R.D. Olson Construction
- Based in
- Irvine
- On San Francisco permits
- Oct 2008 to Aug 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 400 Post St | new drywall partition, multifold doors,lighting, elec, mech and sprinkler work to (e) restaurant on lower level (below street level) sprinklers under separate permit. establishing occupant load.Details
new drywall partition, multifold doors,lighting, elec, mech and sprinkler work to (e) restaurant on lower level (below street level) sprinklers under separate permit. establishing occupant load. | $300,000 |
| Mar 18, 2009 | Never finaled issued Apr 2009, no final | 400 Post St | revision to pa# 2008/10/14/4060 r-1. replace handicap accesssible ramp with wheel chair lift.Details
revision to pa# 2008/10/14/4060 r-1. replace handicap accesssible ramp with wheel chair lift. | |
| Mar 5, 2009 | Expired or cancelled cancelled Jul 2010 | 400 Post St | remodel of e restaurant including interior demolition of exising restaurant at basement level and construction of all tenant improvement elements including partitions, casework. lighting, elec, plumbing, finishes, kitchen, restrooms. no structural work.Details
remodel of e restaurant including interior demolition of exising restaurant at basement level and construction of all tenant improvement elements including partitions, casework. lighting, elec, plumbing, finishes, kitchen, restrooms. no structural work. | $750,000 |
| Oct 14, 2008 | Completed final sign-off Apr 2009 | 400 Post St | demolition (selective) expansion of (e) restaurant and lounge onto 1st floor space. associated construction millwork, finishes, mechanical, plumbing, electrical, fire protection, structural work under appl. 200810023202. fire protection under separate permit.Details
demolition (selective) expansion of (e) restaurant and lounge onto 1st floor space. associated construction millwork, finishes, mechanical, plumbing, electrical, fire protection, structural work under appl. 200810023202. fire protection under separate permit. | $1,500,000 |