Scott E Clement
- Listed as
- architect, engineer
- Firm
- Revel Architecture & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Oct 2026
292 permits since 2000 (architect on 288 permits, engineer on 4 permits): 219 completed, 33 in progress, 25 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 292.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 201 California St | 2/f suite 200: new construction of conference rooms, huddle, phone and breakarea of non-structural elements. doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. existing space is in shell condition. mep and fire safety deferred.Details
2/f suite 200: new construction of conference rooms, huddle, phone and breakarea of non-structural elements. doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. existing space is in shell condition. mep and fire safety deferred. | $900,000 | |
| Oct 1, 2026 | In progress issued Oct 2026 | 201 Mission St | Richlen Construction | suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812Details
suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812 | $715,000 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 601 California St | minor upgrades to an (e) unocupied suite for a new tenant: demo 2 offices to make 1 open office. reworking a copy area for an open teller area and expanding an it / storage closet, additional power outlets. no changes in fixtures count.Details
minor upgrades to an (e) unocupied suite for a new tenant: demo 2 offices to make 1 open office. reworking a copy area for an open teller area and expanding an it / storage closet, additional power outlets. no changes in fixtures count. | $375,000 | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 888 Brannan St | 1st floor:interior demolition of non-structural elements & new construction of 4 all gender restrooms & new ada upgrades for pot. no changes to exterior bldg, site, landscape, use, or bldg structure are proposed. mep, life safety, fire alarm and sprinkler modifications are under seperate permits.Details
1st floor:interior demolition of non-structural elements & new construction of 4 all gender restrooms & new ada upgrades for pot. no changes to exterior bldg, site, landscape, use, or bldg structure are proposed. mep, life safety, fire alarm and sprinkler modifications are under seperate permits. | $250,000 | |
| Sep 29, 2026 | In progress issued Sep 2026 | 600 Harrison St | Rudolph Commercial Interiors Inc, Rci | suite #650: interior demolition & construction of non-structural elements including interior partition, doors, finishes, ceilings, lighting,mechanical systems, modification & electrical outlets & switches. mech & elect plans tobe submitted under separate permits. no change of use or path of travel.Details
suite #650: interior demolition & construction of non-structural elements including interior partition, doors, finishes, ceilings, lighting,mechanical systems, modification & electrical outlets & switches. mech & elect plans tobe submitted under separate permits. no change of use or path of travel. | $2,000,000 |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 500 Beach St | interior demolition and consturction ofn non structural elements including but not necessarily limted to interior partitions, door, finishes,ceilings, lighting, mech, electrical outlets switches. new multi stall and gnr rr5 pot and ramp and stair under prev appvd 202607024493 mep deferredDetails
interior demolition and consturction ofn non structural elements including but not necessarily limted to interior partitions, door, finishes,ceilings, lighting, mech, electrical outlets switches. new multi stall and gnr rr5 pot and ramp and stair under prev appvd 202607024493 mep deferred | $800,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1455 Market St | floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electricDetails
floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric | $85,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1455 Market St | floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.Details
floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed. | $225,000 | |
| Sep 10, 2026 | In progress issued Sep 2026 | 888 Brannan St | Source Planning And Construction Inc | 1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuancDetails
1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuanc | $250,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 444 De Haro St | Gci, Inc | soft demo per ab-017. select demo of non-structure partitions, dropped, ceilings, lighting, and associated power/data, existing equipment and finishesDetails
soft demo per ab-017. select demo of non-structure partitions, dropped, ceilings, lighting, and associated power/data, existing equipment and finishes | $45,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits.Details
47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits. | $202,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 580 California St | Skyline Construction | 15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits.Details
15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & ada accessibility upgrades. mep & ufe safety under separate permits. | $3,034,458 |
| Aug 24, 2026 | In progress issued Aug 2026 | 444 De Haro St | Gci, Inc | 1/fl- minor demo and interior consturciton of non structural partitions, relcoated doors and new exit signs and restroom upgradesDetails
1/fl- minor demo and interior consturciton of non structural partitions, relcoated doors and new exit signs and restroom upgrades | $30,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1455 Market St | Bcci Construction Company | 5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work.Details
5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work. | $2,364,489 |
| Jul 30, 2026 | In progress issued Aug 2026 | 101 California St | Hp Build | 45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072Details
45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072 | $254,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491Details
45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491 | $202,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491Details
39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491 | $202,000 |
| Jun 8, 2026 | In progress issued Aug 2026 | 444 De Haro St | Gci, Inc | ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permitDetails
ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permit | $460,000 |
| Jun 5, 2026 | In progress filed Jun 2026, not yet issued | 550 Kearny St | Source Planning And Construction Inc | 5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.Details
5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528. | |
| May 14, 2026 | In progress filed May 2026, not yet issued | 1455 Market St | Bcci Construction Company | 4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be doneDetails
4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be done | |
| Apr 9, 2026 | In progress issued Apr 2026 | 550 Kearny St | Source Planning And Construction Inc | selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.Details
selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes. | $135,000 |
| Apr 3, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilingsDetails
revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings | |
| Apr 3, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931Details
revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931 | |
| Mar 26, 2026 | In progress issued Sep 2026 | 1455 Market St | Bcci Construction Company | 7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required.Details
7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required. | $257,580 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 101 California St | Hp Build | 16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.Details
16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 101 California St | Hp Build | 24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.Details
24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Feb 13, 2026 | In progress issued Feb 2026 | 185 Berry St | Hathaway Dinwiddie Co. | 2/f suite 2400: tenant improvement. interior construction of non structural elements including but not necessary limited interior partitions, doors, finishes, ceiling and lighting. relocation of restroom. mep deferred.Details
2/f suite 2400: tenant improvement. interior construction of non structural elements including but not necessary limited interior partitions, doors, finishes, ceiling and lighting. relocation of restroom. mep deferred. | $1,400,000 |
| Feb 13, 2026 | In progress issued Feb 2026 | 595 Market St | Source Planning And Construction Inc | 24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permitDetails
24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permit | $400,000 |
| Feb 12, 2026 | In progress issued Feb 2026 | 185 Berry St | Hathaway Dinwiddie Co. | 1/f suite 1200: tenant improvement. new offices interior partitions, doors, finishes, ceiling and lighting. mep deferred. non structural.Details
1/f suite 1200: tenant improvement. new offices interior partitions, doors, finishes, ceiling and lighting. mep deferred. non structural. | $1,100,000 |
| Jan 21, 2026 | Completed final sign-off Jun 2026 | 201 Mission St | Richlen Construction | ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permitsDetails
ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits | $255,000 |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 50 Green St | 1st/f & mezzanine: install new finishes, demo e) finishes. 2nf/f: interior t.i. new partitions, doors, finishes, ceiling & lighting mep deferredDetails
1st/f & mezzanine: install new finishes, demo e) finishes. 2nf/f: interior t.i. new partitions, doors, finishes, ceiling & lighting mep deferred | $750,172 | |
| Oct 30, 2025 | Completed final sign-off Jul 2026 | 201 Mission St | Richlen Construction | 23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.Details
23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant. | $657,000 |
| Oct 23, 2025 | Completed final sign-off May 2026 | 1 Bush St | Skyline Construction | 15th fl - revision to pa 202508082627 capture smoke control narritve updates and assorted mechanical revisions including updates to the smoke fire damper matrixDetails
15th fl - revision to pa 202508082627 capture smoke control narritve updates and assorted mechanical revisions including updates to the smoke fire damper matrix | |
| Oct 16, 2025 | Completed final sign-off Apr 2026 | 795 Folsom St | M C S Construction Services | demolition of non structural elements including building entry exit storefront systems. instal new store front entry systems in 2 locations no site, landscape, use or parking changes proposed.Details
demolition of non structural elements including building entry exit storefront systems. instal new store front entry systems in 2 locations no site, landscape, use or parking changes proposed. | $100,000 |
| Sep 25, 2025 | Completed final sign-off Nov 2025 | 405 Howard St | Bcci Construction Company | 3rd flr. demolition of 7 doors and 3 non structural demising walls at the 3rd floor. no ceiling demolition. floor is currently unoccupied. no change to mep or sprinklers and no fire, life and safety.Details
3rd flr. demolition of 7 doors and 3 non structural demising walls at the 3rd floor. no ceiling demolition. floor is currently unoccupied. no change to mep or sprinklers and no fire, life and safety. | $75,000 |
| Sep 24, 2025 | Completed final sign-off Mar 2026 | 1 Bush St | Skyline Construction | 15th fl - revision to pa 202503051636 provide structural anchorage details for ceiling feature @ servery seating rm-11Details
15th fl - revision to pa 202503051636 provide structural anchorage details for ceiling feature @ servery seating rm-11 | |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 1045 Sansome St | Broadway Building Group Co. | suite 1025. 1st floor: restroom upgrades for accessibility compliance at men's and women's restrooms.Details
suite 1025. 1st floor: restroom upgrades for accessibility compliance at men's and women's restrooms. | $153,360 |
| Sep 5, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | Hathaway Dinwiddie Co. | 17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.Details
17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit. | $800,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 795 Folsom St | M C S Construction Services | level 1, interior demolition of non-structural elements including partitions, doors, finishes, ceilings, lighting. demising grand floor lobby, construction of fitness center. conference room and lounge include path of travel and restroom upgrades. mep. life safety and sprinkler under separate permitDetails
level 1, interior demolition of non-structural elements including partitions, doors, finishes, ceilings, lighting. demising grand floor lobby, construction of fitness center. conference room and lounge include path of travel and restroom upgrades. mep. life safety and sprinkler under separate permit | $1,000,000 |
| Jul 23, 2025 | Completed final sign-off Sep 2026 | 1455 Market St | Bcci Construction Company | 4th/fl:consist of extending the (e) elevator that currently serves the second and third floors. bringing up to serve the 4th/fl. project includes new elevator vestibule on the 4th/fl.the elevator machine room and pit reside onthe 7th /fl.Details
4th/fl:consist of extending the (e) elevator that currently serves the second and third floors. bringing up to serve the 4th/fl. project includes new elevator vestibule on the 4th/fl.the elevator machine room and pit reside onthe 7th /fl. | $450,000 |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 185 Berry St | Hathaway Dinwiddie Co. | tenant improvement: partial demo at e wall, add door, add new wall, relocate e lighting and elecDetails
tenant improvement: partial demo at e wall, add door, add new wall, relocate e lighting and elec | $36,750 |
| May 30, 2025 | In progress issued Jul 2025 | 1 Embarcadero Center | Gci, Inc | 38th fl: demolition of non structural interior partitions and doors. new construction to include doors, partitions, ceiling, lighting, plumbing finishes. mep, life safety & sprinkler modifications will be submitted as separate permitsDetails
38th fl: demolition of non structural interior partitions and doors. new construction to include doors, partitions, ceiling, lighting, plumbing finishes. mep, life safety & sprinkler modifications will be submitted as separate permits | $874,993 |
| May 12, 2025 | Completed final sign-off Feb 2026 | 555 Market St | Peacock Construction | t.i. on 3rd floor: add 2 offices and 1 confernce room. accessible path of travel upgrades in restrooms as noted. mep deferred.Details
t.i. on 3rd floor: add 2 offices and 1 confernce room. accessible path of travel upgrades in restrooms as noted. mep deferred. | $594,000 |
| May 5, 2025 | Completed final sign-off Jun 2025 | 350 Rhode Island St | Rossi Builders Inc. | 2/f suite 240 - interior demo of 1 wall and construction of 3 conference rooms. mechanical, electrical, and fire life safety will be deferred permits.Details
2/f suite 240 - interior demo of 1 wall and construction of 3 conference rooms. mechanical, electrical, and fire life safety will be deferred permits. | $300,000 |
| May 1, 2025 | Completed final sign-off May 2026 | 1 Bush St | Skyline Construction | 15/f level 15: interior tenant improvement. minor non-structural demo. new non-structural partitions, lighting, finishes, including restrooms. mep deferred.Details
15/f level 15: interior tenant improvement. minor non-structural demo. new non-structural partitions, lighting, finishes, including restrooms. mep deferred. | $3,258,010 |
| Apr 4, 2025 | In progress issued Jul 2025 | 660 Market St | Wci-Gc Inc | ground floor- voluntary strutrual strengtheningDetails
ground floor- voluntary strutrual strengthening | $140,500 |
| Apr 1, 2025 | In progress filed Apr 2025, not yet issued | 795 Folsom St | path of travel upgrades to current code compliance and to comply with abe ordinance. includes new parking striping modification, van accessible stall relocation and signage upgrades. abe 201904105680Details
path of travel upgrades to current code compliance and to comply with abe ordinance. includes new parking striping modification, van accessible stall relocation and signage upgrades. abe 201904105680 | $6,000 | |
| Mar 5, 2025 | Completed final sign-off Aug 2026 | 680 Folsom St | Gci, Inc | 15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferredDetails
15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferred | $790,000 |
| Jan 21, 2025 | In progress issued Mar 2025 | 1 Bush St | Skyline Construction | 15th fl structural floor reinforcemnt ada upgrades to restroom (no change in plumbing fixtures)Details
15th fl structural floor reinforcemnt ada upgrades to restroom (no change in plumbing fixtures) | $70,000 |
| Jan 9, 2025 | Completed final sign-off Apr 2025 | 225 Bush St | Novo Construction Inc | installation of 16 phone booth total: 15th floor 9 phone booths, 16th floor 7 phone boothsDetails
installation of 16 phone booth total: 15th floor 9 phone booths, 16th floor 7 phone booths | $98,100 |
| Dec 5, 2024 | Completed final sign-off Mar 2026 | 333 Bush St | Source Planning And Construction Inc | 21st fl restroom upgrades. new interior restroom finishes,lighting, fixtures, stall partiions,drinking fountain. electrical and plumbing will be sep permit ref 202308305609Details
21st fl restroom upgrades. new interior restroom finishes,lighting, fixtures, stall partiions,drinking fountain. electrical and plumbing will be sep permit ref 202308305609 | $110,000 |
| Nov 21, 2024 | Completed final sign-off May 2025 | 660 Market St | Wci-Gc Inc | 3/f: shall consist of inteior demo of lighting, millwork, and finishes. new work - 2 new conf rooms, lighting, break area millwork and finishes. new rated vestibule. mech, electrical, and fire safety plans will be deferred design build.Details
3/f: shall consist of inteior demo of lighting, millwork, and finishes. new work - 2 new conf rooms, lighting, break area millwork and finishes. new rated vestibule. mech, electrical, and fire safety plans will be deferred design build. | $309,543 |
| Nov 20, 2024 | Completed final sign-off Jun 2025 | 405 Howard St | Bcci Construction Company | document building ground floor entrances, elevators, and parking path of travel to full compliance. includes (n) parking striping, ev charging stalls and exit signageDetails
document building ground floor entrances, elevators, and parking path of travel to full compliance. includes (n) parking striping, ev charging stalls and exit signage | $8,000 |
| Oct 28, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | Source Planning And Construction Inc | installation of new lobby hidden door, new finishes and required restroom upgrades electrical will be trade permit path of travel previously approved pa# 2023-0223-2487Details
installation of new lobby hidden door, new finishes and required restroom upgrades electrical will be trade permit path of travel previously approved pa# 2023-0223-2487 | $25,000 |
| Oct 15, 2024 | Completed final sign-off May 2025 | 425 Market St | Principal Builders Inc. | ste 1500- 15/fl- minimal interior demo of non structural elements and construction of inter office including but not limited to interior partitions doors, finishes , celing, lighting, mechanical and electrical outlets and switches. refer to mech and elec. plans. restroom ada accessibility and (n)Details
ste 1500- 15/fl- minimal interior demo of non structural elements and construction of inter office including but not limited to interior partitions doors, finishes , celing, lighting, mechanical and electrical outlets and switches. refer to mech and elec. plans. restroom ada accessibility and (n) | $3,500,000 |
| Oct 2, 2024 | Completed final sign-off May 2025 | 747 Front St | San Francisco Commercial Builders Inc | revision to approved pa # 202405091825: revise scope - revision to partition type c per elevation 8/a104.1 and details 2 & 4 a/a601.1.Details
revision to approved pa # 202405091825: revise scope - revision to partition type c per elevation 8/a104.1 and details 2 & 4 a/a601.1. | |
| Sep 13, 2024 | Completed final sign-off Apr 2025 | 111 Sutter St | Gci, Inc | interior tenant improvement; selective demolition and construction of non-load bearing partitions, new office doors, ceilings, lighting, and new millwork and finishes. mep and fire/life safety under separate permit.Details
interior tenant improvement; selective demolition and construction of non-load bearing partitions, new office doors, ceilings, lighting, and new millwork and finishes. mep and fire/life safety under separate permit. | $950,000 |
| Sep 11, 2024 | Completed final sign-off May 2025 | 221 Main St | Gci, Inc | revise pa# 202403147834: to show updated fixtures, finishes, revised partitions, joists, and posts.Details
revise pa# 202403147834: to show updated fixtures, finishes, revised partitions, joists, and posts. | |
| Sep 5, 2024 | Completed final sign-off Feb 2025 | 333 Bush St | Source Planning And Construction Inc | 15th floor: interior demolition of non structural elements including partitions, doors, finishes, ceiling, lighting. construction of 1 conference, library, break, area. path of travel prevously approved per permit #202308305609Details
15th floor: interior demolition of non structural elements including partitions, doors, finishes, ceiling, lighting. construction of 1 conference, library, break, area. path of travel prevously approved per permit #202308305609 | $435,000 |
| Jun 26, 2024 | Completed final sign-off Nov 2025 | 1160 Battery St | Bcci Construction Company | 4th fl ti non structural. no exterior partitions, finishes, ceilings, lighting, mep. mep equipment anchorage deferred. no cfc until deferred submittals (including mep equipment anchorage) are permitted and completedDetails
4th fl ti non structural. no exterior partitions, finishes, ceilings, lighting, mep. mep equipment anchorage deferred. no cfc until deferred submittals (including mep equipment anchorage) are permitted and completed | $2,514,630 |
| Jun 20, 2024 | Completed final sign-off Sep 2025 | 1455 Market St | Bcci Construction Company | floors 6-8: office ti with (n) non structural interior partitions. minor upgrades to path of travel. 7th floor restroom under this permit.Details
floors 6-8: office ti with (n) non structural interior partitions. minor upgrades to path of travel. 7th floor restroom under this permit. | $500,000 |
| May 30, 2024 | Completed final sign-off Nov 2024 | 44 Montgomery St | M C S Construction Services | 37/f-ste 3750 : demo of interior partitions, power/data, flooring, millwork, ceiling, lighting and finishes. construction includes new partitions, doors, power, ceiling, lighting, finishes and millwork. mep & fore life safety and sprinkler system modifications are to be separete and deferred.Details
37/f-ste 3750 : demo of interior partitions, power/data, flooring, millwork, ceiling, lighting and finishes. construction includes new partitions, doors, power, ceiling, lighting, finishes and millwork. mep & fore life safety and sprinkler system modifications are to be separete and deferred. | $425,000 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 44 Montgomery St | M C S Construction Services | 16/f- ste 1650: demo of interior partitions, power/data, flooring, millwork, lighting and finishes. construction of limited partitions, power, lighting, and finishes. millwork and ada drinking accessible fountain. mep, fls & sprinkler sys modifications are to be separete and deferred.Details
16/f- ste 1650: demo of interior partitions, power/data, flooring, millwork, lighting and finishes. construction of limited partitions, power, lighting, and finishes. millwork and ada drinking accessible fountain. mep, fls & sprinkler sys modifications are to be separete and deferred. | $265,000 |
| May 10, 2024 | Completed final sign-off Jul 2024 | 1 Bush St | Skyline Construction | 15th fl demo only non structural ab017. ti to build out under sep permitDetails
15th fl demo only non structural ab017. ti to build out under sep permit | $67,000 |
| May 2, 2024 | Completed final sign-off Apr 2025 | 704 Sansome St | Roebuck Construction | 3/f: (1) renovated office and (1) new conference room. new millwork pantry. the space is currently unoccupied. mech and elec. plans will be submitted separately.Details
3/f: (1) renovated office and (1) new conference room. new millwork pantry. the space is currently unoccupied. mech and elec. plans will be submitted separately. | $85,000 |
| Apr 26, 2024 | In progress issued May 2024 | 221 Main St | Source Planning And Construction Inc | revision to pa 202401264744 to clarify occupancy load calculationDetails
revision to pa 202401264744 to clarify occupancy load calculation | |
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 343 Sansome St | West Coast Build Aka Fairway Constructio | office ti 9th floor to include soft demo (e) space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add (n) non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator,Details
office ti 9th floor to include soft demo (e) space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add (n) non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator, | $1,012,487 |
| Apr 10, 2024 | Completed final sign-off May 2025 | 221 Main St | Gci, Inc | work on ground fl,consists of interior demo of non-structrural elements indlcuding but not necessarily limited to,interior partitions,doors,finishes,ceilings,lighting,mech & elec outlets & switches.addition of(n)gender neutral restrooms.Details
work on ground fl,consists of interior demo of non-structrural elements indlcuding but not necessarily limited to,interior partitions,doors,finishes,ceilings,lighting,mech & elec outlets & switches.addition of(n)gender neutral restrooms. | $1,375,798 |
| Mar 6, 2024 | Completed final sign-off Mar 2024 | 185 Berry St | Skyline Construction | ste 5000 - interior demolition of non structural to include partitions, doors, finishes, ceilings, lighting and hvac. ab-017 ref 202403057074Details
ste 5000 - interior demolition of non structural to include partitions, doors, finishes, ceilings, lighting and hvac. ab-017 ref 202403057074 | $10,000 |
| Feb 28, 2024 | Completed final sign-off Jul 2024 | 201 California St | Richlen Construction | 6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferredDetails
6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferred | $214,819 |
| Feb 1, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.Details
22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered. | |
| Jan 26, 2024 | In progress issued Feb 2024 | 221 Main St | Source Planning And Construction Inc | suite #700: 7th floor: consists of limited interior demolition & construction of non-structural elements including but not limited to partitions, finishes, electrical outlets and switches. scope of work also includes restroom ada acessibility upgrades. mep plans will be sumitted as seperate permitDetails
suite #700: 7th floor: consists of limited interior demolition & construction of non-structural elements including but not limited to partitions, finishes, electrical outlets and switches. scope of work also includes restroom ada acessibility upgrades. mep plans will be sumitted as seperate permit | $271,648 |
| Jan 25, 2024 | Completed final sign-off May 2024 | 44 Montgomery St | M C S Construction Services | 33/f tes 3340: deferred mechanical & electrical. permit ref # 202311019948. mechanical: add 1 transfer fan, provide new ductwork distribution, ceiling & wall diffusers, relocated (e) thermostats, air balance, relocated 3 vav boxes. electrical: lighting & fixtures & associated circuiting /controls, pDetails
33/f tes 3340: deferred mechanical & electrical. permit ref # 202311019948. mechanical: add 1 transfer fan, provide new ductwork distribution, ceiling & wall diffusers, relocated (e) thermostats, air balance, relocated 3 vav boxes. electrical: lighting & fixtures & associated circuiting /controls, p | $120,000 |
| Jan 10, 2024 | Completed final sign-off Oct 2024 | 747 Front St | San Francisco Commercial Builders Inc | 4th fl - consists of interior demo of non structural elements & ti office build out. office improvements consists of (n) offices, meeting rooms, lounge, shower (n) partitions, doors, finishes, ceilings & lighting. scope of work includes restroom ada accessibility upgrades. mep, life safety & fireDetails
4th fl - consists of interior demo of non structural elements & ti office build out. office improvements consists of (n) offices, meeting rooms, lounge, shower (n) partitions, doors, finishes, ceilings & lighting. scope of work includes restroom ada accessibility upgrades. mep, life safety & fire | $2,000,000 |
| Jan 4, 2024 | Completed final sign-off Apr 2024 | 201 Mission St | Richlen Construction | adding ada passenger drop-off/ loading zone in parking lot.Details
adding ada passenger drop-off/ loading zone in parking lot. | $500 |
| Dec 7, 2023 | Completed final sign-off Feb 2024 | 185 Berry St | Dpr Construction A | suite 6000: scope of work on the 1st fl shall consist of interior demolition of non-structural partitions including power/data, doors/frames/hardware, finishes, and ceiling/lighting. tenant space remain vacant under ab-017.Details
suite 6000: scope of work on the 1st fl shall consist of interior demolition of non-structural partitions including power/data, doors/frames/hardware, finishes, and ceiling/lighting. tenant space remain vacant under ab-017. | $240,000 |
| Nov 9, 2023 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.Details
7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $504,622 |
| Nov 9, 2023 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.Details
22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $442,270 |
| Nov 9, 2023 | Completed final sign-off Apr 2024 | 201 Mission St | Richlen Construction | suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.Details
suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes. | $486,433 |
| Nov 8, 2023 | Completed final sign-off May 2025 | 350 Rhode Island St | Rossi Builders Inc. | 2/f-ste# 220/230: interior demo at non-structural partitions and millwork. new interior partitions at breakroom, finishes and relocate at workstations. lighting & power, mep, life safety, and sprinkler under separate permit.Details
2/f-ste# 220/230: interior demo at non-structural partitions and millwork. new interior partitions at breakroom, finishes and relocate at workstations. lighting & power, mep, life safety, and sprinkler under separate permit. | $850,000 |
| Nov 2, 2023 | Completed final sign-off Jun 2024 | 101 California St | Source Planning And Construction Inc | 8th fl-ste 800: scope of work consist of enclosing an open area and creating a conference room. minimal demolition to coat closed partions doors and lights, act ceiling.Details
8th fl-ste 800: scope of work consist of enclosing an open area and creating a conference room. minimal demolition to coat closed partions doors and lights, act ceiling. | $180,000 |
| Nov 1, 2023 | Completed final sign-off Aug 2024 | 44 Montgomery St | M C S Construction Services | 10th fl ste 1000: demolition of interior partitions, power/data, flooring, millwork, lighting & finishes. construction includes new partitions, doors, power lighting, finishes, and millwork. mep, fire safety, & sprinkler under separate permit.Details
10th fl ste 1000: demolition of interior partitions, power/data, flooring, millwork, lighting & finishes. construction includes new partitions, doors, power lighting, finishes, and millwork. mep, fire safety, & sprinkler under separate permit. | $460,898 |
| Nov 1, 2023 | Completed final sign-off May 2024 | 44 Montgomery St | M C S Construction Services | 33/f: demo of corridor entry, new partitions, doors, power, lighting, finishes, millwork. mep/life safety/sprinkler deferred. ref bpa#202208110367Details
33/f: demo of corridor entry, new partitions, doors, power, lighting, finishes, millwork. mep/life safety/sprinkler deferred. ref bpa#202208110367 | $789,525 |
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 394 Pacific Av | Gci, Inc | 2-3/f: install 7-phone booths, accessibility is provided w/phone rooms directly adjacent to hpone booths. sprinkler/life safety deferredDetails
2-3/f: install 7-phone booths, accessibility is provided w/phone rooms directly adjacent to hpone booths. sprinkler/life safety deferred | $47,000 |
| Oct 19, 2023 | Completed final sign-off Feb 2024 | 101 California St | Novo Construction Inc | 14/f: revision to bpa#202211106261, to remove 14/f from scope of workDetails
14/f: revision to bpa#202211106261, to remove 14/f from scope of work | |
| Oct 18, 2023 | Completed final sign-off Nov 2023 | 4243 18th St | abe #202002242238, to comply with abe program/technical infeasibility or unreasonable hardship per ordinance 51-16Details
abe #202002242238, to comply with abe program/technical infeasibility or unreasonable hardship per ordinance 51-16 | ||
| Oct 16, 2023 | Completed final sign-off Apr 2024 | 225 Bush St | Bcci Construction Company | 17/f: interior only, office ti to include new non-structural partitions, doors, finishes, ceilings and lighting. electrical and mechanical included.Details
17/f: interior only, office ti to include new non-structural partitions, doors, finishes, ceilings and lighting. electrical and mechanical included. | $150,000 |
| Oct 12, 2023 | In progress issued Nov 2023 | 350 Mission St | Novo Construction Inc | 7th flr. documenting occupancy load for place of assembly permit. refer to prmit #2023-0515-7788.Details
7th flr. documenting occupancy load for place of assembly permit. refer to prmit #2023-0515-7788. | |
| Oct 11, 2023 | Completed final sign-off Jul 2024 | 650 California St | Gci, Inc | 28/f: interior demolition and new construction of non-structural elements including interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches as well as restroom accessiblity upgrades. mechanical and electrical under separate permit.Details
28/f: interior demolition and new construction of non-structural elements including interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches as well as restroom accessiblity upgrades. mechanical and electrical under separate permit. | $470,275 |
| Oct 5, 2023 | Completed final sign-off Apr 2024 | 101 California St | Gci, Inc | ste 2870: scope of work on the 28th fl consists of interior demolition of non-structural elements including-interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlet switches.Details
ste 2870: scope of work on the 28th fl consists of interior demolition of non-structural elements including-interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlet switches. | $125,000 |
| Sep 28, 2023 | Completed final sign-off Jan 2024 | 225 Bush St | Bcci Construction Company | 16th fl: interior only office ti to include new non-structural partitions, doors, finishes, ceilings and lighting. electrical and plumbing included. no mechanical hvac ductwork.Details
16th fl: interior only office ti to include new non-structural partitions, doors, finishes, ceilings and lighting. electrical and plumbing included. no mechanical hvac ductwork. | $150,000 |
| Sep 26, 2023 | Completed final sign-off Jan 2024 | 225 Bush St | Bcci Construction Company | 15th fl - interior only office tenant improvement. new partitions, doors, finishes, ceiings and lighting. electrical and plumbing includedDetails
15th fl - interior only office tenant improvement. new partitions, doors, finishes, ceiings and lighting. electrical and plumbing included | $100,000 |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 55 Francisco St | Dpr Construction A | 6/f: single flr tenant remodel on flr 6 to include restroom upgrades, huddle rooms, telephone rooms, meeting rooms and lunch room. scope includes new ceilings finishes, mep, lfs fire alarm & sprinklers under separate permit.Details
6/f: single flr tenant remodel on flr 6 to include restroom upgrades, huddle rooms, telephone rooms, meeting rooms and lunch room. scope includes new ceilings finishes, mep, lfs fire alarm & sprinklers under separate permit. | $1,178,072 |
| Sep 20, 2023 | Completed final sign-off Feb 2024 | 101 California St | Novo Construction Inc | 8/f: bring restrooms & drinking fountains to full compliance. demo of rr partitions, finishes & plumbing fixtures to be replaced w/new mech, elec, l/s & sprinkler system modification will be deferred submittals. this permit shall provided stamped docs to show restrooms & drinking fountains full compDetails
8/f: bring restrooms & drinking fountains to full compliance. demo of rr partitions, finishes & plumbing fixtures to be replaced w/new mech, elec, l/s & sprinkler system modification will be deferred submittals. this permit shall provided stamped docs to show restrooms & drinking fountains full comp | $125,000 |
| Aug 29, 2023 | Completed final sign-off Feb 2024 | 101 California St | Source Planning And Construction Inc | 30th fl ste 3070 & 3000 - combining suites 3070 & 3000 to create one. demo includes non-structural elements, interior partitions, doors, finishes, ceiling, lighting, power/data. construction includes (n) non-structural partitions, doors, finishes, millwork, ceiling, lighting, power & data. allDetails
30th fl ste 3070 & 3000 - combining suites 3070 & 3000 to create one. demo includes non-structural elements, interior partitions, doors, finishes, ceiling, lighting, power/data. construction includes (n) non-structural partitions, doors, finishes, millwork, ceiling, lighting, power & data. all | $950,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2023 | 580 California St | San Francisco Commercial Builders Inc | revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system.Details
revision to pa# 2023-0208-1593, to eliminate from scope of work mep, fire/life safety & sprinkler system. | |
| Jun 28, 2023 | Completed final sign-off Mar 2024 | 350 Mission St | Novo Construction Inc | floors 21,22,23 revision to 202212077850. revised egress plans and calculations that do not impact existing exiting from the spaceDetails
floors 21,22,23 revision to 202212077850. revised egress plans and calculations that do not impact existing exiting from the space | |
| Jun 14, 2023 | Completed final sign-off Mar 2024 | 350 Mission St | Novo Construction Inc | 6th fl: interior demolition of non-structural elements including but not necessarily limited to, interior partitions, doors, finishes, ceilings, lightings, mep to be submitted as separate permit.Details
6th fl: interior demolition of non-structural elements including but not necessarily limited to, interior partitions, doors, finishes, ceilings, lightings, mep to be submitted as separate permit. | $600,000 |
| Jun 14, 2023 | Completed final sign-off Mar 2024 | 350 Mission St | Novo Construction Inc | 5th fl: interior demolition of non-structural elements including but not necessarily limited to, interior partitions, doors, finishes, ceilings, lightings, mep to be submitted as separate permitDetails
5th fl: interior demolition of non-structural elements including but not necessarily limited to, interior partitions, doors, finishes, ceilings, lightings, mep to be submitted as separate permit | $600,000 |
| Jun 13, 2023 | Completed final sign-off May 2024 | 595 Market St | Gci, Inc | ste 1350. tenant improvement demolition, construction, mep, and structural. includes security partitions, meeting room, break area, gender neutural restrooms, and common corridor. path of travel previously approved 202303073171. mep, life safety, sprinkler deferred submittal.Details
ste 1350. tenant improvement demolition, construction, mep, and structural. includes security partitions, meeting room, break area, gender neutural restrooms, and common corridor. path of travel previously approved 202303073171. mep, life safety, sprinkler deferred submittal. | $900,000 |