Leafair Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to May 2026
- Last 24 months
- 4 permits filed
9 permits since 2000: 5 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress filed May 2026, not yet issued | 99 Manchester St | remove (e) wood stairs + supports from 1st fl to ground level add new wood deck (composite decking) w/ aluminum spiral stair. replace (e) wood door @ rear w/ same. replace (e) first floor rear elev. alum windows w/ same. replace (e) on grade conc slab w/ pavers. remove rear facade shingles and..Details
remove (e) wood stairs + supports from 1st fl to ground level add new wood deck (composite decking) w/ aluminum spiral stair. replace (e) wood door @ rear w/ same. replace (e) first floor rear elev. alum windows w/ same. replace (e) on grade conc slab w/ pavers. remove rear facade shingles and.. | $100,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 4645 Anza St | minor revision to risidential interior remodeling#20251006973. 1st floor: remove one interior wall in the garage, replace one (e) window w/ & (n) outdoor door. 2nd floor: add 3 skylight above the kitchen area, replace one (e) window.Details
minor revision to risidential interior remodeling#20251006973. 1st floor: remove one interior wall in the garage, replace one (e) window w/ & (n) outdoor door. 2nd floor: add 3 skylight above the kitchen area, replace one (e) window. | |
| Oct 8, 2025 | In progress issued Oct 2025 | 4645 Anza St | interior remodeling: e) kitchen & e) bathrooms by changing layout, new interior stairs, replacing e) windows in-kindDetails
interior remodeling: e) kitchen & e) bathrooms by changing layout, new interior stairs, replacing e) windows in-kind | $300,000 |
| Dec 4, 2024 | Completed final sign-off Feb 2025 | 1226 07th Av | 2 bathroom remodel in kind. no wall changes. 2nd and 3rd fl unitsDetails
2 bathroom remodel in kind. no wall changes. 2nd and 3rd fl units | $40,000 |
| Aug 27, 2024 | Completed final sign-off Mar 2025 | 3141 16th St | interior remodel of 1st floor restaurant. scope includes front and back of house spaces. new flushes, fixtures and electrical. no structural workDetails
interior remodel of 1st floor restaurant. scope includes front and back of house spaces. new flushes, fixtures and electrical. no structural work | $30,000 |
| Jun 10, 2024 | Completed final sign-off Aug 2024 | 759 33rd Av | bathroom remodel replace shower tile in kind, replace shower pan, replace floor tileDetails
bathroom remodel replace shower tile in kind, replace shower pan, replace floor tile | $17,000 |
| May 16, 2024 | Completed final sign-off Oct 2024 | 3260 Gough St | remove and replace sheetrock and flooring in kitchen area in 5 units (102, 202, 103, 203, 303). one kitchen remodel in units 103, 203, 303 (tot of 3 kitchen remodels). non structural work. work due to water damage.Details
remove and replace sheetrock and flooring in kitchen area in 5 units (102, 202, 103, 203, 303). one kitchen remodel in units 103, 203, 303 (tot of 3 kitchen remodels). non structural work. work due to water damage. | $100,000 |
| Apr 24, 2024 | Completed final sign-off Mar 2026 | 1619 Funston Av | remodel of extg single family home. new bedroom at ground floor. kitchen remodel at 2nd floor.Details
remodel of extg single family home. new bedroom at ground floor. kitchen remodel at 2nd floor. | $50,000 |
| Oct 8, 2021 | Never finaled issued Jun 2022, no final | 344 South Van Ness Av | additions & alteration to dubplex.1st floor: new gym area & home office area in part of the garage. 2nd & 3rd floor, extension to (e) lightwell; partially lower garage to convert into habitable spaceDetails
additions & alteration to dubplex.1st floor: new gym area & home office area in part of the garage. 2nd & 3rd floor, extension to (e) lightwell; partially lower garage to convert into habitable space | $400,000 |