Gracon Construction Inc
- Based in
- Hayward
- On San Francisco permits
- Mar 2008 to Sep 2025
- Last 24 months
- 3 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2025 | Completed final sign-off Jan 2026 | 442 Mississippi St | remodel master bathroom. replace existing tub with new , replace existing toilet with new , replace existing shower with new , replace existing double sink vanity with new, all new tile floors and 2 wall shower enclosure. all in kind, like for like.Details
remodel master bathroom. replace existing tub with new , replace existing toilet with new , replace existing shower with new , replace existing double sink vanity with new, all new tile floors and 2 wall shower enclosure. all in kind, like for like. | $25,000 |
| May 7, 2025 | Completed final sign-off Nov 2025 | 611 Miramar Av | revision to pa # 2024-1213-6785 to add two full (n) skylights and relocate water heater and furnaceDetails
revision to pa # 2024-1213-6785 to add two full (n) skylights and relocate water heater and furnace | |
| Dec 13, 2024 | Completed final sign-off Nov 2025 | 611 Miramar Av | remodel (e) garage to provide additional conditioned space and interior remodel of (e) 2nd floor; 2nd fl: to add closets in 3 bedrooms, infill a staircase, remodel a staircase, and remodel (e) kitchen and (2) bathsDetails
remodel (e) garage to provide additional conditioned space and interior remodel of (e) 2nd floor; 2nd fl: to add closets in 3 bedrooms, infill a staircase, remodel a staircase, and remodel (e) kitchen and (2) baths | $250,000 |
| Dec 20, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | revison to pa# 2022-0615-6358, add n piers, posts & headers at gridlines 4-7.Details
revison to pa# 2022-0615-6358, add n piers, posts & headers at gridlines 4-7. | $5,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room.Details
interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room. | $160,000 |
| Mar 21, 2022 | Expired or cancelled cancelled Jan 2026 | 2858 22nd St | remove and replace all drywall in habitable space. 1500 sqft.Details
remove and replace all drywall in habitable space. 1500 sqft. | $60,000 |
| May 3, 2021 | Completed final sign-off Apr 2023 | 631 Ofarrell St | unit #803: one kitchen & one bath remodel.Details
unit #803: one kitchen & one bath remodel. | $50,000 |
| Mar 11, 2021 | Never finaled issued Mar 2021, no final | 631 O'farrell St | kitchen remodel, like for like (cabinets/countertops) tile one wall in bathroomDetails
kitchen remodel, like for like (cabinets/countertops) tile one wall in bathroom | $25,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2021 | 122 Caselli Av | remove (e) tile over deck, waterproof deck & replace tile, deck is rear of building, 10'x12'Details
remove (e) tile over deck, waterproof deck & replace tile, deck is rear of building, 10'x12' | $12,000 |
| Aug 20, 2020 | Completed final sign-off May 2021 | 631 Ofarrell St | #1116: to comply with nov #202019310. interior remodel of studio residential unit, includes new cabinets, new appliances, new plumbing fixtures, and all interior finishes. removal of interior non-bearing wall.Details
#1116: to comply with nov #202019310. interior remodel of studio residential unit, includes new cabinets, new appliances, new plumbing fixtures, and all interior finishes. removal of interior non-bearing wall. | $20,000 |
| Jul 3, 2019 | Completed final sign-off Sep 2019 | 124 Caselli Av | remove and replace tile and waterproofing at deck. deck is 10' x 15' faces the rear of the building.Details
remove and replace tile and waterproofing at deck. deck is 10' x 15' faces the rear of the building. | $8,500 |
| Mar 4, 2019 | Completed final sign-off Mar 2019 | 1310 29th Av | garage: 45 lf total. voluntary install of anchor bolts and plywood sheathing at 1st flr of residential wood framed building. bolts shall embed at least 7" into masonry or concrete foundation plate or sills bolted 1/2" o.c., spaced no more than 6' o.c. and at least 2 per piece w/ 3" sq washer.Details
garage: 45 lf total. voluntary install of anchor bolts and plywood sheathing at 1st flr of residential wood framed building. bolts shall embed at least 7" into masonry or concrete foundation plate or sills bolted 1/2" o.c., spaced no more than 6' o.c. and at least 2 per piece w/ 3" sq washer. | $4,000 |
| Apr 8, 2015 | Completed final sign-off Jan 2016 | 147 20th Av | remodel existing bathroom, convert closet into bathroom - all work in 2nd floorDetails
remodel existing bathroom, convert closet into bathroom - all work in 2nd floor | $5,000 |
| Jun 25, 2013 | Never finaled issued Jun 2013, no final | 239 Faxon Av | remodel two bathrooms and dkitchen. all like for like.Details
remodel two bathrooms and dkitchen. all like for like. | $30,000 |
| May 21, 2008 | Completed final sign-off Jul 2008 | 1205 37th Av | comply with physical inspection report 3r-5164.Details
comply with physical inspection report 3r-5164. | $1,000 |
| Mar 19, 2008 | Completed final sign-off Jun 2008 | 1813 Mason St | to comply w/ physical inspection #3r-5170.Details
to comply w/ physical inspection #3r-5170. | $3,500 |