Aaron Gordon Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Sep 2026
- Last 24 months
- 19 permits filed
329 permits since 2000: 257 completed, 8 in progress, 45 never finaled, 19 expired or cancelled.
Of the 45 never-finaled permits, 5 are 3 to 5 years old, 14 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 329.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 706 Mission St | ste 803 8/f: the interior remodel of (e) condominium, including the in-kind replaceemnt of sinks, vanities, toilets, and bathtub, new wall finish, and extended kitchen island, the removal and installation of non-structural walls, and new lighting.Details
ste 803 8/f: the interior remodel of (e) condominium, including the in-kind replaceemnt of sinks, vanities, toilets, and bathtub, new wall finish, and extended kitchen island, the removal and installation of non-structural walls, and new lighting. | $200,000 |
| May 5, 2026 | Completed final sign-off Sep 2026 | 706 Mission St | interior remodel of unit 37b on the 37th floor. replace existing light fixtures at existing location utilizing existing j-boxes. new pocket door at entrance to existing master bedroom install new cabinetry and add additional elec. outlets to be undertaken under a sep elec. permit.Details
interior remodel of unit 37b on the 37th floor. replace existing light fixtures at existing location utilizing existing j-boxes. new pocket door at entrance to existing master bedroom install new cabinetry and add additional elec. outlets to be undertaken under a sep elec. permit. | $45,000 |
| Mar 23, 2026 | Completed final sign-off Mar 2026 | 418 Liberty St | to obtain final inspection for work approved under pa# 202209212864. all work is complete.Details
to obtain final inspection for work approved under pa# 202209212864. all work is complete. | |
| Mar 23, 2026 | Completed final sign-off Mar 2026 | 418 Liberty St | to obtain final inspection for work approved under pa# 202212098030. all work is complete.Details
to obtain final inspection for work approved under pa# 202212098030. all work is complete. | |
| Dec 19, 2025 | Completed final sign-off Feb 2026 | 565 Jersey St | to obtain final inspection for work approved under pa# 202411074554. all work is complete.Details
to obtain final inspection for work approved under pa# 202411074554. all work is complete. | |
| Jul 18, 2025 | Completed final sign-off Jul 2025 | 375 Edgehill Wy | to obtain final inspection for work approved under pa# 202106142388. all work is complete.Details
to obtain final inspection for work approved under pa# 202106142388. all work is complete. | |
| Jul 18, 2025 | Completed final sign-off Jul 2025 | 375 Edgehill Wy | to obtain final inspection for work approved under pa# 201508204819 & 201908229631. all work is complete.Details
to obtain final inspection for work approved under pa# 201508204819 & 201908229631. all work is complete. | |
| Jul 11, 2025 | Completed final sign-off Sep 2025 | 1188 Diamond St | demolition of one shower. replace in kind: tile walls and pan, new plumbing fixtures in existing location, new shower door, paint walls and ceiling.Details
demolition of one shower. replace in kind: tile walls and pan, new plumbing fixtures in existing location, new shower door, paint walls and ceiling. | $35,000 |
| Jun 24, 2025 | Completed final sign-off Mar 2026 | 418 Liberty St | replace front facade in kind. replace 7 existing windows in kind at front.Details
replace front facade in kind. replace 7 existing windows in kind at front. | $10,000 |
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 3975 Cesar Chavez St | new interior stair to connect 1st and 2nd floor, (n) skylight.Details
new interior stair to connect 1st and 2nd floor, (n) skylight. | $74,000 |
| May 16, 2025 | Completed final sign-off Mar 2026 | 418 Liberty St | revision to 202209212864, 202210275300, and 202212098030. update wall, floor, ceiling details to reflect e conditions. remove non required fire rated construction details. revisoini to roofdeck. (no change to net area), exterior doors, windows, guardrail,rear yard stair.Details
revision to 202209212864, 202210275300, and 202212098030. update wall, floor, ceiling details to reflect e conditions. remove non required fire rated construction details. revisoini to roofdeck. (no change to net area), exterior doors, windows, guardrail,rear yard stair. | |
| May 14, 2025 | Completed final sign-off Aug 2025 | 55 Capistrano Av | remove and replace existing siding on the south/east elevation in kind. paint siding and trim. some street visibility. no structural work.Details
remove and replace existing siding on the south/east elevation in kind. paint siding and trim. some street visibility. no structural work. | $50,000 |
| May 14, 2025 | Completed final sign-off Sep 2025 | 386 Joost Av | remove and replace existing siding on the rear facade in kind. paint siding and trim. no structural work.Details
remove and replace existing siding on the rear facade in kind. paint siding and trim. no structural work. | $20,000 |
| May 9, 2025 | Completed final sign-off May 2025 | 601 Van Ness Av | g/f ste f: installation of 2 new manufacfured phone booths in e) storage nook, no change are proposed to e) walls, electrical, plumbing, or fire sprinklersDetails
g/f ste f: installation of 2 new manufacfured phone booths in e) storage nook, no change are proposed to e) walls, electrical, plumbing, or fire sprinklers | $5,000 |
| Apr 18, 2025 | Completed final sign-off Jun 2025 | 488 Folsom St | unit #4401: interior remodel new dropped ceiling in living/dining, new recessed lighting, new linear slot diffusers, new blind doors and new barn door. existing sprinklers to be lowered to meet code and by certified contractorDetails
unit #4401: interior remodel new dropped ceiling in living/dining, new recessed lighting, new linear slot diffusers, new blind doors and new barn door. existing sprinklers to be lowered to meet code and by certified contractor | $40,000 |
| Mar 25, 2025 | Completed final sign-off Jul 2025 | 608 Elizabeth St | kitchen remodel. replace in kind. new cabinets,countertops, backsplash and appliances. under cabinet lightingDetails
kitchen remodel. replace in kind. new cabinets,countertops, backsplash and appliances. under cabinet lighting | $85,000 |
| Feb 13, 2025 | In progress issued Feb 2025 | 301 Mission St | gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry.Details
gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry. | $718,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2026 | 565 Jersey St | at 1st floor: 1) remodel 2 bathrooms, 2)relocate laundry closet, 3)replace sliding door at rear building wall, 4) replace interior stairs guardrails. a 2nd floor: 5) replace interior stairs opening guardrail. at roof: 6) add 2 new skylights. 7) add a new roof parapet along east property line.Details
at 1st floor: 1) remodel 2 bathrooms, 2)relocate laundry closet, 3)replace sliding door at rear building wall, 4) replace interior stairs guardrails. a 2nd floor: 5) replace interior stairs opening guardrail. at roof: 6) add 2 new skylights. 7) add a new roof parapet along east property line. | $72,000 |
| Nov 7, 2024 | Expired or cancelled expired Feb 2026 | 565 Jersey St | infill (x2) windows at east elevation (side) property wall(as shown in the drawings for p/a 2018-0706-3924) due to ongoing envelope expansion at neighboring property (p/a 2021-0624-3117). no impact to eero. windows@ breakfast nook and at stairway.2018-0706-3924 for windowDetails
infill (x2) windows at east elevation (side) property wall(as shown in the drawings for p/a 2018-0706-3924) due to ongoing envelope expansion at neighboring property (p/a 2021-0624-3117). no impact to eero. windows@ breakfast nook and at stairway.2018-0706-3924 for window | $5,000 |
| Sep 23, 2024 | Completed final sign-off Mar 2026 | 418 Liberty St | rev to pa# 202209212864, pa# 20221298030 & pa# 202210275300 to change e.o.r. & include revision to replace building foundation with mat slab & replace retaining wall @ garage to backyard transition. minor revision to shear wall length & beam sizes @ upper floors. minor revision to framing details.Details
rev to pa# 202209212864, pa# 20221298030 & pa# 202210275300 to change e.o.r. & include revision to replace building foundation with mat slab & replace retaining wall @ garage to backyard transition. minor revision to shear wall length & beam sizes @ upper floors. minor revision to framing details. | $200,000 |
| Jul 5, 2024 | Completed final sign-off Jul 2025 | 263 Lexington St | remodel of (e) kitchen on level 2 (unit 1) new cabintry enlarge opening between kitchen and dining room replace rear windows in kind (facing rear yard)Details
remodel of (e) kitchen on level 2 (unit 1) new cabintry enlarge opening between kitchen and dining room replace rear windows in kind (facing rear yard) | $50,000 |
| Jun 20, 2024 | In progress issued Aug 2024 | 2600 Green St | (n) roof deck (n) operable skylight, exterior stair from level 4 to (n) roof deck.Details
(n) roof deck (n) operable skylight, exterior stair from level 4 to (n) roof deck. | $27,325 |
| May 2, 2024 | In progress issued May 2024 | 715 Buena Vista Ave West Av | replace 3 chimney caps in kind and associated water proofing.Details
replace 3 chimney caps in kind and associated water proofing. | $1,500 |
| Apr 2, 2024 | In progress issued Sep 2024 | 30 Palo Alto Av | demo e stair. deck addition at rear with metal railing. new metal stair with railingDetails
demo e stair. deck addition at rear with metal railing. new metal stair with railing | $50,000 |
| Jan 17, 2024 | Completed final sign-off Jun 2024 | 1 Steuart Ln | (unit #1501) revision to pa# 202312082157: to remove an (e) tub and replace w/ shower. unit to meet ca bldg code section 1134.a.Details
(unit #1501) revision to pa# 202312082157: to remove an (e) tub and replace w/ shower. unit to meet ca bldg code section 1134.a. | |
| Dec 8, 2023 | Completed final sign-off Jun 2024 | 1 Steuart Ln | 15/f-unit# 1501: remodel of (e) 3-bedroom condo including new wall finishes, new bathroom fixtures that replace (e) ones, new lighting in the ceiling, and relocated outlets.Details
15/f-unit# 1501: remodel of (e) 3-bedroom condo including new wall finishes, new bathroom fixtures that replace (e) ones, new lighting in the ceiling, and relocated outlets. | $150,000 |
| Oct 5, 2023 | In progress issued Nov 2023 | 715 Buena Vista Ave West Av | revision to 202012261736. revision to interior bath changes, direct vent fire place. waterproofing, minor footing and framing and other misc changes.Details
revision to 202012261736. revision to interior bath changes, direct vent fire place. waterproofing, minor footing and framing and other misc changes. | $20,000 |
| Sep 20, 2023 | Completed final sign-off Jan 2025 | 3773 17th St | replace existing front fence/gate and add electrical power for new gate operator.Details
replace existing front fence/gate and add electrical power for new gate operator. | $12,000 |
| Jul 31, 2023 | Never finaled issued Aug 2023, no final | 715 Buena Vista Ave West Av | revision to pa# 202012261736. demo calcs for planning & interior framing.Details
revision to pa# 202012261736. demo calcs for planning & interior framing. | $48,000 |
| Jun 8, 2023 | Completed final sign-off Mar 2024 | 706 Mission St | unit 29a: 1-bathroom vanity replacement in-kind, toilet replacement in-kindDetails
unit 29a: 1-bathroom vanity replacement in-kind, toilet replacement in-kind | $5,000 |
| May 4, 2023 | Completed final sign-off Sep 2023 | 301 Mission St | unit 54a: revision to bpa#202302061414 to remove plumbing from scopeDetails
unit 54a: revision to bpa#202302061414 to remove plumbing from scope | |
| Apr 27, 2023 | Completed final sign-off Dec 2023 | 706 Mission St | unit# 18b: interior remodel of unit 18b. no impact to structure of fire protection systems.Details
unit# 18b: interior remodel of unit 18b. no impact to structure of fire protection systems. | $50,000 |
| Apr 26, 2023 | Completed final sign-off Feb 2024 | 375 Edgehill Wy | revision to pa 2015-0820-4819s1, 2019-0822-9631 and 2021-0614-2388 (adu permit) to reflect as built conditions for stairs onthe east side of the structureDetails
revision to pa 2015-0820-4819s1, 2019-0822-9631 and 2021-0614-2388 (adu permit) to reflect as built conditions for stairs onthe east side of the structure | |
| Mar 28, 2023 | Completed final sign-off Apr 2023 | 201 Folsom St | administrative only. at district inspector's request update valuation from 35000.00 to 100000.00 permit 2021-0423-9224. therefore, this administrative permit value is $65,000.Details
administrative only. at district inspector's request update valuation from 35000.00 to 100000.00 permit 2021-0423-9224. therefore, this administrative permit value is $65,000. | $65,000 |
| Feb 6, 2023 | Completed final sign-off Sep 2023 | 301 Mission St | unit # 54a: remodel of e aprtment, including new light fixtures, new lighting control, new window shades, new flooring, new bath tub, new ceiling soffit, and new cabinetry.Details
unit # 54a: remodel of e aprtment, including new light fixtures, new lighting control, new window shades, new flooring, new bath tub, new ceiling soffit, and new cabinetry. | $300,000 |
| Jan 4, 2023 | Completed final sign-off Apr 2023 | 201 Folsom St | renewal pa# 202104239224 & 201901180692. all work is complete. unit 38dDetails
renewal pa# 202104239224 & 201901180692. all work is complete. unit 38d | |
| Dec 22, 2022 | Completed final sign-off Nov 2023 | 3025 Laguna St | interior remodel. new finishes, electrical, plumbing, mech, structural work, replacement windows & doorsDetails
interior remodel. new finishes, electrical, plumbing, mech, structural work, replacement windows & doors | $950,000 |
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 4930 17th St | renovation of e 2 unit residence at 1st, 2nd, and 3rd levels. no change to the height, exterior envelope, square footage, street facade proposed. kitchen and bathsDetails
renovation of e 2 unit residence at 1st, 2nd, and 3rd levels. no change to the height, exterior envelope, square footage, street facade proposed. kitchen and baths | $100,000 |
| Dec 19, 2022 | In progress issued Feb 2025 | 228 Jersey St | renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doorsDetails
renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors | $400,000 |
| Dec 9, 2022 | Expired or cancelled expired Mar 2026 | 418 Liberty St | new proposed roof deck to existing 3-story building.Details
new proposed roof deck to existing 3-story building. | $15,000 |
| Nov 29, 2022 | Never finaled issued Apr 2023, no final | 715 Buena Vista Ave West Av | revision to bpa#202012261736 w/revised layout, new theater build out & associated structural workDetails
revision to bpa#202012261736 w/revised layout, new theater build out & associated structural work | $125,000 |
| Nov 28, 2022 | Completed final sign-off Sep 2023 | 488 Folsom St | unit 4602: minor modifications of nonstructural walls, install millwork, reconfiguration of hvac grilles, new electrical fixtures/outlets, new plumbing fixtures, new flooringDetails
unit 4602: minor modifications of nonstructural walls, install millwork, reconfiguration of hvac grilles, new electrical fixtures/outlets, new plumbing fixtures, new flooring | $200,000 |
| Oct 27, 2022 | Completed final sign-off Mar 2026 | 418 Liberty St | renovation and addition to single family residence. building additions and renovations are on first floor and the basement below. stairs modified to provide access to additions and rear yard.Details
renovation and addition to single family residence. building additions and renovations are on first floor and the basement below. stairs modified to provide access to additions and rear yard. | $160,000 |
| Sep 21, 2022 | Expired or cancelled expired Mar 2026 | 418 Liberty St | renovation of (e) 3-story residence, including 1st fl stair, 2nd fl kitchen/family room, 3rd fl owner's suite, for an open plan and allowing stair circulation. no exterior work to street facade.Details
renovation of (e) 3-story residence, including 1st fl stair, 2nd fl kitchen/family room, 3rd fl owner's suite, for an open plan and allowing stair circulation. no exterior work to street facade. | $375,000 |
| Sep 20, 2022 | Completed final sign-off Sep 2022 | 1717 Lyon St | rev to pa201911127023: rev to t24 calculations changed form forced air to radiant heating.Details
rev to pa201911127023: rev to t24 calculations changed form forced air to radiant heating. | |
| Sep 15, 2022 | Never finaled issued Sep 2022, no final | 4451 Mission St | remove a portion of the rear siding. replace rear siding in kind. approx. 500sf.Details
remove a portion of the rear siding. replace rear siding in kind. approx. 500sf. | $15,000 |
| Aug 19, 2022 | Completed final sign-off Jun 2023 | 706 Mission St | work is located in unit 703,7th fl of aronson building northeast side along 3rd. project is 2944 sq ft. no sq ft change anticipated from renovation. removal of partial kitchen, primary bdrm and closet partitions, in kind millwork installation, built in closet installation,2 new closet build outs, 1Details
work is located in unit 703,7th fl of aronson building northeast side along 3rd. project is 2944 sq ft. no sq ft change anticipated from renovation. removal of partial kitchen, primary bdrm and closet partitions, in kind millwork installation, built in closet installation,2 new closet build outs, 1 | $200,000 |
| Jul 11, 2022 | Never finaled issued Jul 2022, no final | 3025 Laguna St | replace in kind kitchen, 2 bathrooms, remove all plaster and replace with sheetrock area of plaster to be replaced with 5/8" tyoe -x @ pl walls, @ 1560 sqft of materialDetails
replace in kind kitchen, 2 bathrooms, remove all plaster and replace with sheetrock area of plaster to be replaced with 5/8" tyoe -x @ pl walls, @ 1560 sqft of material | $20,000 |
| Jun 9, 2022 | Completed final sign-off Feb 2024 | 375 Edgehill Wy | 2nd floor revision to pa#201908229631. scope of revision includes a change in location of the mechanical room and interior non-structural wall change to guest bedroom & storage.there are no changes to the approved 3rd floor level or exterior envelope.Details
2nd floor revision to pa#201908229631. scope of revision includes a change in location of the mechanical room and interior non-structural wall change to guest bedroom & storage.there are no changes to the approved 3rd floor level or exterior envelope. | $28,250 |
| May 31, 2022 | Completed final sign-off Apr 2023 | 201 Folsom St | revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetryDetails
revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetry | |
| Mar 31, 2022 | Completed final sign-off May 2022 | 88 Turquoise Wy | replace in-kind (e) 152 sf deck with (n) ipe decking. (n) ipe posts, & (n) steel cable rail sitting on (e) steel beams to remain, built to (e) footprint.Details
replace in-kind (e) 152 sf deck with (n) ipe decking. (n) ipe posts, & (n) steel cable rail sitting on (e) steel beams to remain, built to (e) footprint. | $10,000 |
| Mar 1, 2022 | Completed final sign-off Aug 2022 | 1717 Lyon St | remove rear facade siding, windows, and doors (all in rear). replace in kind.Details
remove rear facade siding, windows, and doors (all in rear). replace in kind. | $50,000 |
| Jan 27, 2022 | Completed final sign-off Oct 2022 | 201 Folsom St | to obtain a final inspection for work approved under previous permits 201909161771 (38a), 201909161764 (38b), & 201911187557(38b). all work is complete.Details
to obtain a final inspection for work approved under previous permits 201909161771 (38a), 201909161764 (38b), & 201911187557(38b). all work is complete. | |
| Jan 27, 2022 | Completed final sign-off Oct 2022 | 201 Folsom St | to obtain a final inspection for work approved under previous permits 201903064583 (38b), 201901049637 (38a&38b), & 201811024885 (38b). all work is complete.Details
to obtain a final inspection for work approved under previous permits 201903064583 (38b), 201901049637 (38a&38b), & 201811024885 (38b). all work is complete. | |
| Oct 1, 2021 | Completed final sign-off Jun 2022 | 212 Presidio Av | revision to pa# 202012181329. roof reinforcement and raise parapet to 42" for maintenance safetyDetails
revision to pa# 202012181329. roof reinforcement and raise parapet to 42" for maintenance safety | $35,000 |
| Jun 14, 2021 | Expired or cancelled expired Jul 2025 | 375 Edgehill Wy | addition of 543 sq ft adu within existing space under the streamlined adu program. proposed location of adu is within second floor level renovation of approved permit 2019-08229631, issued on october 10 2019, currently in construction. no changes to the previously approved envelope.Details
addition of 543 sq ft adu within existing space under the streamlined adu program. proposed location of adu is within second floor level renovation of approved permit 2019-08229631, issued on october 10 2019, currently in construction. no changes to the previously approved envelope. | $4,000 |
| Apr 23, 2021 | Completed final sign-off Apr 2023 | 201 Folsom St | unit 38d: interior renovation. new interior lighting. new cabinets, no structural work. no change of use.Details
unit 38d: interior renovation. new interior lighting. new cabinets, no structural work. no change of use. | $20,000 |
| Apr 21, 2021 | Completed final sign-off Oct 2021 | 706 Mission St | remodel 3 baths & 1 half bath. replace fixtures & finishes, (e) fully sprinkleredDetails
remodel 3 baths & 1 half bath. replace fixtures & finishes, (e) fully sprinklered | $65,939 |
| Mar 31, 2021 | Completed final sign-off May 2022 | 212 Presidio Av | interior remodel of primary bedroom and bathroom. revision to kitchen casework and island, misc. electrical and lighting upgrades. no increase to conditioned space or envelope.Details
interior remodel of primary bedroom and bathroom. revision to kitchen casework and island, misc. electrical and lighting upgrades. no increase to conditioned space or envelope. | $100,000 |
| Mar 23, 2021 | Never finaled issued Mar 2021, no final | 325 Richland Av | to obtain final inspection for permit: 201506239621 and 201510169983: all work is completed.Details
to obtain final inspection for permit: 201506239621 and 201510169983: all work is completed. | |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 201 Folsom St | replace in kind one bathroom sink, faucet and toilet. no tub/shower. unit 42cDetails
replace in kind one bathroom sink, faucet and toilet. no tub/shower. unit 42c | $8,500 |
| Jan 20, 2021 | Completed final sign-off Feb 2021 | 1861 Filbert St | infill case opeing between two rooms, new 2 doors, hardware baseboard and paint. electrical modify light switch and add outlets at demising wal. no new walls.Details
infill case opeing between two rooms, new 2 doors, hardware baseboard and paint. electrical modify light switch and add outlets at demising wal. no new walls. | $50,000 |
| Jan 14, 2021 | Completed final sign-off Oct 2021 | 706 Mission St | remodel 3.5 baths. no wall removal. replace finishes and fixtures in kind. new tile floor,wall tile,basebd in pwdr rm. floor,walltile in mster bath, bath 2 and 3. tub in master.tile showers in mster, 2, 3. vanities,sinks,fxtures master,2,3,pwdr. steam in master shwr.Details
remodel 3.5 baths. no wall removal. replace finishes and fixtures in kind. new tile floor,wall tile,basebd in pwdr rm. floor,walltile in mster bath, bath 2 and 3. tub in master.tile showers in mster, 2, 3. vanities,sinks,fxtures master,2,3,pwdr. steam in master shwr. | $150,000 |
| Dec 26, 2020 | Never finaled issued Feb 2022, no final | 715 Buena Vista Ave West Av | (n) horizontal addition on 2nd fl. infill 2nd fl balcony. (n) windows & skylights. (n) balcony. (n) garage door. window replacements & exterior fresco replacement & plaster repair. work includes interior renovation of family rm, kitchen, powder rm on 1st fl & renovation throughout 2nd flDetails
(n) horizontal addition on 2nd fl. infill 2nd fl balcony. (n) windows & skylights. (n) balcony. (n) garage door. window replacements & exterior fresco replacement & plaster repair. work includes interior renovation of family rm, kitchen, powder rm on 1st fl & renovation throughout 2nd fl | $800,000 |
| Dec 18, 2020 | Completed final sign-off Jun 2022 | 212 Presidio Av | sistering of additional framing support onto (e) framing root work on 4th fl. discovered issued with framingDetails
sistering of additional framing support onto (e) framing root work on 4th fl. discovered issued with framing | $5,000 |
| Dec 18, 2020 | Completed final sign-off Oct 2021 | 706 Mission St | modify/add outlets/switches to accomodate wainscot installation. add light fixtures in closets and bedrooms. replace extg kitchen and bathroom faucets and toilets. remove entry door into master closet. paint. no new wall and no extg wall relocation. new lighting shall comply with cec 150 (k) 3.5Details
modify/add outlets/switches to accomodate wainscot installation. add light fixtures in closets and bedrooms. replace extg kitchen and bathroom faucets and toilets. remove entry door into master closet. paint. no new wall and no extg wall relocation. new lighting shall comply with cec 150 (k) 3.5 | $100,000 |
| Dec 17, 2020 | Never finaled issued Dec 2020, no final | 212 Presidio Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,980 |
| Dec 8, 2020 | Completed final sign-off May 2021 | 472 Fair Oaks St | replace existing kitchen in kind.new cabinets,countertops,new cabinets, countertops,appliances,plumbing fixtures,powder room replace toilet & flr (wood).master bedroom replace vanity,sink,faucet,toilet.replace existing electrical panel.replace existing electrical outlets,switches,fixtures.Details
replace existing kitchen in kind.new cabinets,countertops,new cabinets, countertops,appliances,plumbing fixtures,powder room replace toilet & flr (wood).master bedroom replace vanity,sink,faucet,toilet.replace existing electrical panel.replace existing electrical outlets,switches,fixtures. | $60,000 |
| Nov 24, 2020 | Completed final sign-off Feb 2024 | 375 Edgehill Wy | revision to pa# 201908229631. (e) interior wall to be replaced and reinforced due to framing deficiencies to make the roof safe.Details
revision to pa# 201908229631. (e) interior wall to be replaced and reinforced due to framing deficiencies to make the roof safe. | $4,000 |
| Nov 24, 2020 | Completed final sign-off Mar 2021 | 4015 21st St | voluntary structural upgrade to the ground floor andupgrade to the framing members at the main level deck per 2019 cbc.Details
voluntary structural upgrade to the ground floor andupgrade to the framing members at the main level deck per 2019 cbc. | $25,000 |
| Nov 17, 2020 | Completed final sign-off Oct 2021 | 26 Topaz Wy | selectrive structural improvements of floor framing; add laundry on lower floor.Details
selectrive structural improvements of floor framing; add laundry on lower floor. | $10,000 |
| Nov 16, 2020 | Completed final sign-off Apr 2021 | 510 Franconia St | remove e roof and sidewall shingles. replace in kind. paint entire exterior. roofer will pull separagte permitDetails
remove e roof and sidewall shingles. replace in kind. paint entire exterior. roofer will pull separagte permit | $50,000 |
| Sep 21, 2020 | In progress issued Feb 2024 | 30 Palo Alto Av | renovation of single family home. modifications to front entrance, rear bay windows and rear facade resulting in minor expansion of building envelope. interior renovations on all floors. roof deck and stair penthouse renovations. relocation of interior stair.Details
renovation of single family home. modifications to front entrance, rear bay windows and rear facade resulting in minor expansion of building envelope. interior renovations on all floors. roof deck and stair penthouse renovations. relocation of interior stair. | $800,000 |
| Sep 16, 2020 | Completed final sign-off Jul 2021 | 3750 21st St | scope includes adding a 274 sq ft roof deck. revision to permits #201508063603, #201904158039 & #202001282894. #201508063603 - original permit #201904158039 - revision to add sump pump #202001282894 - revision to front courtyard design & front utility fence.Details
scope includes adding a 274 sq ft roof deck. revision to permits #201508063603, #201904158039 & #202001282894. #201508063603 - original permit #201904158039 - revision to add sump pump #202001282894 - revision to front courtyard design & front utility fence. | $20,000 |
| Aug 21, 2020 | Completed final sign-off Dec 2020 | 280 Spear St | condo#34e: remove existing backsplash & countertops in the kitchen.replace in kind metal framed non load bearing drop down ceiling in the living room & two bedrooms. gypsum boad finish,install 8ea can lights,paint. **maher n/a**Details
condo#34e: remove existing backsplash & countertops in the kitchen.replace in kind metal framed non load bearing drop down ceiling in the living room & two bedrooms. gypsum boad finish,install 8ea can lights,paint. **maher n/a** | $25,000 |
| Aug 7, 2020 | Completed final sign-off Dec 2020 | 256 Pennsylvania Av | remove existing 250 sqft rear deck tiles pavers and waterproof membrane and replace in kind. new exterior siding at parapet wall and window/sliding door wall. add one water spigut for future landscape drip system. install gfci outlet for 2 exterior electrical heaters. all work at rear.Details
remove existing 250 sqft rear deck tiles pavers and waterproof membrane and replace in kind. new exterior siding at parapet wall and window/sliding door wall. add one water spigut for future landscape drip system. install gfci outlet for 2 exterior electrical heaters. all work at rear. | $20,000 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 1545 Pine St | replace bathroom fl & shower tile in-kind.new shower valves. replace (e) faucets 2 each.new interior doors, replace gas stove with induction cooktop. replace kitchen faucet.Details
replace bathroom fl & shower tile in-kind.new shower valves. replace (e) faucets 2 each.new interior doors, replace gas stove with induction cooktop. replace kitchen faucet. | $8,500 |
| Jan 28, 2020 | Completed final sign-off Jul 2021 | 3750 21st St | revision to app#201904158039 and 201508063603 to add a parking screen, utility scress, change to front courtyard, and cover over entry deckDetails
revision to app#201904158039 and 201508063603 to add a parking screen, utility scress, change to front courtyard, and cover over entry deck | $50,000 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 338 Spear St | unit 38c - replace bathroom tiles shower stall in kind.Details
unit 38c - replace bathroom tiles shower stall in kind. | $5,000 |
| Nov 18, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | revision to 201811024885, revision to door openings maher not reqDetails
revision to 201811024885, revision to door openings maher not req | |
| Nov 18, 2019 | Completed final sign-off Aug 2022 | 201 Folsom St | revision to 201909161771 revision to door openingsDetails
revision to 201909161771 revision to door openings | |
| Nov 12, 2019 | Completed final sign-off Sep 2022 | 1717 Lyon St | main floor renovation. removal & replacement of all fixtures, equipment, & finishes. remove & replace windows in existing kitchen. replace interior fireplaces. remove access to stairwell & build access to elevated backyard from main level.Details
main floor renovation. removal & replacement of all fixtures, equipment, & finishes. remove & replace windows in existing kitchen. replace interior fireplaces. remove access to stairwell & build access to elevated backyard from main level. | $525,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2020 | 488 Folsom St | non-structural reconfiguration at condo entry and master closet; add sliding door at laundry, add recessed lighting, minor electrical receptacle layout modificaiton. no change to unit fire separation and no work wisible from public right of wayDetails
non-structural reconfiguration at condo entry and master closet; add sliding door at laundry, add recessed lighting, minor electrical receptacle layout modificaiton. no change to unit fire separation and no work wisible from public right of way | $75,000 |
| Sep 25, 2019 | Never finaled issued Jan 2020, no final | 301 Main St | 3/f: common area - club/lounge. revision to app201908280078. fire stop key note revision.life/safety system intergrationg with fireplace and fire pits.Details
3/f: common area - club/lounge. revision to app201908280078. fire stop key note revision.life/safety system intergrationg with fireplace and fire pits. | |
| Sep 20, 2019 | Completed final sign-off Feb 2020 | 301 Main St | in-kind remodel of common-use kitchen in resident's clubhouse not for general public use. remodel work to comply with sfdbi information sheet da-11 regarding application of 2016 c.b.c chapter 11a and the federal fair housing design manual. maher naDetails
in-kind remodel of common-use kitchen in resident's clubhouse not for general public use. remodel work to comply with sfdbi information sheet da-11 regarding application of 2016 c.b.c chapter 11a and the federal fair housing design manual. maher na | $25,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | revision to app#201811024885. architectural ceiling changes and details. work includes structural details for sliding door, master vanity anchorage, bath vanity support and core wall penetration. n/a for maherDetails
revision to app#201811024885. architectural ceiling changes and details. work includes structural details for sliding door, master vanity anchorage, bath vanity support and core wall penetration. n/a for maher | $75,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | interior alteration of dwelling unit 38a including new interior lighting, new interior partitions, new cabinets. merger at units 38a and 38b under seperate permit #201901049637. n/a for maherDetails
interior alteration of dwelling unit 38a including new interior lighting, new interior partitions, new cabinets. merger at units 38a and 38b under seperate permit #201901049637. n/a for maher | $200,000 |
| Sep 10, 2019 | Completed final sign-off Dec 2019 | 338 Main St | install new led down-lights below existing slab ceiling, intall window shades, reconfigure door at rear bedroom, install new bookcase cabinets. maher naDetails
install new led down-lights below existing slab ceiling, intall window shades, reconfigure door at rear bedroom, install new bookcase cabinets. maher na | $70,000 |
| Aug 28, 2019 | Completed final sign-off Feb 2020 | 301 Main St | ground floor - mechanical and electrical deferred submittal for pa 2019-0613-3359 (remodel of existing common use clubhouse)Details
ground floor - mechanical and electrical deferred submittal for pa 2019-0613-3359 (remodel of existing common use clubhouse) | $100,000 |
| Aug 22, 2019 | Expired or cancelled expired Jul 2025 | 375 Edgehill Wy | revision/reduced to pa 2015-0820-4819. 2nd fl - no horizontal extensions. remove habitable spae @ crawl space. propose renovation of (e) space; 3rd fl -no extension at kitchen & reduce extension @ dining;reduced extension at (n) vestibule lift adjacent (e) garage; reno (e) space & carport. rebuild &Details
revision/reduced to pa 2015-0820-4819. 2nd fl - no horizontal extensions. remove habitable spae @ crawl space. propose renovation of (e) space; 3rd fl -no extension at kitchen & reduce extension @ dining;reduced extension at (n) vestibule lift adjacent (e) garage; reno (e) space & carport. rebuild & | |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 301 Main St | street spaceDetails
street space | |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 301 Main St | remodel bar in club lounge, add (n) electric fireplace, remodel (e) fireplace. all work to be done on "the infinity club lounge & patio. no exterior work. maher naDetails
remodel bar in club lounge, add (n) electric fireplace, remodel (e) fireplace. all work to be done on "the infinity club lounge & patio. no exterior work. maher na | $70,000 |
| May 9, 2019 | Completed final sign-off Jun 2019 | 585 Junipero Serra Bl | at front porch parapet wall; replace in kind front porch concrete slab. 100 sqft. all work to be done at front entry.Details
at front porch parapet wall; replace in kind front porch concrete slab. 100 sqft. all work to be done at front entry. | $10,000 |
| Apr 26, 2019 | Never finaled issued Sep 2019, no final | 201 Folsom St | install 4 new grade-level tempered glass patio doors and glass sidelites at exterior common area patios (units c-0110, c-0111,c-0112, c-0113) and glass wind-creen panels at common area patio at unit c-0113.Details
install 4 new grade-level tempered glass patio doors and glass sidelites at exterior common area patios (units c-0110, c-0111,c-0112, c-0113) and glass wind-creen panels at common area patio at unit c-0113. | $15,000 |
| Apr 15, 2019 | Completed final sign-off Jul 2021 | 3750 21st St | revision to pa #201508063603. temp shoring for excavation of basement sump pump. (added sump pit)Details
revision to pa #201508063603. temp shoring for excavation of basement sump pump. (added sump pit) | $30,000 |
| Mar 6, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | new interior lighting for dwelling unit 38b as a part of interior renovation under app#201811024885Details
new interior lighting for dwelling unit 38b as a part of interior renovation under app#201811024885 | $20,000 |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 201 Folsom St | remodel "in-kind" kitchen and bathroom. kitchen 225 sq ft, bathroom 82 sq ftDetails
remodel "in-kind" kitchen and bathroom. kitchen 225 sq ft, bathroom 82 sq ft | $34,000 |
| Jan 4, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | unit merger of 38a and 38b new interior, lighting, partitions, cabinetry. no struct. per lod 20140030352ad, 9 at 10 mergers performed under this lod. this is the 10th merger under lod. fully sprinklered. no change to occ maher naDetails
unit merger of 38a and 38b new interior, lighting, partitions, cabinetry. no struct. per lod 20140030352ad, 9 at 10 mergers performed under this lod. this is the 10th merger under lod. fully sprinklered. no change to occ maher na | $95,000 |
| Nov 8, 2018 | Completed final sign-off Dec 2020 | 401 Harrison St | unit 42 b. reconfigure and remodel bathrooms, reconfigure laundry area, (n) wine area & closet, spaceDetails
unit 42 b. reconfigure and remodel bathrooms, reconfigure laundry area, (n) wine area & closet, space | $39,000 |
| Nov 2, 2018 | Completed final sign-off Oct 2022 | 201 Folsom St | unit 38b - interior ti work include: new lighting, new ducting, new partition and new cabinet. no strucral work proposedDetails
unit 38b - interior ti work include: new lighting, new ducting, new partition and new cabinet. no strucral work proposed | $20,000 |