West Coast Build Aka Fairway Constructio
- Based in
- Novato
- On San Francisco permits
- Nov 2023 to Sep 2026
- Last 24 months
- 33 permits filed
43 permits since 2000: 28 completed, 15 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Oct 2026 | 140 New Montgomery St | office t.i new non structural partitons, doors, ceilings, lighting fixtures, finishesDetails
office t.i new non structural partitons, doors, ceilings, lighting fixtures, finishes | $800,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 1160 Battery St | 3rd floor east: deferred mechanical and electrical. bldg bpa #202606042525Details
3rd floor east: deferred mechanical and electrical. bldg bpa #202606042525 | $1,935,750 |
| Jul 15, 2026 | Completed final sign-off Aug 2026 | 100 Montgomery St | revision to bpa: 202602276645 - provide ada phone room signages to ada phone rooms 1012 & 1017Details
revision to bpa: 202602276645 - provide ada phone room signages to ada phone rooms 1012 & 1017 | $1,000 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 100 California St | 7/fl- interior install demising wall in (e) tenant space, non rated wallDetails
7/fl- interior install demising wall in (e) tenant space, non rated wall | $50,000 |
| Jun 4, 2026 | In progress issued Aug 2026 | 1160 Battery St | 3/fl- ti includes demo of non strucrual partitions, addition of non structrual paritions, doors, frames, cabinerty and finishes. mep deferred. (east bldg)Details
3/fl- ti includes demo of non strucrual partitions, addition of non structrual paritions, doors, frames, cabinerty and finishes. mep deferred. (east bldg) | $4,900,000 |
| May 29, 2026 | In progress issued Jun 2026 | 100 California St | revision to pa# 202512192291, to show changes in design to vestibule, structural drawings included.Details
revision to pa# 202512192291, to show changes in design to vestibule, structural drawings included. | |
| May 26, 2026 | In progress issued Aug 2026 | 140 New Montgomery St | l9. ti demo of (e) + (n) partitions, finishes, millwork. no structural or exterior work.Details
l9. ti demo of (e) + (n) partitions, finishes, millwork. no structural or exterior work. | $652,077 |
| Apr 3, 2026 | In progress issued Apr 2026 | 140 New Montgomery St | 5/f: new phone booths added to (e) space.Details
5/f: new phone booths added to (e) space. | $10,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 100 Montgomery St | 10/f: deferred electrical upgrade to permit 202602276645Details
10/f: deferred electrical upgrade to permit 202602276645 | $175,000 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 100 Montgomery St | 10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical.Details
10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical. | $525,000 |
| Feb 6, 2026 | Completed final sign-off Jun 2026 | 801 Montgomery St | 2nd/f: revision to 202509256081, new office layout/ phoneroomsDetails
2nd/f: revision to 202509256081, new office layout/ phonerooms | |
| Feb 6, 2026 | In progress issued Feb 2026 | 1160 Battery St | 3/f west bldg: revision to 202509266156 (arch ref 202506189005). demo and revise (e) ductwork and diffusers to accommodate new floor plan layout. furnish and install new duct, diffusers, and terminal units to accommodate new floor plan layout. install new transfer fan to serve new storage space.Details
3/f west bldg: revision to 202509266156 (arch ref 202506189005). demo and revise (e) ductwork and diffusers to accommodate new floor plan layout. furnish and install new duct, diffusers, and terminal units to accommodate new floor plan layout. install new transfer fan to serve new storage space. | $15,000 |
| Jan 23, 2026 | Completed final sign-off May 2026 | 100 California St | 1st/f - revision to 202508012119. remove of (e) pair doors and finishes, (n) pair 20-minute rated doors, adjust (e) light fixture and (n) finishes.Details
1st/f - revision to 202508012119. remove of (e) pair doors and finishes, (n) pair 20-minute rated doors, adjust (e) light fixture and (n) finishes. | $25,000 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 140 New Montgomery St | 25th fl revision to pa #2025-1112-9428: to remove mechanical unit from original scope of work.Details
25th fl revision to pa #2025-1112-9428: to remove mechanical unit from original scope of work. | |
| Dec 31, 2025 | Completed final sign-off Jun 2026 | 801 Montgomery St | 2nd/f mep for t.i. ref 202509256081Details
2nd/f mep for t.i. ref 202509256081 | $10,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 100 California St | 1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting.Details
1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting. | $1,134,601 |
| Dec 19, 2025 | In progress issued Feb 2026 | 100 California St | 10th fl: partial floor tenant improvement. demo and construction of offices. conference rooms, restrooms, break room. structural and mep included.Details
10th fl: partial floor tenant improvement. demo and construction of offices. conference rooms, restrooms, break room. structural and mep included. | $2,701,789 |
| Dec 15, 2025 | In progress issued Mar 2026 | 343 Sansome St | scope of work includes: selective demolition of non structural partitions, doors, glazing, ceiling, light fixtures and finishes. per ab-017. space will remain un-occupied. permit for construction and related accessive features will be required prior to re-occupancy.Details
scope of work includes: selective demolition of non structural partitions, doors, glazing, ceiling, light fixtures and finishes. per ab-017. space will remain un-occupied. permit for construction and related accessive features will be required prior to re-occupancy. | $150,000 |
| Nov 12, 2025 | Completed final sign-off Jan 2026 | 140 New Montgomery St | 25/fl- scope includes soft demo of (e) meeting rooms and ceiling, demo of (e) break area appliances, millwork and finishes. construction of (n) partition height space to serve future tenant. include mep work.Details
25/fl- scope includes soft demo of (e) meeting rooms and ceiling, demo of (e) break area appliances, millwork and finishes. construction of (n) partition height space to serve future tenant. include mep work. | $120,000 |
| Oct 29, 2025 | Completed final sign-off Mar 2026 | 140 New Montgomery St | 5th fl - demo (e) air terminal demo (e) supply ductwork ref pa 202311090498. install (n) air terminals & corresponding air supply install (n) supply ductwork. mechanical/air balance zones vav5-l vav5-6, vav5-7, vav5-9, vav5-15 and vav5-16Details
5th fl - demo (e) air terminal demo (e) supply ductwork ref pa 202311090498. install (n) air terminals & corresponding air supply install (n) supply ductwork. mechanical/air balance zones vav5-l vav5-6, vav5-7, vav5-9, vav5-15 and vav5-16 | $490,000 |
| Sep 30, 2025 | Completed final sign-off Jun 2026 | 100 California St | basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishesDetails
basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishes | $1,160,414 |
| Sep 26, 2025 | In progress issued Dec 2025 | 1160 Battery St | mep for pa#: 202506189005. 3rd floor.Details
mep for pa#: 202506189005. 3rd floor. | $480,000 |
| Sep 25, 2025 | Completed final sign-off Jun 2026 | 801 Montgomery St | 2nd/fl:interior office tenant improvement project at 2nd floor space to include new partitions, doors, glazing, millwork, lighting, electrical, plumbing, mechanical, and finishes. mep tilte 24, and life and safety under seperate permits.Details
2nd/fl:interior office tenant improvement project at 2nd floor space to include new partitions, doors, glazing, millwork, lighting, electrical, plumbing, mechanical, and finishes. mep tilte 24, and life and safety under seperate permits. | $600,000 |
| Aug 12, 2025 | Completed final sign-off Aug 2025 | 100 California St | revision to pa#: 202411215476. revise infill assembly in type 1 building.Details
revision to pa#: 202411215476. revise infill assembly in type 1 building. | |
| Aug 1, 2025 | Completed final sign-off Aug 2026 | 100 California St | 1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishes.Details
1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishes. | $547,894 |
| Jun 18, 2025 | In progress issued Sep 2025 | 1160 Battery St | 3/f: ti - non structural partitions, doors, millwork, and finishes. mep deferred.Details
3/f: ti - non structural partitions, doors, millwork, and finishes. mep deferred. | $2,000,000 |
| May 13, 2025 | Completed final sign-off Sep 2025 | 100 California St | 2nd floor:revision to pa #202411215476. new rated wall and ceiling, replacement of rated door at stair.Details
2nd floor:revision to pa #202411215476. new rated wall and ceiling, replacement of rated door at stair. | $65,000 |
| Apr 24, 2025 | Completed final sign-off Sep 2025 | 1160 Battery St | l3 non structural interior demo only ab17Details
l3 non structural interior demo only ab17 | $90,000 |
| Feb 24, 2025 | Completed final sign-off Jul 2025 | 1160 Battery St | 4th fl 1160 w suite 450 - deferred mep to pa 202501098041Details
4th fl 1160 w suite 450 - deferred mep to pa 202501098041 | $50,000 |
| Jan 9, 2025 | Completed final sign-off Jun 2025 | 1160 Battery St | 4/fl-1160 west suite 450: interior ti includes new non structral partitions, doors, glazing, new relocated lighting. mep deferredDetails
4/fl-1160 west suite 450: interior ti includes new non structral partitions, doors, glazing, new relocated lighting. mep deferred | $450,000 |
| Dec 18, 2024 | Completed final sign-off Mar 2025 | 343 Sansome St | mechanical & electrical ref 202410173178Details
mechanical & electrical ref 202410173178 | $10,000 |
| Nov 21, 2024 | Completed final sign-off Sep 2025 | 100 California St | 2/fl-demo non structural partitons. on level 02.appx 12050sf additionally demo flooring, plumbing, millwork & equipment. new construction. elevator lobby area and structural slab infill. tiles to be replaced on ceiling.Details
2/fl-demo non structural partitons. on level 02.appx 12050sf additionally demo flooring, plumbing, millwork & equipment. new construction. elevator lobby area and structural slab infill. tiles to be replaced on ceiling. | $196,000 |
| Oct 17, 2024 | Completed final sign-off Mar 2025 | 343 Sansome St | 15th floor: expand existing suite to adjacent suite. demolition of expansion suite includes non-structural partitions, doors, glazing, lighting fixture, millwork, and finishes. new construction includees new non structural partitions, doors, glazing, light fixtures millwork and finishes. mep deferreDetails
15th floor: expand existing suite to adjacent suite. demolition of expansion suite includes non-structural partitions, doors, glazing, lighting fixture, millwork, and finishes. new construction includees new non structural partitions, doors, glazing, light fixtures millwork and finishes. mep deferre | $478,000 |
| Aug 26, 2024 | In progress issued Sep 2024 | 1160 Battery St | revision to pa# 202403218319: to revise partition wall type, updated reflected ceiling plan and minor update to wall layout.Details
revision to pa# 202403218319: to revise partition wall type, updated reflected ceiling plan and minor update to wall layout. | |
| Jul 19, 2024 | In progress issued Aug 2024 | 1160 Battery St | east bldg- ref 202403218319- electrical and mechanical ti upgrades to 4th floorDetails
east bldg- ref 202403218319- electrical and mechanical ti upgrades to 4th floor | $100,000 |
| Jul 19, 2024 | Completed final sign-off Dec 2024 | 1160 Battery St | west bldg- ref 202403067245- electrical ti upgrades to 2nd and 4th floors for new lighting located in lobbyDetails
west bldg- ref 202403067245- electrical ti upgrades to 2nd and 4th floors for new lighting located in lobby | $100,000 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 100 California St | suite 725: plans deferred of mech/electrical for t.i. pa 202405031370. no change in occupancy.Details
suite 725: plans deferred of mech/electrical for t.i. pa 202405031370. no change in occupancy. | $400,000 |
| May 3, 2024 | Completed final sign-off Oct 2024 | 100 California St | 7th fl suite 725 demolition and construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy or use. deferred submittals includes mechanical, electrical, plumbing, life safety and sprinklersDetails
7th fl suite 725 demolition and construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy or use. deferred submittals includes mechanical, electrical, plumbing, life safety and sprinklers | $455,520 |
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 343 Sansome St | office ti 9th floor to include soft demo (e) space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add (n) non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator,Details
office ti 9th floor to include soft demo (e) space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add (n) non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator, | $1,012,487 |
| Mar 21, 2024 | In progress issued Apr 2024 | 1160 Battery St | 4th floor: east bldg-interior demo of extg restroom finishes, toilet partitions, vanity and plumbin fixtures. install new finishes, plmg fixtures, toilet partitions and accessories. partial demo of common area shown. new non structural walls, doors, & finishes.Details
4th floor: east bldg-interior demo of extg restroom finishes, toilet partitions, vanity and plumbin fixtures. install new finishes, plmg fixtures, toilet partitions and accessories. partial demo of common area shown. new non structural walls, doors, & finishes. | $150,000 |
| Mar 6, 2024 | Completed final sign-off Dec 2024 | 1160 Battery St | 2/f- building entry lobby - finishes and lighting upgrades only. 4/f - interior ti including (n) non load bearing partitions, doors, restroom upgrades, lighting, finishes and tenant entries.Details
2/f- building entry lobby - finishes and lighting upgrades only. 4/f - interior ti including (n) non load bearing partitions, doors, restroom upgrades, lighting, finishes and tenant entries. | $606,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2026 | 140 New Montgomery St | 5/f: new non-structural partitions, ceilings, light fixtures, finishes. mep and life safety deferred.Details
5/f: new non-structural partitions, ceilings, light fixtures, finishes. mep and life safety deferred. | $968,016 |
| Nov 2, 2023 | Completed final sign-off Feb 2024 | 1160 Battery St | 4th flr: ti non structural interior demo - construct demising partition and suite entry walls w/door; mep deferredDetails
4th flr: ti non structural interior demo - construct demising partition and suite entry walls w/door; mep deferred | $30,000 |