T N T Construction
- Based in
- Vallejo
- On San Francisco permits
- Oct 2009 to Oct 2018
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2018 | Completed final sign-off Jan 2019 | 178 Flournoy St | bathroom and shower remodeling, 8'x10'. dry rot repair where needed. revision to pa#2018-0815-7377Details
bathroom and shower remodeling, 8'x10'. dry rot repair where needed. revision to pa#2018-0815-7377 | $3,500 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 178 Flournoy St | remodel bathroom and shower. approx 8'x10'.Details
remodel bathroom and shower. approx 8'x10'. | $7,500 |
| Jan 15, 2013 | Completed final sign-off Apr 2013 | 1329 29th Av | remove and replace 1 fixed skylight. repair fractured roofing membrane around skylight and adjacent skylight.Details
remove and replace 1 fixed skylight. repair fractured roofing membrane around skylight and adjacent skylight. | $3,175 |
| Feb 7, 2012 | Completed final sign-off Sep 2014 | 1805 Geary Bl | ground floor - demolition of plywood enclosure, demolition of (e) electrical service outside bldg, relocation of electrical service to interior of the bldg, new full height partition & doors.Details
ground floor - demolition of plywood enclosure, demolition of (e) electrical service outside bldg, relocation of electrical service to interior of the bldg, new full height partition & doors. | $55,000 |
| Feb 25, 2011 | Never finaled issued Feb 2011, no final | 1805 Geary Bl | emergency repairs caused by water (rain) dryrot and roof repair on electrical room roof. shore up emergency stairs until new plans by adding 2 columns (steel) non structural. remove and replace leaking conduits on exterior of building.Details
emergency repairs caused by water (rain) dryrot and roof repair on electrical room roof. shore up emergency stairs until new plans by adding 2 columns (steel) non structural. remove and replace leaking conduits on exterior of building. | $10,000 |
| Dec 22, 2010 | Completed final sign-off Dec 2010 | 80 Ashton Av | comply with correction notice dated 12/20/2010 increase valuation of pa#201009241612 by $5,000.00 to comply with nov#201064766Details
comply with correction notice dated 12/20/2010 increase valuation of pa#201009241612 by $5,000.00 to comply with nov#201064766 | $5,000 |
| Sep 24, 2010 | Completed final sign-off Dec 2010 | 80 Ashton Av | bring front entry door to original condition, and provide new deck at 28" above grade at frontDetails
bring front entry door to original condition, and provide new deck at 28" above grade at front | |
| Jul 1, 2010 | Completed final sign-off Dec 2010 | 80 Ashton Av | detached garage. foundation replacement and dry rot repair thru out. no change to existing garage/structure envelope. seismic upgrade.Details
detached garage. foundation replacement and dry rot repair thru out. no change to existing garage/structure envelope. seismic upgrade. | $4,500 |
| Jul 1, 2010 | Completed final sign-off Dec 2010 | 80 Ashton Av | existing house at rear. dry rot repair from sub floor to roof. seismic retrofit.Details
existing house at rear. dry rot repair from sub floor to roof. seismic retrofit. | $7,500 |
| Jun 30, 2010 | Completed final sign-off Oct 2010 | 80 Ashton Av | reroofing (house)Details
reroofing (house) | $1,800 |
| Jun 30, 2010 | Completed final sign-off Oct 2010 | 80 Ashton Av | reroofing (detached garage)Details
reroofing (detached garage) | $900 |
| Mar 11, 2010 | Completed final sign-off Dec 2010 | 80 Ashton Av | dryrot repair and foundation replacement.revision to application 200911302228.Details
dryrot repair and foundation replacement.revision to application 200911302228. | $20,000 |
| Nov 30, 2009 | Completed final sign-off Dec 2010 | 80 Ashton Av | replace broken windows at front and rear. repair dryrot under subloor at kitchen and bathDetails
replace broken windows at front and rear. repair dryrot under subloor at kitchen and bath | $4,000 |
| Oct 8, 2009 | Completed final sign-off Dec 2010 | 80 Ashton Av | general electrical & plumbing repairs to (e) fixtures, replace appliances & repair or replace (e) furnace. provide he lights per t-24. vif new furnace efficiency>78%.Details
general electrical & plumbing repairs to (e) fixtures, replace appliances & repair or replace (e) furnace. provide he lights per t-24. vif new furnace efficiency>78%. | $12,000 |