Smith Development & Construction Comp
- Based in
- Gold River
- On San Francisco permits
- Jul 2012 to May 2018
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2018 | Completed final sign-off Aug 2019 | 50 Fremont St | ti for new restaurant in (e) vacant restaurant space. there is selective dmeo and new construction required, partitions, doors, frames, electrical mechanical & finishes. maher naDetails
ti for new restaurant in (e) vacant restaurant space. there is selective dmeo and new construction required, partitions, doors, frames, electrical mechanical & finishes. maher na | $120,000 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 220 Battery St | revision/modification to pa#2012.0724.5568 to revise women's toilet room into unisex & remvoe the men's. n/a maher ordinanceDetails
revision/modification to pa#2012.0724.5568 to revise women's toilet room into unisex & remvoe the men's. n/a maher ordinance | |
| Feb 10, 2014 | Completed final sign-off Jul 2014 | 195 Pine St | revision to appl #2013.05.07.6313: revised floor plan for value engineering, reduce scope of work -electrical fixtures, equipment & plumbing. compliance with ordinance 155-13 not required. structural supports for two ahu, 1 cu, and 1 ef.Details
revision to appl #2013.05.07.6313: revised floor plan for value engineering, reduce scope of work -electrical fixtures, equipment & plumbing. compliance with ordinance 155-13 not required. structural supports for two ahu, 1 cu, and 1 ef. | |
| Jun 14, 2013 | Expired or cancelled cancelled Jan 2014 | 1175 Columbus Av | electrical vehicle charging stations for electric carsDetails
electrical vehicle charging stations for electric cars | $80,000 |
| Oct 17, 2012 | Completed final sign-off Oct 2012 | 221 Sansome St | revise drawing for pa# 201205049796 - exiting front step to reain, because its local historical district. no work to be done.Details
revise drawing for pa# 201205049796 - exiting front step to reain, because its local historical district. no work to be done. | |
| Jul 24, 2012 | Never finaled issued Aug 2014, no final | 220 Battery St | change of use from b-10 to m-15-new glass storefront replacement, new interior finishes, wall panels, fr wall panels, tile floors, ceiling, new led lights. new ductwork. new plumbing, remodel is for ground floor retial space only. convert 7-11Details
change of use from b-10 to m-15-new glass storefront replacement, new interior finishes, wall panels, fr wall panels, tile floors, ceiling, new led lights. new ductwork. new plumbing, remodel is for ground floor retial space only. convert 7-11 | $175,000 |