Coit Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2025
- Last 24 months
- 2 permits filed
17 permits since 2000: 9 completed, 2 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | In progress issued Aug 2026 | 108 Wawona St | remodel of (e) garage to provide additional conditioned space and interior remodel at 1st floor.Details
remodel of (e) garage to provide additional conditioned space and interior remodel at 1st floor. | $100,000 |
| Oct 2, 2025 | In progress issued Nov 2025 | 1435 Monterey Bl | interior remodel, 1st level convert existing sauna room to a powder room, replace existing sink, 2nd level remodel existing kitchen, powerder room, 3rd level remodel 2 existing bathrooms, convert window to sliding door and add a landingDetails
interior remodel, 1st level convert existing sauna room to a powder room, replace existing sink, 2nd level remodel existing kitchen, powerder room, 3rd level remodel 2 existing bathrooms, convert window to sliding door and add a landing | $90,000 |
| Jul 17, 2024 | Completed final sign-off Jun 2025 | 1201 08th Av | unit #3: kitchen and bathroom remodel in kind. installation of approx. 700 sq ft of 5/8 type sheetrock.Details
unit #3: kitchen and bathroom remodel in kind. installation of approx. 700 sq ft of 5/8 type sheetrock. | $27,000 |
| Jun 4, 2024 | Completed final sign-off Jun 2025 | 227 Dellbrook Av | install bedroom, bathroom and home office at existing ground floor.Details
install bedroom, bathroom and home office at existing ground floor. | $100,000 |
| Nov 6, 2020 | Never finaled issued Apr 2021, no final | 349 Vicente St | alteration to (e) building. 1st flr - add 1 bathroom, fam room and bedroom. 2nd flr - remodel kitchen, add 1 bathroom. remove deck at lightwellDetails
alteration to (e) building. 1st flr - add 1 bathroom, fam room and bedroom. 2nd flr - remodel kitchen, add 1 bathroom. remove deck at lightwell | $80,000 |
| Nov 12, 2019 | Completed final sign-off Jan 2021 | 2587 35th Av | remodeling extg kitchen and bath room (change tile and fixtures at 2nd floor. install 2 bedrooms and 1 full bathroom at 1st floor.Details
remodeling extg kitchen and bath room (change tile and fixtures at 2nd floor. install 2 bedrooms and 1 full bathroom at 1st floor. | $68,000 |
| Feb 15, 2017 | Completed final sign-off May 2017 | 2326 Vicente St | replace kitchen cabinets and countertops like for likeDetails
replace kitchen cabinets and countertops like for like | $18,000 |
| Aug 6, 2015 | Never finaled issued Feb 2017, no final | 477 Elizabeth St | addition of new fourth floor, new third floor roof deck; full interior remodel of unit 4; to include (3) bedrooms; (2.5) bath configurationDetails
addition of new fourth floor, new third floor roof deck; full interior remodel of unit 4; to include (3) bedrooms; (2.5) bath configuration | $60,000 |
| Dec 2, 2009 | Completed final sign-off May 2010 | 970 Lawton St | emove (e) stucco at builidng front and entrance as needed. repair damaged sub structure as needed at front of building. apply finishes to match existingDetails
emove (e) stucco at builidng front and entrance as needed. repair damaged sub structure as needed at front of building. apply finishes to match existing | $9,800 |
| Sep 16, 2009 | Completed final sign-off Sep 2009 | 2160 15th Av | to obtain final inspection for work approved under pa #200712271343. all work is complete.Details
to obtain final inspection for work approved under pa #200712271343. all work is complete. | |
| Aug 29, 2008 | Completed final sign-off Jul 2009 | 2182 Bryant St | comply with ccsf umb requirements per bolts-plus seismic retrofit procedure.Details
comply with ccsf umb requirements per bolts-plus seismic retrofit procedure. | $90,000 |
| Dec 27, 2007 | Never finaled issued Dec 2007, no final | 2160 15th Av | remodel and replace extg kitchen cabinets and top. 2) remodel replace extg master bath tile wall & floorDetails
remodel and replace extg kitchen cabinets and top. 2) remodel replace extg master bath tile wall & floor | $16,000 |
| Apr 19, 2002 | Never finaled issued Mar 2003, no final | 700 Lawton St | construct 2nd floor over exist structure, new kitchen & bath on exist 1st floor.Details
construct 2nd floor over exist structure, new kitchen & bath on exist 1st floor. | $80,000 |
| Jan 4, 2002 | Expired or cancelled expired Jul 2002 | 700 Lawton St | remove/replace kitchen cabinets & remove/replace shower, tile floor, wallsDetails
remove/replace kitchen cabinets & remove/replace shower, tile floor, walls | $8,500 |
| Jul 31, 2000 | Completed final sign-off Dec 2000 | 3241 Gough St | remove & replace kitichen cabinets in apt. #1Details
remove & replace kitichen cabinets in apt. #1 | $8,500 |
| Mar 27, 2000 | Expired or cancelled expired Jul 2000 | 2046 Greenwich St | remove old tubDetails
remove old tub | $4,500 |
| Jan 24, 2000 | Completed final sign-off Jul 2000 | 2693 22nd St | repair rear stairs in kindDetails
repair rear stairs in kind | $1,200 |