Mg And Jc Concrete Inc.
- Based in
- Vacaville
- On San Francisco permits
- Mar 2019 to May 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 5 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2025 | Completed final sign-off Jul 2026 | 43 Cordova St | partial perimeter foundation replacement along south and east wall of the structure. voluntary structural strengtheningDetails
partial perimeter foundation replacement along south and east wall of the structure. voluntary structural strengthening | $30,000 |
| Feb 16, 2024 | Completed final sign-off Jan 2025 | 43 Cordova St | partial perimeter foundation replacement along north garage wall and reconfiguration of (e) posts in the garage for car parking.Details
partial perimeter foundation replacement along north garage wall and reconfiguration of (e) posts in the garage for car parking. | $10,000 |
| Apr 20, 2023 | Never finaled issued Jul 2023, no final | 557 Duboce Av | temporary excavation to facilitate the construction of a retaining wall at 14 walter street (adjacent property). after the retaining wall is completed the soil will be restored to original condition. revision to 202208311640. to comply with nov 202293109Details
temporary excavation to facilitate the construction of a retaining wall at 14 walter street (adjacent property). after the retaining wall is completed the soil will be restored to original condition. revision to 202208311640. to comply with nov 202293109 | $1,500 |
| Aug 22, 2022 | Never finaled issued Aug 2022, no final | 610 Page St | recommencement and completion of work approved under permit 201204168421.Details
recommencement and completion of work approved under permit 201204168421. | $5,000 |
| Aug 18, 2022 | Expired or cancelled expired Oct 2025 | 14 Walter St | replace about 28' of (e) founation on the north side of the building. the new footing will be the same location as the old one. correct nov 202292996. temp shoring.Details
replace about 28' of (e) founation on the north side of the building. the new footing will be the same location as the old one. correct nov 202292996. temp shoring. | $30,000 |
| Aug 24, 2021 | Completed final sign-off Jan 2023 | 28 Montezuma St | provide temporary bracing & drainage for site retaining wall @ 11 aztec st. ref bpa#202108246972Details
provide temporary bracing & drainage for site retaining wall @ 11 aztec st. ref bpa#202108246972 | $15,000 |
| Aug 24, 2021 | Completed final sign-off Apr 2022 | 11 Aztec St | replace 25 linear ft of retaining wall @ rear of property. ref bpa#202108246975Details
replace 25 linear ft of retaining wall @ rear of property. ref bpa#202108246975 | $123,000 |
| Mar 20, 2019 | Completed final sign-off Dec 2023 | 286 Sagamore St | restore existing grade conditions to address nov 201928182.Details
restore existing grade conditions to address nov 201928182. | $20,000 |