Yellow Zone Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Sep 2026
- Last 24 months
- 5 permits filed
87 permits since 2000: 77 completed, 3 in progress, 5 never finaled, 2 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress | 3232 Buchanan St | to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063 | $10,000 |
| Jun 10, 2026 | In progress | 1726 47th Av | replace entry stair riser and landing (less than 50%) at frount of house. replace front cement stucco on street facade. all work in kind. | $30,000 |
| Mar 31, 2026 | Completed | 135 Carl St | common starirs: dry rot repair stairs at light well, less than 50% | $12,000 |
| May 9, 2025 | Completed | 407 29th St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. work previously approved under pa#201910215047. to comply with nov #202296911. | $90,000 |
| Oct 15, 2024 | Completed | 49 Sanchez St | dry rot repair exterior stairs less than 50% | $8,000 |
| Aug 7, 2024 | Completed | 155 Mendosa Av | replace four front windows on 2nd level with like kind aluminum. replace five side and rear windows on 2nd level with like kind aluminum. replace wood siding at front 2nd level with like kind wood, replace right side rear siding at 2nd level with new james hardi siding. | $30,000 |
| May 7, 2024 | Completed | 5549 Anza St | kitchen remodel like kind | $50,000 |
| Feb 7, 2024 | Completed | 3035 Broderick St | remodel one kitchen like in kind. no structural | $38,000 |
| Feb 5, 2024 | Completed | 3577 17th St | replace 5 windows non-street facing | $5,000 |
| Nov 3, 2023 | Completed | 1945 Washington St | #702: 2 bathrooms remodel like for like | $36,000 |
| Aug 25, 2023 | Completed | 2814 Sacramento St | dry rot repair rear stairs, less than 50% | $12,000 |
| May 10, 2023 | Completed | 555 33rd Av | 1/f: renovate existing interior entry foyer. no structural alterations. | $15,000 |
| May 1, 2023 | Completed | 1949 Golden Gate Av | repair dryrot front steps in-kind, less than 50%. | $8,500 |
| Nov 16, 2022 | Completed | 125 20th Av | unit 125 - non-structural kitchen bathroom remodel; new kitchen & bat remodel; infill (e) window @ side of bldg & enlarge window @ rear of bldg; relocate (e) tankless hwh. mechanical electrical & plumbing to be design build under separate permit | $98,000 |
| Mar 4, 2022 | Completed | 33 Aloha Av | dry rot repair. | $42,000 |
| Dec 27, 2021 | Completed | 1854 38th Av | kitchen remodel like for like | $30,000 |
| Feb 24, 2020 | Completed | 2929 Gough St | kitchen remodel like kind | $25,000 |
| Nov 4, 2019 | Completed | 834 26th Av | apt 2: remodel kitchen like in-kind. maher n/a. | $25,000 |
| Sep 9, 2019 | Completed | 348 Hyde St | remove plywood siding at south side (above adjacent building) replace with hardi siding at south side only. building constructed ca. 2004. no changes to front. | $12,000 |
| May 28, 2019 | Completed | 227 El Camino Del Mar | voluntary seismic retrofit at the basement and garage | $21,000 |
| May 20, 2019 | Completed | 310 Colon Av | 1 kitchen & 1 bath remodel. like kind. no alteration of wall, windows and door. | $45,000 |
| Apr 16, 2019 | Completed | 227 El Camino Del Mar | replace kitchen cabinets and counter tops | $30,000 |
| Feb 1, 2019 | Completed | 2892 23rd St | interior apartment remodel including remode of (e) kitchen and bathroom, construct new bathroom add washier and dryer hook up, replace (e) hot water heater, replace non street facing windows, mep to desing build | $39,000 |
| Dec 28, 2018 | Never finaled | 2898 23rd St | kitchen and bathroom remodel. in kind like for like. | $34,000 |
| Nov 19, 2018 | Completed | 255 Maywood Dr | to comply with nov #201899751, item 1. install dryer duct. dryer duct shall be min 4" less than 14' long, teminate minimum 3' away from property line and opening duct shall be rigid metal. | $800 |
| Sep 10, 2018 | Completed | 354 Ralston St | to comply with nov#201620391, item #2, repair wood below front stairs. | $2,800 |
| Mar 12, 2018 | Completed | 104 Lake Merced Hill St South St | to comply with nov #201799381, item #2. dry rot repair at rear deck, less than 50%. | $4,500 |
| Jan 18, 2018 | Completed | 285 Duncan St | kitchen & bathroom remodel - in-kind | $30,000 |
| Dec 14, 2017 | Completed | 1229 Folsom St | to comply with nov #201720191 item #5 - repair rear stairs less than 50%. | $4,500 |
| Dec 14, 2017 | In progress | 750 14th St | to comply with nov #201719181 item #2 - repair stairway less than 50%. | $3,000 |
| Nov 8, 2017 | Completed | 270 Roosevelt Wy | to comply with nov #201707901, #10. install dryer vent. revision to permit #201710161336 | $300 |
| Mar 7, 2017 | Completed | 115 Crestmont Dr | new stair to connect rear deck to grade | $2,000 |
| Feb 22, 2017 | Completed | 426 Hugo St | dry rot repair lightwell stairs 50% less. | $5,000 |
| Sep 28, 2016 | Completed | 3033 Judah St | foundation upgrade at rear of building, half bathroom remodel on 1st floor. new partition walls for storage on 1st floor. framing repair at rear of building | $25,000 |
| Jun 20, 2016 | Completed | 1072 Folsom St | seismic strengthening on gr fl and new accessiblilty ramp; not approved for administrative office excavation 24" (approximately 6 cubic yards). compliance with maher ordinance not required. soft story rerofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $45,000 |
| May 2, 2016 | Completed | 2428 Union St | dry rot stairs repair at lightwell, 50%. | $12,000 |
| Mar 4, 2016 | Completed | 1072 Folsom St | revise foundation bpa# 2015-0508-5855. add approximately 30' and 12' footings | $50,000 |
| Oct 29, 2015 | Completed | 70 Levant St | revisions to existing permit appn. 201508285597; add retaining wall @ south property line. | $1,500 |
| Aug 28, 2015 | Completed | 70 Levant St | replace (e) backyard retainin walls. 20 cubic yard excavation & 6'-0' max height retaining wall at rear yard | $90,000 |
| May 8, 2015 | Completed | 1651 Larkin St | legalize unit per ordinance no# 43-14. 1 bedroom, 1 office, 1 bathroom, 1 living room & 1 kitchen. | $15,000 |
| May 8, 2015 | Completed | 1072 Folsom St | foundation repair approx 60'. maher na | $50,000 |
| Mar 6, 2015 | Completed | 1651 Larkin St | soft story retrofit per chap 34b mandatory earthquake retrofit of wood frame buildings per 75% requirement. | $45,000 |
| Feb 20, 2015 | Completed | 2882 23rd St | abate violation number 201521721 and 201524973. replace rear windows, not visable from street. dryrot repair on rear stairs less than 50% and all other items | $7,500 |
| Oct 7, 2014 | Completed | 582 29th St | (1) kitchen remodel. | $20,000 |
| Jul 17, 2014 | Completed | 778 26th Av | revision to app#201402057894. non structural revision to hallway on ground floor. relocate closet on 2nd floor. no structural changes. show extg window on side of bldg to reflect extg condition. | |
| Jul 1, 2014 | Completed | 2888 23rd St | revision to app#201405125510. remodel of extg kitchen and bathroom, construct new bathroom, add washer and dryer hook ups. replace extg hot water heater. no strctural or exterior work. electrical, mech, plmg to be design build under seperate permit. | $35,000 |
| May 13, 2014 | Completed | 778 26th Av | add a new stair at rear from 2nd floor to backyard, including a new door. (modification to permit #201402057894) previous, no change to original permit scope and layout except adding subject stairway. | $3,000 |
| May 12, 2014 | Completed | 2888 23rd St | kitchen remodel, 1 bath remodel. 1/2 bath remodel | $35,000 |
| Mar 28, 2014 | Completed | 275 26th Av | opening(removal of sheetrock)non-load bearing wall, cutting studs, installing header and pocket door kit(johnson 1500). hanging door. closing door, installing new sheetrock, and cosmetic framing. ref app#90238951 | $400 |
| Feb 5, 2014 | Completed | 778 26th Av | add 3 bedroom & 2 bath @ ground floor, rearrange floor layout, add 2 bedroom & one bath @ 2/f. replace dry-rotted wall & broken foundation @ rear of bldg. remove existing deck & stair @ rear of bldg. | $98,000 |
| Oct 1, 2013 | Completed | 1500 California St | dry rot repair at reat stairs; less than 50% | $12,000 |
| Apr 26, 2013 | Completed | 197 Desmond St | add half bathroom at 2nd floor. legalize two bathroom, one bedroom, study laundry and storage at ground floor. | $53,000 |
| Apr 11, 2013 | Completed | 921 Post St | revision to app#201301288935 to document as-built conditions, including relocated furnace and entry door, kitchen layout and bathroom layout. | |
| Apr 2, 2013 | Completed | 921 Post St | revision to pa#2012-0807-6766. to document as-built condition at stair penthouse to include door and furnace. | $1,000 |
| Jan 28, 2013 | Completed | 921 Post St | conversion of (e) basement in 3-story residential unit into new 519 s.f. unit. work to include kitchen and bathroom. addtion and new egress window along alley way. | $65,000 |
| Dec 31, 2012 | Completed | 44 Alpine Tr | revision to pa# 2012-1011-1789-re-arrange (e) bathroom at 2nd floor, re-arrange 9e) bathroom & add 1 new bathroom at 3rd floor | $6,000 |
| Oct 11, 2012 | Completed | 44 Alpine Tr | remodel (e) bath room, kitchen, re-wire electrical & lighting at second fl. remodel (e) bathroom, re-wire electrical & lighting at third fl. remove (e) new concrete foundation (approx 22'-0") | $48,000 |
| Aug 7, 2012 | Completed | 921 Post St | comply with #201048319 & 200914921-as built conditions for pa# 2012-0202-3452-interior remodel & removal of 3rd floor interior stair to roof. work includes enlarged powder room, re-arranged kitchen island, as well as infilled interior stairwell to roof & infilled stair penthouse doorway. | $6,000 |
| Jun 25, 2012 | Completed | 921 Post St | addition of interior 1-hour stair in extg 3 story over basement residential bldg to connect 1st floor to basement storage area. | $7,400 |
| Apr 19, 2012 | Completed | 179 20th Av | replace 900 sq. ft. of siding and plywood at left rear of bldg. (dry rot repair) replace in kind. | $15,000 |
| Feb 2, 2012 | Completed | 921 Post St | comply with order of abatement's# 103343-a, 102496-a & 103342-a. interior remodel without permit. new scope under this application complete interior remodel per plans. rebuild in-kind lightwell stair to what was previously (e) | $325,000 |
| Nov 14, 2011 | Completed | 117 Inverness Dr | horizontal ground floor extension at rear (approx. 15'- 0"). (n) roof deck at 2nd fl; (n) 2'x 2' skylight in half bath at 2nd fl. | $40,000 |
| Oct 19, 2011 | Completed | 474 Amherst St | conversion ot unoccupied storage area on the 1st fl to habitable family room, 1 bedroom, bath. scope of work also includes removing old furnace and ductwork and replacing it with new furnace. | $31,300 |
| Sep 12, 2011 | Completed | 5092 Diamond Heights Bl | #b- replace kitchen cabinets & countertop (one kitchen remodel) | $18,000 |
| Nov 4, 2010 | Never finaled | 238 11th St | to comply with violation 201069675. replacing 1-piece of siding & provide handrail at rear stairs. | $1,500 |
| Oct 29, 2010 | Completed | 107 Kissling St | to correct (2) nov #201069674 (5) sheeting at stairs to be replaced, rear hand rails at stairs, 1 piece of damaged wood siding, violation/complaint #201069674,201069675 | $3,500 |
| Oct 4, 2010 | Completed | 843 South Van Ness Av | bathroom remodel, tile work. replace sink, toilet and shower | $4,500 |
| Jul 13, 2010 | Expired or cancelled | 256 Stratford Dr | proposed vertical & horizontal addition in rear with new exterior finishes, colors & roof to match existing. proposed kitchen extension include interior improvements & upgrades. proposed addition of master suite include new interior finishes & upgrades. proposed remodel of 2nd story bathroom & deck. | $300,000 |
| May 19, 2010 | Completed | 1969 48th Av | install/move kitchen from ground floor to 2nd. flr. convert master bedrm./study to kitchen/dining/liv.rm. ground flr. will become rec. rm. remodel master bathroom. | $20,000 |
| May 3, 2010 | Completed | 1243 Guerrero St | to comply with nov# 201043918, dated 4/26/2010. install handrail at rear stairs. | $400 |
| Dec 18, 2009 | Never finaled | 181 Marietta Dr | replace 13 pcs ( 2x6) deck boards at rear deck. work to be less than 50% | $700 |
| Mar 19, 2009 | Completed | 2429 California St | repair & replace dryrot in (e) walls two sides approx x 20'-0" wall lengh (ref permit#200808290389s-1. clarification on s3 on original permit. | $1,000 |
| Nov 20, 2008 | Completed | 1025 Lombard St | work @ unit# 3 only. remodel master bath. replace fixtures, tiles, shower pan, toilet, sink & shower door. | $20,000 |
| Aug 29, 2008 | Completed | 2429 California St | one story rear addition to an existing retail building and add 2 new restrooms. | $150,000 |
| Aug 22, 2008 | Completed | 70 Ravenwood Dr | kitchen remodel, replace cabinets, coutner top, tile floor, paint, no change to sink, hood, stove, refrigerator. | $30,000 |
| Jun 26, 2008 | Completed | 514 Noe St | replace rear 30" door w/like kind, replace four side windows with like/kind. no visible from street at sunroom. | $4,500 |
| Jun 3, 2008 | Never finaled | 1326 Haight St | replace kitchen cabinet, counter top with like kind. replace bath tiles with like kind. no structural. (e) light fixtures to remain. | $20,000 |
| Dec 5, 2007 | Completed | 4031 18th St | ocmply with physical inspection report 3r-5015. | |
| Sep 13, 2007 | Never finaled | 1760 Pacific Av | replace 24 front windows to pella wood clad windows | $17,500 |
| Apr 13, 2007 | Completed | 1419 Taraval St | proposed a new beauty salon to existing ground floor. | $33,000 |
| Sep 29, 2006 | Completed | 1516 Hyde St | revised approved appl#200607277827 as request by owner. relocate kitchen @ 1/f, relocate laundry room @ 2/f, delete beam and post @ living room. | |
| Apr 4, 2006 | Expired or cancelled | 45 Lucerne St | replace vanity + bath tub + retile in bathroom. | $11,000 |
| Nov 16, 2005 | Completed | 1166 Shafter Av | proposed a new fish meat, manufacturing shop at existing ground floor meat processig change in use b to f-1 proposed a new fish meat, mana facturing shop at existing ground floor meat processing change in uses b t- f-1 | $50,000 |
| Sep 1, 2005 | Completed | 230 Powell St | proposed a new bealty salon at 3rd fl. | $30,000 |
| Aug 22, 2005 | Completed | 4031 18th St | propsoed remodeling existing 2nd floor and 3rd floor convert existing kitchen to bedrm relocate (e) | $35,000 |
| Aug 3, 2005 | Completed | 4031 18th St | replace kitchen cabinets/appliances,replace bathroom fixtures in both units. | $13,000 |
| Oct 22, 2004 | Completed | 5217 Geary Bl | remodel of (e) interior restaurant space. (n) equipment, some (n) plumbing & electrical. refinishing | $30,000 |