222 permits since 2000: 185 completed, 21 never finaled, 16 expired or cancelled.
Of the 21 never-finaled permits, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 222.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 24, 2013 | Never finaled issued Jan 2014, no final | 730 Harrison St | 2nd floor:demo of non-structural ceiling height partitions. construction of new non structural partitions and related finishes. restroom partitions 2nd, 3rd, and 6th floors.n/a for maher oridinance no. 155-13Details
2nd floor:demo of non-structural ceiling height partitions. construction of new non structural partitions and related finishes. restroom partitions 2nd, 3rd, and 6th floors.n/a for maher oridinance no. 155-13 | $90,000 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 150 California St | 15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate.Details
15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate. | $35,000 |
| Jul 1, 2013 | Completed final sign-off Aug 2013 | 235 Pine St | 11th floor-suite #1175-demo non structural wall, electrical, (e) grid. lights to remain. construction of non structural partition doors, finishes, hardware, millwork & drywall; separate permit for sprinkler.Details
11th floor-suite #1175-demo non structural wall, electrical, (e) grid. lights to remain. construction of non structural partition doors, finishes, hardware, millwork & drywall; separate permit for sprinkler. | $126,023 |
| May 1, 2013 | Never finaled issued May 2013, no final | 875 Howard St | mechanical and electrical. ref app#201303081871Details
mechanical and electrical. ref app#201303081871 | $190,000 |
| Mar 18, 2013 | Completed final sign-off Jul 2013 | 875 Howard St | cut and remove existing conc. slab, re-inforce opening, install steel stairway between 4th and 5th floors for office area- rev. to pa#201303081871Details
cut and remove existing conc. slab, re-inforce opening, install steel stairway between 4th and 5th floors for office area- rev. to pa#201303081871 | $120,000 |
| Mar 8, 2013 | Completed final sign-off May 2013 | 875 Howard St | remove extg walls and doors. construct new walls and door and sidelights. all work on 4/f.Details
remove extg walls and doors. construct new walls and door and sidelights. all work on 4/f. | $1,200,000 |
| Jan 2, 2013 | Expired or cancelled expired Jan 2015 | 221 Main St | construction of (1) phone room. mech, electrial, life safety and sprinkler modifications are not included in this permitDetails
construction of (1) phone room. mech, electrial, life safety and sprinkler modifications are not included in this permit | $10,000 |
| Nov 28, 2012 | Completed final sign-off Apr 2013 | 560 Mission St | 14th & 15th floors-new non load bearing interior partitions, doors, a coustical ceiling system. re-work hvac & electrical. sprinkler & fire alarm on separate permit.Details
14th & 15th floors-new non load bearing interior partitions, doors, a coustical ceiling system. re-work hvac & electrical. sprinkler & fire alarm on separate permit. | $210,710 |
| Nov 27, 2012 | Completed final sign-off Mar 2013 | 560 Mission St | 17th floor - new non-load bearing interior partitions, doors, acoustical ceiling system, rework hvac & electrical.Details
17th floor - new non-load bearing interior partitions, doors, acoustical ceiling system, rework hvac & electrical. | $67,275 |
| Nov 27, 2012 | Completed final sign-off Mar 2013 | 560 Mission St | 16th floor - new non-load bearing interior partitions, doors, acoustical ceiling system, rework hvac & electrical.Details
16th floor - new non-load bearing interior partitions, doors, acoustical ceiling system, rework hvac & electrical. | $80,325 |
| Oct 29, 2012 | Completed final sign-off Sep 2019 | 818 Jackson St | disabled access barrier removal including demo of existing entrance stair and construction of new stair and wheelchair lift.Details
disabled access barrier removal including demo of existing entrance stair and construction of new stair and wheelchair lift. | $35,000 |
| Oct 9, 2012 | Never finaled issued Oct 2012, no final | 185 Berry St | replacement of existing light fixtures, new outlet receptaclesDetails
replacement of existing light fixtures, new outlet receptacles | $65,000 |
| Aug 10, 2012 | Completed final sign-off Jan 2013 | 20 California St | 5th floor project involves minor additions to an (e) t.i. space to include construction of non-load bearing prtitions, relocation of & new light fixtures, new interior doors, glazing & frames, new electrical outlets, modification ot existing millwork, & new finishes.Details
5th floor project involves minor additions to an (e) t.i. space to include construction of non-load bearing prtitions, relocation of & new light fixtures, new interior doors, glazing & frames, new electrical outlets, modification ot existing millwork, & new finishes. | $35,000 |
| Aug 3, 2012 | Completed final sign-off Nov 2012 | 4 Embarcadero Center | # 650: demise nonsturctural, build back non structural partitions. mep under separate permitDetails
# 650: demise nonsturctural, build back non structural partitions. mep under separate permit | $17,500 |
| Aug 3, 2012 | Completed final sign-off Jan 2013 | 20 California St | minor additions to existing tenant improvements space to include construction of non load bearing partitions, relocation of and new light fixtures, new interior doors, glazing and frames, new electrical outlets. modifications to existing millwork and new finishes. mep under separate permit.Details
minor additions to existing tenant improvements space to include construction of non load bearing partitions, relocation of and new light fixtures, new interior doors, glazing and frames, new electrical outlets. modifications to existing millwork and new finishes. mep under separate permit. | $35,000 |
| Jun 11, 2012 | Completed final sign-off Aug 2012 | 20 California St | removal of extg structural support of (e) cooling tower. install of new steel cooling tower structural support. same locationDetails
removal of extg structural support of (e) cooling tower. install of new steel cooling tower structural support. same location | $18,000 |
| Jun 5, 2012 | Completed final sign-off Oct 2012 | 450 Sansome St | 4th floor-demo (e) hvac air handler & associated duct, install new air handler. t.i pa# 2012-0222-4598; install 2 new fsd'sDetails
4th floor-demo (e) hvac air handler & associated duct, install new air handler. t.i pa# 2012-0222-4598; install 2 new fsd's | $82,000 |
| May 17, 2012 | Completed final sign-off May 2013 | 345 California St | office expansion: approx 765 sf adding 2 workstations, two offices, conference rooms, lounge and open office area. mep and sprinkler separate permitDetails
office expansion: approx 765 sf adding 2 workstations, two offices, conference rooms, lounge and open office area. mep and sprinkler separate permit | $27,000 |
| May 17, 2012 | Completed final sign-off Jun 2013 | 201 Mission St | as built changes to 201202093898 fsd units indicated activate on fusible link only. clarification of existing wheelchair accessible drinking foundation to remainDetails
as built changes to 201202093898 fsd units indicated activate on fusible link only. clarification of existing wheelchair accessible drinking foundation to remain | $500 |
| Mar 30, 2012 | Completed final sign-off May 2013 | 59 Grant Av | 4th floor-barrier removal-increase restroom size, re-layout fixtures & accessoriesDetails
4th floor-barrier removal-increase restroom size, re-layout fixtures & accessories | $5,800 |
| Mar 27, 2012 | Completed final sign-off May 2012 | 201 Mission St | construction of non-load bearing partitions, and relocation of door. no change to fire rating of egress. revision of pa# 201202083783. no sprinkler or fire alarm work required.Details
construction of non-load bearing partitions, and relocation of door. no change to fire rating of egress. revision of pa# 201202083783. no sprinkler or fire alarm work required. | $2,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 235 Pine St | suite 1825, interior demolition of extg partitions, new paint, carpet. rework extg electrical.Details
suite 1825, interior demolition of extg partitions, new paint, carpet. rework extg electrical. | $20,000 |
| Feb 22, 2012 | Completed final sign-off Oct 2012 | 450 Sansome St | 4th fl: ti includes demo of non structural partitons. building new non structural partitons. all new or revised hvac, electerical, plumbing, life safety will be design build under separate permit. building not sprinklered. restroom work in mens and womens restroom.Details
4th fl: ti includes demo of non structural partitons. building new non structural partitons. all new or revised hvac, electerical, plumbing, life safety will be design build under separate permit. building not sprinklered. restroom work in mens and womens restroom. | $400,000 |
| Feb 9, 2012 | Completed final sign-off Jun 2013 | 201 Mission St | 11th floor tenant improvement - new partitions, new casework, & finishes. includes mep. life safety & sprinklers under separate permit.Details
11th floor tenant improvement - new partitions, new casework, & finishes. includes mep. life safety & sprinklers under separate permit. | $205,000 |
| Feb 8, 2012 | Completed final sign-off Jun 2012 | 201 Mission St | minor demolition to wall furring. construction of non-load bearing partion to underside of ceiling with one metal framed wood door. no change to fire rating, egress path.Details
minor demolition to wall furring. construction of non-load bearing partion to underside of ceiling with one metal framed wood door. no change to fire rating, egress path. | $6,000 |
| Feb 6, 2012 | Completed final sign-off Jun 2013 | 201 Mission St | t.i. demolish non structural ceiling height partitions, finishes. mep under seperate pemit.(per ab-017)Details
t.i. demolish non structural ceiling height partitions, finishes. mep under seperate pemit.(per ab-017) | $6,500 |
| Jan 5, 2012 | Completed final sign-off Feb 2012 | 33 New Montgomery St | 14th floor-demolition of office partition on an existing multi-tenant floor. new power/data, millwork & finishes. relocate existing light fixtures, space is unoccupied. mep and life safety are under separate permit.Details
14th floor-demolition of office partition on an existing multi-tenant floor. new power/data, millwork & finishes. relocate existing light fixtures, space is unoccupied. mep and life safety are under separate permit. | $40,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2013 | 20 California St | 4th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinklers life safety alarm workDetails
4th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinklers life safety alarm work | $50,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2012 | 1 Montgomery St | 34th floor-tenant improvement-demolition of non load bearing walls, construction of new rated partitions, new light, new power & data. mechanical & electrical under seperate permits. restrooms ada upgrade under previous permitsDetails
34th floor-tenant improvement-demolition of non load bearing walls, construction of new rated partitions, new light, new power & data. mechanical & electrical under seperate permits. restrooms ada upgrade under previous permits | $166,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2013 | 20 California St | 3rd floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes.Details
3rd floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. | $50,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2013 | 20 California St | 5th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinkler, life safety, alarm workDetails
5th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinkler, life safety, alarm work | $50,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 201 Mission St | revision to 201110217326. show existing card readers to remain with new intercom.Details
revision to 201110217326. show existing card readers to remain with new intercom. | $1,200 |
| Nov 1, 2011 | Expired or cancelled expired Jun 2014 | 201 Mission St | #2475: tenant improvement/relocate 2 doors. alter 12' of wall.Details
#2475: tenant improvement/relocate 2 doors. alter 12' of wall. | $8,650 |
| Oct 21, 2011 | Completed final sign-off Jul 2012 | 201 Mission St | project consists of demolition of partitions, power & tele/data, finishes & doors/frames. finishes, power & tele/data. space is currently occupied. mep modification is under seprarate permit.Details
project consists of demolition of partitions, power & tele/data, finishes & doors/frames. finishes, power & tele/data. space is currently occupied. mep modification is under seprarate permit. | $75,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 235 Pine St | 10th floor ste 1000 - interior tenant improvement & demolish existing partitions, ine interior partitions, millwork, new carpet & paint, reworking existing doors, lighting & existing mechanical.Details
10th floor ste 1000 - interior tenant improvement & demolish existing partitions, ine interior partitions, millwork, new carpet & paint, reworking existing doors, lighting & existing mechanical. | $350,000 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 201 Post St | tenant improvement 11th fl. expand existing breakroom. new finishes throughout. mep and fire life safety under separate permit.Details
tenant improvement 11th fl. expand existing breakroom. new finishes throughout. mep and fire life safety under separate permit. | $125,000 |
| Sep 16, 2011 | Completed final sign-off Jan 2012 | 875 Howard St | tenant improvement - remove walls. install new walls, doors, glazing, supspended ceiling, casework, and finishes. hvac, plumbing, electrical, lighting, and lifesafety to be design build uner sep permitDetails
tenant improvement - remove walls. install new walls, doors, glazing, supspended ceiling, casework, and finishes. hvac, plumbing, electrical, lighting, and lifesafety to be design build uner sep permit | $550,000 |
| Sep 12, 2011 | Completed final sign-off Nov 2011 | 530 Bush St | 7th floor: demo of non-bearing partitions, new partitions and doors, accessibility upgrades in existing restrooms, in reference to pa# 201108293450.Details
7th floor: demo of non-bearing partitions, new partitions and doors, accessibility upgrades in existing restrooms, in reference to pa# 201108293450. | $115,000 |
| Aug 29, 2011 | Completed final sign-off Jan 2015 | 530 Bush St | barrier removal for path of travel to building entry. disabled access complianceDetails
barrier removal for path of travel to building entry. disabled access compliance | $25,000 |
| Aug 26, 2011 | Completed final sign-off Dec 2011 | 88 Kearny St | 6th floor ste 600 - tenant improvement-renovation of (e) suite including construction of new non bearing partitions, electrical, mechanical & plumbing. life safety, sprinklers under seperate permitsDetails
6th floor ste 600 - tenant improvement-renovation of (e) suite including construction of new non bearing partitions, electrical, mechanical & plumbing. life safety, sprinklers under seperate permits | $500,000 |
| Aug 17, 2011 | Completed final sign-off Sep 2011 | 33 New Montgomery St | office ti on the 11th fl, suite# 1150. demo of office partitions, constr. of new office partitions, doors, mep modification under separate permitDetails
office ti on the 11th fl, suite# 1150. demo of office partitions, constr. of new office partitions, doors, mep modification under separate permit | $57,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 3 Embarcadero Center | 16th floor-demo select partitions, power data, millwork, finishes, doors & frames. construction of select new non structural partitions, doors, frames, millwork, finishes, power data & light fixtures. unoccupied space, mechanical, electrical, life safety under seperate permitDetails
16th floor-demo select partitions, power data, millwork, finishes, doors & frames. construction of select new non structural partitions, doors, frames, millwork, finishes, power data & light fixtures. unoccupied space, mechanical, electrical, life safety under seperate permit | $75,000 |
| Jul 29, 2011 | Completed final sign-off Sep 2011 | 201 Mission St | 21st floor ste #2150 tenant improvement to consist of; millwork, dfh, glass & glazing, drywall, floor covering, painting. all electrical, hvac, data & life safety under separate permit.Details
21st floor ste #2150 tenant improvement to consist of; millwork, dfh, glass & glazing, drywall, floor covering, painting. all electrical, hvac, data & life safety under separate permit. | $80,000 |
| Jul 20, 2011 | Completed final sign-off Dec 2011 | 88 Kearny St | demo of existing non rated non load bearing partitions, demo of e acoustical ceiling grid and tileDetails
demo of existing non rated non load bearing partitions, demo of e acoustical ceiling grid and tile | $25,000 |
| Jul 19, 2011 | Completed final sign-off Jul 2011 | 2 Embarcadero Center | 4th floor - new non structural partitions for new conference room only, power and data outlets and finishes. no change in occupancy, use or area. mep, sprinkler & fire alarm under seperate permit.Details
4th floor - new non structural partitions for new conference room only, power and data outlets and finishes. no change in occupancy, use or area. mep, sprinkler & fire alarm under seperate permit. | $40,000 |
| Jun 6, 2011 | Completed final sign-off Jul 2011 | 4 Embarcadero Center | 6th floor - demo interior partition & relcoate w/new electrical. mechanical, electrical, fire life safety under separate permit.Details
6th floor - demo interior partition & relcoate w/new electrical. mechanical, electrical, fire life safety under separate permit. | $5,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 222 Kearny St | demo of select partitions and construction of new demising partitions, new power and data, relocate lights, and minor ada upgrades. mech, elec, life safety, and sprinkler not included under this permitDetails
demo of select partitions and construction of new demising partitions, new power and data, relocate lights, and minor ada upgrades. mech, elec, life safety, and sprinkler not included under this permit | $145,000 |
| Apr 25, 2011 | Completed final sign-off Jun 2011 | 555 California St | tenant improvement of (e) fedex office ship center for new casework, electrical work & finishes & dataDetails
tenant improvement of (e) fedex office ship center for new casework, electrical work & finishes & data | $3,200 |
| Apr 8, 2011 | Completed final sign-off Jun 2011 | 475 Sansome St | 5th floor-construct new server closet in suite 510, 5th floor.Details
5th floor-construct new server closet in suite 510, 5th floor. | $46,112 |
| Apr 8, 2011 | Completed final sign-off Mar 2012 | 77 Maiden Ln | modification of existing tenant improvement space to include construction of non load bearing walls, new lighting, finishesDetails
modification of existing tenant improvement space to include construction of non load bearing walls, new lighting, finishes | $300,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 235 Pine St | office ti on the 19th fl incl. existing millwork and relocate sink to new location. all new and revised hvac, electrical, plbg and ls will be design build as determined and or necessary under separate permit. building fully sprinkleredDetails
office ti on the 19th fl incl. existing millwork and relocate sink to new location. all new and revised hvac, electrical, plbg and ls will be design build as determined and or necessary under separate permit. building fully sprinklered | $6,500 |
| Mar 30, 2011 | Completed final sign-off Aug 2011 | 1455 Market St | 11th floor:add two partitions to divide office suit. new finishes, [mep & life safety under separate permit].Details
11th floor:add two partitions to divide office suit. new finishes, [mep & life safety under separate permit]. | $28,000 |
| Mar 17, 2011 | Completed final sign-off Jun 2011 | 3 Embarcadero Center | tenant improvement of (e) fedex office ship center for new casework, electrical/data & finishes.Details
tenant improvement of (e) fedex office ship center for new casework, electrical/data & finishes. | $6,500 |
| Mar 15, 2011 | Completed final sign-off Jun 2011 | 724 Battery St | tenant improvement of e fedex office ship center for new casework, elec/data and finishesDetails
tenant improvement of e fedex office ship center for new casework, elec/data and finishes | $6,500 |
| Mar 14, 2011 | Completed final sign-off May 2011 | 1 Market St | t.i. of (e) fedex office ship center for new casework, electrical work & finishes plus dataDetails
t.i. of (e) fedex office ship center for new casework, electrical work & finishes plus data | $6,500 |
| Mar 10, 2011 | Completed final sign-off May 2011 | 127 Kearny St | t.i. of (e) fedex office ship center for new casework, new wall, relocation of light fixture, finishes & electrical/data work.Details
t.i. of (e) fedex office ship center for new casework, new wall, relocation of light fixture, finishes & electrical/data work. | $6,500 |
| Feb 28, 2011 | Completed final sign-off Apr 2011 | 580 California St | 6th floor-demo (e) non structural partitions, millwork & finishes. new non structural ceiling height partitionsDetails
6th floor-demo (e) non structural partitions, millwork & finishes. new non structural ceiling height partitions | $117,863 |
| Jan 19, 2011 | Completed final sign-off Jan 2011 | 275 Battery St | 5th floor new low ht partitions full ht non-rated partitions, electrical outlets, paint, no demo (e) ceiling, lihgting & partitions to remain. no change of occupancy or use, no increase in area.Details
5th floor new low ht partitions full ht non-rated partitions, electrical outlets, paint, no demo (e) ceiling, lihgting & partitions to remain. no change of occupancy or use, no increase in area. | $70,000 |
| Dec 21, 2010 | Completed final sign-off Jul 2011 | 77 Maiden Ln | revision to #2010-08-18-9018; t.i. construction of ceiling height; non-structural partitionsDetails
revision to #2010-08-18-9018; t.i. construction of ceiling height; non-structural partitions | $100 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 580 California St | suite 1350: demo on on strucural ceiling height paritions. new non structutral partitions. mep and fire alarm sep permitDetails
suite 1350: demo on on strucural ceiling height paritions. new non structutral partitions. mep and fire alarm sep permit | $40,000 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 580 California St | suite 1300: demo non structural celing height partitions. construct non structural partitions. fire alarm under sep permitDetails
suite 1300: demo non structural celing height partitions. construct non structural partitions. fire alarm under sep permit | $70,000 |
| Nov 18, 2010 | Completed final sign-off Jul 2011 | 180 Montgomery St | 6th floor suite 600 - t.i. renovation: demo & construction of non-load bearing partitions, relocation of light fixtures, new doors, sidelights & finishes, barrier removal upgrades to existing multiple-accommodation men & women's restrooms. mep & life safety work performed udner separate permit.Details
6th floor suite 600 - t.i. renovation: demo & construction of non-load bearing partitions, relocation of light fixtures, new doors, sidelights & finishes, barrier removal upgrades to existing multiple-accommodation men & women's restrooms. mep & life safety work performed udner separate permit. | $164,000 |
| Nov 12, 2010 | Completed final sign-off Dec 2010 | 201 Mission St | demo of non-structural partitions. mep under separate permit; vacant space per ab-017Details
demo of non-structural partitions. mep under separate permit; vacant space per ab-017 | $4,000 |
| Nov 12, 2010 | Completed final sign-off Jan 2011 | 333 Kearny St | new ceiling height non-structural partitions. mep under separate permit.Details
new ceiling height non-structural partitions. mep under separate permit. | $48,000 |
| Nov 12, 2010 | Completed final sign-off Jan 2011 | 201 Mission St | new ceiling tile to replace old. new finishes. demo of ceiling height non-structural partitions. mep under separate permit.Details
new ceiling tile to replace old. new finishes. demo of ceiling height non-structural partitions. mep under separate permit. | $93,000 |
| Nov 12, 2010 | Completed final sign-off Jan 2011 | 201 Mission St | install new 2x2 ceiling tile and grid, paint, install new carpet and tile, upgrade restrooms. demo of ceiling height non-structural partitions. mp under separate permit.Details
install new 2x2 ceiling tile and grid, paint, install new carpet and tile, upgrade restrooms. demo of ceiling height non-structural partitions. mp under separate permit. | $97,000 |
| Nov 10, 2010 | Completed final sign-off May 2011 | 165 03rd Av | replace (e) dry rot structural unstable back staircase per nov dated 5-25-10. scope includes repair stairs, treads, stringer, column/post & handrails as requiredDetails
replace (e) dry rot structural unstable back staircase per nov dated 5-25-10. scope includes repair stairs, treads, stringer, column/post & handrails as required | $51,000 |
| Nov 1, 2010 | Expired or cancelled cancelled Jan 2026 | 165 03rd Av | repair existing dry rot structuraly unstable back staircase per nov dated 5/25/10. scope includes in kind replacement of stair access to roof with alum ladder for safety reasons and any damaged tread, handrail, stringers column/postDetails
repair existing dry rot structuraly unstable back staircase per nov dated 5/25/10. scope includes in kind replacement of stair access to roof with alum ladder for safety reasons and any damaged tread, handrail, stringers column/post | $51,000 |
| Oct 22, 2010 | Completed final sign-off Nov 2010 | 41 Grant Av | revision to 201006305630. add power door openerDetails
revision to 201006305630. add power door opener | $2,000 |
| Oct 20, 2010 | Never finaled issued Oct 2010, no final | 131 Steuart St | ground floor restroom upgrade includes demolition, new partitions, doors & frames, finishes, lighting, electrical & plumbing. fire alarm & sprinkler under seperate permit. minor alterations to finishes in lobby area.Details
ground floor restroom upgrade includes demolition, new partitions, doors & frames, finishes, lighting, electrical & plumbing. fire alarm & sprinkler under seperate permit. minor alterations to finishes in lobby area. | $98,500 |
| Sep 9, 2010 | Completed final sign-off Mar 2011 | 201 Mission St | 7th floor - demo of ceiling height non structural partitions. new rated partitions. new light fixtures. meps under separate permit.Details
7th floor - demo of ceiling height non structural partitions. new rated partitions. new light fixtures. meps under separate permit. | $48,000 |
| Aug 18, 2010 | Completed final sign-off Jul 2011 | 77 Maiden Ln | t.i-6th. flr.: modification & expansion of (e) t.i. space to include selective demo & construction of non-load bearig partitions, (n) light fixtures, (n) office doors, frames & hardware & finishes. note: mep, life safety & fire sprinkler on separate permits.Details
t.i-6th. flr.: modification & expansion of (e) t.i. space to include selective demo & construction of non-load bearig partitions, (n) light fixtures, (n) office doors, frames & hardware & finishes. note: mep, life safety & fire sprinkler on separate permits. | $876,626 |
| Aug 18, 2010 | Completed final sign-off Mar 2011 | 77 Maiden Ln | t.i-7th. flr.: modification & expansion of (e) t.i. space to include selective demo & construction of non-load bearing partitions, (n) light fixtures, (n) office doors frames & hardware & finishes. note: mep, life safety & fire sprinklers on separate permits.Details
t.i-7th. flr.: modification & expansion of (e) t.i. space to include selective demo & construction of non-load bearing partitions, (n) light fixtures, (n) office doors frames & hardware & finishes. note: mep, life safety & fire sprinklers on separate permits. | $573,572 |
| Aug 18, 2010 | Completed final sign-off Jul 2011 | 77 Maiden Ln | t.i.-5th. flr.: modification & expansion of (e) t.i. space to include selective demo & construction of non-load bearing partitions, (n) fixtures, (n) doors frames & millwork & finishes. note: mep, life safety & fire sprinkler on separate permits.Details
t.i.-5th. flr.: modification & expansion of (e) t.i. space to include selective demo & construction of non-load bearing partitions, (n) fixtures, (n) doors frames & millwork & finishes. note: mep, life safety & fire sprinkler on separate permits. | $510,541 |
| Aug 13, 2010 | Completed final sign-off Oct 2010 | 201 Mission St | demo of non structural partitions. constuction of new non structural partitions. relocate 2 linear light fixtures. mep separate permit.Details
demo of non structural partitions. constuction of new non structural partitions. relocate 2 linear light fixtures. mep separate permit. | $60,000 |
| Jul 27, 2010 | Completed final sign-off Sep 2010 | 201 Mission St | office ti on the 23rd floor. demo of non structural partitions. new non structural aprtitions. relocation of existing 2x4 light fixtures. me, sprinkler, life safety under separate permit.Details
office ti on the 23rd floor. demo of non structural partitions. new non structural aprtitions. relocation of existing 2x4 light fixtures. me, sprinkler, life safety under separate permit. | $58,000 |
| Jul 27, 2010 | Completed final sign-off Oct 2010 | 201 Mission St | 27th. flr.: demo of non-structural partitions; clg. height. mep under separate permit per ab-017, vacant.Details
27th. flr.: demo of non-structural partitions; clg. height. mep under separate permit per ab-017, vacant. | $4,000 |
| Jul 22, 2010 | Never finaled issued Jul 2010, no final | 580 California St | non structural demo of ceiling height partitionsDetails
non structural demo of ceiling height partitions | $5,000 |
| Jun 30, 2010 | Completed final sign-off Mar 2011 | 33 New Montgomery St | suite#1420: t.i. on (e) multitenant floor. demolition of office partitions, construction of (n) partitions, doors, power & tel/data receptacles, millwork & finishes. relocation of (e) light fixtures & hvac. mech., elec., & sprinkler system modification is under separate permit.Details
suite#1420: t.i. on (e) multitenant floor. demolition of office partitions, construction of (n) partitions, doors, power & tel/data receptacles, millwork & finishes. relocation of (e) light fixtures & hvac. mech., elec., & sprinkler system modification is under separate permit. | $115,000 |
| Jun 30, 2010 | Completed final sign-off Nov 2010 | 41 Grant Av | office ti on floor 3. new accessible restroom (barrier removal). me under separate permit. add new accesible counter and sink on floor 2.Details
office ti on floor 3. new accessible restroom (barrier removal). me under separate permit. add new accesible counter and sink on floor 2. | $30,000 |
| Jun 14, 2010 | Completed final sign-off Nov 2010 | 33 New Montgomery St | minor non-structural interior demolition. (n) drywall partitions, doors, acoustical ceiling repair, finishes. note: mep on separate permits.Details
minor non-structural interior demolition. (n) drywall partitions, doors, acoustical ceiling repair, finishes. note: mep on separate permits. | $169,923 |
| Jun 4, 2010 | Completed final sign-off Jun 2010 | 201 Mission St | (n) full height partition (non-structural) relocate 2-fluorescent fixtures (2x4) all mep, fire sprinklers and fire alarm on separate permit.Details
(n) full height partition (non-structural) relocate 2-fluorescent fixtures (2x4) all mep, fire sprinklers and fire alarm on separate permit. | $35,000 |
| May 19, 2010 | Completed final sign-off Aug 2010 | 580 California St | office ti on the 17th floor- suite 1725. demo walls, install glass in conference rooms. relocating/rework lighting, install carpet, new paint. ada upgrades to restrooms. mep and life safety under separate permit,.Details
office ti on the 17th floor- suite 1725. demo walls, install glass in conference rooms. relocating/rework lighting, install carpet, new paint. ada upgrades to restrooms. mep and life safety under separate permit,. | $117,000 |
| Apr 29, 2010 | Completed final sign-off Jun 2010 | 131 Steuart St | repair of elevator pit, demolition and construction of water damaged fire rated elevator shaft enclosure. minor improvements to restrooms.Details
repair of elevator pit, demolition and construction of water damaged fire rated elevator shaft enclosure. minor improvements to restrooms. | $45,000 |
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 2 Stockton St | construction of a closure wall to enable abandonment of approx 1800 sf of (e) building area located in the basement beneath the sidewalk & outside the property line. new gas meter roots new fire service line connection. no change in use.Details
construction of a closure wall to enable abandonment of approx 1800 sf of (e) building area located in the basement beneath the sidewalk & outside the property line. new gas meter roots new fire service line connection. no change in use. | $350,000 |
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 77 Ofarrell St | construction of a closure wall to enable abandonement of approx 1400 sf of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit.Details
construction of a closure wall to enable abandonement of approx 1400 sf of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit. | $250,000 |
| Apr 12, 2010 | Completed final sign-off May 2010 | 235 Pine St | 11th. flr. remodel to include demolition of one office and construction of one new non-rated wall and door.Details
11th. flr. remodel to include demolition of one office and construction of one new non-rated wall and door. | $25,000 |
| Mar 30, 2010 | Completed final sign-off Jul 2010 | 255 California St | 5th floor-new tenant demising wall creating 2 offices instead of 1 office, replacement od finishes, minor relocation of (e) power & data, new breakroom. no increase of light fixtures. mechanical, electrical, plumbing & life safety under seperate permitDetails
5th floor-new tenant demising wall creating 2 offices instead of 1 office, replacement od finishes, minor relocation of (e) power & data, new breakroom. no increase of light fixtures. mechanical, electrical, plumbing & life safety under seperate permit | $93,555 |
| Mar 26, 2010 | Completed final sign-off May 2010 | 98 Battery St | 4th floor -combine two adjoining suites into one. add fire-rated door assembly. new drywall partitions. note: no electrical or mechanical work.Details
4th floor -combine two adjoining suites into one. add fire-rated door assembly. new drywall partitions. note: no electrical or mechanical work. | $2,600 |
| Mar 26, 2010 | Completed final sign-off Jul 2010 | 101 Montgomery St | tenant improvement of (e) kitchen/take-out counter. replace (e) type-2, (e) flooring & wall tile, remove interior non bearing wall and add prep sink.Details
tenant improvement of (e) kitchen/take-out counter. replace (e) type-2, (e) flooring & wall tile, remove interior non bearing wall and add prep sink. | $20,000 |
| Mar 10, 2010 | Completed final sign-off May 2010 | 222 Kearny St | 10th fl ti. demo 4 offices, demo and relocate electrical closet. new office and pantry/lunchroom and wall in receptionDetails
10th fl ti. demo 4 offices, demo and relocate electrical closet. new office and pantry/lunchroom and wall in reception | $120,000 |
| Mar 5, 2010 | Completed final sign-off May 2010 | 580 California St | 14th floor-removal of acoustical ceiling tile & grid, install of new ceiling tile & grid. relocation of (e) lighting fixtures, existing sprinklers to remain - no work.Details
14th floor-removal of acoustical ceiling tile & grid, install of new ceiling tile & grid. relocation of (e) lighting fixtures, existing sprinklers to remain - no work. | $20,000 |
| Mar 5, 2010 | Completed final sign-off May 2010 | 580 California St | 13th floor-removal of acoustical ceiling tile & grid, install of new ceiling tile & grid. relocation of (e) lighting fixtures, existing sprinkler to remain- no work.Details
13th floor-removal of acoustical ceiling tile & grid, install of new ceiling tile & grid. relocation of (e) lighting fixtures, existing sprinkler to remain- no work. | $20,000 |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 1140 Oak St | to obtain final inspection for work approved under pa#9417319. all work has been completed.Details
to obtain final inspection for work approved under pa#9417319. all work has been completed. | |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 1140 Oak St | to obtain final inspection for work approved under pa#9724273. all work has been completed.Details
to obtain final inspection for work approved under pa#9724273. all work has been completed. | |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 1140 Oak St | to obtain final inspection for work approved under pa#9904141. all work has been completed.Details
to obtain final inspection for work approved under pa#9904141. all work has been completed. | |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 1140 Oak St | to obtain final inspection for work approved under pa#9122006. all work has been completed.Details
to obtain final inspection for work approved under pa#9122006. all work has been completed. | |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 1140 Oak St | to obtain final inspection for work approved under pa#9015498. all work has been completed.Details
to obtain final inspection for work approved under pa#9015498. all work has been completed. | |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 1140 Oak St | to obtain final inspection for work approved under pa#9213960. all work has been completed.Details
to obtain final inspection for work approved under pa#9213960. all work has been completed. | |
| Feb 23, 2010 | Completed final sign-off Mar 2010 | 1140 Oak St | to obtain final inspection for work approved under pa#9621471. all work has been completed.Details
to obtain final inspection for work approved under pa#9621471. all work has been completed. |