Team Commercial Construction Inc.
- Based in
- Point Richmond
- On San Francisco permits
- Jan 2000 to Mar 2024
- Last 24 months
- 0 permits filed
547 permits since 2000: 382 completed, 84 never finaled, 81 expired or cancelled.
Of the 84 never-finaled permits, 9 are 3 to 5 years old, 24 are 5 to 10 years old, 51 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 547.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2024 | Completed final sign-off Apr 2024 | 665 03rd St | revision pa# 202206247101 existing hvac system and all associated support to remain and in operationDetails
revision pa# 202206247101 existing hvac system and all associated support to remain and in operation | |
| Jan 12, 2024 | Completed final sign-off Jan 2024 | 665 03rd St | revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.Details
revision to pa 202206247101. change in direction of the new concrete ramp inside the suite. | |
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 150 California St | 11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926.Details
11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926. | $226,000 |
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 150 California St | 11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926.Details
11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926. | $175,000 |
| Jun 22, 2023 | Completed final sign-off Dec 2023 | 100 Pine St | 10/f:interior t.i. non structiural demolition of interior partitions, relocate in suite, new non structural partitions & doors, proposed associated electrical, no exterior work proposed.Details
10/f:interior t.i. non structiural demolition of interior partitions, relocate in suite, new non structural partitions & doors, proposed associated electrical, no exterior work proposed. | $171,566 |
| Apr 26, 2023 | Completed final sign-off Jun 2023 | 100 Pine St | 7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292Details
7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292 | $44,318 |
| Apr 26, 2023 | Completed final sign-off May 2023 | 100 Pine St | 7th f/ ste 700: lighting fixture and associated circuiting / controls. power and signal devices and associated wiring, ref 2022 1129 7292Details
7th f/ ste 700: lighting fixture and associated circuiting / controls. power and signal devices and associated wiring, ref 2022 1129 7292 | $63,432 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 100 Pine St | 17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762Details
17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762 | $73,545 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 100 Pine St | 17th fl (east) - lighting fixtures and associate circuiting/controls, power and signal devices and associated wiring. ref pa 2022-1102-5762Details
17th fl (east) - lighting fixtures and associate circuiting/controls, power and signal devices and associated wiring. ref pa 2022-1102-5762 | $84,265 |
| Dec 22, 2022 | Completed final sign-off Oct 2023 | 150 California St | 11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes.Details
11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes. | $657,716 |
| Nov 29, 2022 | Completed final sign-off May 2023 | 100 Pine St | 7/f: interior tenant improvement including demo and construction of non structural partitions, ceilings, lighting, elec, millwork, finishesDetails
7/f: interior tenant improvement including demo and construction of non structural partitions, ceilings, lighting, elec, millwork, finishes | $313,389 |
| Nov 4, 2022 | Never finaled issued Dec 2022, no final | 100 Pine St | 1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673.Details
1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673. | $35,302 |
| Nov 4, 2022 | Never finaled issued Dec 2022, no final | 100 Pine St | 1700: office tenant retrofit-light fixtures and associated circuiting/controls in spec suite tenant space. ref bpa#202205063673Details
1700: office tenant retrofit-light fixtures and associated circuiting/controls in spec suite tenant space. ref bpa#202205063673 | $127,470 |
| Nov 2, 2022 | Completed final sign-off May 2023 | 100 Pine St | 17/f (east side): interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes. mep deferred.Details
17/f (east side): interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes. mep deferred. | $616,329 |
| Aug 23, 2022 | Never finaled issued Oct 2022, no final | 150 California St | provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998Details
provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998 | $63,420 |
| Aug 23, 2022 | Never finaled issued Oct 2022, no final | 150 California St | 10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998.Details
10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998. | $57,401 |
| Jun 24, 2022 | Completed final sign-off Apr 2024 | 665 03rd St | complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.Details
complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration. | $550,000 |
| May 20, 2022 | Completed final sign-off Dec 2022 | 150 California St | 10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a.Details
10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a. | $4,000 |
| May 6, 2022 | Never finaled issued May 2022, no final | 100 Pine St | 17/f: interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes, including restroom upgrades.Details
17/f: interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes, including restroom upgrades. | $297,062 |
| Apr 7, 2022 | Completed final sign-off Dec 2022 | 150 California St | ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic.Details
ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic. | $7,000 |
| Jan 18, 2022 | Completed final sign-off May 2022 | 140 New Montgomery St | 15th flr - mech only -demo (e) ductwork per plans. relocate 3 (e) vav boxes. install 2 vav boxes. install new hws+r piping. install new distribution. ref pa# 202107234999. elec/fire/life safety deferred.Details
15th flr - mech only -demo (e) ductwork per plans. relocate 3 (e) vav boxes. install 2 vav boxes. install new hws+r piping. install new distribution. ref pa# 202107234999. elec/fire/life safety deferred. | $70,840 |
| Jan 18, 2022 | Completed final sign-off May 2022 | 140 New Montgomery St | 15th fl - provide lighting tenant improvements to 4150 square feet of office area. ref pa 2021-0723-4999Details
15th fl - provide lighting tenant improvements to 4150 square feet of office area. ref pa 2021-0723-4999 | $31,274 |
| Jan 14, 2022 | Completed final sign-off Dec 2022 | 150 California St | revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred.Details
revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred. | $10,500 |
| Dec 13, 2021 | Completed final sign-off Jan 2023 | 100 Pine St | project scope is to renovate the 27th fl of e 33 story building. renovated space will serve as an expansion suite for an existing business occupancy tenant. select demo of e interior fit ou to facilitate new work. new open work space, enclosed offices, accessible restrooms, meeting rooms, coffee barDetails
project scope is to renovate the 27th fl of e 33 story building. renovated space will serve as an expansion suite for an existing business occupancy tenant. select demo of e interior fit ou to facilitate new work. new open work space, enclosed offices, accessible restrooms, meeting rooms, coffee bar | $1,634,222 |
| Dec 7, 2021 | Completed final sign-off Mar 2022 | 150 California St | 3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696.Details
3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696. | $172,420 |
| Dec 7, 2021 | Completed final sign-off Mar 2022 | 150 California St | 3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 202106172696.Details
3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 202106172696. | $63,801 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 100 Pine St | suite 1400: provide lighting t.i. to 4,770 sq ft offfice space. ref bpa#202107275138Details
suite 1400: provide lighting t.i. to 4,770 sq ft offfice space. ref bpa#202107275138 | $37,918 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 100 Pine St | suite 1400: add one transfer fan/add ceiling diffusers/relocate ceiling diffusers/relocate extg thermostats and induction unit thermostats/air balancing. ref app#202107275138Details
suite 1400: add one transfer fan/add ceiling diffusers/relocate ceiling diffusers/relocate extg thermostats and induction unit thermostats/air balancing. ref app#202107275138 | $41,220 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 100 Pine St | suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056Details
suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056 | $4,820 |
| Oct 12, 2021 | Never finaled issued Oct 2021, no final | 100 Pine St | ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056Details
ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056 | $9,020 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 100 Pine St | 3oth/f, ste 3050- t.i. selective demo and construction of non-structural, non-rated partitions, ceilings, lighting, and finishes. no structural, no increasing area or change of use. mep deferredDetails
3oth/f, ste 3050- t.i. selective demo and construction of non-structural, non-rated partitions, ceilings, lighting, and finishes. no structural, no increasing area or change of use. mep deferred | $234,465 |
| Jul 27, 2021 | Never finaled issued Aug 2021, no final | 100 Pine St | 14th fl: interior tenant improvement including selective demo and construction of non structural, non rated partitions, ceilings, lighting and finsihes including restrooms, no structural, no increase in area or change of use. mep deferredDetails
14th fl: interior tenant improvement including selective demo and construction of non structural, non rated partitions, ceilings, lighting and finsihes including restrooms, no structural, no increase in area or change of use. mep deferred | $812,775 |
| Jul 23, 2021 | Never finaled issued Aug 2021, no final | 140 New Montgomery St | interior ti of 15th fl demo of non bearing walls, finishes, ceilings. construction to include new partition finsihes, lighting, and 1 unisex restroom. mep deferredDetails
interior ti of 15th fl demo of non bearing walls, finishes, ceilings. construction to include new partition finsihes, lighting, and 1 unisex restroom. mep deferred | $700,000 |
| Jun 24, 2021 | Completed final sign-off Dec 2022 | 150 California St | 10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered.Details
10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered. | $657,716 |
| Jun 23, 2021 | Completed final sign-off May 2022 | 100 Pine St | suite 250: add 1 vav box, relocate 1 vav box/ add difusser, register, side wall registers and new ductwork/add 1 vav thermostat, relcate vav thermostats/relocate induction unit thermostats/air balance. ref app#202101293572Details
suite 250: add 1 vav box, relocate 1 vav box/ add difusser, register, side wall registers and new ductwork/add 1 vav thermostat, relcate vav thermostats/relocate induction unit thermostats/air balance. ref app#202101293572 | $10,233 |
| Jun 17, 2021 | Completed final sign-off Mar 2022 | 150 California St | 3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferredDetails
3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferred | $955,510 |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 100 Pine St | suite 250: provide power & lighting tenant improvements to 9.890 sq. ft. of office area. ref pa# 202101298672Details
suite 250: provide power & lighting tenant improvements to 9.890 sq. ft. of office area. ref pa# 202101298672 | $28,620 |
| Jun 2, 2021 | Completed final sign-off May 2022 | 100 Pine St | 23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a.Details
23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a. | $41,735 |
| Jun 1, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing.Details
suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing. | $10,223 |
| May 27, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | provide power and lighting t.i. to 9890 sq ft of office area. ref app#202101152841Details
provide power and lighting t.i. to 9890 sq ft of office area. ref app#202101152841 | $17,495 |
| May 6, 2021 | Never finaled issued May 2021, no final | 100 Pine St | ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673.Details
ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673. | $8,011 |
| Apr 29, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | ste #2250: revision to pa# 202101152841. scope of work includes 3 new offices, new non-structural partitions, ceilings and lighting, electrical. no structural, no increase in area, no change of occupancy. mep deferred.Details
ste #2250: revision to pa# 202101152841. scope of work includes 3 new offices, new non-structural partitions, ceilings and lighting, electrical. no structural, no increase in area, no change of occupancy. mep deferred. | $7,500 |
| Mar 5, 2021 | Completed final sign-off Jun 2021 | 665 03rd St | decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.Details
decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project. | $80,000 |
| Jan 29, 2021 | Never finaled issued Mar 2021, no final | 100 Pine St | 5/f suite 500 interior t.i.: demo and construction of non-structural partitions, celings, lighting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a.Details
5/f suite 500 interior t.i.: demo and construction of non-structural partitions, celings, lighting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a. | $232,306 |
| Jan 29, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | 2/f suite 250: interior t.i.: demo and construction of non-structural partitions, celings, lighhting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a.Details
2/f suite 250: interior t.i.: demo and construction of non-structural partitions, celings, lighhting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a. | $577,246 |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 150 California St | tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683.Details
tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683. | $20,742 |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 150 California St | install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683.Details
install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683. | $28,404 |
| Jan 19, 2021 | Completed final sign-off May 2022 | 100 Pine St | 23rd fl - interior ti including demo and construction of non-structural partitions, ceilings, lighting & finishes. includes restroom and corridor work, no structural, no increase in area, no change of use, mep & fire life safety deferredDetails
23rd fl - interior ti including demo and construction of non-structural partitions, ceilings, lighting & finishes. includes restroom and corridor work, no structural, no increase in area, no change of use, mep & fire life safety deferred | $991,052 |
| Jan 15, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | 22/f: interior tenant improvement: demo & construct non-structural partitions, ceilings, lighting & finishes. includes restroom & cooridor work. no structural, no increase of area, no change of use. mep & fire safety deferred.Details
22/f: interior tenant improvement: demo & construct non-structural partitions, ceilings, lighting & finishes. includes restroom & cooridor work. no structural, no increase of area, no change of use. mep & fire safety deferred. | $217,628 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | 7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636.Details
7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636. | $43,622 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | 18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731.Details
18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731. | $46,782 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | 18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731Details
18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731 | $36,440 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636.Details
provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636. | $53,901 |
| Oct 2, 2020 | Completed final sign-off May 2021 | 150 California St | interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maherDetails
interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maher | $680,467 |
| Oct 1, 2020 | Completed final sign-off Aug 2021 | 150 California St | ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permitDetails
ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit | $30,750 |
| Oct 1, 2020 | Completed final sign-off May 2021 | 150 California St | 7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit.Details
7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit. | $672,516 |
| Jul 1, 2020 | Completed final sign-off Sep 2020 | 150 California St | revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.Details
revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture. | $41,000 |
| Jun 8, 2020 | Completed final sign-off May 2021 | 100 Pine St | suite #3050: provide power and lighting tenant improvements to 4,521 sq. ft. office area.Details
suite #3050: provide power and lighting tenant improvements to 4,521 sq. ft. office area. | $29,204 |
| Feb 5, 2020 | Completed final sign-off Nov 2020 | 425 Market St | 15th floor. update to breakroom area and adjacent lounge, largely millwork, finish related items. removal of 3 glass doors. card readers at 3 locations throughout floor thereby opening up access to entire floor maher not reqDetails
15th floor. update to breakroom area and adjacent lounge, largely millwork, finish related items. removal of 3 glass doors. card readers at 3 locations throughout floor thereby opening up access to entire floor maher not req | $131,065 |
| Jan 16, 2020 | Completed final sign-off Sep 2020 | 100 Pine St | provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310Details
provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310 | $11,842 |
| Dec 4, 2019 | Completed final sign-off May 2020 | 100 Pine St | 22/f: deferred mep from pa #2019-1203-8488Details
22/f: deferred mep from pa #2019-1203-8488 | |
| Dec 3, 2019 | Completed final sign-off May 2020 | 100 Pine St | ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not reqDetails
ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not req | $646,014 |
| Nov 12, 2019 | Completed final sign-off May 2021 | 100 Pine St | ste. 3035: tenant improvement to existing office space. new non structural partitions celing tile, lighting, finishes. demo 201910174768Details
ste. 3035: tenant improvement to existing office space. new non structural partitions celing tile, lighting, finishes. demo 201910174768 | $296,330 |
| Oct 17, 2019 | Completed final sign-off May 2021 | 100 Pine St | suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit.Details
suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit. | $23,103 |
| Oct 3, 2019 | Completed final sign-off Oct 2020 | 150 California St | 8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance.Details
8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance. | $62,250 |
| Oct 3, 2019 | Completed final sign-off Sep 2020 | 150 California St | 8th flr. provide lighting improvements to 1,153 sq ft of office spaceDetails
8th flr. provide lighting improvements to 1,153 sq ft of office space | $11,940 |
| Aug 6, 2019 | Completed final sign-off Oct 2019 | 100 Pine St | ref pa# 201906072810; provide lighting & power, t.i. to 2,007 sq fl of office space/ remove & cap unused ductwork/install 12 new vav terminal new exhuast fan for idf roomDetails
ref pa# 201906072810; provide lighting & power, t.i. to 2,007 sq fl of office space/ remove & cap unused ductwork/install 12 new vav terminal new exhuast fan for idf room | $91,225 |
| Jul 25, 2019 | Completed final sign-off Jul 2020 | 100 Pine St | suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodateDetails
suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodate | $1,300,500 |
| Jul 1, 2019 | Completed final sign-off Sep 2020 | 150 California St | demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maherDetails
demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maher | $181,548 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 150 California St | 2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577Details
2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577 | $15,200 |
| Jun 13, 2019 | Never finaled issued Sep 2019, no final | 180 Howard St | voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1.Details
voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1. | $82,350 |
| Jun 7, 2019 | Completed final sign-off Oct 2019 | 100 Pine St | 20th fl - demo of (e) light fixtures. construction of (n) non-struc'l walls, doors and frames, light fixtures, millwork & finishes. no struc'l work to be included in scope. no increase in area. no change in occupancy or use. mep to be design-build under separate permit. life safety & sprinkler to beDetails
20th fl - demo of (e) light fixtures. construction of (n) non-struc'l walls, doors and frames, light fixtures, millwork & finishes. no struc'l work to be included in scope. no increase in area. no change in occupancy or use. mep to be design-build under separate permit. life safety & sprinkler to be | $847,842 |
| Jun 4, 2019 | Completed final sign-off Sep 2019 | 100 Pine St | provide lighting t.i. to 7450 sq ft of office space. demolish extg ductwork, diffusers, and provide new. relocate extg thermostats. provide new transfer fan for copy room. ref app#201903286512. n/a for maherDetails
provide lighting t.i. to 7450 sq ft of office space. demolish extg ductwork, diffusers, and provide new. relocate extg thermostats. provide new transfer fan for copy room. ref app#201903286512. n/a for maher | $114,622 |
| May 8, 2019 | Completed final sign-off Sep 2020 | 150 California St | 8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits.Details
8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits. | $304,876 |
| Apr 12, 2019 | Never finaled issued Apr 2019, no final | 150 California St | revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a.Details
revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a. | |
| Mar 28, 2019 | Completed final sign-off Sep 2019 | 100 Pine St | interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred.Details
interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred. | $560,000 |
| Mar 27, 2019 | Completed final sign-off Sep 2019 | 180 Howard St | 1st fl: t.i. improvement; new non-structural partitions, light fixtures, ceiling system, power/data and finishes, mep will be provided, life safety, sprinklers under sep permit n/a maherDetails
1st fl: t.i. improvement; new non-structural partitions, light fixtures, ceiling system, power/data and finishes, mep will be provided, life safety, sprinklers under sep permit n/a maher | $1,350,000 |
| Jan 11, 2019 | Completed final sign-off Jul 2019 | 150 California St | 2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancingDetails
2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancing | $57,373 |
| Jan 3, 2019 | Completed final sign-off Apr 2019 | 665 03rd St | 2nd fl - interior tenanat improvement of partial floor.Details
2nd fl - interior tenanat improvement of partial floor. | $83,650 |
| Nov 2, 2018 | Completed final sign-off Jul 2019 | 150 California St | ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher naDetails
ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher na | $481,140 |
| Oct 31, 2018 | Completed final sign-off Aug 2019 | 150 California St | non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permitDetails
non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permit | $131,836 |
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 100 Pine St | 21st floor: provide lighting improvements to 2,846 sq ft of office space. n/a for maher. ref app#201808137128, lighting only for this permitDetails
21st floor: provide lighting improvements to 2,846 sq ft of office space. n/a for maher. ref app#201808137128, lighting only for this permit | $17,640 |
| Oct 22, 2018 | Completed final sign-off Apr 2019 | 665 03rd St | inter ti improvement of partial (e) 3rd floorDetails
inter ti improvement of partial (e) 3rd floor | $83,650 |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | 21st flr. demo duct work, relcate grilles and thermostats, install new exhaust fan, install new vav balance, rebalance vavs to values maher not reqDetails
21st flr. demo duct work, relcate grilles and thermostats, install new exhaust fan, install new vav balance, rebalance vavs to values maher not req | $13,213 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 150 California St | 9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air main. ref pa201803012543. maher n/a.Details
9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air main. ref pa201803012543. maher n/a. | $22,405 |
| Sep 14, 2018 | Never finaled issued Oct 2018, no final | 100 Pine St | 21st fl - provide lighting ti to 1,877 sf of office space. ref pa 2018-0326-4553Details
21st fl - provide lighting ti to 1,877 sf of office space. ref pa 2018-0326-4553 | $20,860 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 100 Pine St | 15th fl - provide lighting ti to 1,112 sf of office space. ref pa 2018-0511-8852Details
15th fl - provide lighting ti to 1,112 sf of office space. ref pa 2018-0511-8852 | $18,105 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 100 Pine St | non-struct partitions, doors & finishes, no change in occupancy use or area. replace 1 set of new elevator lobby doors (20 min). mep, life safety & sprinkler under sep permitDetails
non-struct partitions, doors & finishes, no change in occupancy use or area. replace 1 set of new elevator lobby doors (20 min). mep, life safety & sprinkler under sep permit | $150,555 |
| Sep 13, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | 25th floor: provide lighting t.i. to 9,888 square feet of office space.Details
25th floor: provide lighting t.i. to 9,888 square feet of office space. | $67,250 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 150 California St | #900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress pathDetails
#900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress path | $84,800 |
| Aug 13, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | 21st fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & lights. new construction non-structural partitions, doors, frames, millwork & finishes. no structural work in scope. no increase in area, no change in occupancy or use.Details
21st fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & lights. new construction non-structural partitions, doors, frames, millwork & finishes. no structural work in scope. no increase in area, no change in occupancy or use. | $237,210 |
| Jun 20, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | 25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permitDetails
25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permit | $857,547 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | 26th flr ref pa# 201802232069, partial- scope office tenant retrofit: wiring lighting and controls, elec t-24Details
26th flr ref pa# 201802232069, partial- scope office tenant retrofit: wiring lighting and controls, elec t-24 | $61,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | 26th flr - mechanicall: demo ductwork-relocate stats & grilles. install new vavs - ductwork & grilles. install new heat pump in it room. install new 2 fire smoke dampers ref 201802232069Details
26th flr - mechanicall: demo ductwork-relocate stats & grilles. install new vavs - ductwork & grilles. install new heat pump in it room. install new 2 fire smoke dampers ref 201802232069 | $114,000 |
| May 17, 2018 | Completed final sign-off Feb 2019 | 180 Howard St | 11/f -interior ti - new partitions, ceilings, mep, existing life safety to remainDetails
11/f -interior ti - new partitions, ceilings, mep, existing life safety to remain | $1,300,000 |
| May 11, 2018 | Completed final sign-off Feb 2019 | 100 Pine St | demolition of non structural partitions, doors, frames, floor finishes, millwork, elec, light fix. new construction non structural partitions, doors, frames, millwork and finishes. no structural included.no increase in area,occupancy or use. mep design build. ls and sp design build, maher not reqDetails
demolition of non structural partitions, doors, frames, floor finishes, millwork, elec, light fix. new construction non structural partitions, doors, frames, millwork and finishes. no structural included.no increase in area,occupancy or use. mep design build. ls and sp design build, maher not req | $88,128 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 180 Sansome St | demo existing partitions at front of ground floor, remove kitchen and bathroom finishes. no exterior work. comply with ab-017.Details
demo existing partitions at front of ground floor, remove kitchen and bathroom finishes. no exterior work. comply with ab-017. | $11,720 |
| Mar 26, 2018 | Never finaled issued Mar 2018, no final | 100 Pine St | suite #2150 demo of non structural partitions, doors, frames, finishes millwork, light fixs & electrical. construct non structural partitions, glazing, doors, frames, millwork & finishes. non structural work included in scope, no change occupancy, use life safety sprinkler mep design build underDetails
suite #2150 demo of non structural partitions, doors, frames, finishes millwork, light fixs & electrical. construct non structural partitions, glazing, doors, frames, millwork & finishes. non structural work included in scope, no change occupancy, use life safety sprinkler mep design build under | $152,950 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 150 California St | partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design buildDetails
partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design build | $511,400 |
| Feb 23, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | demo of non-struc'l partitions, doors, frames, floor finishes, millwork, electrical and light fixtures. new construction consists of non-struct'l partitions, doors, frames, millwork and finishes. no struct'l work included in scope. no increase in area, change in use or occupancy. mep & life safetyDetails
demo of non-struc'l partitions, doors, frames, floor finishes, millwork, electrical and light fixtures. new construction consists of non-struct'l partitions, doors, frames, millwork and finishes. no struct'l work included in scope. no increase in area, change in use or occupancy. mep & life safety | $857,547 |