Pacific Gates Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2023 to Jul 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2026 | In progress issued Jul 2026 | 3752 Folsom St | revision 202511190018- remove wall in game room and move wall to have a bigger garage, plumbing will be adjusted for underground workDetails
revision 202511190018- remove wall in game room and move wall to have a bigger garage, plumbing will be adjusted for underground work | |
| Nov 19, 2025 | In progress issued Feb 2026 | 3752 Folsom St | re-doing the foundation and slab in garage. remodel bathroom at the garage floor. bathroom lights and outlets as needed for code.Details
re-doing the foundation and slab in garage. remodel bathroom at the garage floor. bathroom lights and outlets as needed for code. | $110,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 505 Franconia St | revision to 202408158731 to relocate fixtures at 2nd fl bathroom (no structural changes proposed. no change in number of fixture)Details
revision to 202408158731 to relocate fixtures at 2nd fl bathroom (no structural changes proposed. no change in number of fixture) | |
| Sep 14, 2024 | In progress issued May 2025 | 505 Franconia St | add a newly framed conditioned 1st floor over crawl space at the existing ground floor, and interior remodel of 2nd floor.Details
add a newly framed conditioned 1st floor over crawl space at the existing ground floor, and interior remodel of 2nd floor. | $150,000 |
| Apr 2, 2024 | In progress issued Mar 2025 | 3752 Folsom St | to comply with nov 202420392 wall removal, new deck built, new roof above deck, new siding at rear of house, vinyl window installed at front and rear, electrical rewiring, upgrade panels, bathroom remodels, kitchen remodelingDetails
to comply with nov 202420392 wall removal, new deck built, new roof above deck, new siding at rear of house, vinyl window installed at front and rear, electrical rewiring, upgrade panels, bathroom remodels, kitchen remodeling | $120,000 |
| Sep 13, 2023 | Never finaled issued Sep 2023, no final | 3752 Folsom St | in kind kitchen remodel: in kind bathroom remodel: fix any dry rot/ damaged drywall replace flooringDetails
in kind kitchen remodel: in kind bathroom remodel: fix any dry rot/ damaged drywall replace flooring | $15,000 |