Ben Au
- Listed as
- architect, attorney, engineer
- Firm
- Holmes Culley
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Aug 2025
67 permits since 2000 (engineer on 65 permits, architect on 1 permit, attorney on 1 permit): 41 completed, 7 in progress, 10 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2025 | In progress filed Aug 2025, not yet issued | 601 23rd St | erect a one story, type 5b, storage building. see plans for more details.Details
erect a one story, type 5b, storage building. see plans for more details. | $500,000 | |
| Dec 2, 2024 | In progress issued May 2026 | 26 Ofarrell St | Delvin Garcia Construction-A Partnership | revision to pa #202109077889 revise mezzanine framing. clarification notes for city planning purpose about future floor and column finishes. to comply with nov #202181969. add new restroom, adjust ramp and storage room, change occupancy at mezz to b occ. revise stairs, remove lift & dumbwaiter.Details
revision to pa #202109077889 revise mezzanine framing. clarification notes for city planning purpose about future floor and column finishes. to comply with nov #202181969. add new restroom, adjust ramp and storage room, change occupancy at mezz to b occ. revise stairs, remove lift & dumbwaiter. | $20,000 |
| Mar 15, 2024 | In progress issued Mar 2024 | 2329 Divisadero St | Lewis M Merlo Inc | common area - patching foundation walls, spalling concrete on sections of foundationDetails
common area - patching foundation walls, spalling concrete on sections of foundation | $15,400 |
| Oct 25, 2023 | In progress issued Jul 2024 | 3300 Mission St | Guzman Construction Group Inc. | priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st.Details
priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st. | $17,000,000 |
| Jan 20, 2023 | Completed final sign-off Jul 2023 | 926 Fillmore St | Giuliani Construction Incorp | revision to permit 202108045814. new replacement window and sliding door (same size and location) shear wall and hold down work removed.Details
revision to permit 202108045814. new replacement window and sliding door (same size and location) shear wall and hold down work removed. | |
| Dec 27, 2022 | Expired or cancelled withdrawn Mar 2025 | 717 Battery St | int courtyard alterations. project proposes to construct a retractable canopy that will partially cover the (e) ground floor courtyard. no change to any of the (e) uses. mep deferredDetails
int courtyard alterations. project proposes to construct a retractable canopy that will partially cover the (e) ground floor courtyard. no change to any of the (e) uses. mep deferred | $1,670,000 | |
| Dec 13, 2022 | In progress issued Nov 2023 | 2320 Broadway | Bryan Michelsen Construction | interior remodel on third floor.Details
interior remodel on third floor. | $75,000 |
| Dec 9, 2022 | Completed final sign-off Sep 2026 | 2322 Broadway | Bryan Michelsen Construction | infill & interior alteration on 4th & 3rd floor impacting upper unit.Details
infill & interior alteration on 4th & 3rd floor impacting upper unit. | $175,000 |
| Sep 2, 2022 | Never finaled filed Sep 2022, never issued | 388 Avenue Of The Palms | priority processing - parcel c2.3 - shoring associated with priority permit new building under pa# 201912139567.Details
priority processing - parcel c2.3 - shoring associated with priority permit new building under pa# 201912139567. | $100,000 | |
| Sep 2, 2022 | Never finaled filed Sep 2022, never issued | 388 Avenue Of The Palms | priority processing - parcel c2.3 - grading associated with priority permit new building under pa# 201912139567.Details
priority processing - parcel c2.3 - grading associated with priority permit new building under pa# 201912139567. | ||
| Dec 22, 2021 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door.Details
revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door. | $55,000 |
| Aug 4, 2021 | Completed final sign-off Jul 2023 | 926 Fillmore St | Giuliani Construction Incorp | interior remodel of property management offices on the g/f of a multi-unit residential bldg. removal of (e) non structural partitions, new partiions, and new opening at rear for larger window and sliding doors to (e) deck at back of bldg. sprinkler under sep permit.Details
interior remodel of property management offices on the g/f of a multi-unit residential bldg. removal of (e) non structural partitions, new partiions, and new opening at rear for larger window and sliding doors to (e) deck at back of bldg. sprinkler under sep permit. | $15,000 |
| Apr 15, 2021 | Completed final sign-off Apr 2022 | 205 Jones St | Saarman Construction,Ltd. | 100% affordable housing. scope: fire damage repair to two stacks of dwelling units on all seven floors. repair fire damage and return the damaged units to service for the displaced residents. replacement material to be replaced as close to existing as possible. to comply with nov 202052931.Details
100% affordable housing. scope: fire damage repair to two stacks of dwelling units on all seven floors. repair fire damage and return the damaged units to service for the displaced residents. replacement material to be replaced as close to existing as possible. to comply with nov 202052931. | $1,150,000 |
| Apr 14, 2021 | Never finaled issued Jul 2021, no final | 333 Baker St | Casillas Clark Perez (Ccp) Painting Inc | concrete brick repairs at basement level. no change in existing lateral system. 100% affordable housing. (structural only)Details
concrete brick repairs at basement level. no change in existing lateral system. 100% affordable housing. (structural only) | $150,000 |
| Jan 4, 2021 | Completed final sign-off Jan 2023 | 547 18th Av | provide voluntary partial strengthening below the sunroom at rear of structure by adding new wood shear walls and corresponding foundation.Details
provide voluntary partial strengthening below the sunroom at rear of structure by adding new wood shear walls and corresponding foundation. | $10,000 | |
| Nov 1, 2020 | Completed final sign-off May 2021 | 205 Jones St | Advance Construction Technology Inc | basement - brick repair and skim coat & approximately 2,340 square feetconcrete wall treatment and skim - approximately 495 square feetrepair concrete slabs - approximately 300 square feetrepair in 5 concrete footingsDetails
basement - brick repair and skim coat & approximately 2,340 square feetconcrete wall treatment and skim - approximately 495 square feetrepair concrete slabs - approximately 300 square feetrepair in 5 concrete footings | $102,013 |
| Dec 18, 2019 | Completed final sign-off Jan 2021 | 1275 Folsom St | Evolv Commercial Construction Inc | tenant improvement of a 7,200 sq ft office building. scope includes new hvac and conversion of existing 2nd story to a mezzanine.Details
tenant improvement of a 7,200 sq ft office building. scope includes new hvac and conversion of existing 2nd story to a mezzanine. | $842,895 |
| Nov 20, 2019 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | partial voluntary seismic upgrade targeting life safety level for the 475 year event using asce 41-17Details
partial voluntary seismic upgrade targeting life safety level for the 475 year event using asce 41-17 | $200,000 |
| Nov 12, 2019 | Completed final sign-off Sep 2022 | 1717 Lyon St | Aaron Gordon Construction Inc | main floor renovation. removal & replacement of all fixtures, equipment, & finishes. remove & replace windows in existing kitchen. replace interior fireplaces. remove access to stairwell & build access to elevated backyard from main level.Details
main floor renovation. removal & replacement of all fixtures, equipment, & finishes. remove & replace windows in existing kitchen. replace interior fireplaces. remove access to stairwell & build access to elevated backyard from main level. | $525,000 |
| Nov 1, 2019 | Expired or cancelled expired Nov 2025 | 229 Ellis St | structural drawings for new sidewalk in conjunction with dpw street improvement. ref pa 2018-0427-7608Details
structural drawings for new sidewalk in conjunction with dpw street improvement. ref pa 2018-0427-7608 | $49,780 | |
| Oct 2, 2019 | Expired or cancelled withdrawn Jan 2020 | 295 Bay St | strengthening of existinb building foundation to support loads for future ti at an existing reinforced masoning building.Details
strengthening of existinb building foundation to support loads for future ti at an existing reinforced masoning building. | $100,000 | |
| Sep 20, 2019 | Never finaled issued Jun 2020, no final | 650 Sacramento St | seismic upgrade, new stair & elevator warm shell improvementsDetails
seismic upgrade, new stair & elevator warm shell improvements | $500,000 | |
| May 15, 2019 | Completed final sign-off Oct 2019 | 117 Diamond St | Cahill Contractors Llc. | structural strengthening of 2 basement walls & associated footings. 2 proposed nonstructural 1 hour rated partitions to replace extg non-structural partitions. re-roofing. new skylight. accessibility upgrades including parking lot accessible stall restriping & path. nw exterior stair.Details
structural strengthening of 2 basement walls & associated footings. 2 proposed nonstructural 1 hour rated partitions to replace extg non-structural partitions. re-roofing. new skylight. accessibility upgrades including parking lot accessible stall restriping & path. nw exterior stair. | $274,317 |
| Aug 17, 2018 | Completed final sign-off Mar 2019 | 40 22nd Av | Bjlgc Inc | ref app#201806252788: structural work to raise interior ceiling height of 3rd floor master bedroom and 3rd floor office.(no work to roof line or exterior). also add new headers for larger upgraded electrical panel and to add recessed cabinet at master closet (both headers on 3rd floor). n/a for maheDetails
ref app#201806252788: structural work to raise interior ceiling height of 3rd floor master bedroom and 3rd floor office.(no work to roof line or exterior). also add new headers for larger upgraded electrical panel and to add recessed cabinet at master closet (both headers on 3rd floor). n/a for mahe | $4,000 |
| Dec 21, 2017 | Completed final sign-off Sep 2020 | 198 Potrero Av | Plant Construction Co, Lp | interior improvement to 1st fl and e mezzanine. demo doors, plumbing, electrical, finishes, new restrooms, partitions, doors, ceilings, and stairDetails
interior improvement to 1st fl and e mezzanine. demo doors, plumbing, electrical, finishes, new restrooms, partitions, doors, ceilings, and stair | $669,130 |
| Nov 28, 2017 | Completed final sign-off Jul 2018 | 3037 Octavia St | floor extension-3rd floor. partially enclosing southern lightwell to same footprint as lower level enclosure, enclosing approx 12 feet of floor area.Details
floor extension-3rd floor. partially enclosing southern lightwell to same footprint as lower level enclosure, enclosing approx 12 feet of floor area. | $3,000 | |
| Sep 26, 2017 | Expired or cancelled cancelled Mar 2019 | 650 Sacramento St | structural upgrade to an extg unoccupied office bldg includes seismic retrofit to 100% of current bldg code level forces for new bldgs. seismic retrofit includes strengthening to allow for a future partial one story addition at roof of extg building.Details
structural upgrade to an extg unoccupied office bldg includes seismic retrofit to 100% of current bldg code level forces for new bldgs. seismic retrofit includes strengthening to allow for a future partial one story addition at roof of extg building. | $200,000 | |
| Sep 25, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13Details
revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13 | |
| Aug 29, 2017 | Completed final sign-off May 2019 | 122 11th Av | Miann Builder | common area- soft story retrofit per sfebc chapter 4d: asce 41-06, add three shear walls & foundations.Details
common area- soft story retrofit per sfebc chapter 4d: asce 41-06, add three shear walls & foundations. | $45,000 |
| Aug 29, 2017 | Completed final sign-off Sep 2018 | 634 Clayton St | Miann Builder | common area- soft story retrofit per sfebc chapter 4d: fema p-807, add one shear wall & foundation.Details
common area- soft story retrofit per sfebc chapter 4d: fema p-807, add one shear wall & foundation. | $25,000 |
| May 18, 2017 | Never finaled issued May 2017, no final | 851 Beach St | Dome Construction Corp | new interior sculptural element consisting of ropes hanging from a unistrut grid suspended from roof truss maher not reqDetails
new interior sculptural element consisting of ropes hanging from a unistrut grid suspended from roof truss maher not req | $2,500 |
| May 4, 2017 | Completed final sign-off Sep 2020 | 198 Potrero Av | Plant Construction Co, Lp | change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mezDetails
change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mez | $300,000 |
| Dec 29, 2016 | In progress issued Mar 2024 | 44 Treasure Island Rd | Plant Construction Co, Lp | treasure island waterfront plaza public restrooms; work included all structural systems, structure specific improvements associated with sitework, cladding systems, plumbing, and electrical work associated within the public restrooms, limit of work.Details
treasure island waterfront plaza public restrooms; work included all structural systems, structure specific improvements associated with sitework, cladding systems, plumbing, and electrical work associated within the public restrooms, limit of work. | $500,000 |
| Dec 20, 2016 | In progress issued Mar 2024 | 44 Treasure Island Rd | Plant Construction Co, Lp | scope of work for the bus shelters inlc. all structural systems, structure specific improvements associated with sitework, cladding systems, plumbing for roof drainage (note: site drainage is part of the waterfront plaza landscape drawings),and electrical work within the bus shelter limits of work.Details
scope of work for the bus shelters inlc. all structural systems, structure specific improvements associated with sitework, cladding systems, plumbing for roof drainage (note: site drainage is part of the waterfront plaza landscape drawings),and electrical work within the bus shelter limits of work. | $3,000,000 |
| Oct 13, 2016 | Never finaled issued Oct 2016, no final | 505 Divisadero St | voluntary partial strengthening; ab-017Details
voluntary partial strengthening; ab-017 | $80,000 | |
| Mar 25, 2016 | Completed final sign-off Dec 2016 | 131 Staples Av | revision to ref pa 2015 1211 4815: sheets s2.1, s4.1 revising call outs to (e) stairs.Details
revision to ref pa 2015 1211 4815: sheets s2.1, s4.1 revising call outs to (e) stairs. | ||
| Sep 22, 2015 | Never finaled filed Sep 2015, never issued | 210 Post St | infill e skylight in lightwellDetails
infill e skylight in lightwell | $10,000 | |
| Aug 25, 2015 | Completed final sign-off May 2018 | 444 Townsend St | Steven S Donaldson | voluntary seismic upgrade per cd 2013.core and shell under ab017 maher naDetails
voluntary seismic upgrade per cd 2013.core and shell under ab017 maher na | $840,000 |
| Mar 6, 2015 | Completed final sign-off Sep 2025 | 445 Geary St | Oliver & Company Inc. | barrier removal, provide da bathrooms in basement with elevator from 1st floor to basement. enlarge basement upgrade (e) stair to basement, add (n) stairs. mep sprinkler basement under separate permit. rebuild electrical room.Details
barrier removal, provide da bathrooms in basement with elevator from 1st floor to basement. enlarge basement upgrade (e) stair to basement, add (n) stairs. mep sprinkler basement under separate permit. rebuild electrical room. | $500,000 |
| Nov 21, 2014 | Completed final sign-off Jul 2016 | 101 San Aleso Av | Ibc International Building Construction | revision to app#201404173544. 69 sq ft addition at 3rd floor within extg bldg envelope and roof line. bathroom remodel on 3rd floor.Details
revision to app#201404173544. 69 sq ft addition at 3rd floor within extg bldg envelope and roof line. bathroom remodel on 3rd floor. | $70,000 |
| Oct 28, 2014 | Completed final sign-off Aug 2015 | 140 New Montgomery St | Novo Construction Inc | 22nd fl structural work includes support of fish tank, anchorage of serval mech units, support of customer hanging ceiling, analysis of structure under new loading. ref 201409095863 maher not reqDetails
22nd fl structural work includes support of fish tank, anchorage of serval mech units, support of customer hanging ceiling, analysis of structure under new loading. ref 201409095863 maher not req | $20,000 |
| Aug 27, 2014 | Never finaled issued Oct 2014, no final | 50 Fell St | Bcci Construction Company | historical & non-historical items include demo of (e) brick ramp. addition of 2 new doors. addition of ada ramp. site grading & landscaping & play yard. ** maher: compliance with ordinance no# 155-13 not required **Details
historical & non-historical items include demo of (e) brick ramp. addition of 2 new doors. addition of ada ramp. site grading & landscaping & play yard. ** maher: compliance with ordinance no# 155-13 not required ** | $395,000 |
| Jul 16, 2014 | Completed final sign-off Mar 2015 | 731 Market St | Peacock Construction | revision to appl #2014.0605.7611 - five columns to be removed at basement level of structure. the steel beams that frame into the (e) columns will be re-supported by new beams, span between new columns. new foundation work is required to accomodate new load.Details
revision to appl #2014.0605.7611 - five columns to be removed at basement level of structure. the steel beams that frame into the (e) columns will be re-supported by new beams, span between new columns. new foundation work is required to accomodate new load. | $193,000 |
| Jun 19, 2014 | Completed final sign-off Aug 2015 | 555 California St | Bcci Construction Company | 52nd floor. structural work associated with approved pa# 2014/05/28/6857. ** maher: compliance with ordinance no# 155-13 not required **Details
52nd floor. structural work associated with approved pa# 2014/05/28/6857. ** maher: compliance with ordinance no# 155-13 not required ** | $125,000 |
| Apr 30, 2014 | Completed final sign-off Sep 2014 | 536 Mission St | Cahill Const Service Inc | classroom & lecture hall renovtions to the mezzanine & 2nd floor of (e) bldg including (n) interior partitions, (n) finishes, (n) tiered concrete floor, (n) exterior windows & associated accessibility upgrades. no change in use or occupany.Details
classroom & lecture hall renovtions to the mezzanine & 2nd floor of (e) bldg including (n) interior partitions, (n) finishes, (n) tiered concrete floor, (n) exterior windows & associated accessibility upgrades. no change in use or occupany. | $984,000 |
| Apr 24, 2014 | Expired or cancelled withdrawn Apr 2014 | 536 Mission St | Cahill Const Service Inc | classroom and lecture hall renovations to the mezzanine & 2/f including (n) interior partitions, (n) finishes, (n) tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, (n) exterior windows.Details
classroom and lecture hall renovations to the mezzanine & 2/f including (n) interior partitions, (n) finishes, (n) tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, (n) exterior windows. | $984,000 |
| Apr 17, 2014 | Completed final sign-off Jan 2016 | 101 San Aleso Av | Ibc International Building Construction | replace drywall and insulation, kitchen and 4 (e) bathrooms remodel, add powder room in basement, update electrical and plumbing, repair basement footingDetails
replace drywall and insulation, kitchen and 4 (e) bathrooms remodel, add powder room in basement, update electrical and plumbing, repair basement footing | $700,000 |
| Apr 1, 2014 | Completed final sign-off Mar 2015 | 1090 Noe St | High Ground Construction | partial voluntary seismic upgrade at ground floor only, new siding & repaint exterior wall.Details
partial voluntary seismic upgrade at ground floor only, new siding & repaint exterior wall. | $30,000 |
| Feb 10, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | Dettaglio Construction Inc Dba Dci Const | 2nd fl shoring of existing beams is required to demolish the existing concrete beams and install new steel beams. compliance with ord 155-13 not reqd.Details
2nd fl shoring of existing beams is required to demolish the existing concrete beams and install new steel beams. compliance with ord 155-13 not reqd. | $25,000 |
| Jan 30, 2013 | Completed final sign-off Oct 2014 | 300 Seacliff Av | Ggd Inc. | modification of permit no. 201112221203; includes voluntary local partial seismic upgrade at north corner of buildingDetails
modification of permit no. 201112221203; includes voluntary local partial seismic upgrade at north corner of building | $75,000 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 1095 Mission St | Ncr Construction Inc | revision to appl #2010.0513.2365 includes revision to structural details to accommodate field conditions.revision to permit #1215329Details
revision to appl #2010.0513.2365 includes revision to structural details to accommodate field conditions.revision to permit #1215329 | |
| Jun 7, 2012 | Completed final sign-off Jun 2013 | 605 Kearny St | revision to appl #2002.0211.8951 - floor slab extension at mezzanine level. to change mezz into a storyDetails
revision to appl #2002.0211.8951 - floor slab extension at mezzanine level. to change mezz into a story | $6,000 | |
| May 30, 2012 | Completed final sign-off Jul 2018 | 220 Battery St | complete voluntary seismic retrofit & upgrade of (e) bldg. demo (e) stairs & fright elevator. (n) stairs & ada compliant elevator, ada compliant restrooms. mep, life safety engineering ad req'd as design build & separate permit. int. work only.Details
complete voluntary seismic retrofit & upgrade of (e) bldg. demo (e) stairs & fright elevator. (n) stairs & ada compliant elevator, ada compliant restrooms. mep, life safety engineering ad req'd as design build & separate permit. int. work only. | $200,000 | |
| Oct 11, 2011 | Completed final sign-off May 2012 | 3063 25th St | Brautovich Construction Inc. | revision to appl #201107281241 to include new structural piers under four (4) (e) posts.Details
revision to appl #201107281241 to include new structural piers under four (4) (e) posts. | $1,200 |
| Sep 28, 2011 | Expired or cancelled expired Mar 2017 | 1532 Florida St | Brautovich Construction Inc. | construct new exterior deck @ rear of (e) building. provide new 1 hour fire wall @ property line wall along north side of deck. remove & replace (e) windows with new french doors to provide access to deck.Details
construct new exterior deck @ rear of (e) building. provide new 1 hour fire wall @ property line wall along north side of deck. remove & replace (e) windows with new french doors to provide access to deck. | $39,000 |
| Aug 19, 2011 | Never finaled issued Sep 2011, no final | 2410 California St | Fisher Development Inc | revision to appl #201107130151: add a new shear wall. located between exam 1 (0105) & exam 2 (0106).Details
revision to appl #201107130151: add a new shear wall. located between exam 1 (0105) & exam 2 (0106). | |
| Jul 28, 2011 | Completed final sign-off May 2012 | 3063 25th St | Brautovich Construction Inc. | voluntary foundation repair & voluntary seismic strengthening.Details
voluntary foundation repair & voluntary seismic strengthening. | $22,000 |
| Jul 5, 2011 | Completed final sign-off Nov 2012 | 180 28th Av | Zecenas Construction | proposed horizontal addition in the rear of bldg with (n) exterior finishes, colors, & roof to match (e) conditions; interior of (n) addition to be (n) bathroom w/ necessary electrical, mechanical & plumbing as req'd. proposed remodel & upgrades to finishes on (e) master bath, including (n) fixturesDetails
proposed horizontal addition in the rear of bldg with (n) exterior finishes, colors, & roof to match (e) conditions; interior of (n) addition to be (n) bathroom w/ necessary electrical, mechanical & plumbing as req'd. proposed remodel & upgrades to finishes on (e) master bath, including (n) fixtures | $90,000 |
| May 3, 2011 | Completed final sign-off Jan 2014 | 952 Grant Av | Team Commercial Construction Inc. | to comply with nov# 201035574. modification to steel frames to meet stress and drift limits near concrete shear wall from 2nd floor to foundation level. additional wall ties and shear connection where needed.Details
to comply with nov# 201035574. modification to steel frames to meet stress and drift limits near concrete shear wall from 2nd floor to foundation level. additional wall ties and shear connection where needed. | $350,000 |
| Jul 13, 2010 | Expired or cancelled withdrawn Jan 2011 | 256 Stratford Dr | Yellow Zone Construction | proposed vertical & horizontal addition in rear with new exterior finishes, colors & roof to match existing. proposed kitchen extension include interior improvements & upgrades. proposed addition of master suite include new interior finishes & upgrades. proposed remodel of 2nd story bathroom & deck.Details
proposed vertical & horizontal addition in rear with new exterior finishes, colors & roof to match existing. proposed kitchen extension include interior improvements & upgrades. proposed addition of master suite include new interior finishes & upgrades. proposed remodel of 2nd story bathroom & deck. | $300,000 |
| Jun 16, 2010 | Completed final sign-off Feb 2012 | 387 Tehama St | William Gregory Clause | reconfigure 3rd fl walls as tenant improvement. residential unit alteration. construction of mezzine @ rear of live/work space. life safety under separate permit.Details
reconfigure 3rd fl walls as tenant improvement. residential unit alteration. construction of mezzine @ rear of live/work space. life safety under separate permit. | $200,000 |
| Oct 22, 2008 | Never finaled issued Oct 2008, no final | 507 Bush St | Grey Gates Construction | revision to pa #200707237433, staircase structural details. no chang to accessibility. field verify building is fully sprinklered.Details
revision to pa #200707237433, staircase structural details. no chang to accessibility. field verify building is fully sprinklered. | |
| Sep 23, 2008 | Completed final sign-off Oct 2008 | 56 Webster St | S L R Construction | remove & replace structural members as per plans, in response to correction notice. addition of new window on 2nd level. not visible from street. revision to application 200808118896.Details
remove & replace structural members as per plans, in response to correction notice. addition of new window on 2nd level. not visible from street. revision to application 200808118896. | $10,000 |
| Jul 14, 2008 | Expired or cancelled expired Aug 2010 | 1160 Polk St | revision to appl #200606154151 - replace concrete slabs & beams supporting sidewalk & along polk street, sutter st, hemlock st.Details
revision to appl #200606154151 - replace concrete slabs & beams supporting sidewalk & along polk street, sutter st, hemlock st. | $6,000 | |
| Apr 4, 2008 | Completed final sign-off Jul 2008 | 62 Vicksburg St | voluntary partial strengthening to include addition of new concrete footing and a new interior wood shear wall all in existing basement. repair of dry rot damage to existing deck in front yard. les than 50%. no change to existing fence.Details
voluntary partial strengthening to include addition of new concrete footing and a new interior wood shear wall all in existing basement. repair of dry rot damage to existing deck in front yard. les than 50%. no change to existing fence. | $15,000 | |
| Jun 15, 2006 | Completed final sign-off May 2009 | 1160 Polk St | replace sidewalk along polk street, sutter street, hemlock street. reinforce sub-grade structural members. complaint 200562398 - no nov on file 6/15/06 (t.v.).Details
replace sidewalk along polk street, sutter street, hemlock street. reinforce sub-grade structural members. complaint 200562398 - no nov on file 6/15/06 (t.v.). | $200,000 | |
| Jun 15, 2006 | Expired or cancelled expired Nov 2008 | 950 Battery St | install security doors at interior vestibule. replace (e) sink with ada complaint sink. replace (e) door handware in stair exit doors.Details
install security doors at interior vestibule. replace (e) sink with ada complaint sink. replace (e) door handware in stair exit doors. | $10,000 |