Doherty Restoration, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Jul 2026
- Last 24 months
- 13 permits filed
253 permits since 2000: 202 completed, 5 in progress, 32 never finaled, 14 expired or cancelled.
Of the 32 never-finaled permits, 8 are 3 to 5 years old, 15 are 5 to 10 years old, 9 are over 10 years old. 5 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 253.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | Completed final sign-off Aug 2026 | 1201 12th Av | to obatin final inspection for work approved under 202411195326 and 201902082492. all work is completeDetails
to obatin final inspection for work approved under 202411195326 and 201902082492. all work is complete | |
| May 1, 2026 | Completed final sign-off Jul 2026 | 2010 Vallejo St | kitchen/bathroom in kind plus add laundryDetails
kitchen/bathroom in kind plus add laundry | $40,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 8045 Geary Bl | repairing brackets on fire scape rust.Details
repairing brackets on fire scape rust. | $25,000 |
| Feb 4, 2026 | Completed final sign-off Feb 2026 | 2030 Vallejo St | unit#1105: adding washer and dryer to existing permit #202504174665Details
unit#1105: adding washer and dryer to existing permit #202504174665 | $6,000 |
| Oct 3, 2025 | Completed final sign-off Jan 2026 | 484 Guerrero St | revision to 202212228969: revise wall layout in 1st/fDetails
revision to 202212228969: revise wall layout in 1st/f | |
| Jul 7, 2025 | Completed final sign-off Jan 2026 | 1330 Union St | remove section of stucco located on south side, check for dry rot on plywood sheeting and repair if needed . re-stucco to match existing. street visible.Details
remove section of stucco located on south side, check for dry rot on plywood sheeting and repair if needed . re-stucco to match existing. street visible. | $1,500 |
| Apr 17, 2025 | Completed final sign-off Feb 2026 | 2030 Vallejo St | suite#: 1105; remove and replace kitchen cabinets and countertops. remove and replace two bathroom vanities and tops. remove and replace one tub enclosure. remove and replace one shower enclosure. no structural. like for like.Details
suite#: 1105; remove and replace kitchen cabinets and countertops. remove and replace two bathroom vanities and tops. remove and replace one tub enclosure. remove and replace one shower enclosure. no structural. like for like. | $73,000 |
| Apr 1, 2025 | In progress issued Jun 2026 | 800 Innes Av | convert 2nd story of (e) commercial unit #10 into (1) adu per ordinance 162-16 local adu program. ground flr commercial space to remain. remove (e) stair assembly connecting ground flr and 2nd flr at commercial unit #10. in exist. covered multi family dwelling per cbc chapter 11aDetails
convert 2nd story of (e) commercial unit #10 into (1) adu per ordinance 162-16 local adu program. ground flr commercial space to remain. remove (e) stair assembly connecting ground flr and 2nd flr at commercial unit #10. in exist. covered multi family dwelling per cbc chapter 11a | $40,000 |
| Mar 11, 2025 | Completed final sign-off Dec 2025 | 1369 Hyde St | administrative revision to applicatoin #202409040045. the work in this permit complies with and addresses repairs itemized in ab110 report. by borne consulting dated 9/2/22 and approved by dbi 4/11/23Details
administrative revision to applicatoin #202409040045. the work in this permit complies with and addresses repairs itemized in ab110 report. by borne consulting dated 9/2/22 and approved by dbi 4/11/23 | |
| Feb 20, 2025 | Completed final sign-off Feb 2025 | 1440 Broadway | unit #402: dry rot repair on walls around deck. replace deck in kind.Details
unit #402: dry rot repair on walls around deck. replace deck in kind. | $2,500 |
| Jan 28, 2025 | Completed final sign-off Sep 2025 | 1500 Revere Av | ab1114:convert (e) ground floor exercise room into (1) accessory dwelling unit per government code section 65852.2 (state adu) provide one hour rated fire separation between ground floor & 2nd floor per information sheet no. fs-05.Details
ab1114:convert (e) ground floor exercise room into (1) accessory dwelling unit per government code section 65852.2 (state adu) provide one hour rated fire separation between ground floor & 2nd floor per information sheet no. fs-05. | $48,000 |
| Jan 7, 2025 | Completed final sign-off Aug 2026 | 1201 12th Av | rev pa201902082492 -reduction of original socpe from 5 adu to 4 adu.reconfigure garages (5) on g/f to become 4 adu. horizontal extension of side light court.Details
rev pa201902082492 -reduction of original socpe from 5 adu to 4 adu.reconfigure garages (5) on g/f to become 4 adu. horizontal extension of side light court. | |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 649 Mission St | repair steel lintels at wll on minna st and general brick repairs.Details
repair steel lintels at wll on minna st and general brick repairs. | $120,000 |
| Sep 4, 2024 | In progress issued Sep 2024 | 1369 Hyde St | miscellaneous brick repointing and brick repair (approx. 300 bricks) at exteriorDetails
miscellaneous brick repointing and brick repair (approx. 300 bricks) at exterior | $50,000 |
| Apr 1, 2024 | Completed final sign-off Mar 2025 | 1920 Pacific Av | revision to adu pa# 2021-0222-5095 replace (2) drop down fire escape ladders with counter balance laddersDetails
revision to adu pa# 2021-0222-5095 replace (2) drop down fire escape ladders with counter balance ladders | $20,000 |
| Mar 20, 2024 | Expired or cancelled cancelled Aug 2026 | 1590 Pacific Av | re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area.Details
re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area. | $240,000 |
| Oct 6, 2023 | Completed final sign-off Nov 2023 | 618 Andover St | removal of dry rot around one patio door. replace in kind. not street visible.Details
removal of dry rot around one patio door. replace in kind. not street visible. | $6,200 |
| Jun 6, 2023 | Completed final sign-off Jul 2025 | 246 Alma St | eliminate (1)residential unit @ grd level,expand top unit(250)down into portion of 2nd level(248). expand bottow unit (246) up into a portion (248). change bldg from to r-2 to r-3. infill (e) lightwell. reconfig all flrs, install roof access & roof deck less than 500 sq ft.Details
eliminate (1)residential unit @ grd level,expand top unit(250)down into portion of 2nd level(248). expand bottow unit (246) up into a portion (248). change bldg from to r-2 to r-3. infill (e) lightwell. reconfig all flrs, install roof access & roof deck less than 500 sq ft. | $300,000 |
| Jun 2, 2023 | Completed final sign-off Jun 2023 | 828 Innes Av | administrative permit to document actual # of residential units added under previously issued permits. pa# 201912260699 adds one unit. pa# 202206136205 adds 1 unit. pa# 202012171259 adds 1 unit. completed building has 12 residential units.Details
administrative permit to document actual # of residential units added under previously issued permits. pa# 201912260699 adds one unit. pa# 202206136205 adds 1 unit. pa# 202012171259 adds 1 unit. completed building has 12 residential units. | |
| May 16, 2023 | Never finaled issued Jul 2023, no final | 326 Irving St | voluntary seismic upgrade. installation of new shear walls at ground floor. new concrete slab. remove/replace front stairs to ground floorDetails
voluntary seismic upgrade. installation of new shear walls at ground floor. new concrete slab. remove/replace front stairs to ground floor | $30,000 |
| Mar 31, 2023 | Completed final sign-off Oct 2023 | 1040 Greenwich St | unit 36: relocate (e) kitchen, remodel (e) bathroom. addition of (n) office, addition of (n) bathroomDetails
unit 36: relocate (e) kitchen, remodel (e) bathroom. addition of (n) office, addition of (n) bathroom | $75,000 |
| Mar 28, 2023 | Completed final sign-off Mar 2024 | 328 Irving St | revision to 2023-0123-0602: remodel existing kitchen. replace 3 exisitng windows in kind- not visible to the street. no structural changes. same size, same locations, max u-factor 0.30.Details
revision to 2023-0123-0602: remodel existing kitchen. replace 3 exisitng windows in kind- not visible to the street. no structural changes. same size, same locations, max u-factor 0.30. | $27,000 |
| Mar 28, 2023 | Completed final sign-off Feb 2024 | 326 Irving St | revision to 2023-0123-0601: remodel existing kitchen in kind. no structural changes. remodel existing 2nd bathroom in kind. no structural changes. replace 2 existing windows in kind. not visible from the street. same size, same location, max u-factor 0.30.Details
revision to 2023-0123-0601: remodel existing kitchen in kind. no structural changes. remodel existing 2nd bathroom in kind. no structural changes. replace 2 existing windows in kind. not visible from the street. same size, same location, max u-factor 0.30. | $40,000 |
| Jan 25, 2023 | Completed final sign-off Jan 2025 | 655 Powell St | revison to bpa 2020-1015-6602; omit mechanical ventilation at proposed (6) adu.Details
revison to bpa 2020-1015-6602; omit mechanical ventilation at proposed (6) adu. | |
| Jan 23, 2023 | Completed final sign-off Mar 2024 | 326 Irving St | remodel (e) bathroom in kind, no structural changes/ no plans.Details
remodel (e) bathroom in kind, no structural changes/ no plans. | $15,000 |
| Jan 23, 2023 | Completed final sign-off Mar 2024 | 328 Irving St | remodel (e) bathroom in kind, no structural changes no plansDetails
remodel (e) bathroom in kind, no structural changes no plans | $15,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2026 | 484 Guerrero St | renovate 1 guest room at ground floor, install full kitchen & reconfigure for 1-bedroom layout to become adu. convert 1-car garage into 1 adu (state program). adu to be a studio apartment. modifications to (e) sprinklers under separate permit. upgrade fire alarm under separate permit.Details
renovate 1 guest room at ground floor, install full kitchen & reconfigure for 1-bedroom layout to become adu. convert 1-car garage into 1 adu (state program). adu to be a studio apartment. modifications to (e) sprinklers under separate permit. upgrade fire alarm under separate permit. | $75,000 |
| Nov 16, 2022 | In progress issued Feb 2024 | 300 Buchanan St | relocate (e) laundry to basement floor, reconfigure (e) trash room, remove (4) off street parking spots in ground floor garage. non-visible changes to exterior. coordinate with 2022-0310-9641Details
relocate (e) laundry to basement floor, reconfigure (e) trash room, remove (4) off street parking spots in ground floor garage. non-visible changes to exterior. coordinate with 2022-0310-9641 | $20,000 |
| Sep 30, 2022 | Never finaled issued Nov 2022, no final | 793 San Jose Av | revision to 202111021653, revision to t24 paperworkDetails
revision to 202111021653, revision to t24 paperwork | |
| Aug 22, 2022 | Completed final sign-off Jun 2023 | 932 Central Av | convert (e) ground floor storage space into (2) dwelling units, for a buiding total of (4) units. proposed unit is out of right, property is under density. install (n) adu unit on ground floor in compliance with state government code 65852.2Details
convert (e) ground floor storage space into (2) dwelling units, for a buiding total of (4) units. proposed unit is out of right, property is under density. install (n) adu unit on ground floor in compliance with state government code 65852.2 | $84,000 |
| Aug 19, 2022 | Completed final sign-off Nov 2022 | 262 12th Av | unit #3: remodel existing kitchen + bathroom in-kind. no strucutral changes. remove (e) cabinets, counters + replace with new. open up (e) drywall as necessary to install new elec + plumbing per code.Details
unit #3: remodel existing kitchen + bathroom in-kind. no strucutral changes. remove (e) cabinets, counters + replace with new. open up (e) drywall as necessary to install new elec + plumbing per code. | $30,000 |
| Jul 28, 2022 | Completed final sign-off Mar 2025 | 3201 23rd St | revision to pa# 202009033416 & 202205053645. revise layout for unit "a" only. no structural changes. remove (e) garage door recesses, match (e) adjustment brick size, shape, texture, and paint type.Details
revision to pa# 202009033416 & 202205053645. revise layout for unit "a" only. no structural changes. remove (e) garage door recesses, match (e) adjustment brick size, shape, texture, and paint type. | |
| Jun 13, 2022 | Completed final sign-off Jun 2023 | 828 Innes Av | convert an existing commercial unit (#111) at the 2nd and 3rd floors to one adu unit at the 3rd floor and one commerical unit at the 2nd floor per the local adu program. shared plans with pa# 202012171259.Details
convert an existing commercial unit (#111) at the 2nd and 3rd floors to one adu unit at the 3rd floor and one commerical unit at the 2nd floor per the local adu program. shared plans with pa# 202012171259. | $40,000 |
| Jun 6, 2022 | Completed final sign-off Nov 2023 | 828 Taylor St | addition of one adu unit at the ground floor per the state adu program for a total of 10 units. within existing envelope.Details
addition of one adu unit at the ground floor per the state adu program for a total of 10 units. within existing envelope. | $50,000 |
| May 5, 2022 | Completed final sign-off Mar 2025 | 3201 23rd St | revision to 202009033416. infill of window invisible from st. removal of structural changes in (e) garage.Details
revision to 202009033416. infill of window invisible from st. removal of structural changes in (e) garage. | |
| Mar 24, 2022 | Never finaled filed Mar 2022, never issued | 1039 Hudson Av | erect new 3-story over 1-basement, type 5b, single family bldg with one adu, and one j-adu per state program (3 units total).Details
erect new 3-story over 1-basement, type 5b, single family bldg with one adu, and one j-adu per state program (3 units total). | $1,000,000 |
| Mar 24, 2022 | Never finaled filed Mar 2022, never issued | 1039 Hudson Av | erect new 3-story over 1-basement, type 5b, single family bldg with one adu, and one j-adu per state program (3 units total).Details
erect new 3-story over 1-basement, type 5b, single family bldg with one adu, and one j-adu per state program (3 units total). | $1,000,000 |
| Mar 24, 2022 | Never finaled filed Mar 2022, never issued | 1039 Hudson Av | erect new 3-story over 1-basement, type 5b, single family bldg with one adu, and one j-adu per state program (3 units total).Details
erect new 3-story over 1-basement, type 5b, single family bldg with one adu, and one j-adu per state program (3 units total). | $1,000,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2023 | 932 Central Av | voluntary partial seismic upgrade at basement level. excavation of basement to gain ceiling height.Details
voluntary partial seismic upgrade at basement level. excavation of basement to gain ceiling height. | $30,000 |
| Mar 10, 2022 | Never finaled filed Mar 2022, never issued | 300 Buchanan St | addition of 9 adu units at the ground floor under the local adu program.Details
addition of 9 adu units at the ground floor under the local adu program. | $1,000,000 |
| Mar 2, 2022 | Never finaled issued Mar 2022, no final | 2730 Sacramento St | converting 2 extg storage rooms into three new storage rooms on level 1. new storage created shall not be removed during adu construction proposed under 202106071782.Details
converting 2 extg storage rooms into three new storage rooms on level 1. new storage created shall not be removed during adu construction proposed under 202106071782. | $6,000 |
| Feb 8, 2022 | Completed final sign-off Jun 2022 | 655 Kansas St | unit 506: remodel 1 existing bathroom and 1 kitchen. remove exisitng finishes to install new electrical, plumbing, drywall, tile, countertops etc. no structural changes.Details
unit 506: remodel 1 existing bathroom and 1 kitchen. remove exisitng finishes to install new electrical, plumbing, drywall, tile, countertops etc. no structural changes. | $28,500 |
| Dec 17, 2021 | Completed final sign-off Dec 2024 | 1230 Revere Av | to erect a 3-story, type va, 2-unit residential bldg with 1 adu at ground fl, on a vacant lot. total will be 3 units.Details
to erect a 3-story, type va, 2-unit residential bldg with 1 adu at ground fl, on a vacant lot. total will be 3 units. | $525,350 |
| Dec 14, 2021 | Never finaled issued Dec 2022, no final | 1950 Franklin St | addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: noDetails
addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: no | $345,000 |
| Nov 23, 2021 | Completed final sign-off May 2023 | 3035 Baker St | revision to 202008081395: adding an office to unit c, removing the court @ the notrth. reducing the size of the sunken patio in rear yard. change in mech system from ridiators to hini splitsDetails
revision to 202008081395: adding an office to unit c, removing the court @ the notrth. reducing the size of the sunken patio in rear yard. change in mech system from ridiators to hini splits | |
| Nov 2, 2021 | Completed final sign-off Jun 2022 | 795 San Jose Av | revision to bpa#2021/1018/0683. existing window to be replaced same size,same lcoation, not visible from street. wall infill in kitchen as per plans.Details
revision to bpa#2021/1018/0683. existing window to be replaced same size,same lcoation, not visible from street. wall infill in kitchen as per plans. | $30,000 |
| Nov 2, 2021 | Completed final sign-off Feb 2023 | 793 San Jose Av | 1st fl. commercial t.i; reconfigure for new architecture office; install new ada bathroom, install new powder rooms, install new kitchette, new partition framing, reframe portion of ceiling where load bearing walls are required; modification of openings facing 30th st.Details
1st fl. commercial t.i; reconfigure for new architecture office; install new ada bathroom, install new powder rooms, install new kitchette, new partition framing, reframe portion of ceiling where load bearing walls are required; modification of openings facing 30th st. | $75,000 |
| Oct 18, 2021 | Completed final sign-off Jun 2022 | 795 San Jose Av | remodel 1 (e) ktichen & 1 (e) bathroom in-kind. no structural changes. no layout change.Details
remodel 1 (e) ktichen & 1 (e) bathroom in-kind. no structural changes. no layout change. | $22,500 |
| Sep 14, 2021 | Completed final sign-off Feb 2022 | 1795 Ofarrell St | unit 104: repair one damaged beam at second floor framing planDetails
unit 104: repair one damaged beam at second floor framing plan | $7,500 |
| Aug 20, 2021 | Completed final sign-off Jun 2022 | 932 Central Av | 934 central av: remove drywall at ceiling and walls to expose dryrot damage from roof and siding leak. replace in kind.Details
934 central av: remove drywall at ceiling and walls to expose dryrot damage from roof and siding leak. replace in kind. | $3,500 |
| Aug 2, 2021 | Completed final sign-off Jun 2023 | 932 Central Av | unit #934: interior remodel. reconfigure for 3 bedrooms, 2 bathrooms configuration. no visible changes to front or side of building.Details
unit #934: interior remodel. reconfigure for 3 bedrooms, 2 bathrooms configuration. no visible changes to front or side of building. | $60,000 |
| Jul 15, 2021 | Completed final sign-off Jun 2022 | 50 Liberty St | 1)renovation of extg kitchen and bathrooms and reconfiguring 2 extg bathrooms. 2)adding a bathroom to the ground floor in extg storage space. 3)in kind window replacement. 4)new code complaint handrail/guard rail at extg staircase.Details
1)renovation of extg kitchen and bathrooms and reconfiguring 2 extg bathrooms. 2)adding a bathroom to the ground floor in extg storage space. 3)in kind window replacement. 4)new code complaint handrail/guard rail at extg staircase. | $75,000 |
| Jun 21, 2021 | Completed final sign-off Oct 2021 | 655 Kansas St | unit 606: remodel existing one kitchen & one bathroom. remove cabinets, tile. remove existing drywall as necessary to install updated electrical & plumbing. install new drywall cabinets & counter. no structural changes.Details
unit 606: remodel existing one kitchen & one bathroom. remove cabinets, tile. remove existing drywall as necessary to install updated electrical & plumbing. install new drywall cabinets & counter. no structural changes. | $38,500 |
| Jun 10, 2021 | Completed final sign-off Apr 2023 | 2519 Pacific Av | ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only.Details
ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only. | $15,000 |
| Mar 16, 2021 | Completed final sign-off Jan 2022 | 1920 Pacific Av | cosmetic rehab of street facade only. no change to areas, no addition, no change to envelope. adu permit under separate application.Details
cosmetic rehab of street facade only. no change to areas, no addition, no change to envelope. adu permit under separate application. | $20,000 |
| Mar 4, 2021 | Completed final sign-off May 2021 | 262 12th Av | apt 4: remodel 1 (e) ktichen & bathroom. no structural change. remove (e) cabinets & drywall. install new code complying electrical. install new drywall, cbainets, counters etc.Details
apt 4: remodel 1 (e) ktichen & bathroom. no structural change. remove (e) cabinets & drywall. install new code complying electrical. install new drywall, cbainets, counters etc. | $35,000 |
| Mar 4, 2021 | Completed final sign-off Aug 2021 | 3568 18th St | remodel 1 (e) kitchen & bathroom. no structural chnges. rmeove (e) cabinets, drywall ele. install new code complying elec. install new drywall,cabinets, counters etc.Details
remodel 1 (e) kitchen & bathroom. no structural chnges. rmeove (e) cabinets, drywall ele. install new code complying elec. install new drywall,cabinets, counters etc. | $35,000 |
| Feb 22, 2021 | Completed final sign-off Mar 2025 | 1920 Pacific Av | add 4 adus at ground floor parking per ordinance 162-16 to existing 12 residential units. provide sprinklers at the ground floor per nfpa 13Details
add 4 adus at ground floor parking per ordinance 162-16 to existing 12 residential units. provide sprinklers at the ground floor per nfpa 13 | $150,000 |
| Jan 26, 2021 | Completed final sign-off Apr 2021 | 515 Shrader St | unit 4. remodel (e) 1 kitchen & 1 bathroom in kind. no structural changes. remove (e) drywall, cabinets, finishes, etc. install new code complying wiring & install new insulation drywall, cabinets etc. within kitchen area only.Details
unit 4. remodel (e) 1 kitchen & 1 bathroom in kind. no structural changes. remove (e) drywall, cabinets, finishes, etc. install new code complying wiring & install new insulation drywall, cabinets etc. within kitchen area only. | $45,000 |
| Dec 17, 2020 | Completed final sign-off Jun 2023 | 828 Innes Av | convert (2) existing commercial units into (1) new adu's and (1) ground floor commercial unit per ordinance 162-16; no tenant amenities to be impacted. shared plans with pa# 202206136205.Details
convert (2) existing commercial units into (1) new adu's and (1) ground floor commercial unit per ordinance 162-16; no tenant amenities to be impacted. shared plans with pa# 202206136205. | $80,000 |
| Oct 15, 2020 | Completed final sign-off Jan 2025 | 655 Powell St | convert (e) garage, storage & utility rms on 1st & 2nd flr into (6) adu's per ord#162-16, total of (54) units.entire 1st & 2nd flr ceiling assembly to be upgraded to 1-hour rated assembly per info sheet fs-05; fire underground service to be submitted with sprinkler plans;upgrade ground flr to type5aDetails
convert (e) garage, storage & utility rms on 1st & 2nd flr into (6) adu's per ord#162-16, total of (54) units.entire 1st & 2nd flr ceiling assembly to be upgraded to 1-hour rated assembly per info sheet fs-05; fire underground service to be submitted with sprinkler plans;upgrade ground flr to type5a | $320,000 |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 801 Union St | (commercial) revision to pa #2019-0215-3043: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall to foundation detail at grid f/1-1.8 and grid e.6 to match field condition.Details
(commercial) revision to pa #2019-0215-3043: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall to foundation detail at grid f/1-1.8 and grid e.6 to match field condition. | |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 1753 Mason St | (residential) revision to pa #2019-0215-3040: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall t ofoundation detail at grid f/1-1.8 and grid e.6 to match field condition.Details
(residential) revision to pa #2019-0215-3040: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall t ofoundation detail at grid f/1-1.8 and grid e.6 to match field condition. | |
| Sep 16, 2020 | Completed final sign-off Nov 2020 | 1920 Pacific Av | remove dry rotted wood enclosure around garbage area and replace in kind. no visible from street.Details
remove dry rotted wood enclosure around garbage area and replace in kind. no visible from street. | $4,800 |
| Sep 16, 2020 | Never finaled issued Sep 2020, no final | 3440 20th St | remove ~100 sf of existing dry rotted wood siding. replace in kind. not visible from street.Details
remove ~100 sf of existing dry rotted wood siding. replace in kind. not visible from street. | $6,500 |
| Sep 3, 2020 | Completed final sign-off Mar 2025 | 3201 23rd St | convert 3 covered parking spaces & storage rooms into (4) accessory dwellling unit per ordinance 162-16, for a building total of 28 units.Details
convert 3 covered parking spaces & storage rooms into (4) accessory dwellling unit per ordinance 162-16, for a building total of 28 units. | $200,000 |
| Aug 22, 2020 | Completed final sign-off Apr 2023 | 2519 Pacific Av | renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation).Details
renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation). | $75,000 |
| Aug 8, 2020 | Completed final sign-off May 2023 | 3035 Baker St | the scope of work is to add 3 adu's to level 1 per ordinance 162-16Details
the scope of work is to add 3 adu's to level 1 per ordinance 162-16 | $300,000 |
| Jul 27, 2020 | Expired or cancelled expired Apr 2025 | 698 Bush St | add toilet & shower, sink , at units 204, 205, 206, 406 & 504.Details
add toilet & shower, sink , at units 204, 205, 206, 406 & 504. | $30,000 |
| Jun 26, 2020 | Completed final sign-off Sep 2020 | 655 Kansas St | add interior wall to create bedroom, replace kitchen appliance and cabinets. replace bathroom fixtures and add 2 skylights.Details
add interior wall to create bedroom, replace kitchen appliance and cabinets. replace bathroom fixtures and add 2 skylights. | $30,000 |
| Jun 16, 2020 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | unit #204: replace bathroom fixtures, kitchen cabinets and sink in kind , same location.Details
unit #204: replace bathroom fixtures, kitchen cabinets and sink in kind , same location. | $15,500 |
| Jun 16, 2020 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | unit #406: replacing bathroom fixtures, kitchen cabinets and sink in kind ,in same location.Details
unit #406: replacing bathroom fixtures, kitchen cabinets and sink in kind ,in same location. | $15,500 |
| Jun 16, 2020 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | unit #504: replacing bathroom fixtures, kitchen cabinets and sink in kindDetails
unit #504: replacing bathroom fixtures, kitchen cabinets and sink in kind | $15,500 |
| Jun 12, 2020 | Expired or cancelled expired Jul 2025 | 698 Bush St | unit #308: remodel existing bath and kitchen in kind.Details
unit #308: remodel existing bath and kitchen in kind. | $25,000 |
| May 26, 2020 | Never finaled issued Aug 2020, no final | 1425 Vallejo St | remove approx 7 sheet of existing dryrot/damaged t 111 plywood & replace in kind on left side of bldg. side is not visible from street.Details
remove approx 7 sheet of existing dryrot/damaged t 111 plywood & replace in kind on left side of bldg. side is not visible from street. | $3,500 |
| May 12, 2020 | Completed final sign-off Nov 2020 | 1700 Bush St | rev to pa201912068860: soft-story retrofit. new wood shearwalls and grade beams.Details
rev to pa201912068860: soft-story retrofit. new wood shearwalls and grade beams. | |
| Mar 11, 2020 | Completed final sign-off Jan 2022 | 1060 Pine St | adding two adu's to level 1 per ordinance 95-14.both are studio units.Details
adding two adu's to level 1 per ordinance 95-14.both are studio units. | $212,000 |
| Mar 3, 2020 | In progress issued Dec 2024 | 1455 Underwood Av | to erect 3 stories, no basement, type v-b, single family dwelling.Details
to erect 3 stories, no basement, type v-b, single family dwelling. | $500,000 |
| Mar 3, 2020 | In progress issued Dec 2024 | 1459 Underwood Av | to erect 3 stories, no basement, type v-b, single family dwelling.Details
to erect 3 stories, no basement, type v-b, single family dwelling. | $500,000 |
| Feb 18, 2020 | Completed final sign-off Jan 2023 | 3440 20th St | convert garage spaces into (9) new adu's per ordinance no. 162-16 for a building total of (48) units.Details
convert garage spaces into (9) new adu's per ordinance no. 162-16 for a building total of (48) units. | $200,000 |
| Feb 11, 2020 | Completed final sign-off Dec 2020 | 345 Fulton St | unit 40: remodel 1 existing kitchen & 1 existing bathroom in kind. remove & replace drywall as necessary to update elec & plumbing. no structural changes. no alteration of wall, window or doorDetails
unit 40: remodel 1 existing kitchen & 1 existing bathroom in kind. remove & replace drywall as necessary to update elec & plumbing. no structural changes. no alteration of wall, window or door | $45,000 |
| Feb 11, 2020 | Completed final sign-off Sep 2020 | 655 Kansas St | unit 401: remodel 1 existing kitchen & 1 bathroom in kind. remodel & replace drywall as neccessary to upgrade elec & plumbing as needed. no structural changes. no alteration of wall, window or door.Details
unit 401: remodel 1 existing kitchen & 1 bathroom in kind. remodel & replace drywall as neccessary to upgrade elec & plumbing as needed. no structural changes. no alteration of wall, window or door. | $49,500 |
| Jan 13, 2020 | Completed final sign-off Jan 2020 | 1500 Revere Av | car hit post between garage doors. remove interior drywall, exterior siding, plywood, trim etc to access damaged existing 6x10 post. replace post & replace damaged/removed drywall & exterior siding etc in kindDetails
car hit post between garage doors. remove interior drywall, exterior siding, plywood, trim etc to access damaged existing 6x10 post. replace post & replace damaged/removed drywall & exterior siding etc in kind | $25,000 |
| Dec 26, 2019 | Completed final sign-off Jun 2023 | 828 Innes Av | legalization of(e) unit at ground floor per ordinance 43-14. reconfigure unit to be an 808 sq feet studio unitDetails
legalization of(e) unit at ground floor per ordinance 43-14. reconfigure unit to be an 808 sq feet studio unit | $75,000 |
| Dec 20, 2019 | Completed final sign-off Aug 2021 | 1060 Pine St | revision to soft story pa #201709148177. relocate shearwalls.Details
revision to soft story pa #201709148177. relocate shearwalls. | $40,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 301 Dorado Tr | remove 400sf of (e) stucco on left side of building to expose dryrot damange. replace in-kind.Details
remove 400sf of (e) stucco on left side of building to expose dryrot damange. replace in-kind. | $15,000 |
| Dec 6, 2019 | Completed final sign-off Nov 2020 | 1700 Bush St | soft story retrofit in accordance with sfbc chapter 4d. soft story program using iebc appendix a4. (n) shear walls and grade beam.Details
soft story retrofit in accordance with sfbc chapter 4d. soft story program using iebc appendix a4. (n) shear walls and grade beam. | $72,000 |
| Oct 30, 2019 | Completed final sign-off Oct 2019 | 5519 Mission St | replace 10 windows non street facingDetails
replace 10 windows non street facing | $11,000 |
| Oct 23, 2019 | Completed final sign-off Aug 2023 | 262 12th Av | mandatory seismic strengthening per sfebc chapter 4d. 2016 cebc appendix a-4. ref pa #201910255606Details
mandatory seismic strengthening per sfebc chapter 4d. 2016 cebc appendix a-4. ref pa #201910255606 | $40,100 |
| Oct 16, 2019 | Completed final sign-off Jan 2020 | 2240 Larkin St | revision to pa 2016-1123-3505 and permit 2019-0626-4478. mandatory soft story retrofit. revise simpson strong wall location and sizeDetails
revision to pa 2016-1123-3505 and permit 2019-0626-4478. mandatory soft story retrofit. revise simpson strong wall location and size | $5,000 |
| Oct 4, 2019 | Completed final sign-off Jul 2020 | 990 Bay St | voluntary structural strengthening. new concrete shear wall. ref app# 2014 0604 7505Details
voluntary structural strengthening. new concrete shear wall. ref app# 2014 0604 7505 | $30,000 |
| Sep 18, 2019 | Completed final sign-off Sep 2019 | 559 24th Av | identify (e) utility meters on plan for final inspection of 201704204456. no work or change in scopeDetails
identify (e) utility meters on plan for final inspection of 201704204456. no work or change in scope | |
| Sep 16, 2019 | Completed final sign-off Oct 2019 | 5519 Mission St | remove approx 200 sq ft of existing dryrotted side at left side of building and replace in kind. not visible from the streetDetails
remove approx 200 sq ft of existing dryrotted side at left side of building and replace in kind. not visible from the street | $12,500 |
| Sep 9, 2019 | Completed final sign-off Sep 2019 | 4405 California St | soft story retrofit to comply w/2016 sfebc chapter 4d per 2016 cebc appendix a-4 criteria structural revision 2018-0815-7353/2018-0815-7355Details
soft story retrofit to comply w/2016 sfebc chapter 4d per 2016 cebc appendix a-4 criteria structural revision 2018-0815-7353/2018-0815-7355 | $5,000 |
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 1460 Golden Gate Av | apt #6 - removal of existing bath, relocate kitchen, demo non structural wallsDetails
apt #6 - removal of existing bath, relocate kitchen, demo non structural walls | $55,000 |
| Aug 13, 2019 | Completed final sign-off Aug 2019 | 2751 Clay St | as per housing complaint #201955491 replace 2 wood sash at kitchen window; replace existing window at porch with new vinyl window. not visible from street. same size same location. max ufactor .32Details
as per housing complaint #201955491 replace 2 wood sash at kitchen window; replace existing window at porch with new vinyl window. not visible from street. same size same location. max ufactor .32 | $2,100 |
| Aug 2, 2019 | Completed final sign-off Oct 2019 | 3852 California St | remove approx. 700 sq ft of existing stucco at courtyard to check for dry rot. less than 50% of facade.Details
remove approx. 700 sq ft of existing stucco at courtyard to check for dry rot. less than 50% of facade. | $10,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 575 Pierce St | #405: no change to occupancy, egress, relocate kitchen, remodel bath, demo of non-structural partitions, new plumbing & kitchen fixtures. no ext workDetails
#405: no change to occupancy, egress, relocate kitchen, remodel bath, demo of non-structural partitions, new plumbing & kitchen fixtures. no ext work | $45,000 |
| Jul 23, 2019 | Completed final sign-off May 2021 | 990 Bay St | unit 602 - renovate (e) bath, relocate kitchen, demo of non-structural wallsDetails
unit 602 - renovate (e) bath, relocate kitchen, demo of non-structural walls | $45,000 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 630 Grand View Av | revision to pa# 2016-0822-5688 to shear wall to brace frameDetails
revision to pa# 2016-0822-5688 to shear wall to brace frame |