Casillas Clark Perez (Ccp) Painting Inc
- Based in
- Pleasant Hill,
- On San Francisco permits
- Feb 2021 to Apr 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2021 | Never finaled issued Jul 2021, no final | 333 Baker St | concrete brick repairs at basement level. no change in existing lateral system. 100% affordable housing. (structural only)Details
concrete brick repairs at basement level. no change in existing lateral system. 100% affordable housing. (structural only) | $150,000 |
| Feb 1, 2021 | Never finaled issued Feb 2021, no final | 118 Diamond St | remove & replace w/ (n) exterior siding. and trim and paint like for like materials and design. work visible from street. no new framing or replacement. no structure work. wood horizontal siding not hadie plankDetails
remove & replace w/ (n) exterior siding. and trim and paint like for like materials and design. work visible from street. no new framing or replacement. no structure work. wood horizontal siding not hadie plank | $240,000 |