Marketone Builders Inc
- Based in
- Sacramento
- On San Francisco permits
- Aug 2012 to Mar 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2017 | Completed final sign-off Nov 2017 | 240 King St | grnd flr: ti for (e) retail suite g2. new non bearing partitions, ceiling & finishes. mep included. fire sprinklera & alarm deferred. walk in health care, ambulatory care low-acuity clinicDetails
grnd flr: ti for (e) retail suite g2. new non bearing partitions, ceiling & finishes. mep included. fire sprinklera & alarm deferred. walk in health care, ambulatory care low-acuity clinic | $521,000 |
| Nov 12, 2013 | Completed final sign-off Mar 2014 | 555 Mission St | 25th flr:slight revision to prior pa201304265588 to re-configuration of office copy room & conf.room to 3 offices; add re-configuration of another copy print rm.;add new power/data,re-configuration of elevator lobby to provide access by removing one secure entry.exiting will comply to current codes.Details
25th flr:slight revision to prior pa201304265588 to re-configuration of office copy room & conf.room to 3 offices; add re-configuration of another copy print rm.;add new power/data,re-configuration of elevator lobby to provide access by removing one secure entry.exiting will comply to current codes. | $93,109 |
| Nov 1, 2013 | Completed final sign-off Mar 2014 | 555 Mission St | office tenant improvement on 14th fl. mechanical relocations for 201309066193Details
office tenant improvement on 14th fl. mechanical relocations for 201309066193 | $25,000 |
| Sep 6, 2013 | Completed final sign-off Mar 2014 | 555 Mission St | 4th,10th, 11th, 12th, 14th floors:t.i. on multiple single tenent floors:restroom at 4 & 14/f to bring to compliance. 4th fl: addition/reconfiguration of electrified work stations, new elect/data whips. 10th fl: same as 4th fl, but add walmount monitors. 11/f:same as 4/f but also adding partitions.Details
4th,10th, 11th, 12th, 14th floors:t.i. on multiple single tenent floors:restroom at 4 & 14/f to bring to compliance. 4th fl: addition/reconfiguration of electrified work stations, new elect/data whips. 10th fl: same as 4th fl, but add walmount monitors. 11/f:same as 4/f but also adding partitions. | $481,982 |
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 555 Mission St | office tenant improvements on multiple single tenant floors, 6 th flr, add door & casework, 7th flr, door relocation,10/11th flrs, addtional elec outlets, 12th flr add acoustical wall/move elec, 25th flr, convert copy room to 3 officesDetails
office tenant improvements on multiple single tenant floors, 6 th flr, add door & casework, 7th flr, door relocation,10/11th flrs, addtional elec outlets, 12th flr add acoustical wall/move elec, 25th flr, convert copy room to 3 offices | $127,500 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | interior tenant improvement: replace elevator lobby hardwareDetails
interior tenant improvement: replace elevator lobby hardware | $2,000 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | interior tenant improvement: replace elevator lobby hardwareDetails
interior tenant improvement: replace elevator lobby hardware | $2,000 |
| Sep 11, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | 10th floor-replace elevator lobby door hardwareDetails
10th floor-replace elevator lobby door hardware | $2,000 |
| Sep 6, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | replace elevator lobby door hardware per sffd ab# 2.10.Details
replace elevator lobby door hardware per sffd ab# 2.10. | $2,000 |
| Aug 21, 2012 | Never finaled issued Sep 2012, no final | 555 Mission St | 10th floor:t.i. new construction includes new interior ptns, doors, glazing, millwork, plmg, ceiling and finishes. electrical, plmg and t-24 calcs are included in this submittal. life safety is a deferred submittal.Details
10th floor:t.i. new construction includes new interior ptns, doors, glazing, millwork, plmg, ceiling and finishes. electrical, plmg and t-24 calcs are included in this submittal. life safety is a deferred submittal. | $41,250 |