Merrcon Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Aug 2009
- Last 24 months
- 0 permits filed
50 permits since 2000: 43 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2009 | Completed final sign-off Aug 2009 | 55 Hawthorne St | 8th fl - demolition of lease-hold improvements at termination of lease. demolition of partitions, doors, frames, finishes, and some plumbing hvac & elec. demolition. space is vacant and will remain vacant until new tenant signs lease; per ab-017.Details
8th fl - demolition of lease-hold improvements at termination of lease. demolition of partitions, doors, frames, finishes, and some plumbing hvac & elec. demolition. space is vacant and will remain vacant until new tenant signs lease; per ab-017. | $42,000 |
| Jul 8, 2009 | Completed final sign-off Aug 2009 | 433 California St | 8th fl-tenant improvement to (e) ste on multi-tenant flr-new demising of ste from 1 ste into 2 stes, reduce size of telecom area to make rm for new office,no new lights/mechanical. 20% ada upgrade to include new automatic door opener @ mens restrm entry. electrical & life safety under seperate permDetails
8th fl-tenant improvement to (e) ste on multi-tenant flr-new demising of ste from 1 ste into 2 stes, reduce size of telecom area to make rm for new office,no new lights/mechanical. 20% ada upgrade to include new automatic door opener @ mens restrm entry. electrical & life safety under seperate perm | $31,500 |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | to obtain fianl inspection for work approved under pa#200708078922. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200708078922. all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | to obtain fianl inspection for work approved under pa#200710185727. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200710185727. all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | to obtain fianl inspection for work approved under pa#200710115206. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200710115206. all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | to obtain fianl inspection for work approved under pa#200710104940. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200710104940. all work has been completed. | |
| Apr 21, 2009 | Completed final sign-off Jul 2009 | 55 Hawthorne St | 7th floor ste 710- tenant improvement & restroom ada upgrade selective demolition & construction of new partitions, doors, frames, finsihes. minor electrical, lighting, hvac & plumbing work. hvac,elec, life safety & plumbing will be submitted under separate permit.Details
7th floor ste 710- tenant improvement & restroom ada upgrade selective demolition & construction of new partitions, doors, frames, finsihes. minor electrical, lighting, hvac & plumbing work. hvac,elec, life safety & plumbing will be submitted under separate permit. | $85,000 |
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 50 Fremont St | renew pa# 2007/04/18/9075 to obtain final inspection. all work has been completed.Details
renew pa# 2007/04/18/9075 to obtain final inspection. all work has been completed. | |
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 50 Fremont St | renew pa# 2007/07/03/5796 to obtain final inspection. all work has been completed.Details
renew pa# 2007/07/03/5796 to obtain final inspection. all work has been completed. | |
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 50 Fremont St | renew pa# 2007/06/28/5348 to obtain final inspection. all work has been completed.Details
renew pa# 2007/06/28/5348 to obtain final inspection. all work has been completed. | |
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 50 Fremont St | renew pa# 2007/07/19/7182 to obtain final inspection. all work has been completed.Details
renew pa# 2007/07/19/7182 to obtain final inspection. all work has been completed. | |
| Feb 2, 2009 | Completed final sign-off Apr 2009 | 50 Fremont St | renew pa# 2007/08/02/8502 to obtain final inspection. all work has been completed.Details
renew pa# 2007/08/02/8502 to obtain final inspection. all work has been completed. | |
| Jan 26, 2009 | Completed final sign-off Apr 2009 | 185 Berry St | 1,397 sq.ft. tenant improvement, minor demolition, new entry door, new closet, carpet floor shhet vinyl, minor electrical & plum,bing, fire sprinkle under separate permit.Details
1,397 sq.ft. tenant improvement, minor demolition, new entry door, new closet, carpet floor shhet vinyl, minor electrical & plum,bing, fire sprinkle under separate permit. | $28,000 |
| Jan 9, 2009 | Completed final sign-off Jan 2009 | 50 Fremont St | 5th/fl .revision to 200803137007, revise restroom layout for ada clearancesDetails
5th/fl .revision to 200803137007, revise restroom layout for ada clearances | |
| Nov 3, 2008 | Completed final sign-off Feb 2009 | 400 Post St | demolition only/to comply with nov #200879161Details
demolition only/to comply with nov #200879161 | $19,800 |
| Sep 11, 2008 | Completed final sign-off Dec 2008 | 100 California St | demo wall to expand (e) barber shop. new partitions, doors, new electrical, plumbing, millwork. life safety under seperate permitDetails
demo wall to expand (e) barber shop. new partitions, doors, new electrical, plumbing, millwork. life safety under seperate permit | $35,125 |
| Jul 15, 2008 | Completed final sign-off Nov 2008 | 55 Hawthorne St | at 5th floor, electrical & hvac design drawings submitt for review. architectural plans are under seperated permit & approved under #200806114195. fire sprinkler permit also seperated and approved.Details
at 5th floor, electrical & hvac design drawings submitt for review. architectural plans are under seperated permit & approved under #200806114195. fire sprinkler permit also seperated and approved. | $73,550 |
| May 2, 2008 | Completed final sign-off Jun 2008 | 3 Embarcadero Center | lobby level: life safety work for new retail space and fire alarm system - add strobes, speakers and pull station, arch pa #200802215230.Details
lobby level: life safety work for new retail space and fire alarm system - add strobes, speakers and pull station, arch pa #200802215230. | $70,000 |
| May 2, 2008 | Completed final sign-off Oct 2008 | 185 Berry St | 1st floor, suite 1600: work consist of consturction of walls to close openings at corridors created by demolition see sheet a3. no mech, fire sprinkler or life safety alarm work in this scope. space will remain unoccupied in shell condition until leased.work performed under appl#200804179924.Details
1st floor, suite 1600: work consist of consturction of walls to close openings at corridors created by demolition see sheet a3. no mech, fire sprinkler or life safety alarm work in this scope. space will remain unoccupied in shell condition until leased.work performed under appl#200804179924. | $8,500 |
| Apr 23, 2008 | Completed final sign-off Jun 2008 | 3 Embarcadero Center | lobby level-electrical, mechanical, plumbing work for new retail space, architectural pa# 200802215230; 1147631Details
lobby level-electrical, mechanical, plumbing work for new retail space, architectural pa# 200802215230; 1147631 | $70,000 |
| Apr 17, 2008 | Completed final sign-off Jun 2008 | 185 Berry St | demolition of interior finishes and non-load bearing partitions per ab-17. space is to be left in "shell" condition pending future t.i., fire alarm, fire sprinkler system to be under separate permit. new construction is limited to short section of corridor wall to separate work area.Details
demolition of interior finishes and non-load bearing partitions per ab-17. space is to be left in "shell" condition pending future t.i., fire alarm, fire sprinkler system to be under separate permit. new construction is limited to short section of corridor wall to separate work area. | $50,000 |
| Apr 4, 2008 | Never finaled issued Apr 2008, no final | 631 Howard St | 4th floor-selective demolition, construction of new partitions, removal of some electrical outlets, no changes to life safety. electrical changes with title 24 to be submitted seperatlyDetails
4th floor-selective demolition, construction of new partitions, removal of some electrical outlets, no changes to life safety. electrical changes with title 24 to be submitted seperatly | $22,000 |
| Apr 3, 2008 | Completed final sign-off Jan 2009 | 50 Fremont St | 5th floor: addition of uau to serve 2 offices, reference appl #200803137007 - hvac remodel an existing office space including new ductwork, and new vav `diffusers & thermostat.Details
5th floor: addition of uau to serve 2 offices, reference appl #200803137007 - hvac remodel an existing office space including new ductwork, and new vav `diffusers & thermostat. | $7,500 |
| Mar 13, 2008 | Completed final sign-off Jan 2009 | 50 Fremont St | 5th floor: commercial tenant improvement - non-structural partition for 2 offices. mep under separate permit.Details
5th floor: commercial tenant improvement - non-structural partition for 2 offices. mep under separate permit. | $35,000 |
| Mar 13, 2008 | Completed final sign-off Dec 2008 | 360 Post St | suite 1005 - no structural work. interior office remodeling. construction of non-rated partitions and lighing. mechanical, electrical, fire sprinkler and life safety work will be under a separate permit.Details
suite 1005 - no structural work. interior office remodeling. construction of non-rated partitions and lighing. mechanical, electrical, fire sprinkler and life safety work will be under a separate permit. | $147,000 |
| Dec 10, 2007 | Completed final sign-off Nov 2008 | 185 Berry St | rev, to p/a # #2007.03.29.7634. misc. lobby/corridor changes - change to smoke guard doors, deleting scope. show accessible bathrooms as ref. for new work on 6th floor. reduce scope of work on 4th fl. by adding new door at corridor - addition or work on 2nd, 3rd fl. - elevator smoke doors change toDetails
rev, to p/a # #2007.03.29.7634. misc. lobby/corridor changes - change to smoke guard doors, deleting scope. show accessible bathrooms as ref. for new work on 6th floor. reduce scope of work on 4th fl. by adding new door at corridor - addition or work on 2nd, 3rd fl. - elevator smoke doors change to | $25,000 |
| Oct 11, 2007 | Expired or cancelled expired Jul 2009 | 433 California St | mechanical work. add vav's supply ducting permit #1128520 app #200708078922Details
mechanical work. add vav's supply ducting permit #1128520 app #200708078922 | $17,000 |
| Aug 7, 2007 | Expired or cancelled expired May 2009 | 433 California St | t.i.consists of interior remodel of existing office suite i ncluding accessible sink,casework, construction of new partitions, alteration to ceiling & light fixtures. add power locations.new finishes throughout.mep & fire/life safety under seperate permit.no exterior workDetails
t.i.consists of interior remodel of existing office suite i ncluding accessible sink,casework, construction of new partitions, alteration to ceiling & light fixtures. add power locations.new finishes throughout.mep & fire/life safety under seperate permit.no exterior work | $145,500 |
| Jul 27, 2007 | Completed final sign-off Oct 2007 | 505 Montgomery St | work consists of removal of low work station partitions & removal of 2 ceiling high walls to create more open space, patch,paint & carpet.no changes in existing. no changes to existing ceiling plan.lighting,hvac & sprinklers will remain the same.life safety upgrades will be submitted seperately.Details
work consists of removal of low work station partitions & removal of 2 ceiling high walls to create more open space, patch,paint & carpet.no changes in existing. no changes to existing ceiling plan.lighting,hvac & sprinklers will remain the same.life safety upgrades will be submitted seperately. | $85,000 |
| Jul 19, 2007 | Expired or cancelled expired Apr 2009 | 50 Fremont St | install one 4-ton a/c unit at 2nd floorDetails
install one 4-ton a/c unit at 2nd floor | $16,000 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 575 Market St | mech. & electrical submitted under this applciation for oti-2. life safety & fire sprinkler work to be done under seperate permit. no increase in sq.footage. oti-1 appl#200705141208Details
mech. & electrical submitted under this applciation for oti-2. life safety & fire sprinkler work to be done under seperate permit. no increase in sq.footage. oti-1 appl#200705141208 | $36,640 |
| May 15, 2007 | Completed final sign-off Dec 2007 | 185 Berry St | oti-2, 6th floor, el, meDetails
oti-2, 6th floor, el, me | $50,000 |
| Apr 18, 2007 | Expired or cancelled expired Apr 2009 | 50 Fremont St | oti-1, hines, 2nd floor, el, me, ls, sp.Details
oti-1, hines, 2nd floor, el, me, ls, sp. | $105,000 |
| Mar 29, 2007 | Completed final sign-off Nov 2008 | 185 Berry St | work on 2nd to 5th/fl.interior corridor finish upgrade:new carpet, suspended ceiling&gypsum board ceiling,light fixtures,fire doors @ elevator lobby 2. elec&mech work will be design-build. fire alarm system shall be the responsibility of life&safety contracator.fire alarm sprinkler on seperate appl.Details
work on 2nd to 5th/fl.interior corridor finish upgrade:new carpet, suspended ceiling&gypsum board ceiling,light fixtures,fire doors @ elevator lobby 2. elec&mech work will be design-build. fire alarm system shall be the responsibility of life&safety contracator.fire alarm sprinkler on seperate appl. | $594,800 |
| Mar 27, 2007 | Completed final sign-off Dec 2007 | 185 Berry St | oti-1, china basin landing, 6th floor, ls, me, el.Details
oti-1, china basin landing, 6th floor, ls, me, el. | $75,000 |
| Mar 21, 2007 | Completed final sign-off Apr 2007 | 433 California St | oti rev. (rev. to #2007/01/23/2376)Details
oti rev. (rev. to #2007/01/23/2376) | $50 |
| Mar 21, 2007 | Completed final sign-off May 2007 | 50 Fremont St | oti-1 12th floor lt, me, ls, spDetails
oti-1 12th floor lt, me, ls, sp | $65,000 |
| Feb 21, 2007 | Completed final sign-off Sep 2008 | 631 Howard St | replace front windows and doors. re-ramp interior floor to meet sidewalk. demolish int walls. rebuild 1-hour rated 1st & 2nd floor corridors. (partial). strucutral connection to be under seperate permit.Details
replace front windows and doors. re-ramp interior floor to meet sidewalk. demolish int walls. rebuild 1-hour rated 1st & 2nd floor corridors. (partial). strucutral connection to be under seperate permit. | $98,000 |
| Feb 15, 2007 | Completed final sign-off Mar 2007 | 505 Montgomery St | oti-2 3rd/ fl, el, me.Details
oti-2 3rd/ fl, el, me. | $36,162 |
| Feb 13, 2007 | Completed final sign-off Nov 2008 | 185 Berry St | demolition of e ceiling lighting and finishes. tenant improvement of e 6th floor corridor. minor work for accessibility at 6th floor corridor restrooms. (title 24) separate submission for fire, elec,mechanicalDetails
demolition of e ceiling lighting and finishes. tenant improvement of e 6th floor corridor. minor work for accessibility at 6th floor corridor restrooms. (title 24) separate submission for fire, elec,mechanical | $61,500 |
| Jan 24, 2007 | Completed final sign-off Nov 2008 | 185 Berry St | oti-2, mccarthy cook, 6/fl, el, ls, me.Details
oti-2, mccarthy cook, 6/fl, el, ls, me. | $48,525 |
| Dec 19, 2006 | Completed final sign-off Jan 2007 | 433 California St | plvg 2 existing sprnkler heads that were observed to be too close together asfter interior partitions were removedDetails
plvg 2 existing sprnkler heads that were observed to be too close together asfter interior partitions were removed | $300 |
| Nov 9, 2006 | Completed final sign-off Jan 2007 | 433 California St | oti-1 6th floor el, me, l/sDetails
oti-1 6th floor el, me, l/s | $20,400 |
| Oct 13, 2006 | Expired or cancelled cancelled Apr 2009 | 720 Market St | minor remodel of existing occupied office space. reconfigure walls,relocate some existing light fixtures, no new. new wall location does not affect hvac or fire sprinklers and there will be no work for these trades. life safety work separate. no increase in sq footageDetails
minor remodel of existing occupied office space. reconfigure walls,relocate some existing light fixtures, no new. new wall location does not affect hvac or fire sprinklers and there will be no work for these trades. life safety work separate. no increase in sq footage | $38,300 |
| Aug 29, 2006 | Completed final sign-off Oct 2006 | 33 New Montgomery St | electrical & fire sprinkler drawings submitted as oti-2- oti-11 application 200608169623 permit 1095550 no increade in square footageDetails
electrical & fire sprinkler drawings submitted as oti-2- oti-11 application 200608169623 permit 1095550 no increade in square footage | $22,000 |
| Aug 16, 2006 | Completed final sign-off Apr 2007 | 433 California St | remove interior partition walls, add one additional office at 10th floor only. for lighting only sprinklers, mechanical and electrical work will be under separate permit. no increase in office space.Details
remove interior partition walls, add one additional office at 10th floor only. for lighting only sprinklers, mechanical and electrical work will be under separate permit. no increase in office space. | $30,000 |
| Aug 4, 2006 | Completed final sign-off Mar 2007 | 433 California St | cut & patch remodel of existing tenant space. reconfigure office walls, revise lighting & finishes. space will remain partially occupied. safety submitted seperately.Details
cut & patch remodel of existing tenant space. reconfigure office walls, revise lighting & finishes. space will remain partially occupied. safety submitted seperately. | $200,000 |
| Jun 27, 2006 | Completed final sign-off Dec 2006 | 50 Fremont St | recline accessible parking spaces, loading aisles, and walkways, signage relocation - cost $7000.00 (certification of disabled access compliance status of path of travel, including parking, elevator entrances - cost $1.00)Details
recline accessible parking spaces, loading aisles, and walkways, signage relocation - cost $7000.00 (certification of disabled access compliance status of path of travel, including parking, elevator entrances - cost $1.00) | $7,001 |
| Mar 21, 2006 | Completed final sign-off Jul 2006 | 637 Commercial St | cut and patch reomdel of existing office space for new tenant. will occur on floors 2 and 3. non structural partition removal, minor partition construction, electrical, lighting relocations, rplacement of finishes. mech and elec, plumb, fire sprinkler, fire alarm work to be performed on a designDetails
cut and patch reomdel of existing office space for new tenant. will occur on floors 2 and 3. non structural partition removal, minor partition construction, electrical, lighting relocations, rplacement of finishes. mech and elec, plumb, fire sprinkler, fire alarm work to be performed on a design | $225,000 |
| Mar 10, 2006 | Completed final sign-off Apr 2006 | 505 Montgomery St | oti-2, 3rd floor, me, sp.Details
oti-2, 3rd floor, me, sp. | $3,500 |