Ivan Alberto Rivera Rivas
- Based in
- Colma
- On San Francisco permits
- Jun 2011 to Sep 2026
- Last 24 months
- 8 permits filed
87 permits since 2000: 67 completed, 5 in progress, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 868 Minnesota St | remove shower pan and build a new shower pan in kind. patching walls for partial bathroom remodel.Details
remove shower pan and build a new shower pan in kind. patching walls for partial bathroom remodel. | $5,000 |
| May 29, 2026 | Completed final sign-off Jul 2026 | 201 Leavenworth St | recommencement and completion of work approved under pa# 202502039580.Details
recommencement and completion of work approved under pa# 202502039580. | $3,000 |
| Aug 19, 2025 | In progress filed Aug 2025, not yet issued | 155 Clara St | comply with nov 202304484 legalize 1st fl conversion of commercial space to residential unit. to include kitchen, full bath, 1 bedroom, dining rm, living rm. new window at rear.Details
comply with nov 202304484 legalize 1st fl conversion of commercial space to residential unit. to include kitchen, full bath, 1 bedroom, dining rm, living rm. new window at rear. | $20,000 |
| Apr 18, 2025 | Completed final sign-off Dec 2025 | 237 Pierce St | dry rotted siding replacement. replacement of (5) windows and (2) door in kind. replacement of (3) dry rotted beams. all work is in the rear facade, no work is street facing.Details
dry rotted siding replacement. replacement of (5) windows and (2) door in kind. replacement of (3) dry rotted beams. all work is in the rear facade, no work is street facing. | $15,000 |
| Apr 15, 2025 | Completed final sign-off Aug 2025 | 1342 32nd Av | new bathroom on ground floorDetails
new bathroom on ground floor | $20,000 |
| Feb 18, 2025 | In progress issued Feb 2025 | 39 Santa Ynez Av | (e) bathroom remodel to include replace tub for shower.Details
(e) bathroom remodel to include replace tub for shower. | $10,000 |
| Feb 3, 2025 | Expired or cancelled expired May 2026 | 201 Leavenworth St | unit 602- to comply with nov 202533364 for fire damage to replace wallbaord ceiling, roof, window and front door.Details
unit 602- to comply with nov 202533364 for fire damage to replace wallbaord ceiling, roof, window and front door. | $10,000 |
| Oct 25, 2024 | Completed final sign-off Dec 2024 | 1557 Oakdale Av | ref 2023042665190 to comply with nov 202302410 items 2-7 to remove dry rotted wall and rebuild itDetails
ref 2023042665190 to comply with nov 202302410 items 2-7 to remove dry rotted wall and rebuild it | $40,000 |
| Jul 24, 2024 | In progress issued Jul 2024 | 1060 Mississippi St | addition (n) bathroom located at 2nd floor. no structural work.Details
addition (n) bathroom located at 2nd floor. no structural work. | $30,000 |
| May 10, 2024 | Completed final sign-off Apr 2025 | 159 Middlefield Dr | add (n) bathroom w/ window on g/f behind garage. replcae concrete slab and concrete steps in garage. no work on upper floors and roof area.Details
add (n) bathroom w/ window on g/f behind garage. replcae concrete slab and concrete steps in garage. no work on upper floors and roof area. | $40,000 |
| Feb 16, 2024 | Completed final sign-off Feb 2024 | 3326 San Bruno Av | remove deck floor and replace it in kind and remove hand rails and replace them in kind. less than 50%Details
remove deck floor and replace it in kind and remove hand rails and replace them in kind. less than 50% | $10,000 |
| Aug 25, 2023 | Completed final sign-off Nov 2023 | 79 Pierce St | kitchen remodel. no facade changes.Details
kitchen remodel. no facade changes. | $10,000 |
| May 26, 2023 | Completed final sign-off Sep 2023 | 110 Monterey Bl | bathroom remodel in kindDetails
bathroom remodel in kind | $20,000 |
| May 15, 2023 | Completed final sign-off Jul 2023 | 58 Santa Barbara Av | bathroom remodel in kind.Details
bathroom remodel in kind. | $30,000 |
| Jan 30, 2023 | In progress issued Aug 2024 | 4736 03rd St | alter site pa# 2017-0425-4772 and comply w/ nov 20218935. bldg c(rear bldg) 1st floor legalization per ord# 43-14. demolish 2nd floor illegal unit at rear lot. demolish commercial (e) storage at 1st floor rear lot and conver to residential. total 950 sf new habitable area.Details
alter site pa# 2017-0425-4772 and comply w/ nov 20218935. bldg c(rear bldg) 1st floor legalization per ord# 43-14. demolish 2nd floor illegal unit at rear lot. demolish commercial (e) storage at 1st floor rear lot and conver to residential. total 950 sf new habitable area. | $131,000 |
| Jan 20, 2023 | Completed final sign-off Jun 2024 | 37 Norwich St | new bath, sauna, and laundryDetails
new bath, sauna, and laundry | $40,000 |
| Dec 12, 2022 | Never finaled issued Jul 2023, no final | 202 Shipley St | new ada entry improvement.to comply with abe program per ordinance 51-16, abe #202206231677. install push button door opener on right side of door on stucco wall - 330 5th street. new ada entry improvementDetails
new ada entry improvement.to comply with abe program per ordinance 51-16, abe #202206231677. install push button door opener on right side of door on stucco wall - 330 5th street. new ada entry improvement | $4,200 |
| Oct 21, 2022 | Completed final sign-off Jan 2023 | 590 29th St | kitchen remodelDetails
kitchen remodel | $35,000 |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 1177 California St | kitchen remodel and bathroom remodel remodel in kindDetails
kitchen remodel and bathroom remodel remodel in kind | $20,000 |
| Jan 12, 2022 | Completed final sign-off Mar 2022 | 1512 Underwood Av | to comply with nov# 202184713. repair dryrotted wall in like kind. contact building inspector at beginning of work.Details
to comply with nov# 202184713. repair dryrotted wall in like kind. contact building inspector at beginning of work. | $10,000 |
| Jun 9, 2021 | Completed final sign-off Dec 2022 | 1346 Stevenson St | non structural interior remodel to convert two half baths to full baths. remodel (e) full bath.Details
non structural interior remodel to convert two half baths to full baths. remodel (e) full bath. | $5,000 |
| Aug 4, 2020 | Completed final sign-off Sep 2020 | 66 Cleary Ct | unit# 406:change 2 bathroom valve, 1 kitchen angle valve. leave layout as is. no structural changes. no change to existing sprinkler system.Details
unit# 406:change 2 bathroom valve, 1 kitchen angle valve. leave layout as is. no structural changes. no change to existing sprinkler system. | $15,000 |
| Jul 10, 2020 | Never finaled issued Aug 2020, no final | 410 Plymouth Av | administrative permit only: to correct address under pa2019-1017-4852 from 408 plymouth ave to 410 plymouth ave. no other work under this permit.Details
administrative permit only: to correct address under pa2019-1017-4852 from 408 plymouth ave to 410 plymouth ave. no other work under this permit. | |
| May 29, 2020 | Completed final sign-off Aug 2020 | 266 Bella Vista Wy | bathroom remodel in-kind.Details
bathroom remodel in-kind. | $15,000 |
| Feb 7, 2020 | Completed final sign-off Jan 2021 | 2139 18th Av | replacement of existing dry rot entry stairs in same location.Details
replacement of existing dry rot entry stairs in same location. | $6,000 |
| Dec 31, 2019 | Completed final sign-off Jan 2021 | 2139 18th Av | inkind front stair and surrounding siding repairDetails
inkind front stair and surrounding siding repair | $6,000 |
| Dec 17, 2019 | Completed final sign-off May 2020 | 2295 Vallejo St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $30,000 |
| Nov 27, 2019 | Never finaled issued Nov 2019, no final | 1570 45th Av | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $30,000 |
| Nov 20, 2019 | Completed final sign-off Mar 2021 | 160 Bepler St | deck repair in kind less than 50%. no full replacement of structure.Details
deck repair in kind less than 50%. no full replacement of structure. | $20,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 408 Plymouth Av | kitchen remodel 10'x10'Details
kitchen remodel 10'x10' | $25,000 |
| Sep 5, 2019 | Completed final sign-off Dec 2019 | 2295 Vallejo St | kitchen remodel. no change in walls and openings layout. maintain 1 hour fire separation between units at area of workDetails
kitchen remodel. no change in walls and openings layout. maintain 1 hour fire separation between units at area of work | $2,000 |
| Aug 14, 2019 | Completed final sign-off Mar 2024 | 775 Vermont St | comply to correct complaint #201899601. access for roof/solar equipment access. legalize steel spiral roof access ladder stair post installed on conc pad footing.Details
comply to correct complaint #201899601. access for roof/solar equipment access. legalize steel spiral roof access ladder stair post installed on conc pad footing. | $5,000 |
| Jul 11, 2019 | Completed final sign-off Dec 2019 | 143 Athens St | construct deck/elevated at rear.Details
construct deck/elevated at rear. | $20,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2019 | 308 Hill St | replace shingle siding with wood shiplap at front and visible side facades. replace all non-visible siding (rear and sides) with hardie plank. replace 5 windows in-kind with wood casements and 2 doors on front facade. replace lower front railing to meet code. asphalt shingles on front.no other work.Details
replace shingle siding with wood shiplap at front and visible side facades. replace all non-visible siding (rear and sides) with hardie plank. replace 5 windows in-kind with wood casements and 2 doors on front facade. replace lower front railing to meet code. asphalt shingles on front.no other work. | $150,000 |
| Jun 5, 2019 | Completed final sign-off Aug 2019 | 1774 14th Av | exterior plaster replacementDetails
exterior plaster replacement | $40,000 |
| May 24, 2019 | Completed final sign-off Jun 2019 | 735 41st Av | comply with notice of complaint dept of city planning 2019005614enf. remove all kitchen appliances on ground floor.Details
comply with notice of complaint dept of city planning 2019005614enf. remove all kitchen appliances on ground floor. | $5,000 |
| May 23, 2019 | Completed final sign-off Oct 2020 | 308 Missouri St | interior only remodel. no exterior work. add 1 bathroom. recondition (e) bathroom and kitchen. reconfigure kitchen/dining area. expand closetDetails
interior only remodel. no exterior work. add 1 bathroom. recondition (e) bathroom and kitchen. reconfigure kitchen/dining area. expand closet | $55,000 |
| Apr 29, 2019 | Completed final sign-off Jun 2019 | 408 Utah St | demo of (e) corridor in compliance with "report of physical inspections cc 8130" (n) paint and flooring at carriage house.Details
demo of (e) corridor in compliance with "report of physical inspections cc 8130" (n) paint and flooring at carriage house. | $20,000 |
| Mar 27, 2019 | Never finaled issued Apr 2019, no final | 317 Harriet St | unit#20: interior upgrade only: new non-structural interior partition with new doors and electrical outlets per 2016cbc and 2016 cec. n/a for maherDetails
unit#20: interior upgrade only: new non-structural interior partition with new doors and electrical outlets per 2016cbc and 2016 cec. n/a for maher | $10,000 |
| Mar 21, 2019 | Completed final sign-off May 2019 | 807 Columbus Av | unit #2 - remodel bathroom. maher n/a.Details
unit #2 - remodel bathroom. maher n/a. | $15,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2019 | 410 Utah St | remove and replace 9 windows. all windows facing street.Details
remove and replace 9 windows. all windows facing street. | $2,000 |
| Dec 28, 2018 | Completed final sign-off Feb 2020 | 117 Peralta Av | kitchen remodel: tearout old cabinets and replace w/new. put in dedicated circuits and may have to move plumbing for new sink postiion.Details
kitchen remodel: tearout old cabinets and replace w/new. put in dedicated circuits and may have to move plumbing for new sink postiion. | $15,000 |
| Dec 28, 2018 | Completed final sign-off Jun 2019 | 280 Crestlake Dr | plumbing fixture replacement toilet, sink, and shower. 4 feet wide and 9 feet long.Details
plumbing fixture replacement toilet, sink, and shower. 4 feet wide and 9 feet long. | $14,096 |
| Dec 13, 2018 | Completed final sign-off Apr 2019 | 410 Utah St | kitchen & bathroom remodel, no change to (e) floor planDetails
kitchen & bathroom remodel, no change to (e) floor plan | $15,000 |
| Dec 13, 2018 | Completed final sign-off Apr 2019 | 408 Utah St | kitchen & bathroom remodel no chage of (e) floor planDetails
kitchen & bathroom remodel no chage of (e) floor plan | $1,500 |
| Dec 6, 2018 | Completed final sign-off Jan 2019 | 1222 Hawes St | bathroom remodel. shower pan, toilet, vanity. 8'x5'Details
bathroom remodel. shower pan, toilet, vanity. 8'x5' | $12,000 |
| Nov 26, 2018 | Completed final sign-off Aug 2021 | 1475 Thomas Av | comply with n.o.v #201891151. legalize new deck and storage room underneath deck & storage rooms at basement level. legalize unpermited bathroom to be incompliance with citation# 201891151.Details
comply with n.o.v #201891151. legalize new deck and storage room underneath deck & storage rooms at basement level. legalize unpermited bathroom to be incompliance with citation# 201891151. | $18,000 |
| Oct 19, 2018 | Completed final sign-off May 2019 | 4021 Kirkham St | kitchen remodel. remove and replace cabinets and appliances.Details
kitchen remodel. remove and replace cabinets and appliances. | $10,000 |
| Sep 24, 2018 | Completed final sign-off Nov 2018 | 131 Garfield St | remodle bathroom- remove and replace bathtub and tiles.Details
remodle bathroom- remove and replace bathtub and tiles. | $12,000 |
| Sep 10, 2018 | Completed final sign-off Mar 2019 | 6435 California St | remodel balthrrrom , sheet rock in kind. no removal of walls. scopw of work in-kindDetails
remodel balthrrrom , sheet rock in kind. no removal of walls. scopw of work in-kind | $20,000 |
| Jul 30, 2018 | Completed final sign-off May 2019 | 2350 Market St | reconfiguration of building exit stairways, new stairway to exist mezzanine, reconsturction of street facade, new roof deckDetails
reconfiguration of building exit stairways, new stairway to exist mezzanine, reconsturction of street facade, new roof deck | $30,000 |
| Jun 4, 2018 | Completed final sign-off Jul 2018 | 2583 40th Av | remodel bathroom. r/r fixturesDetails
remodel bathroom. r/r fixtures | $7,000 |
| Apr 25, 2018 | Completed final sign-off Sep 2018 | 355 Buena Vista East Av | unit #511 - kitchen cabinet replacement & bath remodel (no change of existing floor plan)Details
unit #511 - kitchen cabinet replacement & bath remodel (no change of existing floor plan) | $20,000 |
| Apr 19, 2018 | Completed final sign-off Jun 2018 | 1511 Baker St | 1 bathroom remodel, in top floor unit, remodel same location, no moving of walls or doorsDetails
1 bathroom remodel, in top floor unit, remodel same location, no moving of walls or doors | $8,900 |
| Apr 9, 2018 | Completed final sign-off Aug 2018 | 461 Stoneridge Ln | kitchen remodel, 11'x8', like-for-like, lighting per cenc 150.0 (k)Details
kitchen remodel, 11'x8', like-for-like, lighting per cenc 150.0 (k) | $15,000 |
| Jan 25, 2018 | Completed final sign-off Feb 2018 | 775 Myra Wy | remodel (e) kitchen.Details
remodel (e) kitchen. | $20,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 893 Meade Av | (e) kitchen upgrade: demo of non structural load bearing wall, new light fixtures, cabs, plm fixt. and flr surfaceDetails
(e) kitchen upgrade: demo of non structural load bearing wall, new light fixtures, cabs, plm fixt. and flr surface | $5,000 |
| Jan 11, 2018 | Completed final sign-off Jun 2018 | 1020 Goettingen St | kitchen remodel. bathroom remodel. no structural change, replace in kind.Details
kitchen remodel. bathroom remodel. no structural change, replace in kind. | $30,000 |
| Dec 28, 2017 | Never finaled issued May 2018, no final | 40 Canyon Dr | to comply with complaint #'s 201850875, 201859365 & 201702702. kitchen remodel. replace cabinets, counters, appliances, change flooring in the kitchen to tile.Details
to comply with complaint #'s 201850875, 201859365 & 201702702. kitchen remodel. replace cabinets, counters, appliances, change flooring in the kitchen to tile. | $20,000 |
| Oct 11, 2017 | Completed final sign-off Dec 2017 | 2135 14th Av | demoeleition, remodel kitchenDetails
demoeleition, remodel kitchen | $20,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2018 | 1282 16th Av | existing rear deck upgrade with new exit stair to rear yard. legalize (e) bathroom on ground floorDetails
existing rear deck upgrade with new exit stair to rear yard. legalize (e) bathroom on ground floor | $80,000 |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 1311 Masonic Av | demo kitchen, remodel kitchen, add 6 recessed lights, 12 receptacles, relocate stoveDetails
demo kitchen, remodel kitchen, add 6 recessed lights, 12 receptacles, relocate stove | $30,000 |
| Aug 24, 2017 | Completed final sign-off Aug 2019 | 1662 21st Av | recommencement and completion of work approved under pa#2013-07-31-3204Details
recommencement and completion of work approved under pa#2013-07-31-3204 | $10,000 |
| Aug 16, 2017 | Completed final sign-off Dec 2017 | 2230 41st Av | remodel kitchen in kind. replace cabinets, stove, dishwasher and counter top. no change to layout. repair wall board at kitchen as needed.Details
remodel kitchen in kind. replace cabinets, stove, dishwasher and counter top. no change to layout. repair wall board at kitchen as needed. | $10,000 |
| Aug 4, 2017 | Completed final sign-off Oct 2017 | 19 Sheldon Tr | bathroom remodelDetails
bathroom remodel | $15,000 |
| Jul 20, 2017 | Completed final sign-off Dec 2017 | 496 Monterey Bl | main fl: bathroom remodel.Details
main fl: bathroom remodel. | $15,000 |
| Jul 18, 2017 | Completed final sign-off Sep 2017 | 749 Colby St | demolition. bathroom remodel in-kind. recessed lights, new tub. no structural workDetails
demolition. bathroom remodel in-kind. recessed lights, new tub. no structural work | $12,000 |
| Jul 12, 2017 | Completed final sign-off Dec 2017 | 397 Upper Tr | demo bathroom, upgrade to (3) recessed lights, add exhaust fan, new vanity, new toilet, shower panDetails
demo bathroom, upgrade to (3) recessed lights, add exhaust fan, new vanity, new toilet, shower pan | $10,000 |
| May 1, 2017 | Completed final sign-off Sep 2017 | 2054 Wawona St | bathroom renovation. no structural workDetails
bathroom renovation. no structural work | $6,000 |
| Apr 25, 2017 | Never finaled issued Mar 2021, no final | 4736 03rd St | legalization of 1 dwelling unit per ord. 43-14 at rear of property. existing rear structure will be rebuilt to 1-story with no expansion or intensification of existing building envelope.Details
legalization of 1 dwelling unit per ord. 43-14 at rear of property. existing rear structure will be rebuilt to 1-story with no expansion or intensification of existing building envelope. | $20,000 |
| Apr 4, 2017 | Completed final sign-off Feb 2021 | 326 Naples St | to obtain final inspection for work approved under pa # 201407312649 and 201411050758. all work is complete.Details
to obtain final inspection for work approved under pa # 201407312649 and 201411050758. all work is complete. | |
| Mar 6, 2017 | Completed final sign-off May 2018 | 2179 41st Av | revision to 201106077540 201701308198: remove bay window and add triple window at rear of building on each of the two upper levels. change direction of 1st flr stairsDetails
revision to 201106077540 201701308198: remove bay window and add triple window at rear of building on each of the two upper levels. change direction of 1st flr stairs | $3,000 |
| Jan 30, 2017 | Completed final sign-off May 2018 | 2179 41st Av | to complete work and obtain final inspection for work approved uiner building permit application # 201106077540.Details
to complete work and obtain final inspection for work approved uiner building permit application # 201106077540. | $41,200 |
| Dec 1, 2016 | Expired or cancelled cancelled Sep 2025 | 535 Cordova St | illegal unit removal and proposed interior garage access stairs in original location.Details
illegal unit removal and proposed interior garage access stairs in original location. | $20,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 535 Cordova St | demolition of kitchen wall and partial kitchen area down stairs to create new stairs to access basement (under seperate permit). demo only.Details
demolition of kitchen wall and partial kitchen area down stairs to create new stairs to access basement (under seperate permit). demo only. | $5,000 |
| Jun 24, 2016 | Completed final sign-off Nov 2016 | 330 Lexington St | lower unit: bathroom remodel, tile/shower repair, tile floor, replace ceiling fan, repalce sink/toilet, all lighting is high efficacy.Details
lower unit: bathroom remodel, tile/shower repair, tile floor, replace ceiling fan, repalce sink/toilet, all lighting is high efficacy. | $20,000 |
| Sep 2, 2015 | Completed final sign-off Nov 2015 | 371 Staples Av | waterproof around periemeter back of house. no plans required per r. berrios, bldng. insp. (correction notice).Details
waterproof around periemeter back of house. no plans required per r. berrios, bldng. insp. (correction notice). | $3,000 |
| Mar 30, 2015 | Completed final sign-off May 2015 | 1313 Palou Av | comply w/nov #200715010, 8-15-07 items 2,3,4: repair less than 50% stairs.Details
comply w/nov #200715010, 8-15-07 items 2,3,4: repair less than 50% stairs. | $3,000 |
| Mar 27, 2015 | Completed final sign-off May 2015 | 1313 Palou Av | replace and repair fire damaged walls, garage door in kind with sectional door and roof repair in kind.Details
replace and repair fire damaged walls, garage door in kind with sectional door and roof repair in kind. | $3,000 |
| Dec 5, 2014 | Completed final sign-off Dec 2014 | 1051 Portola Dr | structural upgrade/add shearwall to garage walls, add anchor bolts to foundation/ 5/8" type x plus firetape along property line walls.Details
structural upgrade/add shearwall to garage walls, add anchor bolts to foundation/ 5/8" type x plus firetape along property line walls. | $10,000 |
| Jul 28, 2014 | Completed final sign-off Mar 2015 | 226 Powell St | 2 & 3/f - t.i. to (e) salon- 1/ replace equipment & fixtures 2/ frame new doors and non-bearing walls 3/new accessible counters 4/ new showers & accessibility & steam room 5/ health dept change of ownership and added use for health care and medical services for ca state certified establishment.Details
2 & 3/f - t.i. to (e) salon- 1/ replace equipment & fixtures 2/ frame new doors and non-bearing walls 3/new accessible counters 4/ new showers & accessibility & steam room 5/ health dept change of ownership and added use for health care and medical services for ca state certified establishment. | $95,000 |
| Apr 29, 2014 | Completed final sign-off Mar 2017 | 2179 41st Av | remove any posible enchroachments over property line along right side of bldg grid line c per plans. (move wall to south 3/4") to comply with nov #201455691.Details
remove any posible enchroachments over property line along right side of bldg grid line c per plans. (move wall to south 3/4") to comply with nov #201455691. | $15,000 |
| Jul 30, 2013 | Never finaled issued Jul 2013, no final | 4824 03rd St | will recover outside 3 front 6 ft decorative columns, remove and replace rotten wood and cover it back. no structural workDetails
will recover outside 3 front 6 ft decorative columns, remove and replace rotten wood and cover it back. no structural work | $800 |
| May 31, 2013 | Never finaled issued May 2013, no final | 201 Leavenworth St | to comply with ordinance 029-13. installation of grab bars at the following location: 1 bathroom each on floors 2, 3, 4, 5 & 6. 5 total grab bars installed.Details
to comply with ordinance 029-13. installation of grab bars at the following location: 1 bathroom each on floors 2, 3, 4, 5 & 6. 5 total grab bars installed. | $315 |
| Oct 31, 2011 | Completed final sign-off Nov 2012 | 1465 De Haro St | rotten rear deck to be replaced with new deck that will extend out from the house by 2 ft more than curent deck. variance was approved on 9/6/11. no change to the height of the deck off of the ground or to the width of the deck. homeowners association has also given its approval.Details
rotten rear deck to be replaced with new deck that will extend out from the house by 2 ft more than curent deck. variance was approved on 9/6/11. no change to the height of the deck off of the ground or to the width of the deck. homeowners association has also given its approval. | $6,000 |
| Oct 21, 2011 | Never finaled issued Oct 2011, no final | 1350 Palou Av | revert back to last legal use as single dwelling unit on a single floor of occupancy. a garage/storage room to comply with violation #201129281. legalize unwarranted bathroom at lower floor and new bedroom.Details
revert back to last legal use as single dwelling unit on a single floor of occupancy. a garage/storage room to comply with violation #201129281. legalize unwarranted bathroom at lower floor and new bedroom. | $2,350 |
| Jun 7, 2011 | Expired or cancelled expired Jun 2018 | 2179 41st Av | 1st floor addition @ rear. partial 3rd floor addition @ rear. interior remodel.Details
1st floor addition @ rear. partial 3rd floor addition @ rear. interior remodel. | $250,000 |