Roebuck Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to May 2024
- Last 24 months
- 0 permits filed
127 permits since 2000: 72 completed, 34 never finaled, 21 expired or cancelled.
Of the 34 never-finaled permits, 8 are 5 to 10 years old, 26 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 127.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | Completed final sign-off Apr 2025 | 704 Sansome St | 3/f: (1) renovated office and (1) new conference room. new millwork pantry. the space is currently unoccupied. mech and elec. plans will be submitted separately.Details
3/f: (1) renovated office and (1) new conference room. new millwork pantry. the space is currently unoccupied. mech and elec. plans will be submitted separately. | $85,000 |
| Feb 20, 2024 | Expired or cancelled expired Nov 2025 | 550 Montgomery St | ref 202309136478- mep systems for ti project on ground floor. fire protection under separate permit.Details
ref 202309136478- mep systems for ti project on ground floor. fire protection under separate permit. | |
| Sep 27, 2023 | Completed final sign-off Apr 2024 | 3861 24th St | demo and site improvement to install a single user restroom that has been pre fabricated and state approved including utility connections. relocation of site furnishings, site grading and paving, fencing, irrigation, foudnation pad, plantingDetails
demo and site improvement to install a single user restroom that has been pre fabricated and state approved including utility connections. relocation of site furnishings, site grading and paving, fencing, irrigation, foudnation pad, planting | $200,000 |
| Sep 13, 2023 | Completed final sign-off Nov 2025 | 550 Montgomery St | ground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain (e) historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work.Details
ground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain (e) historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work. | $420,020 |
| Mar 9, 2022 | Completed final sign-off Mar 2023 | 1199 09th Av | install 6" fire line as required under permits 202102164716 & 202102164730.Details
install 6" fire line as required under permits 202102164716 & 202102164730. | $20,000 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 1199 09th Av | demolition of a type 5 1 story maintenance & plant propagation, within golden gate parkDetails
demolition of a type 5 1 story maintenance & plant propagation, within golden gate park | $15,000 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 1199 09th Av | demolition of a type 5 1-story wood greenhouse, within golden gate parkDetails
demolition of a type 5 1-story wood greenhouse, within golden gate park | $25,000 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 1199 09th Av | demolition of a type 5 1 story storage, within golden gate parkDetails
demolition of a type 5 1 story storage, within golden gate park | $3,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2024 | 1199 09th Av | to erect 1 story greenhouse, type v-nDetails
to erect 1 story greenhouse, type v-n | $1,500,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2024 | 1199 09th Av | to erect 1 story headhouse w/ office area, restrooms, clean room, agricultural maint bay, nursery storage and horticultural storageDetails
to erect 1 story headhouse w/ office area, restrooms, clean room, agricultural maint bay, nursery storage and horticultural storage | $1,500,000 |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 240 Shotwell St | remodel of extg outpatient clinic. work includes remodel of 2nd floor medical records area. new mechanical & electrical work in affected areas. minor structural work. no horizontal or vertical addition.Details
remodel of extg outpatient clinic. work includes remodel of 2nd floor medical records area. new mechanical & electrical work in affected areas. minor structural work. no horizontal or vertical addition. | $300,000 |
| Oct 31, 2019 | Completed final sign-off Feb 2020 | 944 Market St | 3/f: rev to pa# 201907125736; converting 1 radious wall from metal stud/sheetrock to intumescent covered plywood as detailed in the variance. maher n/a.Details
3/f: rev to pa# 201907125736; converting 1 radious wall from metal stud/sheetrock to intumescent covered plywood as detailed in the variance. maher n/a. | |
| Oct 16, 2019 | Never finaled issued Aug 2020, no final | 300 16th St | hvac, rooftop units extg heaters, misc plumb for kitch and restrooms, new elect. service throughout. t.i on seperate permit #201908138652Details
hvac, rooftop units extg heaters, misc plumb for kitch and restrooms, new elect. service throughout. t.i on seperate permit #201908138652 | $150,000 |
| Sep 5, 2019 | Completed final sign-off Apr 2020 | 2301 San Jose Av | deferred submittal 3 to 201606018886 fire protection system underground piping, overhead piping approved and installed under 201905173654Details
deferred submittal 3 to 201606018886 fire protection system underground piping, overhead piping approved and installed under 201905173654 | |
| Aug 13, 2019 | Never finaled issued Feb 2020, no final | 300 16th St | interior ti restaurant in (e) shell core & bathrms, exterior new entry door, new passthru service window, new rooftop equip (e) bld. exterior new bar, new wood screen, new heaters, new gates, new seating at (e0 patio structure.Details
interior ti restaurant in (e) shell core & bathrms, exterior new entry door, new passthru service window, new rooftop equip (e) bld. exterior new bar, new wood screen, new heaters, new gates, new seating at (e0 patio structure. | $600,000 |
| Jul 12, 2019 | Completed final sign-off Aug 2020 | 2301 San Jose Av | revision to 201606018886 engineering calcs for structural glass floorDetails
revision to 201606018886 engineering calcs for structural glass floor | |
| Jul 12, 2019 | Completed final sign-off Feb 2020 | 944 Market St | 3rd flr - ti - int only. new finishes & furnishings throughout, new non structural partitions. demo men's and women's restrooms. new ada gender neutral restroom upgrades (2 total). mo structural work . mep/fir/life saftey under sep permitDetails
3rd flr - ti - int only. new finishes & furnishings throughout, new non structural partitions. demo men's and women's restrooms. new ada gender neutral restroom upgrades (2 total). mo structural work . mep/fir/life saftey under sep permit | $149,000 |
| Jun 7, 2019 | Completed final sign-off Aug 2020 | 2301 San Jose Av | revision to app#201606018886. technical infeasibility request for door in historic openings. n/a for maherDetails
revision to app#201606018886. technical infeasibility request for door in historic openings. n/a for maher | |
| Dec 20, 2018 | Completed final sign-off Mar 2019 | 101 California St | 0n 30th floor - minor demolition of nbon structural partitions. construction of new non-structural partitions. n/a for maherDetails
0n 30th floor - minor demolition of nbon structural partitions. construction of new non-structural partitions. n/a for maher | $90,000 |
| Nov 30, 2018 | Completed final sign-off Aug 2020 | 2301 San Jose Av | revision to pa 201606018886. t.i to building interior. adjust swing doors, expand electrical rm, convert storage to expanded pantry, addition of 218 sq ft office rmDetails
revision to pa 201606018886. t.i to building interior. adjust swing doors, expand electrical rm, convert storage to expanded pantry, addition of 218 sq ft office rm | $100,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2018 | 240 Shotwell St | selective demo and new construction of non bearing partitions, finishes. no change to ex building square footage. design \build mechDetails
selective demo and new construction of non bearing partitions, finishes. no change to ex building square footage. design \build mech | $58,000 |
| May 11, 2018 | Completed final sign-off Aug 2020 | 2301 San Jose Av | ref to pa# 201606018886:foundation for temporary modular/remanufactured restroom facility and access platform to service bldg owned by city. modular structure certified by state of ca will be filed under separate permitDetails
ref to pa# 201606018886:foundation for temporary modular/remanufactured restroom facility and access platform to service bldg owned by city. modular structure certified by state of ca will be filed under separate permit | $140,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 777 Florida St | update app#201801027654 to add electrical and mechanical title 24 documents. n/a for maherDetails
update app#201801027654 to add electrical and mechanical title 24 documents. n/a for maher | $16,000 |
| Feb 22, 2018 | Completed final sign-off Mar 2018 | 2455 Harrison St | to comply with nov #201833381. removal of non-permitted work that was done 20+ years ago. the two mezzanine storage rooms wll be removed(demo), shower and electrical junction boxes will be removed as well.Details
to comply with nov #201833381. removal of non-permitted work that was done 20+ years ago. the two mezzanine storage rooms wll be removed(demo), shower and electrical junction boxes will be removed as well. | $2,000 |
| Jan 10, 2018 | Completed final sign-off Sep 2018 | 109 Oak St | add air conditioning to existing ventilation and heating system in several locations throughout the bldg.Details
add air conditioning to existing ventilation and heating system in several locations throughout the bldg. | $50,000 |
| Jan 10, 2018 | Never finaled issued Jan 2018, no final | 70 Elk St | amendment to bldg permit set addendum #1 201406249343-s1, change to ext. restroomds 106 & 107 gender designation per city ordinance. per 11b-213.2 only one restroom in single user cluster is required to be accessible. restroom 107 is not required to be accessible.Details
amendment to bldg permit set addendum #1 201406249343-s1, change to ext. restroomds 106 & 107 gender designation per city ordinance. per 11b-213.2 only one restroom in single user cluster is required to be accessible. restroom 107 is not required to be accessible. | |
| Jan 2, 2018 | Completed final sign-off Sep 2018 | 777 Florida St | tenant improvement with new accessible restrooms, 1 new 1 hr rated common corridor, mech, elec, plumbing, sprinkler work under sep permit. combine suites 200, 202, 204, 206 and 208. maher naDetails
tenant improvement with new accessible restrooms, 1 new 1 hr rated common corridor, mech, elec, plumbing, sprinkler work under sep permit. combine suites 200, 202, 204, 206 and 208. maher na | $200,000 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 199 Museum Wy | installation of new electrical service. amend scope of work on 201406259468Details
installation of new electrical service. amend scope of work on 201406259468 | $200,000 |
| Jul 11, 2017 | Completed final sign-off Jul 2018 | 240 Shotwell St | relocate outlets, switches and some lights from demo walls to new walls, install additional outlets in reconfigured area, remove then reinstall (e) lights, most in same location to accommodate ceiling remodel. n/a ordinance #155-13Details
relocate outlets, switches and some lights from demo walls to new walls, install additional outlets in reconfigured area, remove then reinstall (e) lights, most in same location to accommodate ceiling remodel. n/a ordinance #155-13 | |
| May 8, 2017 | Completed final sign-off Sep 2017 | 199 Museum Wy | to obtain final inspection for work approved under pa#2001-03-23-5111. all work is complete.Details
to obtain final inspection for work approved under pa#2001-03-23-5111. all work is complete. | |
| Mar 28, 2017 | Completed final sign-off Jul 2018 | 240 Shotwell St | selective demolition & new construction of non-bearing partitions, finishes & various accessibility upgrades. n ochange to exisitng building square footage. design/build mep. n/a maher ordinanceDetails
selective demolition & new construction of non-bearing partitions, finishes & various accessibility upgrades. n ochange to exisitng building square footage. design/build mep. n/a maher ordinance | $454,290 |
| Nov 15, 2016 | Expired or cancelled expired Oct 2025 | 2337 Vallejo St | expansion of kitchen into rear garden w/ (n) roof deck above. (n) half bath, kitchen remodel & rear yard landscape improvements. expansion of basement under kitchen to create (n) guest room, bathroom, laundry & mechanical room on this level.Details
expansion of kitchen into rear garden w/ (n) roof deck above. (n) half bath, kitchen remodel & rear yard landscape improvements. expansion of basement under kitchen to create (n) guest room, bathroom, laundry & mechanical room on this level. | $300,000 |
| Aug 19, 2016 | Completed final sign-off Nov 2016 | 101 California St | 30th floor - demo of non-strl partitons, finishes, elec & lighting. construction of non-strl partitions, doors/frames/hardware. elec. fixtures, lighting, plumbing, mech. mep under separate permit. life safety, fire sprinkler, fire alarm under separate permit.Details
30th floor - demo of non-strl partitons, finishes, elec & lighting. construction of non-strl partitions, doors/frames/hardware. elec. fixtures, lighting, plumbing, mech. mep under separate permit. life safety, fire sprinkler, fire alarm under separate permit. | $192,000 |
| Jun 20, 2016 | Expired or cancelled suspend Jun 2017 | 199 Museum Wy | underground portionof the fire sprinkler permit (ref pa 2016 0427 5868) and in conjunction with ref pa 2015 1218 5449Details
underground portionof the fire sprinkler permit (ref pa 2016 0427 5868) and in conjunction with ref pa 2015 1218 5449 | |
| Jun 1, 2016 | Completed final sign-off Aug 2020 | 2301 San Jose Av | work on "power house" part of building only. work includes: rehabilitation, & restoration of exterior facade, seismic upgrade, new mep systems, interior renovations, site improvements, pre-manufactured toilet facility & ramp under separate permit. ** maher: n/a **Details
work on "power house" part of building only. work includes: rehabilitation, & restoration of exterior facade, seismic upgrade, new mep systems, interior renovations, site improvements, pre-manufactured toilet facility & ramp under separate permit. ** maher: n/a ** | $5,050,000 |
| Apr 26, 2016 | Completed final sign-off Mar 2017 | 3625 24th St | alteration to classrooms #105 & #103 for conversion to gen science classroom with installation of lcient-supplied casework & associated plumbg, data & elect. create a (n) ada accessible stall & fixtures. provide (n) accessible entrance to library & computer lab.Details
alteration to classrooms #105 & #103 for conversion to gen science classroom with installation of lcient-supplied casework & associated plumbg, data & elect. create a (n) ada accessible stall & fixtures. provide (n) accessible entrance to library & computer lab. | $88,300 |
| Mar 16, 2016 | Completed final sign-off May 2016 | 2868 Mission St | exit door at 1st floor, no modification needed, revision for permit no. 201502118084.Details
exit door at 1st floor, no modification needed, revision for permit no. 201502118084. | |
| Mar 11, 2016 | Completed final sign-off May 2016 | 2868 Mission St | emergency evacuation sign permit.Details
emergency evacuation sign permit. | $7,500 |
| Dec 18, 2015 | Never finaled issued Feb 2016, no final | 199 Museum Wy | partial demolition o f walls; interior renovation of two rooms in the randall musuem (stem lab & toddler room), including electrical outlets & lighting and finishes: to be built in connection with improvements permitted under 2014-0625-9768sDetails
partial demolition o f walls; interior renovation of two rooms in the randall musuem (stem lab & toddler room), including electrical outlets & lighting and finishes: to be built in connection with improvements permitted under 2014-0625-9768s | $150,000 |
| Oct 21, 2015 | Completed final sign-off Dec 2015 | 70 Elk St | soft demo of recently vacant public recreation ctr. the work involves the removal of all non structural elements of the bld which includes all mep, doors and windows and all finishes. bldg. is non sprinklereed and no fire alarm.Details
soft demo of recently vacant public recreation ctr. the work involves the removal of all non structural elements of the bld which includes all mep, doors and windows and all finishes. bldg. is non sprinklereed and no fire alarm. | |
| Sep 5, 2014 | Completed final sign-off Nov 2015 | 109 Oak St | revision to pa# 2013/04/04/3800. replace (e) apparatus bay doors with new apparatus bay doors. 3 total.Details
revision to pa# 2013/04/04/3800. replace (e) apparatus bay doors with new apparatus bay doors. 3 total. | $180,000 |
| Jun 23, 2014 | Expired or cancelled cancelled Jan 2026 | 3135 24th St | minor remodel to a newly constructed commercial unit on the ground floor of a new apartment bldg.Details
minor remodel to a newly constructed commercial unit on the ground floor of a new apartment bldg. | $50,000 |
| Apr 2, 2014 | Never finaled issued Apr 2014, no final | 465 California St | revision to appl #2013.0816.4527 with sheet #'s a3.0,a6.0 & a9.0 amended to illustrate a waterproof membrane as requested by the bldg inspector. compliance with ordinance #155-13 not requiredDetails
revision to appl #2013.0816.4527 with sheet #'s a3.0,a6.0 & a9.0 amended to illustrate a waterproof membrane as requested by the bldg inspector. compliance with ordinance #155-13 not required | |
| Jan 30, 2014 | Never finaled issued Feb 2014, no final | 360 Pine St | tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required.Details
tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required. | $135,000 |
| Jan 23, 2014 | Completed final sign-off Dec 2015 | 367 Bay Shore Bl | to erect 1 story, restroom for car wash / commercial building. ** maher: compliance with ordinance no. 155-13 not required. **Details
to erect 1 story, restroom for car wash / commercial building. ** maher: compliance with ordinance no. 155-13 not required. ** | $25,000 |
| Jan 21, 2014 | Never finaled issued Aug 2014, no final | 367 Bay Shore Bl | to demolish 1 story office building (compliance with maher ordinance - extended ordinance no.155-13 not required. excavation less than 50 cu. yd.)Details
to demolish 1 story office building (compliance with maher ordinance - extended ordinance no.155-13 not required. excavation less than 50 cu. yd.) | $10,000 |
| Dec 20, 2013 | Completed final sign-off Mar 2014 | 674 Harrison St | replace the existing 2nd floor windows on the south elevation with new aluminum, dual paned glass windows to match those on the 1st floor or the buildingDetails
replace the existing 2nd floor windows on the south elevation with new aluminum, dual paned glass windows to match those on the 1st floor or the building | $12,000 |
| Dec 20, 2013 | Completed final sign-off Jan 2019 | 2251 Greenwich St | erect 2-story, 1 accessory use dwelling unit, new fire station.Details
erect 2-story, 1 accessory use dwelling unit, new fire station. | $6,100,000 |
| Dec 18, 2013 | Completed final sign-off Nov 2014 | 1188 Franklin St | t.i. of 2nd floor unoccupied offices and reconfiguration of the common corridor to connect this space to an occupied suite. plumbing & electrical under separate permit.Details
t.i. of 2nd floor unoccupied offices and reconfiguration of the common corridor to connect this space to an occupied suite. plumbing & electrical under separate permit. | $124,000 |
| Aug 16, 2013 | Completed final sign-off Mar 2016 | 465 California St | remodel of the extg commercial kitchen to upgrade it to a modern catering facility with new finishes, equipment etc.Details
remodel of the extg commercial kitchen to upgrade it to a modern catering facility with new finishes, equipment etc. | $250,000 |
| Apr 4, 2013 | Completed final sign-off Nov 2015 | 109 Oak St | comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors.Details
comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors. | $3,140,000 |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 360 Pine St | comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear novDetails
comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear nov | |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 360 Pine St | comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear novDetails
comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear nov | |
| Jun 22, 2012 | Expired or cancelled cancelled Feb 2014 | 340 Pine St | restroation of the original building facade on pine street with the removal of the gated patio. installation of a new entry & staircase to the basement & construction of new handicap accessible restroomsDetails
restroation of the original building facade on pine street with the removal of the gated patio. installation of a new entry & staircase to the basement & construction of new handicap accessible restrooms | $300,000 |
| Apr 24, 2012 | Completed final sign-off Aug 2012 | 2535 17th Av | conversion of 3196 sf of (e) after school care to 2 kindergarden rooms & accessory spaces. work to include: minor non-structural demo of (e) partions & kitchen equipment; construction of 2 (n) classrooms & accessory spaces, 2 accessible restrooms & (n) lighting. no change of use.Details
conversion of 3196 sf of (e) after school care to 2 kindergarden rooms & accessory spaces. work to include: minor non-structural demo of (e) partions & kitchen equipment; construction of 2 (n) classrooms & accessory spaces, 2 accessible restrooms & (n) lighting. no change of use. | $65,000 |
| Jun 29, 2011 | Completed final sign-off Aug 2012 | 240 Shotwell St | remodel to (e) outpatient care community clinic. remodel of (e) 1st and 2nd fl restroomd 2nd fl janitor closet and floor water proofing. installation of mech. upgrades at selecterd areas and associated struc. and elec. upgrades. ada parking space restripping per modDetails
remodel to (e) outpatient care community clinic. remodel of (e) 1st and 2nd fl restroomd 2nd fl janitor closet and floor water proofing. installation of mech. upgrades at selecterd areas and associated struc. and elec. upgrades. ada parking space restripping per mod | $330,000 |
| Jan 20, 2011 | Completed final sign-off Dec 2015 | 367 Bay Shore Bl | to erect 1 story, car wash / commercial building.Details
to erect 1 story, car wash / commercial building. | $200,000 |
| Oct 22, 2010 | Expired or cancelled cancelled Mar 2015 | 340 Pine St | change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor.Details
change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor. | $9,999 |
| Jun 22, 2010 | Never finaled issued Jun 2010, no final | 1833 Page St | fire life safety alarm system on both floors. install manual pull stations, smoke detectors, relays, heat detectors and strobes.Details
fire life safety alarm system on both floors. install manual pull stations, smoke detectors, relays, heat detectors and strobes. | $30,000 |
| Feb 5, 2010 | Never finaled issued Mar 2011, no final | 4750 Martin Luther King Dr | seismic improvements, ada code upgrades, electrical & hvac upgrades, window replacement & re-roofingDetails
seismic improvements, ada code upgrades, electrical & hvac upgrades, window replacement & re-roofing | $500,000 |
| Dec 24, 2009 | Never finaled filed Dec 2009, never issued | 360 Pine St | mechanical permit for kitchen hoodDetails
mechanical permit for kitchen hood | |
| Dec 2, 2009 | Completed final sign-off Mar 2010 | 77 Van Ness Av | 2nd floor-tenant improvement in ste #203-install new kitchen, partitions, conference room & office, new hvac & electrical. new bldg pa# 2000-0717-5308 & 2009-0914-6785Details
2nd floor-tenant improvement in ste #203-install new kitchen, partitions, conference room & office, new hvac & electrical. new bldg pa# 2000-0717-5308 & 2009-0914-6785 | $175,000 |
| May 12, 2009 | Never finaled issued May 2009, no final | 465 California St | to obtain final inspection for work approved under pa 200708240803 all work is completeDetails
to obtain final inspection for work approved under pa 200708240803 all work is complete | |
| Dec 16, 2008 | Expired or cancelled expired Jun 2026 | 360 Pine St | change of use b/m to b/a-2. occupancy load verification for p-142 assembly permit. new kitchen & restaurant dinining vacant space. new storage for propose restaurant in (e) basement. establish new occupancy load. (all interior work).Details
change of use b/m to b/a-2. occupancy load verification for p-142 assembly permit. new kitchen & restaurant dinining vacant space. new storage for propose restaurant in (e) basement. establish new occupancy load. (all interior work). | $500,000 |
| Oct 31, 2008 | Never finaled issued Oct 2008, no final | 360 Pine St | on ground floor: revision to appl #200706194311 - change the entrance door to swing out and comply w/submit ab-011 for the front entry doors with powered door operator.Details
on ground floor: revision to appl #200706194311 - change the entrance door to swing out and comply w/submit ab-011 for the front entry doors with powered door operator. | $7,000 |
| Sep 9, 2008 | Never finaled issued Sep 2008, no final | 360 Pine St | to complete work started under pa#200706194311.Details
to complete work started under pa#200706194311. | |
| Jun 17, 2008 | Completed final sign-off Jun 2008 | 465 California St | renew pa#200706214634,#200712120267 for final inspection.Details
renew pa#200706214634,#200712120267 for final inspection. | |
| May 22, 2008 | Completed final sign-off Aug 2008 | 465 California St | #1200- minor revision to application 200705151330 , door located in conference room 101. as builts.Details
#1200- minor revision to application 200705151330 , door located in conference room 101. as builts. | |
| Apr 29, 2008 | Completed final sign-off May 2008 | 240 Shotwell St | renew pa#2006/02/10/4420 for final inspectionDetails
renew pa#2006/02/10/4420 for final inspection | |
| Dec 12, 2007 | Expired or cancelled expired Jun 2008 | 465 California St | 12th floor - life safety system addition to accommodate new strobe lights, 3 strobes, 7 speaker/strobes, 1 strobe booster, 1 nac control module, 1 smoke detector.Details
12th floor - life safety system addition to accommodate new strobe lights, 3 strobes, 7 speaker/strobes, 1 strobe booster, 1 nac control module, 1 smoke detector. | $9,000 |
| Nov 21, 2007 | Never finaled issued Nov 2007, no final | 525 05th St | renew pa#200510196022 for final inspection.Details
renew pa#200510196022 for final inspection. | |
| Nov 16, 2007 | Never finaled issued Nov 2007, no final | 2116 Baker St | renew pa#200604280220 for final inspection.Details
renew pa#200604280220 for final inspection. | |
| Oct 19, 2007 | Completed final sign-off Nov 2007 | 2116 Baker St | to remove the one sprinkler head in the dining rm on the first fl, revision to pa 200702083669Details
to remove the one sprinkler head in the dining rm on the first fl, revision to pa 200702083669 | |
| Oct 19, 2007 | Completed final sign-off Nov 2007 | 2116 Baker St | renew app #2006/07/05/5654 and 2007/02/08/3669 and 2007/04/06/8260 for the purpose of conducting a final inspectionDetails
renew app #2006/07/05/5654 and 2007/02/08/3669 and 2007/04/06/8260 for the purpose of conducting a final inspection | |
| Sep 11, 2007 | Completed final sign-off Feb 2008 | 465 California St | 14th floor - life safety system addition to accomodate office remodel. (2) strobes, (2) speakers, (20) speaker/strobes, (1) nac control module, (7) smoke detectors.Details
14th floor - life safety system addition to accomodate office remodel. (2) strobes, (2) speakers, (20) speaker/strobes, (1) nac control module, (7) smoke detectors. | $14,000 |
| Aug 31, 2007 | Never finaled filed Aug 2007, never issued | 465 California St | application to apply flame control mastics 50-696. product to the exposed bottom flange of the (e) steel girders/beams throughout the 14th fl. this scope is inclued in permit app#200708159824.Details
application to apply flame control mastics 50-696. product to the exposed bottom flange of the (e) steel girders/beams throughout the 14th fl. this scope is inclued in permit app#200708159824. | |
| Aug 24, 2007 | Expired or cancelled expired May 2009 | 465 California St | 5th floor - localized slab repair on the sixth floor. area to be repaired measures approx. 80 sq. ft.Details
5th floor - localized slab repair on the sixth floor. area to be repaired measures approx. 80 sq. ft. | $10,000 |
| Aug 15, 2007 | Completed final sign-off Feb 2008 | 465 California St | tenant improvement including construction of new partitions, ceilings, finishes, and associated electrical & mechanical workDetails
tenant improvement including construction of new partitions, ceilings, finishes, and associated electrical & mechanical work | $450,000 |
| Aug 3, 2007 | Completed final sign-off Feb 2008 | 465 California St | remodel the existing elevator lobby with new automatic fire doors, construct new men's & women's restrooms with new drinking fountain. plumbing & electrical under seperate permit. fire alarm & sprinkler.Details
remodel the existing elevator lobby with new automatic fire doors, construct new men's & women's restrooms with new drinking fountain. plumbing & electrical under seperate permit. fire alarm & sprinkler. | $115,000 |
| Jul 25, 2007 | Completed final sign-off Dec 2007 | 465 California St | life safety system addition to accommodate kitchen remodel on 15th floor.Details
life safety system addition to accommodate kitchen remodel on 15th floor. | $9,000 |
| Jun 21, 2007 | Completed final sign-off Jun 2008 | 2509 Filbert St | revise elevator shaftway dimensions indicated on permit app #2005/09/06/2029 to address the complaint #200798215.Details
revise elevator shaftway dimensions indicated on permit app #2005/09/06/2029 to address the complaint #200798215. | |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | 4th floor-construct one conference room, one private office, some low height partitions and upgrade the finishes in the (e) space.Details
4th floor-construct one conference room, one private office, some low height partitions and upgrade the finishes in the (e) space. | $47,000 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | 2nd floor-construct one conference room, some low height partitions and upgrade the finishes on the floor.Details
2nd floor-construct one conference room, some low height partitions and upgrade the finishes on the floor. | $35,000 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade.Details
demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade. | $75,000 |
| May 15, 2007 | Completed final sign-off Oct 2007 | 465 California St | 7th floor - remodel of one (e) office space with the construction of new interior partitions to convert it into a single tenant floor. electrical and sprinklers under separate permit.Details
7th floor - remodel of one (e) office space with the construction of new interior partitions to convert it into a single tenant floor. electrical and sprinklers under separate permit. | $65,000 |
| May 15, 2007 | Completed final sign-off Aug 2008 | 465 California St | 12th floor - office remodel: combining two adjacent suites on the 12th floor to convert the spaces into one suite.Details
12th floor - office remodel: combining two adjacent suites on the 12th floor to convert the spaces into one suite. | $150,000 |
| May 15, 2007 | Completed final sign-off Aug 2007 | 465 California St | 8th floor - office remodel -existing tenant on the 8th floor is expanding into the adjacent suite with the construction of new interior non-rated partitions. electrical and sprinklers under seperate permit.Details
8th floor - office remodel -existing tenant on the 8th floor is expanding into the adjacent suite with the construction of new interior non-rated partitions. electrical and sprinklers under seperate permit. | $55,000 |
| Apr 17, 2007 | Completed final sign-off Dec 2007 | 465 California St | mechanical permit documents for permit application number #200701252573 (remodel the existing kitchen on the 15th floor) kitchen hood details (permit)Details
mechanical permit documents for permit application number #200701252573 (remodel the existing kitchen on the 15th floor) kitchen hood details (permit) | $20,000 |
| Apr 6, 2007 | Completed final sign-off Apr 2007 | 960 Noe St | for final inspection onlyDetails
for final inspection only | |
| Apr 6, 2007 | Expired or cancelled expired Nov 2007 | 2116 Baker St | installation of a fire excape ladder in the lkghhtwell as permit alpplication #200604290220Details
installation of a fire excape ladder in the lkghhtwell as permit alpplication #200604290220 | $3,000 |
| Jan 25, 2007 | Completed final sign-off Dec 2007 | 465 California St | remodel the extg kchn on the 15th floor.Details
remodel the extg kchn on the 15th floor. | $350,000 |
| Jan 25, 2007 | Completed final sign-off Mar 2008 | 465 California St | remodel the existing elevator lobby by removing the extg fire doors and replacing them with a new won door. also remodel the extg restrooms upgradeing them to current h.c. code. no mechanical under this permit.Details
remodel the existing elevator lobby by removing the extg fire doors and replacing them with a new won door. also remodel the extg restrooms upgradeing them to current h.c. code. no mechanical under this permit. | $100,000 |
| Sep 8, 2006 | Completed final sign-off Nov 2006 | 18 De Boom St | repalce the existing cabinetry in the break room area and pull out one wall.Details
repalce the existing cabinetry in the break room area and pull out one wall. | $2,500 |
| Jul 5, 2006 | Completed final sign-off Jan 2008 | 2116 Baker St | removal of cabinetry, plumbing & electrical fixtures, plaster, & drywall finishes for 1 kitchen & 2 bathrooms.Details
removal of cabinetry, plumbing & electrical fixtures, plaster, & drywall finishes for 1 kitchen & 2 bathrooms. | $50,000 |
| May 11, 2006 | Completed final sign-off Nov 2006 | 2355 Ocean Av | remodel existing dental office. fire inspector to field verify existing fire sprinkler coverage is maintainedDetails
remodel existing dental office. fire inspector to field verify existing fire sprinkler coverage is maintained | $20,000 |
| Jan 25, 2005 | Expired or cancelled expired Feb 2006 | 1315 Ellis St | replace approx. 34' tall chain link fencing w/new 8'talll concrete block wall uswg the (e) foundatiaDetails
replace approx. 34' tall chain link fencing w/new 8'talll concrete block wall uswg the (e) foundatia | $8,442 |
| Jan 19, 2005 | Expired or cancelled expired Jul 2011 | 465 California St | renew app #200407239707/200409174434/200407239679 for final inspectionDetails
renew app #200407239707/200409174434/200407239679 for final inspection | |
| Dec 1, 2004 | Expired or cancelled expired Jun 2006 | 151 Mendell St | handicap upgrade of the (e) restrooms & exterior landing. conversion of (e) office & warehouse intoDetails
handicap upgrade of the (e) restrooms & exterior landing. conversion of (e) office & warehouse into | $300,000 |
| Nov 2, 2004 | Never finaled issued Nov 2004, no final | 4062 23rd St | rev.appl#200304112037 base on inspector comments.rated skylights,room tag for study,clg.framing detaDetails
rev.appl#200304112037 base on inspector comments.rated skylights,room tag for study,clg.framing deta | |
| Sep 17, 2004 | Never finaled issued Sep 2004, no final | 465 California St | renew 200304091780 for finalDetails
renew 200304091780 for final |