Fnj Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2009 to Aug 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2015 | Completed final sign-off Nov 2015 | 140 Geary St | 2nd flr: this is a commercial t.i. of a lease space the work includes selective demolition & new construction of partitions, doors, frames, electrical, plumbing & finishes.Details
2nd flr: this is a commercial t.i. of a lease space the work includes selective demolition & new construction of partitions, doors, frames, electrical, plumbing & finishes. | $100,000 |
| Oct 20, 2014 | Completed final sign-off Jul 2015 | 601 Van Ness Av | layout to stay the same, no structural work to be performed. remove & replace existing cabinets in kitchen. install new cabinets, sink, faucet, appliances, remove existing restroom fixtures, light fan, tub, toilet, sink vanity. install new layout to stay the same.Details
layout to stay the same, no structural work to be performed. remove & replace existing cabinets in kitchen. install new cabinets, sink, faucet, appliances, remove existing restroom fixtures, light fan, tub, toilet, sink vanity. install new layout to stay the same. | $18,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 580 Market St | ground floor lobby - light demo to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor.Details
ground floor lobby - light demo to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor. | $13,000 |
| Dec 5, 2013 | Completed final sign-off Dec 2013 | 3001 19th St | demo and remove 4 non structural walls and 4 non structural partitons used as cubicles. patch 3 areas where wall became exposedDetails
demo and remove 4 non structural walls and 4 non structural partitons used as cubicles. patch 3 areas where wall became exposed | $4,500 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 430 Girard St | remodel (1) restroom, floor tile, lighting vanity toilet, tub. replace & repair gyp. bd. in kind. no structural work (n) lighting comply with cec 150(k) area= 200 sq. ft. gyp bd.Details
remodel (1) restroom, floor tile, lighting vanity toilet, tub. replace & repair gyp. bd. in kind. no structural work (n) lighting comply with cec 150(k) area= 200 sq. ft. gyp bd. | $7,000 |
| Mar 29, 2011 | Never finaled issued Mar 2011, no final | 144 02nd St | work in arcade (basement) level. remove some decorative sheetrock and short height walls and carpet. space to remain vacant until ti plans submitted in the future. no structural element to be removed. work per ab 57Details
work in arcade (basement) level. remove some decorative sheetrock and short height walls and carpet. space to remain vacant until ti plans submitted in the future. no structural element to be removed. work per ab 57 | $8,000 |
| Dec 30, 2010 | Completed final sign-off Mar 2011 | 144 02nd St | work in vacant 5th fl: remove decorative sheetrock, remove low partiion glass blocks. remove hanging light fixtures. remove non service duct work. space to remain vacant until ti plans have been submitted in the future. no struct element to be removedDetails
work in vacant 5th fl: remove decorative sheetrock, remove low partiion glass blocks. remove hanging light fixtures. remove non service duct work. space to remain vacant until ti plans have been submitted in the future. no struct element to be removed | $6,000 |
| Dec 21, 2009 | Completed final sign-off Sep 2010 | 211 Sutter St | furnish and install new ventialtion for 4th., 5th. 7th. floor restrooms, revision to 2009/1210/2983.Details
furnish and install new ventialtion for 4th., 5th. 7th. floor restrooms, revision to 2009/1210/2983. | $2,000 |
| Dec 10, 2009 | Completed final sign-off Sep 2010 | 211 Sutter St | demo existing toilet room on 4th, 5th and 7th floors and construct new ada compliant toilet roomsDetails
demo existing toilet room on 4th, 5th and 7th floors and construct new ada compliant toilet rooms | $30,000 |