Quan Remodeling Company
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to May 2025
- Last 24 months
- 1 permit filed
23 permits since 2000: 21 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2025 | Completed final sign-off May 2025 | 2531 14th Av | rev permit# 202303244357: as-builts revision. ref permits 202309217077, 202308114229.Details
rev permit# 202303244357: as-builts revision. ref permits 202309217077, 202308114229. | |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 77 Dorado Tr | replace 12 windows in front of the house. repair 100sqft stucco in front of the house.Details
replace 12 windows in front of the house. repair 100sqft stucco in front of the house. | $15,000 |
| Apr 9, 2024 | Completed final sign-off Apr 2024 | 1516 Powell St | replace new 13 windows at the back of the bldg. same size, same location. u = 0.3 max. (sash only).Details
replace new 13 windows at the back of the bldg. same size, same location. u = 0.3 max. (sash only). | $4,000 |
| Sep 21, 2023 | Completed final sign-off May 2025 | 2531 14th Av | structural revision to approved bpa# 202308114229 to proposed framing.Details
structural revision to approved bpa# 202308114229 to proposed framing. | |
| Aug 17, 2023 | Completed final sign-off Feb 2024 | 4533 Ulloa St | 2/f remodeling kitchen & bathroom. all work in-kind . led lighting. replace furnace. min. 81%.Details
2/f remodeling kitchen & bathroom. all work in-kind . led lighting. replace furnace. min. 81%. | $31,000 |
| Aug 11, 2023 | Completed final sign-off May 2025 | 2531 14th Av | revision to pa202303244357 to accommodate 2nd fl lightwell infill with bathroom remodel and 1st fl (e) post removal and (n) landing at (e) interior stairs.Details
revision to pa202303244357 to accommodate 2nd fl lightwell infill with bathroom remodel and 1st fl (e) post removal and (n) landing at (e) interior stairs. | $40,000 |
| Mar 24, 2023 | Completed final sign-off May 2025 | 2531 14th Av | remodel of (e) single family home and conversion of ground fl. garage space to provide conditioned spaceDetails
remodel of (e) single family home and conversion of ground fl. garage space to provide conditioned space | $150,000 |
| Feb 8, 2023 | Completed final sign-off Jul 2023 | 2030 44th Av | g/f relocate furnace and water heater and laundry (n) bathroom 2/f (n) dish washer in kitchen an new bathroom and frame closestsDetails
g/f relocate furnace and water heater and laundry (n) bathroom 2/f (n) dish washer in kitchen an new bathroom and frame closests | $50,000 |
| Nov 22, 2022 | Completed final sign-off Mar 2023 | 619 28th St | 1st fl. renovation bath, office, living room, exercise roomDetails
1st fl. renovation bath, office, living room, exercise room | $40,000 |
| Oct 18, 2022 | Completed final sign-off Aug 2023 | 327 Russia Av | unit 1 - remodel kitchen, relocate bath, remodel bedrms & dining rm by replacing sheetrock 5/8" typx on all ceilings and exterior walls & 1/2" typ on other walls; unit 2 remodel kitchen, relocate bath, (n) 1/2 bath, remodel living, bedrm and dining rm w 5/8" typ x on all ceiling & exterior wallsDetails
unit 1 - remodel kitchen, relocate bath, remodel bedrms & dining rm by replacing sheetrock 5/8" typx on all ceilings and exterior walls & 1/2" typ on other walls; unit 2 remodel kitchen, relocate bath, (n) 1/2 bath, remodel living, bedrm and dining rm w 5/8" typ x on all ceiling & exterior walls | $85,000 |
| Sep 12, 2022 | Completed final sign-off Aug 2024 | 767 10th Av | adding new dweling unit (du) on 1st fl per site density.Details
adding new dweling unit (du) on 1st fl per site density. | $90,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 1350 Revere Av | remodel kitchen 2 full bathroom, replace new 5/8" sheetrock 6 new windows at rear comply with complaint #202293580Details
remodel kitchen 2 full bathroom, replace new 5/8" sheetrock 6 new windows at rear comply with complaint #202293580 | $4,500 |
| May 9, 2022 | Completed final sign-off Nov 2022 | 1350 Revere Av | comply # complaint# 202285981. 1 repair stair. 2. repair exterior damaged door. 3. repair siding 4. repaint the exterior wall.Details
comply # complaint# 202285981. 1 repair stair. 2. repair exterior damaged door. 3. repair siding 4. repaint the exterior wall. | $15,000 |
| May 4, 2022 | Completed final sign-off Apr 2023 | 2151 28th Av | 2/f: alter (e) bathroom and add 1 bathroom. g/f: relocate furnace, water heater, laundry and shft bathroom. no other work performed.Details
2/f: alter (e) bathroom and add 1 bathroom. g/f: relocate furnace, water heater, laundry and shft bathroom. no other work performed. | $36,000 |
| Apr 22, 2022 | Expired or cancelled cancelled Jan 2026 | 1516 Powell St | install replacement (9) windows.Details
install replacement (9) windows. | $2,000 |
| Mar 9, 2022 | Completed final sign-off Jul 2022 | 468 Edinburgh St | replace in kind kitchen cabinets and countertop. kitchen area not expanding. not moving existing walls. position of sink/stove remains the same. replace floor tiles for kitchen and dining room approx. 200 sq.ft.Details
replace in kind kitchen cabinets and countertop. kitchen area not expanding. not moving existing walls. position of sink/stove remains the same. replace floor tiles for kitchen and dining room approx. 200 sq.ft. | $10,000 |
| Feb 17, 2022 | Completed final sign-off May 2023 | 942 Naples St | to comply with nov202286912 eid202286928. g/f - convert storage to 2 new bedrooms, add 2 bathrooms, one bar and relocate furnace. 2/f remodel kitchen and relocate bathroom and add one bathroom, new 36in type internal staircase.Details
to comply with nov202286912 eid202286928. g/f - convert storage to 2 new bedrooms, add 2 bathrooms, one bar and relocate furnace. 2/f remodel kitchen and relocate bathroom and add one bathroom, new 36in type internal staircase. | $64,000 |
| Jan 24, 2022 | Completed final sign-off Jun 2022 | 268 Parque Dr | remodel kitchen at 2nd floorDetails
remodel kitchen at 2nd floor | $15,000 |
| Mar 24, 2021 | Completed final sign-off Apr 2024 | 1516 Powell St | remodel kitchen & (1) full bathroom, upgrade electrical in entire buildingDetails
remodel kitchen & (1) full bathroom, upgrade electrical in entire building | $25,000 |
| Nov 7, 2019 | Completed final sign-off Jun 2020 | 201 Foote Av | remodel kitchen & 1 full bathroom on 2/f. upgrade electrical and service.Details
remodel kitchen & 1 full bathroom on 2/f. upgrade electrical and service. | $25,000 |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 2463 19th Av | street spaceDetails
street space | |
| Oct 29, 2019 | Completed final sign-off Dec 2019 | 15 Morrell Pl | common area. repair rear deck dryrot, less than 50%Details
common area. repair rear deck dryrot, less than 50% | $6,000 |
| Oct 29, 2019 | Completed final sign-off Jan 2020 | 1659 25th Av | remodel kitchen (10'x17') & 1 bathroom (5'x8'), 1 powder room (3'x6') @ 2/fDetails
remodel kitchen (10'x17') & 1 bathroom (5'x8'), 1 powder room (3'x6') @ 2/f | $30,000 |