William Gregory Clause
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Mar 2025
- Last 24 months
- 5 permits filed
234 permits since 2000: 212 completed, 1 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 234.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2025 | Completed final sign-off Mar 2025 | 1509 10th Av | to obtain final inspection for work approved under pa #201803214224. all work is completedDetails
to obtain final inspection for work approved under pa #201803214224. all work is completed | |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 1509 10th Av | revision to pa # 2018-0321-4224 update to window schedule. remove fireplace at 3rd fl. remove window at rearDetails
revision to pa # 2018-0321-4224 update to window schedule. remove fireplace at 3rd fl. remove window at rear | $8,000 |
| Nov 22, 2024 | Completed final sign-off Dec 2024 | 464 Douglass St | revision to pa#202305043772 to delete cable railing from scope. keep exisiting 42" guardrail.Details
revision to pa#202305043772 to delete cable railing from scope. keep exisiting 42" guardrail. | |
| Nov 22, 2024 | Completed final sign-off May 2025 | 464 Douglass St | rev to pa# 2023-0811-4208; revise door to bedroom to 48" from 60" delette new post header and pier belowDetails
rev to pa# 2023-0811-4208; revise door to bedroom to 48" from 60" delette new post header and pier below | |
| Oct 17, 2024 | Completed final sign-off Apr 2025 | 88 King St | unit 124- remodel (e) kitchenDetails
unit 124- remodel (e) kitchen | $54,000 |
| Jul 22, 2024 | Completed final sign-off Aug 2024 | 1509 10th Av | to obtain final inspection for work approved under pa#201803214224 and 201805148991. all work is completeDetails
to obtain final inspection for work approved under pa#201803214224 and 201805148991. all work is complete | |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 428 Corbett Av | 3/f: remodel existing kitchen and bathroom.Details
3/f: remodel existing kitchen and bathroom. | $65,000 |
| Jun 20, 2024 | In progress issued Jun 2024 | 4348 26th St | renew app# 202301240640 for final inspection.Details
renew app# 202301240640 for final inspection. | |
| May 31, 2024 | Completed final sign-off Nov 2024 | 1105 Bosworth St | remodel (e) 1st fl. bath in place, replace (1) window at south side not visible from streetDetails
remodel (e) 1st fl. bath in place, replace (1) window at south side not visible from street | $42,000 |
| May 20, 2024 | Completed final sign-off May 2025 | 54 States St | repair and replace (2) front facing wood decks and guardrails in kind.Details
repair and replace (2) front facing wood decks and guardrails in kind. | $35,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 816 Ortega St | relocate full bath and install new bath (2) new windows not visible from the streetDetails
relocate full bath and install new bath (2) new windows not visible from the street | $110,000 |
| Apr 2, 2024 | Completed final sign-off May 2025 | 54 States St | rev 202304034907- remove one existing post, add additional post and beam.Details
rev 202304034907- remove one existing post, add additional post and beam. | $2,000 |
| Aug 11, 2023 | Completed final sign-off May 2025 | 464 Douglass St | remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st).Details
remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st). | $160,000 |
| Aug 4, 2023 | Completed final sign-off Dec 2024 | 464 Douglass St | facade refresh only - remove and replace stucco, new architectual elements as shown on plan, new windows, trim. all within property lines.Details
facade refresh only - remove and replace stucco, new architectual elements as shown on plan, new windows, trim. all within property lines. | $85,000 |
| Apr 3, 2023 | Completed final sign-off Jun 2025 | 54 States St | remodel e 2nd flr kitchen, reconfigure bathroom at 1st flr, infill under entry stair landing to add new bathroom and laundry at 1st flr, 2 new windows (not visible from street).Details
remodel e 2nd flr kitchen, reconfigure bathroom at 1st flr, infill under entry stair landing to add new bathroom and laundry at 1st flr, 2 new windows (not visible from street). | $110,000 |
| Mar 28, 2023 | Completed final sign-off Dec 2023 | 333 Haight St | revision to permit 2022-1103-5808 structural revisions to reflect existing condition, unit 4, 1st flr.Details
revision to permit 2022-1103-5808 structural revisions to reflect existing condition, unit 4, 1st flr. | |
| Jan 24, 2023 | Completed final sign-off Jun 2024 | 4348 26th St | revision to bpa#202206025420 & 202012019987 to document (e) conditions per district inspectorDetails
revision to bpa#202206025420 & 202012019987 to document (e) conditions per district inspector | |
| Nov 3, 2022 | Completed final sign-off Dec 2023 | 333 Haight St | unit 4: interior renovation including kitchen and 2 baths; add new bath; replace windows and add 2 windows (not visible from street)Details
unit 4: interior renovation including kitchen and 2 baths; add new bath; replace windows and add 2 windows (not visible from street) | $290,000 |
| Sep 1, 2022 | Completed final sign-off Apr 2023 | 3828 19th St | renovate (e) kitchen enlarge kitchen wall opening to adjacent dinng room at pantry alcove new vented hood for (e) rangeDetails
renovate (e) kitchen enlarge kitchen wall opening to adjacent dinng room at pantry alcove new vented hood for (e) range | $36,500 |
| Jun 30, 2022 | Completed final sign-off Nov 2023 | 423 Eureka St | add new laundry room and pantry at 2nd fl within existing patio footprint partial infill of covered lightwellDetails
add new laundry room and pantry at 2nd fl within existing patio footprint partial infill of covered lightwell | $30,000 |
| Jun 2, 2022 | Completed final sign-off Jun 2024 | 4348 26th St | convert (e) storage to living area, reconfigure bed room suite, and 1 new window (not visibel from the street)Details
convert (e) storage to living area, reconfigure bed room suite, and 1 new window (not visibel from the street) | $125,000 |
| Jan 19, 2022 | Completed final sign-off Dec 2023 | 4309 19th St | remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work.Details
remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work. | $125,000 |
| Sep 16, 2021 | Completed final sign-off May 2025 | 54 States St | remodel e 3rd fl kitchen, reconfigure e 2 baths at 3rd fl, new window not visible from street. new skylight and parapetDetails
remodel e 3rd fl kitchen, reconfigure e 2 baths at 3rd fl, new window not visible from street. new skylight and parapet | $85,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 350 Church St | remodel kitchen in place- new cabinets, counters, fixtures.Details
remodel kitchen in place- new cabinets, counters, fixtures. | $22,000 |
| Mar 29, 2021 | Completed final sign-off Feb 2022 | 64 Divisadero St | remodel kitchen in place. no walls moved. new cabinets, counters, fixtures, tile, new windows, replace same size, same location. not visible from street.Details
remodel kitchen in place. no walls moved. new cabinets, counters, fixtures, tile, new windows, replace same size, same location. not visible from street. | $45,000 |
| Feb 22, 2021 | Completed final sign-off May 2021 | 701 Minnesota St | remodel bath in place-new fixtures, tile, vanity, high efficancy lightingDetails
remodel bath in place-new fixtures, tile, vanity, high efficancy lighting | $20,000 |
| Feb 4, 2021 | Completed final sign-off Aug 2024 | 1509 10th Av | rev to pa# 201805148991: update to window schedule. sprinklers under separated permit. remove non-compliant 3-story stairs and replace with new stair & deck. add windows at domerd.Details
rev to pa# 201805148991: update to window schedule. sprinklers under separated permit. remove non-compliant 3-story stairs and replace with new stair & deck. add windows at domerd. | $25,000 |
| Feb 4, 2021 | Expired or cancelled withdrawn May 2022 | 1509 10th Av | rev to pa201803214224: update to window schedule. removal of non-compliant 3-story exterior stairs.Details
rev to pa201803214224: update to window schedule. removal of non-compliant 3-story exterior stairs. | $3,000 |
| Dec 1, 2020 | Completed final sign-off Aug 2022 | 4732 Fulton St | convert garage space to habitable living space, new bath, new stair from 1st to 2nd fl. new door to rear year. (2) new windows (not visible from street)Details
convert garage space to habitable living space, new bath, new stair from 1st to 2nd fl. new door to rear year. (2) new windows (not visible from street) | $150,000 |
| Dec 1, 2020 | Completed final sign-off Jun 2024 | 4348 26th St | reconfigure 2 interior stairs,convert some unconditioned space to habitaable on lower level; remodel 1 bath,relocate 1 bath,remodel kitchen,replace 5 pairs sliders at rear, removed 2 wood burning fireplaces.add 1 new gas fireplace, add 3 stop elevator, 2 new skylights.Details
reconfigure 2 interior stairs,convert some unconditioned space to habitaable on lower level; remodel 1 bath,relocate 1 bath,remodel kitchen,replace 5 pairs sliders at rear, removed 2 wood burning fireplaces.add 1 new gas fireplace, add 3 stop elevator, 2 new skylights. | $450,000 |
| Oct 21, 2020 | Completed final sign-off Jan 2021 | 374 11th St | remodel kitchen in place, new cabinet, counters, no walls moved. replace wood floors.Details
remodel kitchen in place, new cabinet, counters, no walls moved. replace wood floors. | $30,000 |
| Sep 25, 2020 | Completed final sign-off Mar 2021 | 64 Divisadero St | remodel bath in place, no walls moved. new fixtures, tile, vanity.Details
remodel bath in place, no walls moved. new fixtures, tile, vanity. | $28,000 |
| Sep 11, 2020 | Completed final sign-off Feb 2021 | 363 Princeton St | kitchen remodel in kind; no walls moved; new cabinets, counter appliances; bath remodl in kind - no walls moved; new fixtures, vanity, tileDetails
kitchen remodel in kind; no walls moved; new cabinets, counter appliances; bath remodl in kind - no walls moved; new fixtures, vanity, tile | $65,000 |
| Jul 21, 2020 | Completed final sign-off Jun 2021 | 1212 08th Av | remodel kitchen in place - new cabinets, counters, appliances, remove new bearing wall. remodel bath - new tile, vanity, fixtures. add 1/2 bath at former pantry.Details
remodel kitchen in place - new cabinets, counters, appliances, remove new bearing wall. remodel bath - new tile, vanity, fixtures. add 1/2 bath at former pantry. | $95,000 |
| Jul 15, 2020 | Completed final sign-off Apr 2021 | 926 Grove St | remodel bath in place no walls moved, new fixitures, tile replace hardwood floors.Details
remodel bath in place no walls moved, new fixitures, tile replace hardwood floors. | $30,000 |
| Jul 8, 2020 | Completed final sign-off Jun 2021 | 362 Lexington St | remodel bath in place. new fixtures tile. high deffiency lighting,no walls moved. work to be done at 2nd floor.Details
remodel bath in place. new fixtures tile. high deffiency lighting,no walls moved. work to be done at 2nd floor. | $22,000 |
| Feb 27, 2020 | Completed final sign-off Sep 2020 | 1998 Broadway | remodel kitchen in kind. no walls moved. replace vanity in (2) bathrooms. all work in kind.Details
remodel kitchen in kind. no walls moved. replace vanity in (2) bathrooms. all work in kind. | $45,000 |
| Jan 8, 2020 | Completed final sign-off Jun 2021 | 1212 08th Av | remove fireplace upstairs, add interior stair from upper to lower level. convert existing storage to bedroom & lounge, add bathroom at first level.Details
remove fireplace upstairs, add interior stair from upper to lower level. convert existing storage to bedroom & lounge, add bathroom at first level. | $250,000 |
| Dec 19, 2019 | Completed final sign-off Feb 2020 | 42 Littlefield Tr | remodel 2 bathrooms in kind. new shower, tub tiles, vanity. h.e lighting- no wals move. new on damand water heater in attic "comply with ced 150.1(a.c) req." with hall access. 35&45 sq ft bathroomDetails
remodel 2 bathrooms in kind. new shower, tub tiles, vanity. h.e lighting- no wals move. new on damand water heater in attic "comply with ced 150.1(a.c) req." with hall access. 35&45 sq ft bathroom | $35,000 |
| Oct 17, 2019 | Completed final sign-off Jan 2020 | 733 Joost Av | remodel 40sq ft bath- new fixtures, new tile, high efficacy lighting- no walls moved.Details
remodel 40sq ft bath- new fixtures, new tile, high efficacy lighting- no walls moved. | $18,000 |
| Oct 15, 2019 | Completed final sign-off Apr 2021 | 292 San Jose Av | at existing 3rd fl. renovate (e) kitchen, relocate washer/dryer into enlarged closet at hall area, add new opening between (e) living room and kitchenDetails
at existing 3rd fl. renovate (e) kitchen, relocate washer/dryer into enlarged closet at hall area, add new opening between (e) living room and kitchen | $31,000 |
| Aug 28, 2019 | Completed final sign-off Jan 2020 | 1107 Castro St | remodel 1 (e) bath to create 1 full bath + 1 half bath. move front door to recess, reconfigure bedroom doors to fit new abthrm configurations. fix leaj @ (e) entry corridor/Details
remodel 1 (e) bath to create 1 full bath + 1 half bath. move front door to recess, reconfigure bedroom doors to fit new abthrm configurations. fix leaj @ (e) entry corridor/ | $10,000 |
| Aug 28, 2019 | Completed final sign-off Oct 2020 | 926 Grove St | remove non structural partition wall new countertop. change staircase guardrail. add storage under staircase. move door of upstairs bedroomDetails
remove non structural partition wall new countertop. change staircase guardrail. add storage under staircase. move door of upstairs bedroom | $5,000 |
| Aug 16, 2019 | Completed final sign-off Sep 2019 | 3959 19th St | to comply with inspection report cc8385Details
to comply with inspection report cc8385 | $5,000 |
| May 16, 2019 | Completed final sign-off Oct 2019 | 70 Divisadero St | remodel in place 1 56sq feet full bathroom, 1 12sq feet half bath. new fixture, vanities, tile and high efficacy lighting. nw walls moved. same foot print.Details
remodel in place 1 56sq feet full bathroom, 1 12sq feet half bath. new fixture, vanities, tile and high efficacy lighting. nw walls moved. same foot print. | $30,000 |
| Mar 29, 2019 | Completed final sign-off Jan 2020 | 1476 07th Av | remove existing non-permitted improvements on and reconfigure existing 1st floor - convert unconditioned storage and garage space to living space and relocate/add bathroom, add bedroom; add exterior stair from 2nd fl to rear yard.Details
remove existing non-permitted improvements on and reconfigure existing 1st floor - convert unconditioned storage and garage space to living space and relocate/add bathroom, add bedroom; add exterior stair from 2nd fl to rear yard. | $190,285 |
| Oct 3, 2018 | Completed final sign-off Jul 2019 | 36 Seward St | replace 5 windows at rear side in kind. not visible from st. comply with 105.2(b)1b.Details
replace 5 windows at rear side in kind. not visible from st. comply with 105.2(b)1b. | $8,000 |
| Jun 7, 2018 | Completed final sign-off Oct 2019 | 1720 Larkin St | to comply with nov #20185531. structural revisionto pa #201803062926. memorialize structural changes to property line (south) walls. revision to 2nd fl framing at front.Details
to comply with nov #20185531. structural revisionto pa #201803062926. memorialize structural changes to property line (south) walls. revision to 2nd fl framing at front. | |
| May 14, 2018 | Expired or cancelled expired Aug 2024 | 1509 10th Av | ground flr conversion to habitable space with renovation to (e) second floor and (1) bike space. adding doors and windows to rearDetails
ground flr conversion to habitable space with renovation to (e) second floor and (1) bike space. adding doors and windows to rear | $170,000 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 64 Nordhoff St | expamd existing garage under house 92 sq ftDetails
expamd existing garage under house 92 sq ft | $20,000 |
| Apr 11, 2018 | Completed final sign-off Jun 2019 | 1714 Larkin St | rev to app # 201803062926, permeation grouting to improve loose sand underneath existing foundation at north side. work to be implemented due to excavation at adjacent property (1720 larkin st.)Details
rev to app # 201803062926, permeation grouting to improve loose sand underneath existing foundation at north side. work to be implemented due to excavation at adjacent property (1720 larkin st.) | $10,000 |
| Apr 10, 2018 | Completed final sign-off Dec 2018 | 201 Buchanan St | remodel (e) bathroom - new fixtures and finsihes, remodel (e) family room - new electrical fixtures and finishesDetails
remodel (e) bathroom - new fixtures and finsihes, remodel (e) family room - new electrical fixtures and finishes | $55,000 |
| Apr 5, 2018 | Completed final sign-off Jul 2019 | 36 Seward St | kitchen renovation at new location. convert half bath to full bath on 2nd floor. full bath renovation at 3rd floor. sheetrock garage and storage. install 5 new windows at rear not visible to street.Details
kitchen renovation at new location. convert half bath to full bath on 2nd floor. full bath renovation at 3rd floor. sheetrock garage and storage. install 5 new windows at rear not visible to street. | $200,000 |
| Apr 4, 2018 | Completed final sign-off Aug 2018 | 1475 Noe St | remodel master bath in place. new fixtures, new vanity, tile.Details
remodel master bath in place. new fixtures, new vanity, tile. | $19,000 |
| Mar 23, 2018 | Completed final sign-off Aug 2018 | 1475 Noe St | remodel (2) full and (1) 1/2 baths, new vanities, tile, fixturesDetails
remodel (2) full and (1) 1/2 baths, new vanities, tile, fixtures | $35,000 |
| Mar 21, 2018 | Expired or cancelled expired Mar 2025 | 1509 10th Av | third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units.Details
third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units. | $100,000 |
| Mar 6, 2018 | Completed final sign-off Oct 2019 | 1720 Larkin St | replace (e) masonry foundation with new concrete foundation ground floor lateral strengthening witn new steel moment frame and plywood shear wallsDetails
replace (e) masonry foundation with new concrete foundation ground floor lateral strengthening witn new steel moment frame and plywood shear walls | $80,000 |
| Mar 5, 2018 | Completed final sign-off Aug 2019 | 1720 Larkin St | remodel of 2 units: unit #1 relocate kitchen, remodel bathroom and add 2 new bathroom. unit #2: relocate kitchen remodel 2 bathroom. 3rd unit - relocate kitchen - add bath - remodel (e) bathDetails
remodel of 2 units: unit #1 relocate kitchen, remodel bathroom and add 2 new bathroom. unit #2: relocate kitchen remodel 2 bathroom. 3rd unit - relocate kitchen - add bath - remodel (e) bath | $50,000 |
| Mar 1, 2018 | Completed final sign-off Jul 2019 | 36 Seward St | voluntary seismic upgrade/structural strengthening: new steel ordinary moment frame installed near the front of garage. no exterior work.Details
voluntary seismic upgrade/structural strengthening: new steel ordinary moment frame installed near the front of garage. no exterior work. | $35,000 |
| Feb 9, 2018 | Never finaled issued Feb 2018, no final | 1720 Larkin St | on each level. exploratory demo limited to 400 sq ft of plaster/lath or drywall on walls, 200 sq ft of demo at ceilings.Details
on each level. exploratory demo limited to 400 sq ft of plaster/lath or drywall on walls, 200 sq ft of demo at ceilings. | $1,000 |
| Feb 9, 2018 | Completed final sign-off Jul 2019 | 36 Seward St | re-roofingDetails
re-roofing | $6,000 |
| Nov 17, 2017 | Completed final sign-off Mar 2018 | 849 Dolores St | bathroom remodel, new hardwood floor, lights, and cabinet. replace windows, and create storageDetails
bathroom remodel, new hardwood floor, lights, and cabinet. replace windows, and create storage | $60,000 |
| Nov 1, 2017 | Completed final sign-off Apr 2019 | 450 27th St | existing unconditioned shed at rear yard, not visable to street, install 1 new exterior door, change pitched roof to flat roof, less than 10' highDetails
existing unconditioned shed at rear yard, not visable to street, install 1 new exterior door, change pitched roof to flat roof, less than 10' high | $12,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2018 | 218 26th Av | remodel bath in place: new vanity, shower pan, tiles, fixturesDetails
remodel bath in place: new vanity, shower pan, tiles, fixtures | $15,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2018 | 80 Venus St | work on garage level- convert closet at bath on 1st floor to shower, add partition wall to storage area.Details
work on garage level- convert closet at bath on 1st floor to shower, add partition wall to storage area. | $18,000 |
| Sep 6, 2017 | Completed final sign-off Nov 2017 | 2251 Washington St | remodel bath in place - new tile, fixtures, vanity, new high efficacy lighting, new flooring throughout.Details
remodel bath in place - new tile, fixtures, vanity, new high efficacy lighting, new flooring throughout. | $32,000 |
| May 25, 2017 | Completed final sign-off Feb 2018 | 840 Taylor St | revision to pa 2016-06160144 to reflect physical conditionsDetails
revision to pa 2016-06160144 to reflect physical conditions | |
| May 3, 2017 | Completed final sign-off May 2017 | 3448 19th St | remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street.Details
remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street. | $40,000 |
| May 3, 2017 | Completed final sign-off May 2017 | 3446 19th St | remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street.Details
remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street. | $40,000 |
| Mar 29, 2017 | Never finaled issued Mar 2017, no final | 3855 17th St | street spaceDetails
street space | |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 45 Henry St | apt #2: revision to 201701278062 - replace windows at lightwell kitchen and slider at living area - not visible from street. move 1 partition wall at bath, change door location at closet, add door from foyer to bedroom, close-up bath window, repair dryrot at sliderDetails
apt #2: revision to 201701278062 - replace windows at lightwell kitchen and slider at living area - not visible from street. move 1 partition wall at bath, change door location at closet, add door from foyer to bedroom, close-up bath window, repair dryrot at slider | $9,000 |
| Mar 29, 2017 | Completed final sign-off Mar 2017 | 3450 19th St | revision to 201508043273 - delete mechanical rm for future elevator (controls to be located at roof level per 201507151613) relocate closet doorDetails
revision to 201508043273 - delete mechanical rm for future elevator (controls to be located at roof level per 201507151613) relocate closet door | |
| Feb 8, 2017 | Completed final sign-off Jun 2017 | 2318 44th Av | remodel kitchen in place. new cabinets, countertops, appliances.Details
remodel kitchen in place. new cabinets, countertops, appliances. | $25,000 |
| Jan 27, 2017 | Completed final sign-off Jun 2017 | 45 Henry St | remodel kitchen in place, new cabinets, counters, remodel bath in place, new fixtures, tile no walls moved.( unit # 2)Details
remodel kitchen in place, new cabinets, counters, remodel bath in place, new fixtures, tile no walls moved.( unit # 2) | $55,000 |
| Jan 20, 2017 | Never finaled issued Jan 2017, no final | 45 Henry St | voluntary seismic upgrade at garage level for open garage front only.Details
voluntary seismic upgrade at garage level for open garage front only. | $12,000 |
| Sep 7, 2016 | Expired or cancelled withdrawn Jun 2017 | 1640 Alabama St | rear bldg. adding (1) accessory dwelling unit pursuant to ordinance 30-15 in conjunction w/previously approved voluntary seismic upgrade (ref, permit #201609077013) (n) unit does not extend beyond (e) building envelope. sprinkler under sep permit.Details
rear bldg. adding (1) accessory dwelling unit pursuant to ordinance 30-15 in conjunction w/previously approved voluntary seismic upgrade (ref, permit #201609077013) (n) unit does not extend beyond (e) building envelope. sprinkler under sep permit. | $50,000 |
| Aug 3, 2016 | Completed final sign-off Apr 2017 | 1105 Castro St | 3rd floor - add toilet to (e) bath; add shower & vanity to toilet room. move washer/dryer connections from 2nd floor to 3rd floor. no walls removedDetails
3rd floor - add toilet to (e) bath; add shower & vanity to toilet room. move washer/dryer connections from 2nd floor to 3rd floor. no walls removed | $28,000 |
| Aug 1, 2016 | Completed final sign-off Nov 2016 | 1450 Post St | remodel bathroom & kitchen. no walls moved.Details
remodel bathroom & kitchen. no walls moved. | $38,000 |
| Jun 30, 2016 | Completed final sign-off Feb 2018 | 1111 Bay St | remodel bath in place. new fixtures, tile, vanity, new highefficacy lighting. no walls removed.Details
remodel bath in place. new fixtures, tile, vanity, new highefficacy lighting. no walls removed. | $25,000 |
| Jun 16, 2016 | Completed final sign-off Jul 2017 | 1640 Alabama St | voluntary seismic upgrade of ground floor only. new storage and replace foundationDetails
voluntary seismic upgrade of ground floor only. new storage and replace foundation | $45,000 |
| Feb 9, 2016 | Completed final sign-off Mar 2016 | 1865 California St | replace (1) lightwell kitchen window in kind, not visible from street. same location, same opening.Details
replace (1) lightwell kitchen window in kind, not visible from street. same location, same opening. | $3,000 |
| Jan 21, 2016 | Completed final sign-off Aug 2016 | 423 Eureka St | interior remodel. remove wall between kitchen, dining rm. replace cabinets, counters, appliances at kitchen, new high eff lighting, remodel bath, new fixtures, tile. add 1/2 bathDetails
interior remodel. remove wall between kitchen, dining rm. replace cabinets, counters, appliances at kitchen, new high eff lighting, remodel bath, new fixtures, tile. add 1/2 bath | $150,000 |
| Jan 11, 2016 | Completed final sign-off Jan 2016 | 999 Green St | #3005 - revision to pa #201310109024 to include correct number of condo (106) & story count (24) in the building.Details
#3005 - revision to pa #201310109024 to include correct number of condo (106) & story count (24) in the building. | |
| Dec 22, 2015 | Completed final sign-off May 2016 | 451 Kansas St | apt#368: at (2) bathrooms: replace vanity, fixtures, tile, new h.e. lighting. new wood flooing at (2) bedrooms. no structural work.Details
apt#368: at (2) bathrooms: replace vanity, fixtures, tile, new h.e. lighting. new wood flooing at (2) bedrooms. no structural work. | $32,000 |
| Nov 17, 2015 | Completed final sign-off Mar 2016 | 733 Joost Av | partial kitchen remodel - replace lower cabinets, counters, sink, faucet only.Details
partial kitchen remodel - replace lower cabinets, counters, sink, faucet only. | $12,000 |
| Nov 9, 2015 | Completed final sign-off Feb 2016 | 45 Henry St | remodel kitchen in place - new cabinets, counters, plumbing fixtures, new high efficacy lighting, new sliding door. replace in-kind.Details
remodel kitchen in place - new cabinets, counters, plumbing fixtures, new high efficacy lighting, new sliding door. replace in-kind. | $38,000 |
| Oct 23, 2015 | Completed final sign-off Dec 2015 | 161 Beaver St | to obtain finall inspection for work approved under pa#200707055945, 200710185791 & 201111028154. all work complete.Details
to obtain finall inspection for work approved under pa#200707055945, 200710185791 & 201111028154. all work complete. | |
| Oct 16, 2015 | Completed final sign-off Mar 2016 | 1865 California St | remodel bathroom in-place, new tub, vanity, tilet. remodel kitchen in place, new cabinets, counters, appliances, new light efficiency lighting.Details
remodel bathroom in-place, new tub, vanity, tilet. remodel kitchen in place, new cabinets, counters, appliances, new light efficiency lighting. | $38,000 |
| Sep 2, 2015 | Completed final sign-off Nov 2015 | 119 Parnassus Av | kitchen remodel: sreplace (3) cabinets, countertops, tile, backsplash, sink, faucet, replace undercabinet lighting to led.Details
kitchen remodel: sreplace (3) cabinets, countertops, tile, backsplash, sink, faucet, replace undercabinet lighting to led. | $22,000 |
| Aug 28, 2015 | Completed final sign-off Feb 2016 | 65 Villa Tr | replace wood exterior steps on grade with new concrete. replace wood retaining wall with new concrete at front and side of property. no work visible from street. no excavation.Details
replace wood exterior steps on grade with new concrete. replace wood retaining wall with new concrete at front and side of property. no work visible from street. no excavation. | $21,000 |
| Aug 7, 2015 | Completed final sign-off Apr 2019 | 450 27th St | 2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades.Details
2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades. | $550,000 |
| Aug 4, 2015 | Completed final sign-off Mar 2017 | 3446 19th St | convert 1st flr storage to living space for unit #3450 - 1/2 bath, install 3 exterior doors, 7 windows (not visible from street), new foundations & slab on grade.. new patio slabDetails
convert 1st flr storage to living space for unit #3450 - 1/2 bath, install 3 exterior doors, 7 windows (not visible from street), new foundations & slab on grade.. new patio slab | $200,000 |
| Jul 15, 2015 | Completed final sign-off May 2017 | 3446 19th St | vert addition. kit & 2 full baths. (n) elevator from 1st fl to 4th fl & roof. (n) stair from 4th fl to roof. (n) penthouse & rear roof deck (488 sq ft). (3) exterior doors, 21 windows & 2 skylights. not visible from street. fire sprinklers and life safety @ 4th fl & roof under separate permit.Details
vert addition. kit & 2 full baths. (n) elevator from 1st fl to 4th fl & roof. (n) stair from 4th fl to roof. (n) penthouse & rear roof deck (488 sq ft). (3) exterior doors, 21 windows & 2 skylights. not visible from street. fire sprinklers and life safety @ 4th fl & roof under separate permit. | $275,000 |
| Jun 18, 2015 | Completed final sign-off Sep 2015 | 1701 Baker St | bath remodel: new tub, tile, vanity, 1/2 bath remodel 50 sq. ft., replace toilet & sink only, 24 sq. ft.Details
bath remodel: new tub, tile, vanity, 1/2 bath remodel 50 sq. ft., replace toilet & sink only, 24 sq. ft. | $12,000 |
| Jun 11, 2015 | Completed final sign-off Jan 2016 | 92 Sotelo Av | remodel existing kitchen, relocate half bath @ ground floor.Details
remodel existing kitchen, relocate half bath @ ground floor. | $55,000 |
| May 12, 2015 | Completed final sign-off Oct 2017 | 3855 17th St | replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights.Details
replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights. | $460,000 |
| May 4, 2015 | Completed final sign-off Feb 2016 | 65 Villa Tr | install intercom system and light fixture ar exterior gateDetails
install intercom system and light fixture ar exterior gate | $800 |
| Apr 29, 2015 | Completed final sign-off Feb 2016 | 65 Villa Tr | replace (3) exterior doors in existing opening at rear; replace in kindDetails
replace (3) exterior doors in existing opening at rear; replace in kind | $6,000 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 161 Beaver St | add roof deck at extg penthouse, a.k.a. top floor.Details
add roof deck at extg penthouse, a.k.a. top floor. | $15,000 |
| Mar 19, 2015 | Completed final sign-off Feb 2016 | 9 Ord St | convert basement space to living space(450 sq ft) inc full bath. install spiral stair to connect to 1st floor. new foundations and fl. slab & stair to rear yard. install 1 extg door and 3 windows at rear(not visible to street).Details
convert basement space to living space(450 sq ft) inc full bath. install spiral stair to connect to 1st floor. new foundations and fl. slab & stair to rear yard. install 1 extg door and 3 windows at rear(not visible to street). | $110,000 |