) accessory dwelling unit @ front building. per ca government code 65852.2 site permit: no | $15,000 |
| Jul 30, 2021 | Expired or cancelled cancelled Jan 2026 | 245 Leavenworth St | replacement of (e) wood drop beam within the basement.Details
replacement of (e) wood drop beam within the basement. | $20,000 | |
| Jun 16, 2021 | Never finaled issued Jun 2021, no final | 2739 Geary Bl | Construction Unlimited | as built revision to the approved pa #201912300978 to include voluntary soft story retrofit per cebc 2019Details
as built revision to the approved pa #201912300978 to include voluntary soft story retrofit per cebc 2019 | $20,000 |
| Jun 9, 2021 | Completed final sign-off Dec 2022 | 1346 Stevenson St | Ivan Alberto Rivera Rivas | non structural interior remodel to convert two half baths to full baths. remodel (e) full bath.Details
non structural interior remodel to convert two half baths to full baths. remodel (e) full bath. | $5,000 |
| Jun 8, 2021 | Completed final sign-off Jul 2022 | 27 Arnold Av | Bc Construction & Development Inc | remodel of (e) single family homeDetails
remodel of (e) single family home | $20,000 |
| May 13, 2021 | Expired or cancelled expired Jun 2024 | 1748 Fell St | mandatory soft story retrofit per 2019 cebc, chapter 4d. interior remodel work proposed on separate bpa# 2020-0715-0232. ground floor accessory dweling unit proposed on separate bpa# 2020-0715-0245.Details
mandatory soft story retrofit per 2019 cebc, chapter 4d. interior remodel work proposed on separate bpa# 2020-0715-0232. ground floor accessory dweling unit proposed on separate bpa# 2020-0715-0245. | ||
| Apr 2, 2021 | Completed final sign-off Mar 2022 | 639 23rd Av | interior remodel of kitchen and bathroom.Details
interior remodel of kitchen and bathroom. | $40,000 | |
| Mar 10, 2021 | Expired or cancelled withdrawn Mar 2026 | 2739 Geary Bl | 2 story vertcal & horizontal addition to (e) multi -family dwelling to include four (n) dwelling units for a total of 7 units, per density@ front bldg.Details
2 story vertcal & horizontal addition to (e) multi -family dwelling to include four (n) dwelling units for a total of 7 units, per density@ front bldg. | $400,000 | |
| Feb 25, 2021 | Completed final sign-off May 2021 | 82 Parnassus Av | Velero Inc | revision to pa# 201911137164. to remove a revised length of the load bearing wall between kitchen and dining room at the subject unit.Details
revision to pa# 201911137164. to remove a revised length of the load bearing wall between kitchen and dining room at the subject unit. | |
| Dec 7, 2020 | Completed final sign-off Apr 2023 | 249 Raymond Av | Construction Unlimited | (n) streamlined detached accessory dwelling unitDetails
(n) streamlined detached accessory dwelling unit | $150,000 |
| Dec 7, 2020 | Completed final sign-off Apr 2023 | 251 Raymond Av | Construction Unlimited | remodel of (e) single family home to provide independent access to (n) detached adu per separate bpa# 202012070383Details
remodel of (e) single family home to provide independent access to (n) detached adu per separate bpa# 202012070383 | $150,000 |
| Dec 4, 2020 | Never finaled issued Jan 2021, no final | 1425 Baker St | voluntary seismic strengthening through the earthquake brace and bolt programDetails
voluntary seismic strengthening through the earthquake brace and bolt program | $6,000 | |
| Dec 4, 2020 | Completed final sign-off Feb 2023 | 32 Margaret Av | Dhd Builders Llc, Big 4 Construction | removal of interior bearing wall & kitchen remodel to (e) single family homeDetails
removal of interior bearing wall & kitchen remodel to (e) single family home | $30,000 |
| Oct 16, 2020 | Completed final sign-off Jun 2025 | 291 28th Av | comply w/ nov #202018041: legalize landscape architectural work in rear yard.Details
comply w/ nov #202018041: legalize landscape architectural work in rear yard. | $1,500 | |
| Oct 9, 2020 | Never finaled filed Oct 2020, never issued | 1674 Geneva Av | legalization of (e) unauthorized dwelling unit on 1st floor per ordinance 43-14.Details
legalization of (e) unauthorized dwelling unit on 1st floor per ordinance 43-14. | $34,200 | |
| Aug 8, 2020 | Completed final sign-off Feb 2024 | 1725 Turk St | Sandbank Construction, Inc | the scope of work is to add three new accessory dwelling units to the ground level per ordinance no. 162-16. the three new adu's will be one-bedroom units. new retaining wall at rear yard for patio extension. exavation of 28 cubic yards of soil for extended patio at rear.Details
the scope of work is to add three new accessory dwelling units to the ground level per ordinance no. 162-16. the three new adu's will be one-bedroom units. new retaining wall at rear yard for patio extension. exavation of 28 cubic yards of soil for extended patio at rear. | $230,000 |
| Jul 21, 2020 | Expired or cancelled withdrawn Jul 2022 | 2300 Leavenworth St | to comply with complaint 202014261. construct (n) deck, 430 sfDetails
to comply with complaint 202014261. construct (n) deck, 430 sf | $5,000 | |
| Jul 15, 2020 | Expired or cancelled expired Jun 2024 | 1748 Fell St | creat two (n) accessory dwelling units within (e) first floor.Details
creat two (n) accessory dwelling units within (e) first floor. | $100,000 |