William Diefenbach
- Listed as
- architect, designer, engineer
- Firm
- Smith Group Jjr
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Nov 2017
87 permits since 2000 (architect on 82 permits, engineer on 4 permits, designer on 1 permit): 69 completed, 11 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2017 | Completed final sign-off Oct 2019 | 650 California St | Skyline Construction | interior office tenant improvement on the 11th fl to include interior non structural demo, new partitons all gender restrooms, new accoustical gypsum board ceilings, mep under sep permit. maher naDetails
interior office tenant improvement on the 11th fl to include interior non structural demo, new partitons all gender restrooms, new accoustical gypsum board ceilings, mep under sep permit. maher na | $975,000 |
| Nov 8, 2017 | Completed final sign-off Oct 2019 | 650 California St | Skyline Construction | interior office tenant improvemen on the 9th fl to include interior non structural demo, new partitons, all gender restrooms, new accoustical and gypsum board ceiling mip under sep permit. maher naDetails
interior office tenant improvemen on the 9th fl to include interior non structural demo, new partitons, all gender restrooms, new accoustical and gypsum board ceiling mip under sep permit. maher na | $975,000 |
| Nov 8, 2017 | Completed final sign-off Oct 2019 | 650 California St | Skyline Construction | interior office tenant improvemen on the 10th fl to include interior non structural demo, new partition, all gender restroooms new accoustical and new gypsum board ceiling mep under serparate permit maher not reqDetails
interior office tenant improvemen on the 10th fl to include interior non structural demo, new partition, all gender restroooms new accoustical and new gypsum board ceiling mep under serparate permit maher not req | $975,000 |
| Aug 7, 2017 | Completed final sign-off Mar 2019 | 795 Folsom St | Gci, Inc | revision to pa #201608306376 - structural detail for approved new roof deck.Details
revision to pa #201608306376 - structural detail for approved new roof deck. | |
| Mar 13, 2017 | Completed final sign-off Dec 2017 | 101 California St | Bcci Construction Company | 31st fl: interior ti including new partitions, doors, glazing hardware, ceilings, lights, finishes, mech and elec. life safety deferred.Details
31st fl: interior ti including new partitions, doors, glazing hardware, ceilings, lights, finishes, mech and elec. life safety deferred. | $1,290,120 |
| Dec 30, 2016 | Completed final sign-off Apr 2017 | 150 California St | Principal Builders Inc. | 17th full floor arch ti: partial demo of 3 interior non load bearing partitions, finishes, doors, construct 1 interior non load bearing partition & finishes, adjusted switching, restroom upgrade. all mep/fire/life safety work under sep permit. no new light fixtures no structural no hazmat maher naDetails
17th full floor arch ti: partial demo of 3 interior non load bearing partitions, finishes, doors, construct 1 interior non load bearing partition & finishes, adjusted switching, restroom upgrade. all mep/fire/life safety work under sep permit. no new light fixtures no structural no hazmat maher na | $121,000 |
| Nov 2, 2016 | Completed final sign-off Jan 2017 | 101 California St | Source Planning And Construction Inc | 8th flr: partial flr ti with demo, new partitions and acoustic ceiling etc. mep/fire/life safety & sprinklers under sep permit maher naDetails
8th flr: partial flr ti with demo, new partitions and acoustic ceiling etc. mep/fire/life safety & sprinklers under sep permit maher na | $147,470 |
| May 18, 2016 | Completed final sign-off Nov 2016 | 343 Sansome St | Clune Construction Company L P | interior ti: demo of (e) non load bearing partitions, ceiling grids, lighting and finishes. new construction includes interior partitions, ceilings, light fixtures, casework and installation of doors, compliance with 155-13 not required.Details
interior ti: demo of (e) non load bearing partitions, ceiling grids, lighting and finishes. new construction includes interior partitions, ceilings, light fixtures, casework and installation of doors, compliance with 155-13 not required. | $370,000 |
| Apr 22, 2015 | Completed final sign-off Nov 2016 | 101 California St | Source Planning And Construction Inc | 19th floor suite 1950 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitoins, doors, tiles & finishes, mech & elect included. n/a maher ordinanceDetails
19th floor suite 1950 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitoins, doors, tiles & finishes, mech & elect included. n/a maher ordinance | $120,150 |
| Apr 22, 2015 | Completed final sign-off Nov 2016 | 101 California St | Source Planning And Construction Inc | 28th floor suite 2850 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitions, doors, tiles & finishes, mech & elect included. n/a maher ordinanceDetails
28th floor suite 2850 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitions, doors, tiles & finishes, mech & elect included. n/a maher ordinance | $94,720 |
| Apr 22, 2015 | Completed final sign-off Nov 2016 | 101 California St | Source Planning And Construction Inc | 9th floor suite 950 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitoins, doors, tiles & finishes, mech & elect included. n/a maher ordinanceDetails
9th floor suite 950 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitoins, doors, tiles & finishes, mech & elect included. n/a maher ordinance | $56,400 |
| Apr 22, 2015 | Completed final sign-off Nov 2016 | 101 California St | Source Planning And Construction Inc | 42nd floor suite 4240 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitoins, doors, tiles & finishes, mech & elect included. n/a maher ordinanceDetails
42nd floor suite 4240 - demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light fixtures & finishes. (n) construction includes (n) non-rated partitoins, doors, tiles & finishes, mech & elect included. n/a maher ordinance | $84,420 |
| Feb 18, 2015 | Completed final sign-off Mar 2016 | 300 Clay St | Matrix Hg Inc | 26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor systemDetails
26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor system | $875,000 |
| Jun 30, 2014 | Completed final sign-off Jan 2015 | 201 Mission St | Richlen Construction | interior alteration to existing common corridor, elevator lobby and restrooms on the 13th floor. scope does not affect existing tenant suites, exit access, path of egress travel, or exit stairs. new finishes and plumbing fixtures to replace existing. minor modifications to lighting and switchingDetails
interior alteration to existing common corridor, elevator lobby and restrooms on the 13th floor. scope does not affect existing tenant suites, exit access, path of egress travel, or exit stairs. new finishes and plumbing fixtures to replace existing. minor modifications to lighting and switching | $286,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 580 California St | San Francisco Commercial Builders Inc | #1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a.Details
#1925- t.i. on 19th floor. construction of non-load bearing partitions, doors, finishes, modification to light switching as needed. maher n/a. | $58,000 |
| Jun 30, 2014 | Completed final sign-off Jan 2015 | 201 Mission St | Richlen Construction | interior alterations to existing common corridor, elevator lobby and restrooms on the 22nd floor. scope does not affect existing tenant suites, exit access, path of egress travel or exit stairs. new finishes and plumbing fixtures to replace existing. minor modifications to existing sprinklers.Details
interior alterations to existing common corridor, elevator lobby and restrooms on the 22nd floor. scope does not affect existing tenant suites, exit access, path of egress travel or exit stairs. new finishes and plumbing fixtures to replace existing. minor modifications to existing sprinklers. | $286,000 |
| Jun 18, 2014 | Completed final sign-off Jan 2015 | 201 Mission St | Richlen Construction | interior alteration work to existing unisex shower and womens lockerroom on gr fl. upgrade existing mens and womens restroom on 2nd fl and tenanat improvement of suite 230 on 2nd fl. non load bearing paritions, doors, and finishes per drawings. new finishes, plumbing fixtures at existing restrooms/Details
interior alteration work to existing unisex shower and womens lockerroom on gr fl. upgrade existing mens and womens restroom on 2nd fl and tenanat improvement of suite 230 on 2nd fl. non load bearing paritions, doors, and finishes per drawings. new finishes, plumbing fixtures at existing restrooms/ | $420,000 |
| Jun 9, 2014 | Completed final sign-off Jan 2015 | 201 California St | Skyline Construction | demolition of existing non-load bearing partitions minor modification to ceiling grid light fixtures floor finishes. new construction interior partition, doors, glazing millwork and finishes, mep under separate permit; compliance with ord 155-13 not requiredDetails
demolition of existing non-load bearing partitions minor modification to ceiling grid light fixtures floor finishes. new construction interior partition, doors, glazing millwork and finishes, mep under separate permit; compliance with ord 155-13 not required | $410,000 |
| Apr 14, 2014 | Completed final sign-off May 2014 | 101 California St | C B 2 Builders Incorporated | suite 2940: demo, new partitions, power & lights, relocate door, frames, hardware. mep & sprinklers under seperate permit. n/a ordinance #155-13.Details
suite 2940: demo, new partitions, power & lights, relocate door, frames, hardware. mep & sprinklers under seperate permit. n/a ordinance #155-13. | $100,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 580 California St | Marchetti Construction Inc. | barrier removal: minor relocation of toilets and toilet accessories for accessibility compliance compliance with ord no.155-13 not required. excavation < 50 cu ydDetails
barrier removal: minor relocation of toilets and toilet accessories for accessibility compliance compliance with ord no.155-13 not required. excavation < 50 cu yd | $13,000 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 160 Pacific Av | Novo Construction Inc | bldg c- demolition and construction of interior non-load bearing partition, doors and finsihes. mep, life safety and fire sprinkler under seperate permit.Details
bldg c- demolition and construction of interior non-load bearing partition, doors and finsihes. mep, life safety and fire sprinkler under seperate permit. | $12,000 |
| Oct 1, 2013 | Completed final sign-off Dec 2013 | 201 Mission St | Richlen Construction | suite 2280:demolition of interior non load bearing partitions, doors and finishes, and modifications of doors and finishes. minor modification to extg lighting and switching as affected by demo of 2 offices restroom accessibility upgrades. no exterior work.Details
suite 2280:demolition of interior non load bearing partitions, doors and finishes, and modifications of doors and finishes. minor modification to extg lighting and switching as affected by demo of 2 offices restroom accessibility upgrades. no exterior work. | $71,189 |
| Sep 26, 2013 | Completed final sign-off Mar 2014 | 201 Mission St | Richlen Construction | 14th flr int alteration work to (e) common corridor, elevator lobby & restroom upgrades. no affect (e) tenant suites, exit access, path of egress or exit stairs. new finishes & plumbing fixtures, revise (e) toilets turinals, adjustments to lighting, switching,mep under separate permit,no ext workDetails
14th flr int alteration work to (e) common corridor, elevator lobby & restroom upgrades. no affect (e) tenant suites, exit access, path of egress or exit stairs. new finishes & plumbing fixtures, revise (e) toilets turinals, adjustments to lighting, switching,mep under separate permit,no ext work | $286,000 |
| Sep 26, 2013 | Completed final sign-off Mar 2014 | 201 Mission St | Richlen Construction | 20th flr int alteration work to (e) common corridor, elevator lobby & restroom upgrades. no affect (e) tenant suites, exit access, path of egress or exit stairs. new finishes & plumbing fixtures, revise (e) toilet & urinals, adjustments to lighting, switching, mep under separate permit,no ext workDetails
20th flr int alteration work to (e) common corridor, elevator lobby & restroom upgrades. no affect (e) tenant suites, exit access, path of egress or exit stairs. new finishes & plumbing fixtures, revise (e) toilet & urinals, adjustments to lighting, switching, mep under separate permit,no ext work | $286,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 1 Market St | Gci, Inc | removal of existing ceiling grid, light fixtures, wall and floor finishes, install new ceiling grid, new gyp bd ceiling and soffits, new wall and floors finishes at elevator lobby & corridor at 12th floor.Details
removal of existing ceiling grid, light fixtures, wall and floor finishes, install new ceiling grid, new gyp bd ceiling and soffits, new wall and floors finishes at elevator lobby & corridor at 12th floor. | $110,000 |
| Jul 2, 2013 | Completed final sign-off Mar 2014 | 580 California St | Richlen Construction | 21st floor-constrct interior non bearing partitions, doors & finshes. modifications to (e) lighting & switching as affected by scope. refer to mep drawings. there are ada upgrades to (e) restrooms. there is no exterior work. there are no hazardous materials on siteDetails
21st floor-constrct interior non bearing partitions, doors & finshes. modifications to (e) lighting & switching as affected by scope. refer to mep drawings. there are ada upgrades to (e) restrooms. there is no exterior work. there are no hazardous materials on site | $700,000 |
| Jun 20, 2013 | Completed final sign-off Sep 2013 | 201 Mission St | Richlen Construction | construction of interior non load bearing partitions, doors, and finishes as demonstrated on drawings. minor modifications to existing lighting and switching as affected by scope. ada restroom work per 20% rule form cDetails
construction of interior non load bearing partitions, doors, and finishes as demonstrated on drawings. minor modifications to existing lighting and switching as affected by scope. ada restroom work per 20% rule form c | $112,732 |
| Jun 5, 2013 | Completed final sign-off Nov 2013 | 201 California St | Commercial Interior Builders Inc | 12th floor-new non load bearing partitions, relocate doors, glass & light fixtures. mechanical, electrical, fire alarm & fire sprinklers under seperate permitsDetails
12th floor-new non load bearing partitions, relocate doors, glass & light fixtures. mechanical, electrical, fire alarm & fire sprinklers under seperate permits | $123,340 |
| Apr 29, 2013 | Completed final sign-off Jun 2013 | 201 California St | Source Planning And Construction Inc | 3rd floor suite 375 - demolition of exisitng non-load bearing interior partition & doors, containing electrical items, data & t-stat, remove 2 existing light fixtures for relocation, remove floor finishes throughout, interior work only, no structural, no hazmat, per ab-017 demolition only.Details
3rd floor suite 375 - demolition of exisitng non-load bearing interior partition & doors, containing electrical items, data & t-stat, remove 2 existing light fixtures for relocation, remove floor finishes throughout, interior work only, no structural, no hazmat, per ab-017 demolition only. | $4,000 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 1 Market St | Dpr Construction | steuart tower - 3rd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire alarm & fire sprinkler under separate permit.Details
steuart tower - 3rd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire alarm & fire sprinkler under separate permit. | $3,268,920 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 1 Market St | Dpr Construction | steuart tower, 2nd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire sprinkler, fire alarm & life safety under separate permit.Details
steuart tower, 2nd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire sprinkler, fire alarm & life safety under separate permit. | $1,925,520 |
| Nov 13, 2012 | Completed final sign-off Jan 2013 | 101 California St | Howard S. Wright Constructors Lp | demolition of existing non load bearing partitions, glazing, and lighting. new non rated partitons, doors, glazing, and finishes. mep, life safety and fire sprinkler under separate permitDetails
demolition of existing non load bearing partitions, glazing, and lighting. new non rated partitons, doors, glazing, and finishes. mep, life safety and fire sprinkler under separate permit | $83,500 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | Marketone Builders Inc | interior tenant improvement: replace elevator lobby hardwareDetails
interior tenant improvement: replace elevator lobby hardware | $2,000 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | Marketone Builders Inc | interior tenant improvement: replace elevator lobby hardwareDetails
interior tenant improvement: replace elevator lobby hardware | $2,000 |
| Sep 6, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | Marketone Builders Inc | replace elevator lobby door hardware per sffd ab# 2.10.Details
replace elevator lobby door hardware per sffd ab# 2.10. | $2,000 |
| Aug 22, 2012 | Completed final sign-off Feb 2013 | 575 Market St | Bcci Construction Company | 32nd floor-tenant improvement including new non rated partitions, glazing, millwork, plumbing, lighting, finishes & associated mechanical & electricalDetails
32nd floor-tenant improvement including new non rated partitions, glazing, millwork, plumbing, lighting, finishes & associated mechanical & electrical | $760,000 |
| Aug 21, 2012 | Never finaled issued Sep 2012, no final | 555 Mission St | Marketone Builders Inc | 10th floor:t.i. new construction includes new interior ptns, doors, glazing, millwork, plmg, ceiling and finishes. electrical, plmg and t-24 calcs are included in this submittal. life safety is a deferred submittal.Details
10th floor:t.i. new construction includes new interior ptns, doors, glazing, millwork, plmg, ceiling and finishes. electrical, plmg and t-24 calcs are included in this submittal. life safety is a deferred submittal. | $41,250 |
| Aug 3, 2012 | Completed final sign-off Nov 2012 | 23 Geary St | Gci, Inc | remove (e) temp lights, construct (n) partitions, ceilings, lighting, finishes & mep work. no structural work. interior only. smoke control building- sprinklers and fire alarm separate permitDetails
remove (e) temp lights, construct (n) partitions, ceilings, lighting, finishes & mep work. no structural work. interior only. smoke control building- sprinklers and fire alarm separate permit | $743,000 |
| Jul 31, 2012 | Completed final sign-off Sep 2012 | 101 California St | Source Planning And Construction Inc | 8th floor - demolition of existing non-load bearing partition, new construction includes non-rated partitions, doors, glazing millwork & fiishes, mep, life safety, fire sprinkler under separate permit.Details
8th floor - demolition of existing non-load bearing partition, new construction includes non-rated partitions, doors, glazing millwork & fiishes, mep, life safety, fire sprinkler under separate permit. | $96,855 |
| Jul 27, 2012 | Completed final sign-off Nov 2012 | 101 California St | Source Planning And Construction Inc | 18th floor:t.i. and mep for partial floor demo and of new construction of non structural walls, doors, finishes, ceiling, millwork, and equipment.Details
18th floor:t.i. and mep for partial floor demo and of new construction of non structural walls, doors, finishes, ceiling, millwork, and equipment. | $1,593,537 |
| Jul 3, 2012 | Never finaled issued Aug 2012, no final | 795 Folsom St | Principal Builders Inc. | 6th floor-selective demo of non bearning walls, construction of new partitions, doors, frames. installation of new furniture, minor modifications to (e) lighting, switching. plumbing for new breakrm sink. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permitsDetails
6th floor-selective demo of non bearning walls, construction of new partitions, doors, frames. installation of new furniture, minor modifications to (e) lighting, switching. plumbing for new breakrm sink. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permits | $135,000 |
| Jul 3, 2012 | Completed final sign-off Feb 2013 | 795 Folsom St | Principal Builders Inc. | 2nd floor-new partitions, millwork & relocated furniture. plumbing for new breakrm sink & dishwasher. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permitsDetails
2nd floor-new partitions, millwork & relocated furniture. plumbing for new breakrm sink & dishwasher. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permits | $60,000 |
| Jul 3, 2012 | Completed final sign-off Feb 2013 | 795 Folsom St | Principal Builders Inc. | 3rd floor-selective demo of door, frame & ceiling. construction of new partitions, installation of new furniture. minor modifications to (e) lighting & switching. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permitsDetails
3rd floor-selective demo of door, frame & ceiling. construction of new partitions, installation of new furniture. minor modifications to (e) lighting & switching. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permits | $40,000 |
| Jun 29, 2012 | Completed final sign-off Sep 2012 | 580 California St | San Francisco Commercial Builders Inc | selective demo of non load bearing walls, new partitions, door, frames, sidelites, installation aof relocated furniture. mnor modificiation to existing lighting and switching. breakroom sink plumbing, ada restroom upgrades. modification to exisitng sprinkler, mep, life safety to be under design bldDetails
selective demo of non load bearing walls, new partitions, door, frames, sidelites, installation aof relocated furniture. mnor modificiation to existing lighting and switching. breakroom sink plumbing, ada restroom upgrades. modification to exisitng sprinkler, mep, life safety to be under design bld | $231,524 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 101 02nd St | Source Planning And Construction Inc | 5th floor-t.i.-demolition of (e) non load bearing partitions, removal of (e) doors, glazing, ceiling grid, light fixtures & finishes. new construction includes new 1-hr rated partitions, new int partitions, doors, glazing & ceiling & finishes. common corridor, elev upgrds, demo (e) light fixturesDetails
5th floor-t.i.-demolition of (e) non load bearing partitions, removal of (e) doors, glazing, ceiling grid, light fixtures & finishes. new construction includes new 1-hr rated partitions, new int partitions, doors, glazing & ceiling & finishes. common corridor, elev upgrds, demo (e) light fixtures | $198,855 |
| Jun 7, 2012 | Expired or cancelled withdrawn Feb 2015 | 835 Market St | 7th floor-t.i.-demolition of (e) non load bearing partitions, removal of (e) doors, glazing, floor finishes, partial removal of (e) ceiling grid & tile. new construction includes new interior partitions, doors, ceiling & finishes. fire, life safety eng., electrical, mechanical eng., under seperate pDetails
7th floor-t.i.-demolition of (e) non load bearing partitions, removal of (e) doors, glazing, floor finishes, partial removal of (e) ceiling grid & tile. new construction includes new interior partitions, doors, ceiling & finishes. fire, life safety eng., electrical, mechanical eng., under seperate p | $50,000 | |
| Jun 6, 2012 | Completed final sign-off Sep 2012 | 101 02nd St | Source Planning And Construction Inc | 3rd fl,tenant improvement - demolition of existing non-load bearing walls, partitions, removal of existing doors, existing ceiling tiles and light fixtures. new construction includes new interior partitions, doors glazing, millwork, ceiling and finishes.Details
3rd fl,tenant improvement - demolition of existing non-load bearing walls, partitions, removal of existing doors, existing ceiling tiles and light fixtures. new construction includes new interior partitions, doors glazing, millwork, ceiling and finishes. | $89,680 |
| May 2, 2012 | Never finaled issued Aug 2012, no final | 555 Mission St | tenant improvement. new construction includes new 1 hour rated partitions, interior ptns, doors, glazing, millwork, plumbing, ceiling, finishes, electrical and 524 calculations included in this submittal. upgrades to restroom facility. life safety deferred submittal.Details
tenant improvement. new construction includes new 1 hour rated partitions, interior ptns, doors, glazing, millwork, plumbing, ceiling, finishes, electrical and 524 calculations included in this submittal. upgrades to restroom facility. life safety deferred submittal. | $25,500 | |
| Feb 6, 2012 | Completed final sign-off Jun 2013 | 201 Mission St | Ward Alan Emery Construction Inc. | t.i. demolish non structural ceiling height partitions, finishes. mep under seperate pemit.(per ab-017)Details
t.i. demolish non structural ceiling height partitions, finishes. mep under seperate pemit.(per ab-017) | $6,500 |
| Jan 25, 2012 | Never finaled issued Feb 2012, no final | 100 Montgomery St | Gci, Inc | t.i. demolition of non load bearing walls, doors, millwork clg, grid, light fixtures, finishes. new construction includes interior partitions, doors/glazing, millwork, plmg, electrical ceiling, lights,finishes.Details
t.i. demolition of non load bearing walls, doors, millwork clg, grid, light fixtures, finishes. new construction includes interior partitions, doors/glazing, millwork, plmg, electrical ceiling, lights,finishes. | $45,000 |
| Jan 25, 2012 | Completed final sign-off Apr 2012 | 100 Montgomery St | Gci, Inc | 14th floor:t.i. demolition of non load bearing walls, doors, millwork clg, grid, light fixtures, finishes. new construction includes interior partitions, doors/glazing, millwork, plmg, electrical ceiling, lights,finishes.Details
14th floor:t.i. demolition of non load bearing walls, doors, millwork clg, grid, light fixtures, finishes. new construction includes interior partitions, doors/glazing, millwork, plmg, electrical ceiling, lights,finishes. | $45,000 |
| Dec 16, 2011 | Completed final sign-off Dec 2013 | 1 Market St | Source Planning And Construction Inc | partial floor ti on 18th floor to demo and construct non-load bearing partition, door and finishes. mech/elect,ls/sprklr under seperate pemit.Details
partial floor ti on 18th floor to demo and construct non-load bearing partition, door and finishes. mech/elect,ls/sprklr under seperate pemit. | $85,300 |
| Aug 1, 2011 | Completed final sign-off Apr 2012 | 201 Mission St | Turner Construction Co | (second flr #250) t.i., new construction includes new interior, partitions, doors, glazing, millwork, plumbing, ceiling and finishes (mech, elct, fire, t-24 calcs and life safety engineering submitted under separate permit).Details
(second flr #250) t.i., new construction includes new interior, partitions, doors, glazing, millwork, plumbing, ceiling and finishes (mech, elct, fire, t-24 calcs and life safety engineering submitted under separate permit). | $171,000 |
| Jul 29, 2011 | Completed final sign-off Sep 2011 | 201 Mission St | Ward Alan Emery Construction Inc. | 21st floor ste #2150 tenant improvement to consist of; millwork, dfh, glass & glazing, drywall, floor covering, painting. all electrical, hvac, data & life safety under separate permit.Details
21st floor ste #2150 tenant improvement to consist of; millwork, dfh, glass & glazing, drywall, floor covering, painting. all electrical, hvac, data & life safety under separate permit. | $80,000 |
| Jul 6, 2011 | Completed final sign-off Mar 2012 | 201 Mission St | Turner Construction Co | suite 560, 5th fl: ti new construction includes new interior partitions, relocate door, relocate glazing, millwork, finishes. any modification to existing. elec wprinkler, hvac, and life safety systems under sep permitDetails
suite 560, 5th fl: ti new construction includes new interior partitions, relocate door, relocate glazing, millwork, finishes. any modification to existing. elec wprinkler, hvac, and life safety systems under sep permit | $31,094 |
| Jun 29, 2011 | Completed final sign-off Jul 2012 | 1 Montgomery St | Bcci Construction Company | renovation of extg ground floor building entry and lobby. consisting of new entry door,new ceiling elements, new interior finishes, lighting and signage. life safety under separate permit.Details
renovation of extg ground floor building entry and lobby. consisting of new entry door,new ceiling elements, new interior finishes, lighting and signage. life safety under separate permit. | $1,200,000 |
| Jun 2, 2011 | Never finaled issued Jun 2011, no final | 201 Mission St | Skyline Construction | 28th floor -demolition, new wall construction, finishes. mechanical, electrical, life safety and fire sprinkler under seperate permit.Details
28th floor -demolition, new wall construction, finishes. mechanical, electrical, life safety and fire sprinkler under seperate permit. | $140,000 |
| May 17, 2011 | Completed final sign-off Feb 2012 | 555 Mission St | Turner Construction Co | 25th floor - t.i. new construction includes new one-hour rated partitions, interior partitions, doors, glazing, millwork, ceiling & finishes. plumbing, mechanical, electrical & fire, title 24 calculations includes in this submitted. life safety engry submitted under separate permit.Details
25th floor - t.i. new construction includes new one-hour rated partitions, interior partitions, doors, glazing, millwork, ceiling & finishes. plumbing, mechanical, electrical & fire, title 24 calculations includes in this submitted. life safety engry submitted under separate permit. | $1,600,000 |
| Jan 19, 2011 | Completed final sign-off May 2011 | 100 Montgomery St | Source Planning And Construction Inc | office ti on 21st fl. demo of (e) non load bearing partitions, removal of (e) doors,millwork, glazing, ceiling grid, light fixturesmfloor finishes, plb and fixtures. new const includes new int partitions, doors. glazing. milwork, plbdg, clg and finishes. mep,fls,asbestos containmn underseparate pa,Details
office ti on 21st fl. demo of (e) non load bearing partitions, removal of (e) doors,millwork, glazing, ceiling grid, light fixturesmfloor finishes, plb and fixtures. new const includes new int partitions, doors. glazing. milwork, plbdg, clg and finishes. mep,fls,asbestos containmn underseparate pa, | $126,000 |
| Dec 2, 2010 | Completed final sign-off Aug 2011 | 225 Bush St | Barnegat Group | construct 4 demising partitions. install 4 doors, paint, ada work in ganged bath rooms. accessory and signage relocation. elec/ls to be design buildDetails
construct 4 demising partitions. install 4 doors, paint, ada work in ganged bath rooms. accessory and signage relocation. elec/ls to be design build | $25,000 |
| Jun 19, 2009 | Completed final sign-off Aug 2009 | 580 California St | Ward Alan Emery Construction Inc. | 20th floor-install new grid & tile. reloate 18 light fixtures; cost does not include mep except light fixtures.Details
20th floor-install new grid & tile. reloate 18 light fixtures; cost does not include mep except light fixtures. | $33,000 |
| May 26, 2009 | Completed final sign-off Feb 2010 | 303 02nd St | Bcci Construction Company | 7th floor-remodel of tenant suite 700 including demolition/construction of new partitions, relocation/installation of light fixtures, power/data installation. associated mechanical & electrical to include new vav boxes, heat pump, air distribution & fire smoke damper. l.s. under seperate permitDetails
7th floor-remodel of tenant suite 700 including demolition/construction of new partitions, relocation/installation of light fixtures, power/data installation. associated mechanical & electrical to include new vav boxes, heat pump, air distribution & fire smoke damper. l.s. under seperate permit | $1,028,368 |
| Feb 20, 2009 | Completed final sign-off Apr 2009 | 1 Market St | Ayoob & Peery Plumbing Co Inc | 18th floor-relocate fire sprinkler heads per tenant improvement-relocate 16Details
18th floor-relocate fire sprinkler heads per tenant improvement-relocate 16 | $3,500 |
| Jan 9, 2009 | Completed final sign-off Apr 2009 | 1932 Fell St | work @ unit# 11 only. install 1 new window on rear of building at unit #11, not visible from street.Details
work @ unit# 11 only. install 1 new window on rear of building at unit #11, not visible from street. | $1,900 | |
| Sep 30, 2008 | Completed final sign-off Dec 2008 | 1 Market St | Bcci Construction Company | tenant improvement in suites 345 & 346 to include: remove portion of (e) partitions, all finishes & all ceilings/light fixtures. build back new partitions, install new ceiling, new light fixtures, carpet, paint & mill work. mechanical, electrical & ls under separate permits.Details
tenant improvement in suites 345 & 346 to include: remove portion of (e) partitions, all finishes & all ceilings/light fixtures. build back new partitions, install new ceiling, new light fixtures, carpet, paint & mill work. mechanical, electrical & ls under separate permits. | $124,300 |
| Jul 30, 2008 | Completed final sign-off Apr 2009 | 120 Montgomery St | C B 2 Builders Incorporated | 20th floor-tenant improvements consisting of demolition of (e) ceiling. limited demolition of partitions & removal of (e) flooring. new ceiling, lights & finishes throughout. no work to (e) corridor of demising walls. no structural work or changes to building envelope. m.e.p. to be design build & suDetails
20th floor-tenant improvements consisting of demolition of (e) ceiling. limited demolition of partitions & removal of (e) flooring. new ceiling, lights & finishes throughout. no work to (e) corridor of demising walls. no structural work or changes to building envelope. m.e.p. to be design build & su | $50,000 |
| Feb 11, 2008 | Completed final sign-off Mar 2008 | 301 Howard St | Gci, Inc | 3rd floor-soft demo to remove (e) doors, partitions and walls to create office spaceDetails
3rd floor-soft demo to remove (e) doors, partitions and walls to create office space | $35,550 |
| Feb 4, 2008 | Completed final sign-off Apr 2008 | 1 Market St | Bcci Construction Company | 41st floor-partial demolition of floor including partitions, doors, frames, glazing, casework & ceiling system. this work is being performed per sf ab017 and will remain unoccupiedDetails
41st floor-partial demolition of floor including partitions, doors, frames, glazing, casework & ceiling system. this work is being performed per sf ab017 and will remain unoccupied | $12,000 |
| Jan 19, 2007 | Never finaled issued Feb 2007, no final | 88 Kearny St | Swinerton Builders | teknion: oti-2, revision, 15th floor, el, me, lsDetails
teknion: oti-2, revision, 15th floor, el, me, ls | $100 |
| Nov 13, 2006 | Never finaled issued Dec 2006, no final | 88 Kearny St | Swinerton Builders | oti-2, 15th floor, el, me, ls.Details
oti-2, 15th floor, el, me, ls. | $300,000 |
| Sep 1, 2006 | Expired or cancelled expired Jun 2011 | 1 Maritime Pz | Bcci Construction Company | restroom upgrades on floor 22. no structural work under this permit. seperate permit required for mechanical/lighting.Details
restroom upgrades on floor 22. no structural work under this permit. seperate permit required for mechanical/lighting. | $40,000 |
| Apr 10, 2006 | Completed final sign-off Feb 2007 | 83 Natoma St | revision to current app 200510246328, move existing storefront approx 6', replace new wood frame components with aluminum glazing system. total occupancy 93Details
revision to current app 200510246328, move existing storefront approx 6', replace new wood frame components with aluminum glazing system. total occupancy 93 | $5,000 | |
| Aug 24, 2005 | Expired or cancelled expired Oct 2006 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | revision to pa# 2005/08/02/9221. widen one portion of new corridor & add 1 "s" door.Details
revision to pa# 2005/08/02/9221. widen one portion of new corridor & add 1 "s" door. | $4,000 |
| Aug 2, 2005 | Completed final sign-off Jun 2006 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | extend the rated corridor & install demising wall (3) . ref oti-1, pa# 2005/07/26/8606.Details
extend the rated corridor & install demising wall (3) . ref oti-1, pa# 2005/07/26/8606. | $22,000 |
| Jul 15, 2005 | Completed final sign-off Jun 2006 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | oti-1 16th/fl-el,me,ls, sp.Details
oti-1 16th/fl-el,me,ls, sp. | $210,000 |
| Jul 15, 2005 | Completed final sign-off Jun 2006 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | oti-1, 17th/fl-el,me, ls, sp.Details
oti-1, 17th/fl-el,me, ls, sp. | $190,000 |
| Jun 20, 2005 | Expired or cancelled cancelled Mar 2007 | 301 Howard St | Wcp Svcs, Dba: Venture Builders | oti-1, 16th floor, el, me, ls, sp.Details
oti-1, 16th floor, el, me, ls, sp. | $81,640 |
| Jun 14, 2005 | Completed final sign-off Oct 2005 | 301 Howard St | Wcp Svcs, Dba: Venture Builders | oti-1, 18th floor, el, me, ls, sp.Details
oti-1, 18th floor, el, me, ls, sp. | $25,000 |
| May 20, 2005 | Completed final sign-off Sep 2005 | 1 Market St | Turner Construction Co | oti-1, 15th floor, el, me, ls, sp.Details
oti-1, 15th floor, el, me, ls, sp. | $180,000 |
| May 5, 2005 | Completed final sign-off Feb 2006 | 201 California St | Wcp Svcs, Dba: Venture Builders | oti-1 11/f revision.rev.appl#200503147541 (e)doors to remain,new power assisted door operators,Details
oti-1 11/f revision.rev.appl#200503147541 (e)doors to remain,new power assisted door operators, | $8,000 |
| Apr 28, 2005 | Completed final sign-off Aug 2005 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | oti-1, 2nd floor, me, el, sp, ls.Details
oti-1, 2nd floor, me, el, sp, ls. | $35,000 |
| Apr 1, 2005 | Expired or cancelled expired Oct 2006 | 1 Market St | Wcp Svcs, Dba: Venture Builders | tenant improvement n restroom work 7500, demo walls, construct n walls, (offices) n closet accessiblDetails
tenant improvement n restroom work 7500, demo walls, construct n walls, (offices) n closet accessibl | $181,218 |
| Mar 8, 2005 | Completed final sign-off Aug 2005 | 580 California St | Bcci Construction Company | oti-1 14th/fl-el,me, ls, spDetails
oti-1 14th/fl-el,me, ls, sp | $350,000 |
| Nov 19, 2004 | Never finaled issued Nov 2004, no final | 301 Howard St | Wcp Svcs, Dba: Venture Builders | 2 doors to get locksets & electrified strikes. relocation of exit sign. reference oti-1 permit app#Details
2 doors to get locksets & electrified strikes. relocation of exit sign. reference oti-1 permit app# | $400 |
| Nov 18, 2004 | Expired or cancelled expired Jul 2007 | 1 Maritime Pz | demo of non rated walls and lavatory counter, relocate stall partitions, relocate plumb fixtures andDetails
demo of non rated walls and lavatory counter, relocate stall partitions, relocate plumb fixtures and | $46,400 | |
| Nov 3, 2004 | Expired or cancelled withdrawn Jun 2005 | 215 Fremont St | Swinerton Builders | add new structural steel framing to support future installation of high density files. raised accessDetails
add new structural steel framing to support future installation of high density files. raised access | $25,000 |
| Oct 26, 2004 | Completed final sign-off Apr 2005 | 201 California St | Wcp Svcs, Dba: Venture Builders | oti-1 3th full floors being converted to 4 speculative suits oti-1 3rd fl, el, me, ls,spDetails
oti-1 3th full floors being converted to 4 speculative suits oti-1 3rd fl, el, me, ls,sp | $225,000 |