127 permits since 2000 (architect on 120 permits, authorized agent-others on 6 permits, engineer on 3 permits): 94 completed, 1 in progress, 16 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 127.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 10, 2026 | In progress issued Apr 2026 | 441 Ellis St | Rockaway Construction Inc. | create emergency egress window, street level windows in the west bay were replaced with cmu. project is to restore a window with emergency egress compliant function serving an apartment unti. saw cut (e) cmu to created window at same overall dimensions. an added not reated opening in a 1 hr ratedDetails
create emergency egress window, street level windows in the west bay were replaced with cmu. project is to restore a window with emergency egress compliant function serving an apartment unti. saw cut (e) cmu to created window at same overall dimensions. an added not reated opening in a 1 hr rated | $53,500 |
| Sep 15, 2022 | Completed final sign-off Nov 2022 | 416 Hayes St | Bic Construction Inc | rev to pa 202107305470. the work showen is commerical ti, includes, retail case work, closets, lighting, electrical distribution. no alterations to the existing struc and no new struc work.Details
rev to pa 202107305470. the work showen is commerical ti, includes, retail case work, closets, lighting, electrical distribution. no alterations to the existing struc and no new struc work. | $57,000 |
| Aug 26, 2022 | Completed final sign-off Dec 2023 | 416 Hayes St | Custom Contracting Services, Maguire Inc Dba Lahue And Associates | the new tenant of ground floor retail space proposes to install asign directly above their storefront glazing on hayes street the sign is basically flat with a small blade sign element mounted directly to front of three story building. non-electricDetails
the new tenant of ground floor retail space proposes to install asign directly above their storefront glazing on hayes street the sign is basically flat with a small blade sign element mounted directly to front of three story building. non-electric | $2,500 |
| Apr 8, 2022 | Completed final sign-off Mar 2024 | 59 Grant Av | Peacock Construction | install a fully concealed coiling roll down security grile covering the retail storefront glass only. the entrance of building lobby serving all spaces including ground fl. retail in not coverd by security grille, work includes cutting and modifying the (e) cement plastor soff it the coiling rollDetails
install a fully concealed coiling roll down security grile covering the retail storefront glass only. the entrance of building lobby serving all spaces including ground fl. retail in not coverd by security grille, work includes cutting and modifying the (e) cement plastor soff it the coiling roll | $30,000 |
| Jul 9, 2021 | Completed final sign-off Mar 2022 | 5800 Geary Bl | Cal C A D E Construction Inc | comply with planning enforcement case #202-010672enf, removal of clover shaped window and installing 2 new rectagle with curved top windows on 22nd ave. frontage in catergory b building without permit.Details
comply with planning enforcement case #202-010672enf, removal of clover shaped window and installing 2 new rectagle with curved top windows on 22nd ave. frontage in catergory b building without permit. | $10,000 |
| Oct 2, 2020 | Expired or cancelled cancelled Jan 2026 | 1 Avenue Of The Palms | Cal C A D E Construction Inc | treasure island: aka 749 9th street t.i.: selective demo of (e) resroom s & doors. new construction of food prip area & non-cooking kitchen including matching tile & finishes.Details
treasure island: aka 749 9th street t.i.: selective demo of (e) resroom s & doors. new construction of food prip area & non-cooking kitchen including matching tile & finishes. | $150,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 1 Avenue Of The Palms | Cal C A D E Construction Inc | install ada door (not visible from the street)Details
install ada door (not visible from the street) | $8,000 |
| Dec 27, 2019 | Expired or cancelled cancelled Jan 2026 | 171 02nd St | improvement of lease hold space. cmo and new construction req. the work 8include new interior wall, door frames, finishesDetails
improvement of lease hold space. cmo and new construction req. the work 8include new interior wall, door frames, finishes | $50,000 | |
| Feb 25, 2019 | Completed final sign-off Feb 2019 | 412 Broadway | administrative permit only. compliance with planning commission motion 20330 of oct 25, 2018 to allow extension of operation hours to 4am daily for an extg restaurant and plans of entertainment use. no new work on this permit.Details
administrative permit only. compliance with planning commission motion 20330 of oct 25, 2018 to allow extension of operation hours to 4am daily for an extg restaurant and plans of entertainment use. no new work on this permit. | ||
| Sep 28, 2018 | Completed final sign-off Jan 2019 | 631 Howard St | Novo Construction Inc | 5th fl: commercial tenant improvement of a lease hold space. the work includes convert storage to open office, removal of partitions & door. new construction includes floor finishes of new office, hvac to be re-balanced.Details
5th fl: commercial tenant improvement of a lease hold space. the work includes convert storage to open office, removal of partitions & door. new construction includes floor finishes of new office, hvac to be re-balanced. | $20,000 |
| Jun 29, 2018 | Completed final sign-off Mar 2019 | 1 Taylor St | R.M.R. Construction Company | elevator upgrade/barrierDetails
elevator upgrade/barrier | $50,000 |
| May 18, 2018 | Completed final sign-off Aug 2019 | 50 Fremont St | Smith Development & Construction Comp | ti for new restaurant in (e) vacant restaurant space. there is selective dmeo and new construction required, partitions, doors, frames, electrical mechanical & finishes. maher naDetails
ti for new restaurant in (e) vacant restaurant space. there is selective dmeo and new construction required, partitions, doors, frames, electrical mechanical & finishes. maher na | $120,000 |
| Dec 4, 2017 | Completed final sign-off Jul 2018 | 3251 Pierce St | Diego Brothers Inc. | selective demo and new construction, the work includes partitions, doors, frames, electrical and finishes. maher naDetails
selective demo and new construction, the work includes partitions, doors, frames, electrical and finishes. maher na | $20,000 |
| Sep 21, 2017 | Never finaled issued Oct 2017, no final | 55 Hawthorne St | Novo Construction Inc | this project builds an additional storage & junitor room on 3rd floor parking level & move an ada parking to the ground floor level parking. work including non-load bearing walls, doors, electrical outlets & lighting.Details
this project builds an additional storage & junitor room on 3rd floor parking level & move an ada parking to the ground floor level parking. work including non-load bearing walls, doors, electrical outlets & lighting. | $20,000 |
| Sep 5, 2017 | Completed final sign-off Nov 2017 | 2208 Fillmore St | Engler Construction | change space from vacant commercial to custom eye wear store. installation of cabinet fixtures, display shelving finishes, new flooring. no exterior workDetails
change space from vacant commercial to custom eye wear store. installation of cabinet fixtures, display shelving finishes, new flooring. no exterior work | $10,000 |
| Aug 28, 2017 | Completed final sign-off May 2018 | 55 Hawthorne St | Novo Construction Inc | 8/f- demolition only project, intended to prepare a commercial office space for new tenant improvementDetails
8/f- demolition only project, intended to prepare a commercial office space for new tenant improvement | $10,000 |
| Apr 18, 2017 | Expired or cancelled withdrawn Jun 2017 | 59 Grant Av | front windows - frames shall remain w/ minor repair, replace w/ (n) wood sash. rear windows replace w/ energy efficient aluminum framed window w/ operable components.Details
front windows - frames shall remain w/ minor repair, replace w/ (n) wood sash. rear windows replace w/ energy efficient aluminum framed window w/ operable components. | $76,000 | |
| Jan 11, 2017 | Completed final sign-off Jul 2019 | 1182 Market St | R.M.R. Construction Company | emergency backup power - in lieu of broken diesel generator, install ups on 4th floor wiht 94 gallons electrolytes battery packs. gas detection included. fire under separate permits n/a for maherDetails
emergency backup power - in lieu of broken diesel generator, install ups on 4th floor wiht 94 gallons electrolytes battery packs. gas detection included. fire under separate permits n/a for maher | $50,000 |
| Jan 9, 2017 | Completed final sign-off May 2017 | 211 Steiner St | Bt Construction | selective demo and new construction required work includes partitions, doors, frames finishes, minor elec and plumbing for nail salon.Details
selective demo and new construction required work includes partitions, doors, frames finishes, minor elec and plumbing for nail salon. | $18,000 |
| Nov 5, 2015 | Completed final sign-off Jan 2016 | 131 Steuart St | Peacock Construction | suite 501 - interior tenant improvement work includes selective demo of partitions, provide wall & ceiling insulation, relocation of power outlets & patching of affected finishes. n/a maher ordinanceDetails
suite 501 - interior tenant improvement work includes selective demo of partitions, provide wall & ceiling insulation, relocation of power outlets & patching of affected finishes. n/a maher ordinance | $50,000 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 445 Bush St | Engler Construction | 5th floor: selective demo and new construction, including partitions, doors, frames, elec, finishes and minor changes to lighting and mech.Details
5th floor: selective demo and new construction, including partitions, doors, frames, elec, finishes and minor changes to lighting and mech. | $100,000 |
| Oct 6, 2015 | Completed final sign-off Oct 2016 | 1031 Kearny St | Raytech Electric | barrier removal. ref pa201504012579 to install left (ada).Details
barrier removal. ref pa201504012579 to install left (ada). | $38,000 |
| Aug 25, 2015 | Completed final sign-off Nov 2015 | 140 Geary St | Fnj Construction | 2nd flr: this is a commercial t.i. of a lease space the work includes selective demolition & new construction of partitions, doors, frames, electrical, plumbing & finishes.Details
2nd flr: this is a commercial t.i. of a lease space the work includes selective demolition & new construction of partitions, doors, frames, electrical, plumbing & finishes. | $100,000 |
| Aug 24, 2015 | Completed final sign-off Jan 2016 | 570 Pacific Av | Engler Construction | grnd flr: commerical ti - selective demo and new construction. work partitions, door, frames, electrical and plumbing and finishes.Details
grnd flr: commerical ti - selective demo and new construction. work partitions, door, frames, electrical and plumbing and finishes. | $100,000 |
| Jul 6, 2015 | Expired or cancelled cancelled Jan 2026 | 657 Harrison St | commercial t.i. there is selectrive demolition & new construction required. the work includes partitions, doors, frames, finishes & ceiling systems, bldg is fully sprinklered; maher n/a. mep under separate permitDetails
commercial t.i. there is selectrive demolition & new construction required. the work includes partitions, doors, frames, finishes & ceiling systems, bldg is fully sprinklered; maher n/a. mep under separate permit | $500,000 | |
| Apr 7, 2015 | Completed final sign-off Jan 2016 | 445 Bush St | Peacock Construction | this project is to comply with field inspection violation for the escape exit access. adding exit signs & release buttons.Details
this project is to comply with field inspection violation for the escape exit access. adding exit signs & release buttons. | $5,000 |
| Feb 25, 2015 | Completed final sign-off Jun 2015 | 55 Hawthorne St | Field Construction Inc. | this is demolition only project intended to prepare a commercial office space for a new tenant improvement. per ab-017Details
this is demolition only project intended to prepare a commercial office space for a new tenant improvement. per ab-017 | $50,000 |
| Jan 29, 2015 | Completed final sign-off Mar 2015 | 604 Divisadero St | Bt Construction | revision to 201412053165. minor dryrot repair under exsting storefront sillDetails
revision to 201412053165. minor dryrot repair under exsting storefront sill | $500 |
| Dec 5, 2014 | Never finaled issued Dec 2014, no final | 604 Divisadero St | Bt Construction | commercial t.i. selective demolition and new construction of ada restroom upgrade: doors,frames, minor electrical and plumbing.Details
commercial t.i. selective demolition and new construction of ada restroom upgrade: doors,frames, minor electrical and plumbing. | $50,000 |
| Jun 27, 2014 | Never finaled issued Sep 2014, no final | 100 Pine St | Dome Construction Corp | #1700- create 2 private offices. work includes interior partitions and doors. maher not requiredDetails
#1700- create 2 private offices. work includes interior partitions and doors. maher not required | $7,000 |
| May 15, 2014 | Completed final sign-off Sep 2014 | 550 Kearny St | R.M.R. Construction Company | 5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13.Details
5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13. | $682,000 |
| Feb 19, 2014 | Completed final sign-off Jul 2014 | 131 Steuart St | Peacock Construction Inc | 4th floor restroom: barrier removal. work includes reversing door swings of toilet partition and providing power door opener for toilet partition doors. compliance with ordinance #155-13 not requiredDetails
4th floor restroom: barrier removal. work includes reversing door swings of toilet partition and providing power door opener for toilet partition doors. compliance with ordinance #155-13 not required | $3,000 |
| Dec 17, 2013 | Completed final sign-off Jul 2014 | 391 Broadway | Raytech Electric | response to nov #200683572, work includes rebuilding of the storefront components at ground floor only. work includes new doors. glazing, exterior finish components. no new lighting, no mechanical/plumbing, no structure. exit with & exit separtion to remain.Details
response to nov #200683572, work includes rebuilding of the storefront components at ground floor only. work includes new doors. glazing, exterior finish components. no new lighting, no mechanical/plumbing, no structure. exit with & exit separtion to remain. | $40,000 |
| Dec 5, 2013 | Completed final sign-off Jun 2014 | 160 Pine St | 6th fl restroom upgrade. relocate 8 new toilets, new toilet patriton, patch and repair finishesDetails
6th fl restroom upgrade. relocate 8 new toilets, new toilet patriton, patch and repair finishes | $16,000 | |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 1390 Market St | Field Construction Inc. | 2nd floor - demolition of existing cafe, new demising wall, doors, lighting, casework, plumbing, finishesDetails
2nd floor - demolition of existing cafe, new demising wall, doors, lighting, casework, plumbing, finishes | $135,000 |
| Sep 9, 2013 | Completed final sign-off Mar 2014 | 50 Beale St | Peacock Construction Inc | 1st floor -new interior t.i to create an atm lobby within (e) bank. new partition, doors & windows, flooring. installation of atm machine & electrical. no new lighting. relocation of 1 ceiling register & additional new return. fire alarm under seperate permitDetails
1st floor -new interior t.i to create an atm lobby within (e) bank. new partition, doors & windows, flooring. installation of atm machine & electrical. no new lighting. relocation of 1 ceiling register & additional new return. fire alarm under seperate permit | $28,000 |
| Jul 15, 2013 | Completed final sign-off Oct 2013 | 1 Market St | Peacock Construction Inc | 15th floor interior tenant improvement - minor demolition, new partition, door, patching of finishes, relocate switch & card reader.Details
15th floor interior tenant improvement - minor demolition, new partition, door, patching of finishes, relocate switch & card reader. | $36,000 |
| Dec 24, 2012 | Never finaled issued Jan 2013, no final | 425 Bush St | Harte Building & Design Inc. | barrier removal work - 4th floor restroom. work includes new partitions, doors & frame, new fixtures, finishes, lighting, minor plumbing & electrical.Details
barrier removal work - 4th floor restroom. work includes new partitions, doors & frame, new fixtures, finishes, lighting, minor plumbing & electrical. | $53,000 |
| Dec 18, 2012 | Completed final sign-off Apr 2013 | 400 Post St | North American Commercial Construction | ti. retail store minor demolition & new construction. new work includes partitions, finishes, relocating light fixtures, painting & casework on ground & second floor.Details
ti. retail store minor demolition & new construction. new work includes partitions, finishes, relocating light fixtures, painting & casework on ground & second floor. | $175,000 |
| Nov 26, 2012 | Completed final sign-off May 2013 | 550 Kearny St | Skyline Construction | 2nd floor tenant improvement: minor demolition & new construction, new work include doors & frames, ceiling, casework, finishes, electrical & mechanical. (sprinkler & fire alarm under separate permit).Details
2nd floor tenant improvement: minor demolition & new construction, new work include doors & frames, ceiling, casework, finishes, electrical & mechanical. (sprinkler & fire alarm under separate permit). | $175,000 |
| Oct 2, 2012 | Completed final sign-off May 2013 | 550 Kearny St | Skyline Construction | ground floor -assembly occupancy (conference rooms) being added in old office space- demo, new paritions, doors, frames, ceiling, lighting, casework, finishes, common area restroom remodel, mech and elec sep permit. sprinkler under separate permitDetails
ground floor -assembly occupancy (conference rooms) being added in old office space- demo, new paritions, doors, frames, ceiling, lighting, casework, finishes, common area restroom remodel, mech and elec sep permit. sprinkler under separate permit | $250,000 |
| Jun 7, 2012 | Completed final sign-off Oct 2012 | 1 Market St | Peacock Construction Inc | 15th floor/spear tower-tenant improvement-minor demolition, new construction includes partitions, doors, frames, lighting, casework, electrical & mechanical. sprinkelrs, fire alarm under seperate permitDetails
15th floor/spear tower-tenant improvement-minor demolition, new construction includes partitions, doors, frames, lighting, casework, electrical & mechanical. sprinkelrs, fire alarm under seperate permit | $400,000 |
| May 4, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Skyline Construction | 4th floor-revision to pa #2012.01.18.2433 ( 4th floor): revised partitions, location, minor changes in lighting, finishes, & mechancial. sprinkler & f.a. under separate permit.Details
4th floor-revision to pa #2012.01.18.2433 ( 4th floor): revised partitions, location, minor changes in lighting, finishes, & mechancial. sprinkler & f.a. under separate permit. | |
| May 4, 2012 | Expired or cancelled expired Jun 2014 | 55 Hawthorne St | Rudolph Commercial Interiors Inc, Rci | 10th & 11th floor - minor demolitoin, new partitions, doors & frames, painting, lighting relocation, electrical & mechanical deferred submittal, sprinkler & f.a. under separate permit.Details
10th & 11th floor - minor demolitoin, new partitions, doors & frames, painting, lighting relocation, electrical & mechanical deferred submittal, sprinkler & f.a. under separate permit. | $30,100 |
| Feb 7, 2012 | Completed final sign-off Sep 2014 | 1805 Geary Bl | T N T Construction | ground floor - demolition of plywood enclosure, demolition of (e) electrical service outside bldg, relocation of electrical service to interior of the bldg, new full height partition & doors.Details
ground floor - demolition of plywood enclosure, demolition of (e) electrical service outside bldg, relocation of electrical service to interior of the bldg, new full height partition & doors. | $55,000 |
| Jan 18, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Skyline Construction | commercial ti on 2 floors. minor demo, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit.Details
commercial ti on 2 floors. minor demo, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit. | $695,000 |
| Oct 25, 2011 | Completed final sign-off Apr 2012 | 400 Post St | North American Commercial Construction | interior retail tenant improvement work includes minor demolition; new partitions, dumbwaiter shaft enclosure, doors & frames, finishes, lighting, electrical & mechanical, new restroom fixtures & finishes. sprinklers & fire alarm under separate permit.Details
interior retail tenant improvement work includes minor demolition; new partitions, dumbwaiter shaft enclosure, doors & frames, finishes, lighting, electrical & mechanical, new restroom fixtures & finishes. sprinklers & fire alarm under separate permit. | $1,892,000 |
| May 31, 2011 | Completed final sign-off Aug 2011 | 100 Pine St | Team Commercial Construction Inc. | 12th flr, #1200- minor demolition, new partition, doors and frames, finishes, casework. lighting,elec mech sep permit, sprinker/alarm sep permitDetails
12th flr, #1200- minor demolition, new partition, doors and frames, finishes, casework. lighting,elec mech sep permit, sprinker/alarm sep permit | $450,000 |
| May 31, 2011 | Completed final sign-off Jul 2011 | 100 Pine St | Team Commercial Construction Inc. | 3rd flr: (stes #325 &350) minor demo, new partitions, door and frames, finishes, casework. lighting, elec,mech sep permit, sprinker fire alarm sep permitDetails
3rd flr: (stes #325 &350) minor demo, new partitions, door and frames, finishes, casework. lighting, elec,mech sep permit, sprinker fire alarm sep permit | $260,000 |
| Dec 29, 2010 | Completed final sign-off Apr 2011 | 100 Pine St | Team Commercial Construction Inc. | office ti on 30th floor. minor demo, new construction, partitions, doors, frames, lighting, finishes, casework, mech, elec. sprinkler under separate permitDetails
office ti on 30th floor. minor demo, new construction, partitions, doors, frames, lighting, finishes, casework, mech, elec. sprinkler under separate permit | $330,056 |
| Aug 27, 2010 | Never finaled issued Aug 2010, no final | 100 Pine St | Team Commercial Construction Inc. | revision to pa# 2009.09.30.7948. changing wall type b in security room closet 1-hr rated- sheet a 101, smoke damper & exhaust fan not necessary.Details
revision to pa# 2009.09.30.7948. changing wall type b in security room closet 1-hr rated- sheet a 101, smoke damper & exhaust fan not necessary. | |
| Jun 28, 2010 | Completed final sign-off Dec 2010 | 100 Pine St | Team Commercial Construction Inc. | ste 2150, 21st flr: demolition, new partition, doors, frames, finishes & casework; electrical & mechanical, under separate permit addition of one sinkDetails
ste 2150, 21st flr: demolition, new partition, doors, frames, finishes & casework; electrical & mechanical, under separate permit addition of one sink | $210,000 |
| Apr 9, 2010 | Completed final sign-off Jun 2010 | 171 02nd St | D A Pope Inc | 5th floor suite 500 minor remodel to existing commercial (office) tenant space including partitions, door frames, electrical & mechanical improvements.Details
5th floor suite 500 minor remodel to existing commercial (office) tenant space including partitions, door frames, electrical & mechanical improvements. | $75,000 |
| Dec 15, 2009 | Completed final sign-off Oct 2010 | 100 Pine St | Team Commercial Construction Inc. | single floor tenant improvement project. selective demo, new walls, doors, frames, finishes. minor changes to lighting. elec, life safety, sprinklers under sep permitDetails
single floor tenant improvement project. selective demo, new walls, doors, frames, finishes. minor changes to lighting. elec, life safety, sprinklers under sep permit | $33,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 100 Pine St | Team Commercial Construction Inc. | 19th floor - commercial tenant improvement of a lease hold space selective demolition. construction of new partitions doors frames finishes and millwork. minor electrical plumbing & life safety under separate permit. life safety showing on drawings for reference only).Details
19th floor - commercial tenant improvement of a lease hold space selective demolition. construction of new partitions doors frames finishes and millwork. minor electrical plumbing & life safety under separate permit. life safety showing on drawings for reference only). | $275,000 |
| Apr 30, 2009 | Expired or cancelled cancelled Jun 2010 | 25 Kearny St | add 3 new signage banners to exterior of building.Details
add 3 new signage banners to exterior of building. | $15,000 | |
| Apr 21, 2009 | Completed final sign-off Jul 2009 | 55 Hawthorne St | Merrcon Inc. | 7th floor ste 710- tenant improvement & restroom ada upgrade selective demolition & construction of new partitions, doors, frames, finsihes. minor electrical, lighting, hvac & plumbing work. hvac,elec, life safety & plumbing will be submitted under separate permit.Details
7th floor ste 710- tenant improvement & restroom ada upgrade selective demolition & construction of new partitions, doors, frames, finsihes. minor electrical, lighting, hvac & plumbing work. hvac,elec, life safety & plumbing will be submitted under separate permit. | $85,000 |
| Mar 18, 2009 | Never finaled issued Apr 2009, no final | 400 Post St | R.D. Olson Construction | revision to pa# 2008/10/14/4060 r-1. replace handicap accesssible ramp with wheel chair lift.Details
revision to pa# 2008/10/14/4060 r-1. replace handicap accesssible ramp with wheel chair lift. | |
| Feb 20, 2009 | Never finaled issued Feb 2009, no final | 350 Parnassus Av | Niscayah Inc. | renew pa# 2007/09/14/2650 to obtain final inspection. all work has been completed.Details
renew pa# 2007/09/14/2650 to obtain final inspection. all work has been completed. | |
| Dec 29, 2008 | Completed final sign-off May 2009 | 100 Pine St | Team Commercial Construction Inc. | tenant improvement. selective demolition. construction of (n) partitions,doors,frames,millwork finishes. minor electrical,mechanical & plumbing, life safety work, relocation of (e) light fixtures, electrical,mech,life safety work will be submitted for seperate permit.Details
tenant improvement. selective demolition. construction of (n) partitions,doors,frames,millwork finishes. minor electrical,mechanical & plumbing, life safety work, relocation of (e) light fixtures, electrical,mech,life safety work will be submitted for seperate permit. | $327,000 |
| Nov 25, 2008 | Expired or cancelled cancelled Feb 2012 | 400 Post St | replacement of exterior store front window and mullions to match adjacent existing mullion pattern.Details
replacement of exterior store front window and mullions to match adjacent existing mullion pattern. | $10,000 | |
| Nov 19, 2008 | Completed final sign-off May 2009 | 400 Post St | construction of demising wall and rated corridor to prep space for 2 new tenants ( retail). construction of temp handicap ramp.Details
construction of demising wall and rated corridor to prep space for 2 new tenants ( retail). construction of temp handicap ramp. | $17,000 | |
| Nov 14, 2008 | Completed final sign-off Dec 2008 | 55 Hawthorne St | 4th fl: selective demolition of partition for new partitions, door, and frame. relocation of 1 light switch.Details
4th fl: selective demolition of partition for new partitions, door, and frame. relocation of 1 light switch. | $10,000 | |
| Oct 21, 2008 | Never finaled issued Oct 2008, no final | 100 Pine St | Team Commercial Construction Inc. | renew pa# 2008/01/17/2701 to obtain final inspection.Details
renew pa# 2008/01/17/2701 to obtain final inspection. | |
| Oct 2, 2008 | Completed final sign-off May 2009 | 400 Post St | selective demolition of existing interior walls. construction of new demising wall and exit stair along with associated hvac, lighting and plumbing work. life safety under seperate permit.Details
selective demolition of existing interior walls. construction of new demising wall and exit stair along with associated hvac, lighting and plumbing work. life safety under seperate permit. | $185,000 | |
| Sep 29, 2008 | Never finaled issued Sep 2008, no final | 100 Pine St | Skyline Construction | selective demolition of existing walls. new millwork and finishes. minorchanges to lighting, electrical, hvac, plumbing and life safety as well as title 24 calculations will be submitted under separate permit.Details
selective demolition of existing walls. new millwork and finishes. minorchanges to lighting, electrical, hvac, plumbing and life safety as well as title 24 calculations will be submitted under separate permit. | $197,000 |
| Sep 25, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | selective demolition and construction of new soffits and suspenden ceiling. title 24, electric, lighting, mechanical under separate permit.Details
selective demolition and construction of new soffits and suspenden ceiling. title 24, electric, lighting, mechanical under separate permit. | $95,000 | |
| Sep 23, 2008 | Completed final sign-off May 2009 | 100 Pine St | there is selective demolition and construction of new partitions. minor electrical work, finishes and changes to lighting, hvac sprinklers and life safety systems. title 24 lighting, electrical, hvac plmg and life safty will be submitted under separate permitDetails
there is selective demolition and construction of new partitions. minor electrical work, finishes and changes to lighting, hvac sprinklers and life safety systems. title 24 lighting, electrical, hvac plmg and life safty will be submitted under separate permit | $48,000 | |
| Jul 31, 2008 | Completed final sign-off Sep 2008 | 631 Howard St | 4th floor-commercial tenant improvement-selective demo. new construction-walls, doors, frames and finishes. electrical, plumbing, lighting with title 24 submitted under separate permit. upgrade men's restroom.Details
4th floor-commercial tenant improvement-selective demo. new construction-walls, doors, frames and finishes. electrical, plumbing, lighting with title 24 submitted under separate permit. upgrade men's restroom. | $90,000 | |
| Jun 26, 2008 | Completed final sign-off May 2009 | 100 Pine St | Team Commercial Construction Inc. | 6th floor-selective demolition, construction of new partitions, doors, glazing and frames & finishes. to provide compartmentation per ab-0037- 1 mhour walls with 20 min doors- electrical, life safety, plumbing, lighting & sprinkler work willbe submitted under seperate permit.Details
6th floor-selective demolition, construction of new partitions, doors, glazing and frames & finishes. to provide compartmentation per ab-0037- 1 mhour walls with 20 min doors- electrical, life safety, plumbing, lighting & sprinkler work willbe submitted under seperate permit. | $108,272 |
| Jun 11, 2008 | Completed final sign-off Nov 2008 | 55 Hawthorne St | 5th floor tenant improvement: selective demolition, new construction of partitions, doors, frames, finishes, repair & patching of (e) ceiling grid & tiles. lighting, life safety, elec & mech work will be under separate permit.Details
5th floor tenant improvement: selective demolition, new construction of partitions, doors, frames, finishes, repair & patching of (e) ceiling grid & tiles. lighting, life safety, elec & mech work will be under separate permit. | $256,000 | |
| May 30, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | 8th floor: remodel of tenant space including demolition & partial suspended ceiling repair. construction of new ada compliant restrooms. electrical, mechanical, plumbing, sprinkler & life safety will be sumbitted under separate permit.Details
8th floor: remodel of tenant space including demolition & partial suspended ceiling repair. construction of new ada compliant restrooms. electrical, mechanical, plumbing, sprinkler & life safety will be sumbitted under separate permit. | $190,000 | |
| May 9, 2008 | Completed final sign-off Jul 2008 | 55 Hawthorne St | selective demolition. construction of new partitions, door frames, finishes. (minor changes to electrical lighting & life safety under separate permit).Details
selective demolition. construction of new partitions, door frames, finishes. (minor changes to electrical lighting & life safety under separate permit). | $55,000 | |
| Mar 27, 2008 | Expired or cancelled expired Sep 2010 | 350 Parnassus Av | resurfacing and water proofing portion of entry plaza and stairs. provide new handrails and metal grid mat at entry doors and new security gates at the rear. new lighting, electrical, plumbinng and waterproofing will be under separate permitDetails
resurfacing and water proofing portion of entry plaza and stairs. provide new handrails and metal grid mat at entry doors and new security gates at the rear. new lighting, electrical, plumbinng and waterproofing will be under separate permit | $70,000 | |
| Mar 19, 2008 | Completed final sign-off Aug 2008 | 100 Pine St | Team Commercial Construction Inc. | 5th floor #560: tenant improvement - minor demolition, construct new walls doors, frames & sidelights. minor modifications to electrical outlets & lighting. new finishes. deffered submittals for hvac, elec, & life safety under separate permit.Details
5th floor #560: tenant improvement - minor demolition, construct new walls doors, frames & sidelights. minor modifications to electrical outlets & lighting. new finishes. deffered submittals for hvac, elec, & life safety under separate permit. | $45,000 |
| Mar 13, 2008 | Completed final sign-off Aug 2008 | 222 Sutter St | selective demolition of (e) lobby suspended ceiling and lighting. installation of new finishes, new suspended ceiling, new lighting, minor mechanical and sprinkler and life safety modificationsDetails
selective demolition of (e) lobby suspended ceiling and lighting. installation of new finishes, new suspended ceiling, new lighting, minor mechanical and sprinkler and life safety modifications | $170,000 | |
| Jan 31, 2008 | Completed final sign-off Apr 2008 | 100 Pine St | Team Commercial Construction Inc. | 9th floor; selective demolition, new construction of walls, doors, frames, electrical work, minor changes to lighting. mech hvac, sprinklers, etc. will be submitted under separate permit.Details
9th floor; selective demolition, new construction of walls, doors, frames, electrical work, minor changes to lighting. mech hvac, sprinklers, etc. will be submitted under separate permit. | $275,000 |
| Jan 17, 2008 | Never finaled issued Jan 2008, no final | 100 Pine St | Team Commercial Construction Inc. | renew pa# 2007/06/06/3129 for final inspection only.Details
renew pa# 2007/06/06/3129 for final inspection only. | |
| Jan 14, 2008 | Never finaled issued Jan 2008, no final | 100 Pine St | office tenant improvement on 5th floor, suite 560.Details
office tenant improvement on 5th floor, suite 560. | $45,000 | |
| Jan 11, 2008 | Never finaled issued Jan 2008, no final | 100 Pine St | Team Commercial Construction Inc. | revision to pa# 200706063126 to correct renewal of on 17th, 15th, 31st & 9th floors. pa# 200611077121 and pa# 200611077119.Details
revision to pa# 200706063126 to correct renewal of on 17th, 15th, 31st & 9th floors. pa# 200611077121 and pa# 200611077119. | |
| Oct 2, 2007 | Completed final sign-off Dec 2007 | 100 Pine St | 2nd floor - minor remodel, new finishes. demolish approx. 50 ft. of partition, construct new low walls in open office area and minor, office reconfiguration. minor electrical work is required and relocation of light fixtures.no mech.or life safety, sprinkler required.Details
2nd floor - minor remodel, new finishes. demolish approx. 50 ft. of partition, construct new low walls in open office area and minor, office reconfiguration. minor electrical work is required and relocation of light fixtures.no mech.or life safety, sprinkler required. | $87,000 | |
| Sep 14, 2007 | Expired or cancelled expired Jul 2010 | 350 Parnassus Av | Niscayah Inc. | install prefabricated atm on existing plaza. (e) atm structure to be legalized and made accessible per ada requirements.Details
install prefabricated atm on existing plaza. (e) atm structure to be legalized and made accessible per ada requirements. | $10,000 |
| Sep 13, 2007 | Completed final sign-off Dec 2007 | 100 Pine St | Team Commercial Construction Inc. | #500- electrical: lighting and power. fire: new devices including smoke detector and speaker and strobe. mech: new vav and duct work where needed.Details
#500- electrical: lighting and power. fire: new devices including smoke detector and speaker and strobe. mech: new vav and duct work where needed. | $25,000 |
| Sep 13, 2007 | Completed final sign-off Dec 2007 | 100 Pine St | Team Commercial Construction Inc. | #590- electrical: power and lighting. fire: new devices. mechanical: new vav, new ducting where shown.Details
#590- electrical: power and lighting. fire: new devices. mechanical: new vav, new ducting where shown. | $15,000 |
| Aug 21, 2007 | Never finaled issued Aug 2007, no final | 100 Pine St | Team Commercial Construction Inc. | ti-architectural only - li/me/ls/sp on sep app. convert multi tenant fl to single tenant.Details
ti-architectural only - li/me/ls/sp on sep app. convert multi tenant fl to single tenant. | $87,000 |
| Jul 12, 2007 | Completed final sign-off Dec 2007 | 100 Pine St | Team Commercial Construction Inc. | suite #590; 5th floor-some demolition, new partitions, doors and side lights. plumbing for sinks. electrical for work stations & offices. relocation and new light fixtures. interior work only. no structural workDetails
suite #590; 5th floor-some demolition, new partitions, doors and side lights. plumbing for sinks. electrical for work stations & offices. relocation and new light fixtures. interior work only. no structural work | $100,000 |
| Jul 2, 2007 | Completed final sign-off Dec 2007 | 100 Pine St | Team Commercial Construction Inc. | suite #500; 5th floor-tenant improvement; partition walls, sidelites,doors, electrical at remodeled offices and workstations, plumbing at coffee station; fire protection, life safety, mechanical and electrical under separate permit.Details
suite #500; 5th floor-tenant improvement; partition walls, sidelites,doors, electrical at remodeled offices and workstations, plumbing at coffee station; fire protection, life safety, mechanical and electrical under separate permit. | $87,000 |
| Jun 21, 2007 | Completed final sign-off Nov 2007 | 425 Bush St | D A Pope Inc | third floor sutie 300. demolition: removal of clerestory windows, celing @ conference room, new partitions, doors, electrical, suspeded ceiling and finishes. all work in interior.Details
third floor sutie 300. demolition: removal of clerestory windows, celing @ conference room, new partitions, doors, electrical, suspeded ceiling and finishes. all work in interior. | $95,000 |
| Jun 7, 2007 | Completed final sign-off Aug 2007 | 100 Pine St | Team Commercial Construction Inc. | oti-1, 17th floor, el, ls, spDetails
oti-1, 17th floor, el, ls, sp | $45,000 |
| May 17, 2007 | Completed final sign-off Jul 2007 | 631 Howard St | oti-1 3rd floorDetails
oti-1 3rd floor | $15,600 | |
| Apr 30, 2007 | Completed final sign-off Dec 2007 | 222 Sutter St | oti-1, capital & counties usa inc, 7th fl, suite 700, el, ls.Details
oti-1, capital & counties usa inc, 7th fl, suite 700, el, ls. | $45,000 | |
| Feb 21, 2007 | Completed final sign-off Sep 2008 | 631 Howard St | Merrcon Inc. | replace front windows and doors. re-ramp interior floor to meet sidewalk. demolish int walls. rebuild 1-hour rated 1st & 2nd floor corridors. (partial). strucutral connection to be under seperate permit.Details
replace front windows and doors. re-ramp interior floor to meet sidewalk. demolish int walls. rebuild 1-hour rated 1st & 2nd floor corridors. (partial). strucutral connection to be under seperate permit. | $98,000 |
| Nov 22, 2006 | Completed final sign-off May 2007 | 100 Pine St | Team Commercial Construction Inc. | oti-1 only, 20th floor, rest defferred submittals.Details
oti-1 only, 20th floor, rest defferred submittals. | $80,000 |
| Oct 31, 2006 | Completed final sign-off May 2007 | 100 Pine St | Team Commercial Construction Inc. | oti-1 17th floor, el, me, ls, spDetails
oti-1 17th floor, el, me, ls, sp | $160,000 |
| Oct 16, 2006 | Expired or cancelled expired Jun 2008 | 121 Steuart St | Novo Construction Inc | replacement of entry storefront. full replacement of frames and glass.Details
replacement of entry storefront. full replacement of frames and glass. | $18,000 |
| Aug 22, 2006 | Completed final sign-off Oct 2006 | 350 Parnassus Av | oti-1, 2nd floor, el, me, ls, sp.Details
oti-1, 2nd floor, el, me, ls, sp. | $30,000 | |
| Aug 22, 2006 | Completed final sign-off May 2007 | 100 Pine St | Team Commercial Construction Inc. | oti-2 5th floor, el, me, ls, spDetails
oti-2 5th floor, el, me, ls, sp | $24,000 |
| Aug 21, 2006 | Completed final sign-off Mar 2007 | 131 Steuart St | Novo Construction Inc | minor demolition & new construction including partitions. electrical & life safety under seperate permit. interior work only. no mechanical work.Details
minor demolition & new construction including partitions. electrical & life safety under seperate permit. interior work only. no mechanical work. | $25,000 |
| Jun 21, 2006 | Expired or cancelled expired Feb 2008 | 1390 Market St | Rossi Builders Inc. | oti-1 8th floor ltg, mech, ls, spr.Details
oti-1 8th floor ltg, mech, ls, spr. | $70,000 |
| Jun 12, 2006 | Completed final sign-off Nov 2008 | 55 Hawthorne St | oti 1-6th floor, el, ls, spDetails