Ibc International Building Construction
- Based in
- San Leandro
- On San Francisco permits
- Apr 2014 to Apr 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2019 | Completed final sign-off Nov 2019 | 380 Brentwood Av | replace stucco at exterior on all facades - texture to match existing feathered stucco. no other work under this permit.Details
replace stucco at exterior on all facades - texture to match existing feathered stucco. no other work under this permit. | $5,000 |
| Dec 9, 2014 | Completed final sign-off Jan 2016 | 101 San Aleso Av | alteration to extg windows as noted, addition of windows on rear of house, new 5'-0" gate to side yard create slot for extg drain at driveway.Details
alteration to extg windows as noted, addition of windows on rear of house, new 5'-0" gate to side yard create slot for extg drain at driveway. | $20,000 |
| Nov 21, 2014 | Completed final sign-off Jul 2016 | 101 San Aleso Av | revision to app#201404173544. 69 sq ft addition at 3rd floor within extg bldg envelope and roof line. bathroom remodel on 3rd floor.Details
revision to app#201404173544. 69 sq ft addition at 3rd floor within extg bldg envelope and roof line. bathroom remodel on 3rd floor. | $70,000 |
| Apr 17, 2014 | Completed final sign-off Jan 2016 | 101 San Aleso Av | replace drywall and insulation, kitchen and 4 (e) bathrooms remodel, add powder room in basement, update electrical and plumbing, repair basement footingDetails
replace drywall and insulation, kitchen and 4 (e) bathrooms remodel, add powder room in basement, update electrical and plumbing, repair basement footing | $700,000 |